综合体地产项目造价估算指标.xls
下载文档
上传人:正***
编号:857447
2023-12-22
6页
96.50KB
1、单位:万元、平方米、元/平方米类型全全装装修修大大型型百百货货大大楼楼(高高层层)大大型型购购物物中中心心(Shopping Mall)大大型型超超级级市市场场建筑面积67,000100,00021,000地上52,00072,00021,000地下15,00028,000其他地下2层,地上10层地下2层,地上6层3层序号工程和费用名称总价数量单方造价总价数量单方造价总价数量单方造价一土建及装饰工程1 打桩1,144.0052,0002201,800.0072,000250315.0021,0001502 基坑围护1,500.0015,0001,0002,520.0028,0009003 土方2、工程600.0015,0004001,120.0028,00040021.0021,000104 地下建筑1,200.0015,000800700.0028,0002505 地下结构4,200.0015,0002,8007,280.0028,0002,6006 地上建筑1,300.0052,0002502,160.0072,000300525.0021,0002507 地上结构5,460.0052,0001,0506,120.0072,0008501,680.0021,0008008 装饰9,360.0052,0001,8007,000.0072,000972735.0021,0003509 3、外立面4,056.0052,0007806,000.0072,000833378.0021,00018010 屋面130.0052,00025180.0072,00025168.0021,00080土土建建及及装装饰饰工工程程费费小小计计28,950.0067,0004,32134,880.00100,0003,4883,822.0021,0001,820二机电安装工程1 给排水工程536.0067,00080600.00100,0006063.0021,000302 消防喷淋670.0067,0001001,000.00100,000100168.0021,000803 煤气134.00674、,00020200.00100,0002042.0021,000204 变配电1,005.0067,0001502,000.00100,000200378.0021,0001805 应急柴油发电机组301.5067,00045400.00100,00040168.0021,000806 电气2,144.0067,0003201,800.00100,000180336.0021,0001607 泛光照明234.0052,00045144.0072,000208 消防报警402.0067,00060550.00100,00055126.0021,000609 综合布线368.5067,0005555、00.00100,0005084.0021,0004010 弱电配管134.0067,00020300.00100,0003073.5021,0003511 弱电架桥201.0067,00030200.00100,0002012 BA系统(楼宇设备管理系统)268.0067,00040400.00100,0004063.0021,0003013 有线电视134.0067,00020100.00100,0001014 安防系统134.0067,00020200.00100,0002052.5021,0002515 广播系统100.5067,00015100.00100,0001031.5021,6、0001516 空调送排风2,814.0067,0004204,000.00100,000400735.0021,00035017 电梯1,474.0067,0002202,000.00100,000200252.0021,00012018 车库管理105.0015,00070112.0028,0004019 标识100.5067,00015150.00100,00015机机电电安安装装工工程程费费小小计计11,260.0067,0001,68114,756.00100,0001,4762,572.5021,0001,225三预预备备费费(按按建建安安工工程程费费的的8%计计列列)3,216.7、8067,0004803,970.88100,000397511.5621,000244建建安安工工程程总总费费用用43,426.8067,0006,48253,606.88100,0005,3616,906.0621,0003,2891、地下建筑含地下一层装修1、电梯含自动扶梯1、建筑含外保温2、地上建筑含外保温2、外立面含门窗3、外立面含门窗3、电梯含自动扶梯4、电梯含自动扶梯单位:万元、平方米、元/平方米类型高高档档装装修修甲甲级级写写字字楼楼(超超高高层层)甲甲级级办办公公楼楼(高高层层)政政府府办办公公楼楼/乙乙级级办办公公楼楼(高高层层)研研发发中中心心(多多层层)乙乙级级办办公公8、楼楼(多多层层)建筑面积124,00057,00032,00022,0006,400地上100,00045,00026,00022,0006,400地下24,00012,0006,000其他地下3层,地上=45层地下3层,地上=24层地下2层,地上=20层地下0层,地上=5层地下0层,地上3-5层序号工程和费用名称总价数量单方造价总价数量单方造价总价数量单方造价总价数量单方造价总价数量单方造价一土建及装饰工程1 打桩2,500.00100,000250990.0045,000220520.0026,000200264.0022,00012076.806,4001202 基坑围护2,112.009、24,0008801,320.0012,0001,100564.006,0009406,400-3 土方工程624.0024,000260318.0012,000265120.006,00020033.0022,000159.606,400154 地下建筑960.0024,000400480.0012,000400228.006,0003806,400-5 