个人中心
个人中心
添加客服WX
客服
添加客服WX
添加客服WX
关注微信公众号
公众号
关注微信公众号
关注微信公众号
升级会员
升级会员
返回顶部
顶管法施工方案(英文版)(4页)
顶管法施工方案(英文版)(4页).doc
下载文档 下载文档
其它文档
上传人:正*** 编号:486649 2022-07-25 4页 21.50KB
1、 Method Statement for Pipe Jacking1. Construction of PitsThe jacking pit with a dimension of 6mx5 clear opening with depth of 250mm below invert level of the steel pipe.The floor will be leveled by 100mm thick concrete blinding fixing tow I beams(1.5mx15cm) in the center of the pit for fixing jackin2、g frame.2. Installation of Jacking FrameAfter the construction of drive, the jacking rig will be lowered into the pit and adjust to the control line and level. The rig will be used on this contract consist of two number of hydraulic cylinders with a capacity of 150 ton each to give a total jacking f3、orce of 300 tons. The rig will have guided rails, pushing plate and base plate to hydraulic power back with control unit. The hydraulic system will run through a diesel engine installed the top of the pit.The rig will installed to the correct line and level and check by the consultant in respect to 4、level and alignment.3. Thrust WallConstructing a concrete block behind the base plate of the rig to a dimension of 2x1.5x0.5m will be provided to take and distribute the jacking load.4. Pipe Jacking OperationA steel shield is used at the front of the pipe to accommodate the miner and to allow for st5、eering of the pipe jack. The soil within the shield is manually excavated and loaded into a wheel skip for transport to the pit bottom. The miner does not dig outside the shield (both in front and radically) and the front, or cutting edge, of the shield is always kept buried in the face, so stabilit6、y is maintained. The shield is thus used to trim the excavation to the size of the pipe thus minimizing the potential for settlement of the ground above the pipe jack.In the pit bottom, the skip is hoisted to the surface, emptied and returned to the used to loosen it prior to digging. The exact diam7、eter of shield will be selected to suit the pushing pipes.As excavation continues, the shield is jacking forward using two hydraulic jacks thrusting from the back wall. When the shield is buried, the jacks are retracted and the first sleeve pipe lowered on to the rails. This in then pushed up to the8、 shield and excavation can then continue.When the sleeve pipe is pushed home, the hydraulic jacks are retracted and the services (lighting& ventilation) disconnected. The next sleeve pipe is lowered on to the rails and the services reconnected and the cycle repeated until the shield is pushed into t9、he receiving pit and the pipeline pushed into final position.5. Maintaining Line and LevelIn order to maintain the correct line and level, a graduated target plate is located within the shield. The site engineer notes the position of the visible sport on the target, this initial position is used as 10、reference value to locate the relative position of the shield at all times during the drive. At each push, the site engineer monitors the position reference value with the help of level instrument and theodalite, thus giving a shield position (high or low, right or left) relative to the design posit11、ion. Based on this information, the operator manipulates a correct course.Extending or retracting a combination of steering rams causing the front of the shield to articulate in the required direction carries out the steering. As the pipe follows the shield, the correct line and level will be mainta12、ined. At all times, the amount steering applied is kept to minimum.6. Fixing Carrier PipesAfter completion of the pipe jacking , we check the line and level for the steel pipe and we take the exact line and level for the carrier pipe with the help of survey instruments.A 3 steel angle bar fixed by w13、elding in the correct bottom level of the carrier pipe, then 3mm thick flat bar half moon claps will fixed through wielding in the correct line after that we put neoprene rubber 3mm thick in the clamp to avoid the scratches of the carrier pipes.Then we start laying the carrier pipe one by one and fi14、x the clamps through nuts and bolts. After fixing the nuts and bolts we make angle support in between the top of the clamp and top of the pipe. Then we fix the other pipe in the same manner. The same procedure will continues up to the requirement.7. GroutingUpon completion of pipe jacking we make 4 15、2 holes like ventilation in every meter, it helps the concrete fill the gap between the steel pipe and ground. Then we fixed six inch grouting pipe vertically one meter height in the top of the pipe both end jacking and receiving. One side will keep ventilation and the other side for connection and 16、the concrete pump.After that we lay the carrier pipe in the correct line and level then check with the consultant and make the test required from the consultant then we close the both end between steel and carrier pipe by m/s plate welding or masonry, the gap between steel sleeve and ground in the both end we close by cement.During grouting the grout will push through the down string end.Pumping process will continue till the grout reaches the up string end ventilation pipe. When the grout will overflow from the ventilation pipe, grouting process is completed.
会员尊享权益 会员尊享权益 会员尊享权益
500万份文档
500万份文档 免费下载
10万资源包
10万资源包 一键下载
4万份资料
4万份资料 打包下载
24小时客服
24小时客服 会员专属
开通 VIP
升级会员
  • 周热门排行

