个人中心
个人中心
添加客服WX
客服
添加客服WX
添加客服WX
关注微信公众号
公众号
关注微信公众号
关注微信公众号
升级会员
升级会员
返回顶部
保冷施工方案(7页)
保冷施工方案(7页).pdf
下载文档 下载文档
其它文档
上传人:正*** 编号:432778 2022-07-07 7页 3.26MB
1、CSPC Nahai Petrochemicals Project- Intermediate and Product Tanks GDCC PR- GDCC- 0000- 3079 Rev. A Page 3 of 6 Contract No.: C2- WHPE- CSPC- 0037 I/P Tank Insulation Rework Procedure 使用完成前硬化,应准确预估施工速度,根据施工速度掌握胶泥配置量,避免浪费,待胶泥完全硬化后开始粘贴绝热弧板。 Because the joints on roof is butt joints. Before the insulati2、on lay on, make sure the steel surface being level smoothly. The adhesive mortar shall be double component, and the density shall be proper. After fabricated this adhesive mortar, it shall be used up within 30 minutes. To avoid this mortar get solid before using up, the construction speed shall be a3、ccurate estimated. And then fabricate mortar quantity according to estimated construction speed so as to prevent waste. After this mortar dry completely, the PIR or PUR can be sticked on. 4.1.4 施工时采用从中心向四周依次环形的施工方法;每天的工作必须完成整圈PIR 和 FIBAROLL 的施工,用铝铂粘贴接口处,及时密封好,以防止雨水渗入。 During construction, the sequen4、ce is from the center to the circumference; each day shall finish overall ring of PIR and FIBAROLL layer. The butt joints shall be seal by aluminum foil so as to avoid water leakage in. 4.1.5 聚氨酯弧板下料时应充分考虑支撑环位置和尺寸,将搭缝排布在支撑环位置。 When fabricating the PIR materials, the supports position and dimension s5、hall be taken into consideration. The butt joints shall be arranged near the support ring. 4.1.6 在预制好的绝热材料(PIR)与罐体接触面四周均匀满涂粘接剂(胶泥) ,且接触面中间均匀涂抹五点,保证与罐体表面密实、牢固的粘贴;粘贴好的聚氨酯弧板接缝应紧密均匀,并用胶泥严密填充、找平。 Brush the adhesive agent on the PIR material, make sure the faces connected with roof plate and other PIR sha6、ll be completed brushed. And the interface with steel plate shall be brushed 5 points evenly so as to make sure it could stick firmly; the sticked on PIR shall be tight and smoothly. Where not level shall be fill with adhesive mortar and keep level. 4.1.7 聚氨酯弧板粘贴后将纵横搭缝用 PAP 胶带密封、压实。 After sticked on7、 the PIR board, the vertical joints shall be seal with PAP Band and roll smoothly. 4.1.8 在支撑环处弧板粘贴完成后,安装不锈钢钢带,用自攻螺钉将不锈钢钢带固定在支撑钢件上, 安装时确保钢带将弧板妥善固定,无缝隙。粘贴FIBAROLL 之前应将钢带表面用稀释剂擦拭干净, 用过的钢带应用抛光机处理表面,然后再用稀释剂擦拭。 After sticked on the PIR board around the support ring, install the stainless stell band on the8、 support device with crew. When install the stainless steel band, make sure the PIR is sticked firmly and without any gap. Prior to stick FIBAROLL on, the stainless steel shall be cleaned. The used band shall be grinded and clean with thinner. CSPC Nahai Petrochemicals Project- Intermediate and Prod9、uct Tanks GDCC PR- GDCC- 0000- 3079 Rev. A Page 4 of 6 Contract No.: C2- WHPE- CSPC- 0037 I/P Tank Insulation Rework Procedure 4.1.9 外保护层(FIBAROLL)使用前应用黑胶带或无破损纸箱密封妥善保管,施工使用前应仔细检查。 The FIBAROLL is packed in paper box with black band. Prior to use, check the package carefully. 4.1.10 粘贴保护层前应准确测量并在下料工棚10、内放样后将 FIBAROLL 裁切成所需尺寸,下料时应充分考虑支撑环位置和尺寸,将搭缝排布在支撑环位置;加工过程中应注意避光, 加工过的材料应在规定时间内及时完成施工; Before stick the protection layer, measure it carefully and cut it into the shape required, which shall be guided by sample. The support ring position and dimension shall be taken into consideration, and the butt jo11、int shall be arranged under the support ring; during cutting process, the light shall be avoided. And the fabricated material shall be used up in the fixed period. 4.1.11 粘贴外保护层(FIBAROLL)前应保护安装好的绝热层弧板表面,保持其表面平整、干净,如有污渍应及时处理干净。 Before lay on the protection layer (FIBAROLL), the insulation layer surfa12、ce shall be protected and under sound condition. Keep the surface level and clean, once find the dirts, remove it immediately. 4.1.12 FIBAROLL 接缝处采用搭接条粘贴在绝热层表面,再粘贴大块 FIBAROLL硬化膜,FIBAROLL 应裁剪成合适尺寸,确保每一块 FIBAROLL 与 100mm宽的 FIBAROLL 搭接条搭接宽度都为 50mm。