地下结构7,200.0024,0003,0003,360.0012,0002,8001,500.006,0002,5006,400-6 地上建筑3,500.00100,0003501,575.0045,000350858.0026,000310、30616.0022,000280160.006,4002507 地上结构16,000.00100,0001,6004,500.0045,0001,0002,210.0026,0008501,848.0022,000840480.006,4007508 装饰20,000.00100,0002,0002,700.0045,0006001,820.0026,0007001,540.0022,000700448.006,4007009 外立面14,000.00100,0001,4004,725.0045,0001,0501,170.0026,000450990.0022,000450243.206,11、40038010 屋面250.00100,00025180.0045,00040104.0026,00040198.0022,0009051.206,40080土土建建及及装装饰饰工工程程费费小小计计67,146.00124,0005,41520,148.0057,0003,5359,094.0032,0002,8425,489.0022,0002,4951,468.806,4002,295二机电安装工程1 给排水工程2,480.00124,0002001,026.0057,000180320.0032,000100330.0022,00015057.606,400902 消防喷淋1,860.12、00124,000150741.0057,000130224.0032,00070297.0022,00013544.806,400703 煤气124.00124,0001057.0057,0001016.0032,000577.0022,000354 变配电2,852.00124,0002301,197.0057,000210480.0032,000150968.0022,00044038.406,400605 应急柴油发电机组1,240.00124,000100456.0057,00080352.0022,0001606 电气4,960.00124,0004001,938.0057,00013、340640.0032,000200990.0022,000450128.006,4002007 泛光照明200.00100,00020135.0045,0003033.0022,000158 消防报警310.00124,00025171.0057,0003096.0032,0003066.0022,0003019.206,400309 综合布线744.00124,00060285.0057,00050144.0032,00045616.0022,00028028.806,4004510 弱电配管682.00124,00055256.5057,0004596.0032,0003066.002214、,0003012.806,4002011 弱电架桥434.00124,00035199.5057,0003564.0032,0002044.0022,000209.606,4001512 智能化调光系统372.00124,0003085.5057,0001544.0022,0002013 BA系统(楼宇设备管理系统)992.00124,00080513.0057,00090160.0032,00050220.0022,00010032.006,4005014 卫星天线及有线电视124.00124,0001057.0057,0001032.0032,00022.0022,000106.406,415、001015 计算机网络机房496.00124,00040128.0032,000440.0022,00020016 安防系统372.00124,00030171.0057,0003080.0032,00025396.0022,00018016.006,4002517 广播系统124.00124,0001057.0057,0001032.0032,0001011.0022,00056.406,4001018 程控电话248.00124,0002096.0032,00044.0022,0002025.606,4004019 空调送排风9,300.00124,0007503,990.0057,0016、07001,760.0032,0005501,672.0022,000760224.006,40035020 锅炉620.00124,00050285.0057,00050308.0022,00014021 电梯3,720.00124,0003001,425.0057,000250576.0032,000180154.0022,0007044.806,4007022 擦窗机450.00100,00045337.5045,0007522.0022,0001023 车库管理96.0024,0004060.0012,0005048.006,0008044.0022,0002024 标识300.00117、00,0003025 厨房设备、垃圾压缩机等77.0022,0003526 集成管理系统22.0022,0001027 