  • 月热门排行

  • 季热门排行

  1. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  2. 陕西化学工业公司招聘管理与职业发展管理手册30页.doc
  3. 混凝土工程施工工艺标准化培训课件(50页).pptx
  4. 建筑工程外脚手架专项施工方案(悬挑式脚手架、落地式脚手架)(25页).doc
  5. 2020柏向堂房地产公司材料标准化手册3.0(143页).pdf
  6. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  7. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  8. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  9. 天碱商业区观山苑工程人防监理规划(43页).doc
  10. 工程变形测量之基坑监测培训课件(155页).ppt
  11. 房地产开发企业拿地操作指引方案.pdf
  12. 新规下的户型增值秘籍.ppt(22页)
  13. 房地产开发贷款实操指南(5页).pdf
  14. 鄂尔多斯空港物流园区总体规划方案(2017-2030)环境影响评价报告书(23页).doc
  15. 规划兰园西路道路工程环境方案环境影响评价报告书(89页).pdf
  16. 屋面圆弧形穹顶结构高支模施工方案(40米)(47页).doc
  17. 埋石混凝土挡土墙施工方案(23页).doc
  18. 厂区至矿区管网蒸汽管道系统扩容改造工程施工组织设计方案(105页).doc
  19. 重庆市城口县东安乡等6个乡镇土地开发整理项目监理规划及施工组织设计方案(122页).doc
  20. 超高纯氦气厂建设项目办公楼、变电站、水泵房及消防水池、门卫、厂房、仓库、配套工程施工组织设计方案(140页).doc
  21. 园林景观投标方案施工组织设计方案技术标(115页).doc
  22. 园林绿化景观工程技术标施工组织设计方案(71页).doc
  1. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  2. 2024大楼室内精装修工程专业分包投标文件(393页).docx
  3. 苏州水秀天地商业项目购物中心100%室内设计方案(158页).pptx
  4. 龙港市专业市场布局规划方案(2023-2035年)(草案)(61页).pdf
  5. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  6. 室内移动式操作平台工程施工方案(19页).doc
  7. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  8. 施工工程安全教育培训技术交底(13页).doc
  9. 老旧小区改造施工方案及技术措施(365页).doc
  10. 矿山治理工程施工组织设计方案(240页).docx
  11. 老旧小区改造工程施工方案及技术措施(364页).doc
  12. 北京科技园公寓建设项目整体报告方案.ppt
  13. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  14. 四川凉山攀西灵山国际度假区小镇活力中心商业业态规划方案建议书(33页).pdf
  15. 埋石混凝土挡土墙施工方案(23页).doc
  16. 地下停车场环氧地坪漆施工方案(45页).doc
  17. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  18. 地铁深基坑及钢筋笼吊装安全专项施工方案【98页】.doc
  19. 住宅定价策略及价格表制定培训课件.ppt
  20. 西安名京九合院商业项目招商手册(28页).pdf
  21. 2010-2030年湖北咸宁市城市总体规划(32页).doc
  22. 建筑工程施工进度计划表横道图自动生成版(模板).xls
  1. 建筑工程夜间施工专项施工方案(18页).doc
  2. 永胜县程海镇河口村“多规合一”实用性村庄规划方案(2020-2035年)(116页).pdf
  3. 赣州无动力亲子乐园景观设计方案(111页).pdf
  4. 2016泰安乡村旅游规划建设示范案例(165页).pdf
  5. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  6. 龙山县里耶文化生态景区里耶古城片区旅游修建性详细规划2015奇创.pdf
  7. 连云港市土地利用总体规划2006-2020年调整方案文本图集(78页).pdf
  8. 850亩项目塑钢门窗工程施工组织设计方案(34页).doc
  9. 老旧小区改造工程施工方案及技术措施(364页).doc
  10. 城市更新项目地价公式测算表.xlsx
  11. 房地产项目规划前期投资收益测算模板带公式.xls
  12. 室内移动式操作平台工程施工方案(19页).doc
  13. 装配式结构工业厂房基础、主体结构、门窗及装饰工程施工方案(83页).doc
  14. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  15. 施工工程安全教育培训技术交底(13页).doc
  16. 老旧小区改造施工方案及技术措施(365页).doc
  17. 新建贵广铁路线下工程沉降变形观测及评估监理实施细则(126页).doc
  18. 消防火灾应急疏散演练预案(12页).doc
  19. 矿山治理工程施工组织设计方案(240页).docx
  20. 崖城站悬臂式挡墙施工方案(92页).doc
  21. 老旧小区改造施工组织设计F方案(232页).doc
  22. 北京科技园公寓建设项目整体报告方案.ppt