个人中心
个人中心
添加客服WX
客服
添加客服WX
添加客服WX
关注微信公众号
公众号
关注微信公众号
关注微信公众号
升级会员
升级会员
返回顶部
E-House电缆桥架安装脚手架搭设方案(14页)
E-House电缆桥架安装脚手架搭设方案(14页).doc
下载文档 下载文档
其它文档
上传人:正*** 编号:860250 2023-12-26 14页 244KB
1、Bozshakol Copper ProjectClay plantAB偏跨E-House电缆桥架安装脚手架搭设方案Method statement of AB side building E-House cable tray installation program scaffolding erection窗体底端11373-BD-NFC-3300-MS-OOO-E-0003 0IFRREV#DATEREASONORIGINATORLi XinhuaCHECKEDXia QingAPPROVEDLiu Jianhui目 录Content一、 搭设方案 1. Installation Meth2、od二、 风险评估2. Risk Assessment三、 安全管理方案3. Safety Management Method一、搭设方案Installation method 1. 概况 根据设计图纸AB偏跨内E-House下设置了2000多米电缆桥架及敷设大量的电缆,工作面相当大,工作时间持续长,而电缆桥架安装在10米的高空上,为了保障工作人员操作的安全性及不影响地面设备安装的空间,采取了以下方案搭设脚手架。1. Brief As per the design drawing, more than 2000 m cable trays and huge quantity cables sh3、all be installed for E-house of AB side building. Beside part of the trays shall be install in 10m high place; for ensure safety of installation personnel and reduce the influence of installation of equipment on ground, the method of scaffold installation shall be adopt as mentioned below: 2. 编制依据 C4、odes and references2.1 设计图纸:Design drawings2.2 现场勘测资料 on site survey document3. 施工准备 preparation works3.1 技术准备 technical preparation 根据设计图纸及现场资料,进行图纸及资料自审和会审工作。 Self check and cross check of drawing3.1.2 图纸及资料自审、会审后,组织施工班组熟悉施工过程及有关技术要求,结合现场实际情况集中进行一次全面技术交底。 After self check and cross check, organize5、 the construction team to get familiar with the construction process and the relevant technical requirements, and to give a technical disclosure combined with the actual situation. 3.2 施工部署 Personnel and responsibilities3.2.1 主要施工设备、机具准备 Equipment and tools preparation 设备进场投入使用前进行全面检修,使设备处于完好状态。 Car6、ry out a overall inspection and maintenance to make sure all the equipment in working condition before putting in use.4. 脚手架的搭设 Scaffolding installation4.1 脚手架材料检查 Inspection of materials of scaffolding 对到场的脚手架及配件进行检查,外观检查应无损坏及变形。 Insure no deformation and damage for all materials4.2 搭设流程 Installati7、on Process 4.2.1 场地安全措施的安装 Installation of safety facilities 设置安全警示标志,设立安全网。 Set safety sign and safety net4.2.2 搭设作业 Installation work 根据现场位置,利用多台(至少两台)升降机上升至搭设高度将有卡板的脚手架卡在E-House下的PG600工字钢上,以此为支点进行搭设,骨架搭设完成后继续搭设脚手板,完成搭设。 As per the site situation, use at least two elevators to mount scaffold with 8、plate to PG600 I steel under E-HOUSE, then use it as the point to install the frame. After finish the frame installation, amount the plate. 4.2.3 完成搭设,场地清理 House keeping 搭设完成后,多余的材料及废料及时清理出场,安全警告标示不撤除。 Clean the area after installation, but remain the safety warming sign. 附图4.2.2(1)附图4.2.2(2)附图4.2.29、(3)二、风险评估( 脚手架搭设、拆除作业 )工 作 危 害 分析 rick assessment for Removal and Erection of Scaffold工作内容(风险项目)Job content(risk item)危害分析Hazard 风险Risk 矫正措施 Correction measures脚手架搭设、拆除作业Removal and erection of scaffold安全通道 safety access滑倒、跌倒、绊倒slip down, trip down and fall down1、进出通道上禁止摆放材料,保持通道不受阻。The access shall10、 not have obstacles and keep the good housekeeping2、保证作业临边有必要的防护措施,如安全栏杆 working area shall have protective fence3、保证有符合要求的梯子或作业平台 ladder and operating platform shall qualified脚手架搭设拆除作业erection remove人员高空坠落、材料高空坠物People and materials dropping from higher place1、脚手架搭设、拆除作业站脚处搭设操作平台(预防人员坠落)Platform sh11、ould be erected when remove scaffold to avoid people dropping.2、搭设、拆除作业遵守拆除作业工序(预防高空坠物)erected and removed work should according to the descending orders (To avoid dropping from high