搭接缝隙要平整、均匀并环环相扣。 For the joints of FIBAROLL, use the jo13、int bar to stick on the insulation surface, and another big piece of FIBAROLL shall be applied on it. The FIBAROLL shall be cut into accurate dimension. Make sure that each FIBAROLL have overlap joints of 50mm. The overlap joints shall be level and evenly. 4.1.13 粘贴施工时,粘贴后要用特制滚筒碾压平滑,确保保护层与绝热层的均匀、牢固、14、密实粘贴;应特别注意接缝部位的平整及严密性。 During the sticking construction, the sticky parts shall be rolled smoothly. Make sure that the protection layer could sticked with the under layer firmly. The tightness and smooth of the overlap joints shall be ensured. 4.1.14 如外保护层 FIBAROLL表面接头有细小裂缝或翘曲等缺陷时, 可采用 fibagel FR UV15、(光硬化聚酯胶泥) 进行填充、修补。 If find tiny crack or warp at the FIBAROLL joints, use FIBAGEL FR UV to fill and repair. 4.1.15 粘贴好的 FIBAROLL 应在其固化一段时间后而完全固化以前,揭除其表面的塑料薄膜;该时间安排有经验丰富的施工人员进行掌握,时间适当,保护层表面才平滑、光亮。 After sticked the FIBAROLL and cured a certain period, the plastic film on the CSPC Nahai Petrochemicals16、 Project- Intermediate and Product Tanks GDCC PR- GDCC- 0000- 3079 Rev. A Page 5 of 6 Contract No.: C2- WHPE- CSPC- 0037 I/P Tank Insulation Rework Procedure surface shall be removed. This certain period shall be controlled by experienced and skilled personnel. Proper period could ensure the smooth 17、and level surface of FIBAROLL. 4.1.16 罐顶为外网架结构的储罐,其罐顶被网架角钢分成小块方格,施工应注意其与其他罐顶的不同,这些储罐的罐顶弧板应下成与网架方格尺寸相同,粘贴时注意与网架角钢的接缝应紧密。聚氨酯材料粘贴后还要以 PS 板切成同样尺寸将网格空隙填满并用胶泥抹缝找平,使其上表面与网架角钢齐平,之后安装不锈钢带,最后粘贴 FIBAROLL 保护层。 For the tanks with external roof structure, the tank roof have been divided into many small grid. When18、 carry out construction on these tanks, special care shall be taken. The PIR dimension shall be the same as the grid dimension. When stick the PIR materials, the gap between angle bar and joints shall be tight. After sticked the PIR on the steel surface, same dimension of PS board shall be lay on th19、e PIR and the gap between grids shall be filled with adhesive mortar and keep level. Till the PS surface is at the same level with angle bar, and then the stainless stell band could be installed. Finally, the protection layer (FIBAROLL) can be applied. 4.1.17 罐沿的施工应特别注意其防水性,因其处于罐顶与罐壁的交界点,施工时罐壁四周绝热材料20、(PIR)的粘贴应距离罐顶四周罐沿 50mm,该部分绝热材料(PIR)应与罐壁之间满胶粘贴,保护层(FIBAROLL)应裁成 50mm 宽长条,粘贴与罐壁与罐壁四周绝热材料(PIR)上部,然后用特制成型绝热材料(PIR)安装于罐沿上,中间用特制材料填平。保护层 FIBAROLL 底边与罐壁保温层搭缝,搭缝采用上缝压下缝(顺雨水方向)的方法;上层于罐顶保温层搭接,搭缝也是上缝压下缝(顺雨水)方向;避免雨水侵入。 The water- proof function of the connection between roof and shelll shall take more care. Bec21、ause this parts is between the shell and roof, make sure that the PIR materials shall be 50mm away from the tank roof circumference. This parts shall be fully brushed adhesive agent. And the FIBAROLL shall be cut into piece with 50mm width and stick it on the top of PIR. The fabricated parts for upp22、er ring could installed then. The FIBAROLL bottom of upper ring shall over lap on the shell insulation layer. Then the joints shall could comply with the rain water flow direction. And so the rain water could not leak into the insulation layer. 4.1.18 罐顶保温层施工完毕后,应全面检查,如发现有翘边或有气泡现象,用壁纸刀进行修理后,再用特制胶进行涂23、抹、找平。 After the roof insulation layer finished, check it completely. If find any wrap of air bubble, use small knife to repair it and use the special adhesive agent to spray on it. And finally make sure keep level. 5 保温工程质量措施保温工程质量措施 Insulation Quality Measure 祥细质量控制和检查要点请见绝热工程质量检测和试验计划 (PL-GDCC-00024、0-0009) The detailed quality control and inspection points could refer to Insulation Project Quality CSPC Nahai Petrochemicals Project- Intermediate and Product Tanks GDCC PR- GDCC- 0000- 3079 Rev. A Page 6 of 6 Contract No.: C2- WHPE- CSPC- 0037 I/P Tank Insulation Rework Procedure Inspection and Testing Plan (PL-GDCC-0000-0009).