会议室音视频系统220.0022,000100机机电电安安装装工工程程费费小小计计33,100.00124,0002,66913,443.0057,0002,3584,992.0032,0001,5607,535.0022,0003,425694.406,4001,085三预预备备费费(按按建建安安工工程程费费的的8%计计列列)8,019.68124,0006472,687.2857,0004711,126.8832,0003521,041.9222,000474173.0618、6,400270建建安安工工程程总总费费用用108,265.68124,0008,73136,278.2857,0006,36515,212.8832,0004,75414,065.9222,0006,3942,336.266,4003,6501、给排水工程含水箱1、给排水工程含水箱1、建筑含外保温1、消防喷淋含气体灭火1、建筑含外保温2、消防喷淋含气体灭火2、消防喷淋含气体灭火2、外立面含门窗2、外立面含门窗、外保温2、外立面含门窗3、地上建筑含外保温3、电梯含自动扶梯3、空调送排风含恒温恒湿3、电梯含自动扶梯4、装饰为公共部分4、地下建筑含地下室装修4、地下建筑含地下室装修5、外立面含门窗19、单位:万元、平方米、元/平方米类型五五星星级级酒酒店店(超超高高层层)四四星星级级酒酒店店(高高层层)三三星星级级酒酒店店(高高层层)经经济济型型酒酒店店(多多层层)酒酒店店式式公公寓寓(高高层层)建筑面积80,00062,00036,0006,00035,600地上65,00050,00028,0006,00032,800地下15,00012,0008,0002,800其他地下3层,地上=40层地下2层,地上=26层地下2层,地上=22层地下0层,地上=7层地下1层,地上=20层序号工程和费用名称总价数量单方造价总价数量单方造价总价数量单方造价总价数量单方造价总价数量单方造价一土建及装饰工程20、1打桩1,495.0065,0002301,100.0050,000220616.0028,00022072.006,000120590.4032,8001802基坑围护1,500.0015,0001,0001,080.0012,000900816.008,0001,020120.402,8004303土方工程375.0015,000250312.0012,000260216.008,0002706.006,0001078.402,8002804地下建筑600.0015,000400480.0012,000400304.008,00038084.002,8003005地下结构3,750.00121、5,0002,5002,640.0012,0002,2001,760.008,0002,200700.002,8002,5006地上建筑2,925.0065,0004502,250.0050,0004501,120.0028,000400210.006,0003501,148.0032,8003507地上结构6,175.0065,0009504,000.0050,0008002,100.0028,000750450.006,0007502,296.0032,8007008装饰22,100.0065,0003,40013,500.0050,0002,7005,600.0028,0002,000422、68.006,0007806,560.0032,8002,0009外立面6,500.0065,0001,0005,000.0050,0001,000896.0028,000320132.006,0002202,624.0032,80080010屋面195.0065,00030150.0050,0003098.0028,0003524.006,0004065.6032,80020土土建建及及装装饰饰工工程程费费小小计计45,615.0080,0005,70230,512.0062,0004,92113,526.0036,0003,7571,362.006,0002,27014,266.8035,23、6004,008二机电安装工程1给排水工程3,200.0080,0004002,170.0062,0003501,080.0036,000300150.006,0002501,246.0035,6003502消防喷淋960.0080,000120682.0062,000110360.0036,00010039.006,00065284.8035,600803煤气160.0080,00020124.0062,0002072.0036,000203.006,000521.3635,60064变配电2,160.0080,0002701,240.0062,000200504.0036,0001408924、0.0035,6002505应急柴油发电机组1,200.0080,000150682.0062,000110180.0036,00050391.6035,6001106电气3,040.0080,0003802,356.0062,0003801,152.0036,000320180.006,000300890.0035,6002507泛光照明292.5065,00045200.0050,0004084.0028,0003098.4032,800308消防报警360.0080,00045248.0062,00040126.0036,0003518.006,00030142.4035,600409综25、合布线480.0080,00060341.0062,00055180.0036,0005018.006,00030142.4035,6004010弱电配管320.0080,00040248.0062,00040126.0036,0003512.006,0002011弱电架桥240.0080,00030186.0062,0003090.0036,000259.006,00015320.4035,6009012智能化调光系统400.0080,00050310.0062,00050126.0036,0003513BA系统(楼宇设备管理系统)560.0080,00070341.0062,000551826、0.0036,00050142.4035,6004014卫星天线及有线电视120.0080,0001593.0062,0001536.0036,000106.006,00010106.8035,6003015安防系统320.0080,00040248.0062,00040144.0036,000406.006,00010160.2035,6004516广播系统80.0080,0001062.0062,0001036.0036,000106.006,0001035.6035,6001017程控电话320.0080,00040248.0062,00040144.0036,00040142.403527、,6004018空调送排风6,000.0080