place)3、遵循脚手架搭设、拆除作业工序要求,严禁违反操作作业 erected and removed for scaffold shall refer to the specification, illegal work is 12、never qualified4、每步搭设、拆除时要及时对材料进行清理,扣件尽量采取麻袋装取运输 The materials should be cleaning after the remove work finished; Fastener should be packaged by sacking, pay more attention to the housekeeping is important.5、禁止同一个垂直面上搭设、拆除作业 erected and removed work at the same vertical is forbidden6、脚手架操作期间,下面有人作业须13、有足够的防护 underside worker shall have more enough personal PPE during the scaffold works.7、操作人员不得抛掷工器具与材料 Throwing the tools and materials is not allowedHousekeeping摔倒、跌倒、撞伤、刮伤slip down, trip down, fall down and bruise1、拆除作业时,边拆除边清理 Removed work should be with removing and cleaning2、搭设、拆除作业时,注意扣件、钢管等材料14、的堆码 Pay more attention to the piled fastener and conduit during the erected and removed work 3、扣件采用箱装较好,钢管采用堆放在支撑架上较好(规格:1.5米*1.5米或1.5米*2.0米)fastener should saved in the box, steel conduit shall piled in the frame (specification: 1.5m or 1.5m*2.0m)物体打击与坠落 materials dropping and beating人员受伤或死亡 person15、nel died or injury1、作业人员佩戴好自己的PPE,特别是安全帽(预防头部撞伤),须系安全帽带 Operator shall wear personal PPE, especially the helmet with safety belt.2、遵循搭设、拆除作业循序,严禁自下往上抛投材料,严禁同一垂直面同时搭设拆除 erected and removed work shall refer to the descending orders, throwing materials or tools from bottom to the up is forbidden, work 16、at the same vertical is not allowed火源 fire source火灾 fire accident1、禁止在现场吸烟 non-smoking in the working site2、做好Housekeeping清理工作 make the good housekeeping work in the site3、配置灭火器 fire stopper should be assembled人的不安全行为personal unsafe situation 不安全状态导致人员违章作业 unsafe situation lead to illegal work1、搭设拆除17、作业前,要预先做好脚手架搭设拆除作业许可证的申请 work permit shall prepared before remove the scaffold. 2、由有资质的脚手架工进行搭设和拆除 erected and removed work shall work by the qualified people3、脚手架搭设拆除作业人员在进行作业前要预先检查自己的安全防护用品完好,特别是安全带 Operator shall wear personal PPE, especially the safety belt.4、安全带采取高挂低用的方式,同时必须要有一个牢靠的锚固点,可以是钢管,也可18、以是生命绳 safety belt shall have an anchor fixed point by both of steel conduit and safety rope. 5、脚手架作业时严禁打闹戏骂 joking and making fun of someone during the scaffold work is not allowed6、划定维护区域,并进行维护与隔离 maintenance area should be arranged with insulated functions7、有心脏病、高血压的人员不得进行脚手架作业 heart disease and h19、igh blood pressure couldnt implement to the scaffold work.8、组织相关的技能培训和教育,严禁违章指挥 Relevant training skill and education should be have, illegal direct is not allowed9、临边操作人员必须系挂全束身安全带 aside staff must wear safety belt 不安全工作方式导致人员违章unsafe situation lead to illegal work13、脚手架作业人员必须佩戴工具袋,大工具袋系保险绳,严禁抛掷物件 20、scaffold worker should be wear tool bag, large tool bag should tied by safety rope, throwing tools is forbidden14、脚手架作业时严禁随意攀爬 climbing in the scaffold random is not allowed 15、脚手架作业时,作业人员严禁坐在平台孔洞边缘、骑坐在栏杆上、躺在走道上休息 lie on the ground, side on the railing, sit down beside the hole in the platform is no21、t allowed during scaffold work.16、使用合格的登高工具-斜道、楼梯等 ladder for the slope and stairs should be qualified安全防护 safety protection没有按照规范导致人员违章 not according to the code lead to illegal work1、在夜间、光线不足的地方加强照明 Add more lighting strengthen to the low power area2、防护栏杆高度必须符合要求 fence should according to the spec22、ification3、平台、走道、斜道装设挡脚板 platform, walking access and slope road should have protective foot plate4、作业周围孔洞、沟道装设盖板或围栏 hole and trench should have protective cover or fence5、成品仓(粉矿仓)在高空作业时周围布设安全网 high place working around in the ore bin shall have protective net