会员尊享权益 会员尊享权益 会员尊享权益
500万份文档
500万份文档 免费下载
10万资源包
10万资源包 一键下载
4万份资料
4万份资料 打包下载
24小时客服
24小时客服 会员专属
开通 VIP
升级会员
  • 周热门排行

  • 月热门排行

  • 季热门排行

  1. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  2. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  3. 陕西化学工业公司招聘管理与职业发展管理手册30页.doc
  4. 动火作业安全告知卡(1页).docx
  5. 高处作业安全告知卡(1页).docx
  6. 广场工程建设项目施工招标评标报告表格(24页).pdf
  7. 原油码头消防工程维保方案(39页).docx
  8. 建筑工程外脚手架专项施工方案(悬挑式脚手架、落地式脚手架)(25页).doc
  9. 2020柏向堂房地产公司材料标准化手册3.0(143页).pdf
  10. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  11. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  12. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  13. 房地产开发贷款实操指南(5页).pdf
  14. 学校宿舍楼建设工程施工方案【153页】.docx
  15. 住宅小区工程施工方案【234页】.docx
  16. 鄂尔多斯空港物流园区总体规划方案(2017-2030)环境影响评价报告书(23页).doc
  17. 规划兰园西路道路工程环境方案环境影响评价报告书(89页).pdf
  18. 屋面圆弧形穹顶结构高支模施工方案(40米)(47页).doc
  19. 埋石混凝土挡土墙施工方案(23页).doc
  20. 重庆市五小水利工程建设规划报告(64页).doc
  21. 厂区至矿区管网蒸汽管道系统扩容改造工程施工组织设计方案(105页).doc
  22. 超高纯氦气厂建设项目办公楼、变电站、水泵房及消防水池、门卫、厂房、仓库、配套工程施工组织设计方案(140页).doc
  1. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  2. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  3. 2024大楼室内精装修工程专业分包投标文件(393页).docx
  4. 苏州水秀天地商业项目购物中心100%室内设计方案(158页).pptx
  5. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  6. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  7. 室内移动式操作平台工程施工方案(19页).doc
  8. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  9. 矿山治理工程施工组织设计方案(240页).docx
  10. 老旧小区改造工程施工方案及技术措施(364页).doc
  11. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  12. 川主寺城镇风貌整治景观规划设计方案(60页).pdf
  13. 建筑工程三级安全教育内容(24页).doc
  14. 新疆风电十三间房二期工程49.5mw风电项目可行性研究报告(附表)(239页).pdf
  15. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  16. 四川凉山攀西灵山国际度假区小镇活力中心商业业态规划方案建议书(33页).pdf
  17. 埋石混凝土挡土墙施工方案(23页).doc
  18. 地下停车场环氧地坪漆施工方案(45页).doc
  19. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  20. 住宅定价策略及价格表制定培训课件.ppt
  21. 西安名京九合院商业项目招商手册(28页).pdf
  22. 2010-2030年湖北咸宁市城市总体规划(32页).doc
  1. 建筑工程夜间施工专项施工方案(18页).doc
  2. 赣州无动力亲子乐园景观设计方案(111页).pdf
  3. 2016泰安乡村旅游规划建设示范案例(165页).pdf
  4. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  5. 龙山县里耶文化生态景区里耶古城片区旅游修建性详细规划2015奇创.pdf
  6. 连云港市土地利用总体规划2006-2020年调整方案文本图集(78页).pdf
  7. 850亩项目塑钢门窗工程施工组织设计方案(34页).doc
  8. 老旧小区改造工程施工方案及技术措施(364页).doc
  9. 城市更新项目地价公式测算表.xlsx
  10. 房地产项目规划前期投资收益测算模板带公式.xls
  11. 存储器基地项目及配套设施建筑工程临时用水施工方案(40页).docx
  12. 铁路客运枢纽项目站前框构中桥工程路基注浆加固专项施工方案(19页).doc
  13. 室内移动式操作平台工程施工方案(19页).doc
  14. 装配式结构工业厂房基础、主体结构、门窗及装饰工程施工方案(83页).doc
  15. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  16. 施工工程安全教育培训技术交底(13页).doc
  17. 老旧小区改造施工方案及技术措施(365页).doc
  18. 新建贵广铁路线下工程沉降变形观测及评估监理实施细则(126页).doc
  19. 消防火灾应急疏散演练预案(12页).doc
  20. 矿山治理工程施工组织设计方案(240页).docx
  21. 崖城站悬臂式挡墙施工方案(92页).doc
  22. 北京科技园公寓建设项目整体报告方案.ppt