,0007504,030.0062,0006501,800.0036,000500150.006,0002501,424.0035,60040019锅炉400.0080,00050217.0062,00035144.0036,0004020电梯2,400.0080,0003001,426.0062,000230540.0036,00015060.006,000100569.6035,60016021擦窗机357.5065,00055300.0050,00060164.0032,8005022车库管理82.5015,0005560.0012,000528、040.008,0005036.402,80013023标识200.0080,00025124.0062,0002054.0036,000153.006,000524厨房设备1,950.0065,0003001,000.0050,000200420.0028,00015042.006,00070164.0032,8005025宾馆管理系统260.0065,00040200.0050,0004098.0028,0003533.006,00055131.2032,8004026VOD点播系统162.5065,00025125.0050,00025131.2032,8004027游泳池设备195.029、065,00030150.0050,0003028康体设备390.0065,00060200.0050,0004084.0028,00030机机电电安安装装工工程程费费小小计计26,610.0080,0003,32617,611.0062,0002,8407,800.0036,0002,167735.006,0001,2257,635.1635,6002,145三预预备备费费(按按建建安安工工程程费费的的8%计计列列)5,778.0080,0007223,849.8462,0006211,706.0836,000474167.766,0002801,752.1635,600492建建安安工工程30、程总总费费用用78,003.0080,0009,75051,972.8462,0008,38323,032.0836,0006,3982,264.766,0003,77523,654.1235,6006,6441、煤气包括调压站1、煤气包括调压站1、煤气包括调压站1、消防喷淋含气体灭火1、安防系统包括访客、窗磁、门禁、门磁2、外立面包含入口雨篷2、外立面包含入口雨篷2、外立面包含入口雨篷2、外立面含门窗、外保温2、外立面含门窗3、地下建筑含地下室装修3、地下建筑含地下室装修3、地下建筑含地下室装修3、空调送排风含恒温恒湿3、给排水:热水全铜管、卫生洁具进口TOTO4、电梯含自动扶梯4、电梯含自31、动扶梯4、电梯含自动扶梯单位:万元、平方米、元/平方米类型多多层层住住宅宅(4-6层层)小小高高层层住住宅宅(8-14层层)高高层层住住宅宅(15-22层层)高高层层住住宅宅(23-33层层)豪豪华华装装修修超超高高层层(33-45层层)独独立立式式普普通通别别墅墅全全装装修修高高标标准准别别墅墅建筑面积4,0007,04015,40022,50038,500300450地上4,0006,48014,40021,78033,000300450地下5601,0007205,500其他4-6层地下1层,地上8-14层地下1层,地上15-22层地下1层,地上23-33层地下2层,地上=45层地下0层32、,地上=3层地下0层,地上=3层序号工程和费用名称总价数量单方造价总价数量单方造价总价数量单方造价总价数量单方造价总价数量单方造价总价数量单方造价总价数量单方造价一土建及装饰工程1 打桩48.004,00012071.286,480110216.0014,400150370.2621,780170825.0033,0002504.05450902 基坑围护31.3656056065.001,00065043.20720600467.505,5008503 土方工程2.004,00056.7256012012.001,0001208.6472012066.005,5001204 地下建筑6.7233、56012012.001,0001208.64720120192.505,5003505 地下结构84.005601,500165.001,0001,650144.007202,0001,622.505,5002,9506 地上建筑80.004,000200136.086,480210331.2014,400230588.0621,780270990.0033,0003007.5030025012.604502807 地上结构160.004,000400375.846,480580864.0014,4006001,633.5021,7807502,805.0033,00085022.5030034、75038.254508508 装饰30.004,0007532.406,4805064.8014,40045217.8021,7801009,900.0033,0003,00058.504501,3009 外立面64.004,000160149.046,480230360.0014,400250544.5021,7802502,343.0033,00071010.5030035027.0045060010 屋面8.004,000209.726,4801528.8014,4002026.1421,7801266.0033,000203.753001254.0545090土土建建及及装装饰饰工工35、程程费费小小计计392.004,000980903.167,0401,2832,118.8015,4001,3763,584.7422,5001,59319,277.5038,5005,00744.253001,475144.454503,210二机电安装工程1 给排水工程24.004,0006042.247,0406077.0015,40050168.7522,500751,540.0038,5004002.40300807.204501602 