in final products or ore bin.6、六级及以上大风或23、恶劣气候停止露天高空作业 above lever 6 wind shall not working in the high place7、凌冻天气进行脚手架作业要注意采取防滑措施 attention to the slip down in frozen day when do the scaffold work8、上下交叉作业中间搭设隔离层 cross work between up and down shall have insulated coat 没有按照规范导致高空落物not according to the code lead to the staff dropping9、平台、走道24、脚手架上堆放物件不超过允许载荷 piled materials over-loading in the platform, walking access and scaffold is not allowed10、切割的工件、边角余料等应放置在牢靠的地方或用铁丝扣牢并有防止坠落的措施或废料及时清理放到地面 cutting components and excessive material should be fixed by iron wire or another, ground should cleaning it.11、点焊的物件不得移动 spot welding components25、 shall not remove12、交叉施工的隔离层严禁随意拆除 Insulated coat for cross work shall not random remove 疲劳作业Tired work人员伤害Personnel injury1、合理调配人力,注意休息prepare workers reasonable with enough resting time2、检查、观察、发现作业人员疲劳,立即停止作业Pay more attention to the workers situation and exhausted person should asking stopped to 26、have a rest.脚手架材质 scaffold material quality钢管、扣件、木方、跳板Conduit, fastener, wood and springboard 不符合要求导致人身伤害 illegal code lead to Personnel injury1、搭设脚手架材料应符合规范要求,凡弯曲、压扁、有裂纹或已经严重锈蚀的钢管严禁使用 the pipe which bending-rupture, cracked and rusty shall not use in the scaffold materials beside all of them should27、 according to the specification2、立杆搭设循序:平整地面-铺设跳板-摆放底座-竖立杆 leveling ground-springboard laying- foundation laying-erect standing bar脚手板铺设 scaffold board paving1、材料不合要求 unqualified materials 人身伤害Personnel injury1、脚手板应满铺,不得有空隙和探头板 plate should be fully paving, inter space and excessive plate shall not 28、have2、脚手板未满铺 non fully paving 2、板与板搭接长度不得小于20CM The plate distance shall not less than 20cm3、脚手板未绑扎或压条 non fixed or bundling3、脚手板上翻时,应由两人从里向外按顺序进行,工作时挂好安全带 wear safety belt when rolling the scaffold board with according to the descending orders.脚手架搭设 scaffold erection违章作业 work against regulations人身伤29、害Personnel injury1、脚手架的外侧、斜道和平台应设1.0高的防护栏杆(从脚手板上量起)和20CM高的挡脚板,中间防护栏杆高度45CM-50CM(从脚手板上量起),搭设脚手架时,作业人员要挂好安全带 exterior scaffold, ramp and platform should have protective fence which 1.0m high and protective foot plate which 20cm high, middle protective fence which high is 45cm50cm, scaffold worker shal30、l wear PPE.2、斜坡道、跳板的坡度不得大于1:3,宽度不得小于1.2M,并钉有防护条,防滑条的间距不得大于30CMThe slope degree of ramp and springboard hall not over 1:3, wide shall not less than 1.2m with studding protective tape, the distance of non-slip strip shall not more than 30cm 脚手架拆除 remove scaffold 违章作业work against regulations人身伤害Personn31、el injury1、脚手架拆除时应自上而下按顺序进行,严禁上下同时作业或将脚手架整体推到 scaffold remove shall according to the descending orders from up to bottom,2、拆除作业区周围应设防护围栏或警告标志,并有专人监护,严禁无关人员入内 removing site shall have warning sign and protective fence which with specified monitoring and authorized person only.3、任何物品一律不得抛掷 throwing st32、uff is not allowed材料堆放 work against regulations1、拆除的脚手架管应堆放到指定区域,堆码整齐 keep the good housekeep and materials shall be piled in the pointed area.2、保证施工通道的完好 keep the housekeeping of the construction access三、安全管理方案3. Safety management plan1. 总要求 1. General requirements 作业前根据注意特点编制施工方案,并对参加作业的人员进行方案和安全技33、术交底。作业周边应设置警戒区域,设置明显的警示标志,并设立安全监护人员。在搭设作业前,需要NFC与KBPV人员共同启动会议。2. 高空作业要求 严格遵守高空作业的相关工作条例,防止高空坠落和高空坠物伤人!2. Working at height Work permit shall be opened before work, and all personnel shall be told the risk before work.3. 相关注意事项 进入作业区域必须佩带相关安全防护用品,不得违反施工规范、安全技术规程和本方案进行施工。3. Relate noticeFull PPE has to be equipment in working area.