消防喷淋/消防31.687,0404523.1015,4001567.5022,50030173.2538,500453 煤气2.404,0006436、.227,04069.2415,400613.5022,500630.8038,50080.36300120.54450124 变配电1,155.0038,5003005 电气32.004,0008056.327,04080154.0015,400100225.0022,5001001,578.5038,5004104.503001509.904502206 泛光照明192.5038,500507 消防报警23.1015,4001533.7522,50015154.0038,500408 综合布线327.2538,500850.30300100.45450109 弱电配管10.004,000237、514.087,0402038.5015,4002556.2522,5002596.2538,500250.60300200.904502010 弱电架桥115.5038,5003011 智能化调光系统577.0038,50015012 BA系统(楼宇设备管理系统)288.7538,5007513 卫星天线及有线电视4.004,000107.047,0401015.4015,4001022.5022,50010231.0038,500600.30300100.684501514 安防系统2.004,00053.527,04057.7015,400511.2522,5005115.5038,5038、0300.30300100.904502015 广播系统38.5038,5001016 冷却循环系统57.7538,5001517 空调送排风22.5022,500101,732.5038,50045038.2545085018 锅炉77.0038,5002019 电梯56.327,04080107.8015,40070292.5022,500130731.5038,50019020 擦窗机165.0033,0005021 车库管理99.005,50018022 厨房1,386.0033,00042024.7545055023 中央吸尘系统214.0033,0006524 热水炉0.9045039、20机机电电安安装装工工程程费费小小计计74.404,000186215.427,040306455.8415,400296913.5022,50040611,076.5538,5002,8778.7630029284.474501,877三预预备备费费(按按建建安安工工程程费费的的8%计计列列)37.314,0009389.497,040127205.9715,400134359.8622,5001602,428.3238,5006314.2430014118.31450407建建安安工工程程总总费费用用503.714,0001,2591,208.077,0401,7162,780.611540、,4001,8064,858.1022,5002,15932,782.3738,5008,51557.253001,908247.234505,4941、安防系统包括门禁、门磁1、安防系统包括门禁、门磁、窗磁1、安防系统包括门禁、门磁、窗磁1、安防系统包括门禁、门磁、窗磁1、安防系统包括访客、窗磁、门禁、门磁1、安防系统包括门禁、门磁、窗磁1、安防系统包括访客、门禁、门磁、窗磁2、外立面包含门窗2、外立面包含门窗2、外立面包含门窗2、外立面包含门窗2、外立面含门窗、保暖2、外立面包含门窗2、外立面包含门窗3、地上建筑含外保温3、地上建筑含外保温3、地上建筑含外保温3、地上建筑含外保温3、给排水41、含水箱/洁具3、地上建筑含保温3、地上建筑含外保温4、消防仅消火栓4、消防仅消火栓4、空调送排风仅通风4、消防喷淋为公共部位喷淋4、地上结构含基础5、电气包括主要管线和入户配电箱5、给排水工程配置一盆一厕(普通)单位:万元、平方米、元/平方米类型单单层层轻轻型型厂厂房房单单层层重重型型厂厂房房建筑面积12,00015,000地上12,00015,000地下其他地下0层,地上1层,局部辅助用房2层地下0层,地上1层,局部辅助用房2层序号工程和费用名称总价数量单方造价总价一土建及装饰工程1 打桩114.0012,00095225.002 基坑围护3 土方工程30.0012,0002545.004 42、地下建筑5 地下结构6 地上建筑360.0012,000300480.007 地上结构1,020.0012,0008501,575.008 装饰120.0012,000100150.009 外立面10 屋面300.0012,000250375.00土土建建及及装装饰饰工工程程费费小小计计1,944.0012,0001,6202,850.00二机电安装工程1 给排水工程60.0012,0005075.002 消防喷淋72.0012,0006090.003 变配电228.0012,000190375.004 电气工程180.0012,000150270.005 通风、空调72.0012,0006043、90.006 综合布线36.0012,0003045.007 安全防范系统24.0012,0002030.008 广播系统2.4012,00023.009 弱电架桥、配管24.0012,0002030.00机机电电安安装装工工程程费费小小计计698.4012,0005821,008.00三预预备备费费(按按建建安安工工程程费费的的8%计计列列)211.3912,000176308.64建建安安工工程程总总费费用用2,853.7912,0002,3784,166.641、地上建筑含门窗、外立面1、地上建筑含门窗、外立面2、结构含屋架2、结构含屋架数量单方造价15,00015015,0003015,00032015,0001,05015,00010015,00025015,0001,90015,0005015,0006015,00025015,00018015,0006015,0003015,0002015,000215,0002015,00067215,00020615,0002,778地下0层,地上1层,局部辅助用房2层1、地上建筑含门窗、外立面