会员尊享权益 会员尊享权益 会员尊享权益
500万份文档
500万份文档 免费下载
10万资源包
10万资源包 一键下载
4万份资料
4万份资料 打包下载
24小时客服
24小时客服 会员专属
开通 VIP
升级会员
  • 周热门排行

  • 月热门排行

  • 季热门排行

  1. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  2. 陕西化学工业公司招聘管理与职业发展管理手册30页.doc
  3. 建筑工程外脚手架专项施工方案(悬挑式脚手架、落地式脚手架)(25页).doc
  4. 2020柏向堂房地产公司材料标准化手册3.0(143页).pdf
  5. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  6. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  7. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  8. 桥梁工程深基坑开挖专项施工方案(24页).doc
  9. 深基坑土方开挖及基坑支护专项施工方案.doc
  10. 天碱商业区观山苑工程人防监理规划(43页).doc
  11. 工程变形测量之基坑监测培训课件(155页).ppt
  12. 房地产开发企业拿地操作指引方案.pdf
  13. 新规下的户型增值秘籍.ppt(22页)
  14. 房地产开发贷款实操指南(5页).pdf
  15. 鄂尔多斯空港物流园区总体规划方案(2017-2030)环境影响评价报告书(23页).doc
  16. 规划兰园西路道路工程环境方案环境影响评价报告书(89页).pdf
  17. 屋面圆弧形穹顶结构高支模施工方案(40米)(47页).doc
  18. 埋石混凝土挡土墙施工方案(23页).doc
  19. 重庆市五小水利工程建设规划报告(64页).doc
  20. 厂区至矿区管网蒸汽管道系统扩容改造工程施工组织设计方案(105页).doc
  21. 超高纯氦气厂建设项目办公楼、变电站、水泵房及消防水池、门卫、厂房、仓库、配套工程施工组织设计方案(140页).doc
  22. 园林景观投标方案施工组织设计方案技术标(115页).doc
  1. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  2. 2024大楼室内精装修工程专业分包投标文件(393页).docx
  3. 苏州水秀天地商业项目购物中心100%室内设计方案(158页).pptx
  4. 龙港市专业市场布局规划方案(2023-2035年)(草案)(61页).pdf
  5. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  6. 室内移动式操作平台工程施工方案(19页).doc
  7. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  8. 矿山治理工程施工组织设计方案(240页).docx
  9. 老旧小区改造工程施工方案及技术措施(364页).doc
  10. 北京科技园公寓建设项目整体报告方案.ppt
  11. 川主寺城镇风貌整治景观规划设计方案(60页).pdf
  12. 建筑工程三级安全教育内容(24页).doc
  13. 新疆风电十三间房二期工程49.5mw风电项目可行性研究报告(附表)(239页).pdf
  14. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  15. 四川凉山攀西灵山国际度假区小镇活力中心商业业态规划方案建议书(33页).pdf
  16. 埋石混凝土挡土墙施工方案(23页).doc
  17. 地下停车场环氧地坪漆施工方案(45页).doc
  18. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  19. 地铁深基坑及钢筋笼吊装安全专项施工方案【98页】.doc
  20. 住宅定价策略及价格表制定培训课件.ppt
  21. 西安名京九合院商业项目招商手册(28页).pdf
  22. 2010-2030年湖北咸宁市城市总体规划(32页).doc
  1. 建筑工程夜间施工专项施工方案(18页).doc
  2. 赣州无动力亲子乐园景观设计方案(111页).pdf
  3. 2016泰安乡村旅游规划建设示范案例(165页).pdf
  4. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  5. 龙山县里耶文化生态景区里耶古城片区旅游修建性详细规划2015奇创.pdf
  6. 连云港市土地利用总体规划2006-2020年调整方案文本图集(78页).pdf
  7. 850亩项目塑钢门窗工程施工组织设计方案(34页).doc
  8. 老旧小区改造工程施工方案及技术措施(364页).doc
  9. 城市更新项目地价公式测算表.xlsx
  10. 房地产项目规划前期投资收益测算模板带公式.xls
  11. 存储器基地项目及配套设施建筑工程临时用水施工方案(40页).docx
  12. 铁路客运枢纽项目站前框构中桥工程路基注浆加固专项施工方案(19页).doc
  13. 室内移动式操作平台工程施工方案(19页).doc
  14. 装配式结构工业厂房基础、主体结构、门窗及装饰工程施工方案(83页).doc
  15. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  16. 施工工程安全教育培训技术交底(13页).doc
  17. 老旧小区改造施工方案及技术措施(365页).doc
  18. 新建贵广铁路线下工程沉降变形观测及评估监理实施细则(126页).doc
  19. 消防火灾应急疏散演练预案(12页).doc
  20. 矿山治理工程施工组织设计方案(240页).docx
  21. 崖城站悬臂式挡墙施工方案(92页).doc
  22. 北京科技园公寓建设项目整体报告方案.ppt