济南国际花都市政绿化带景观概念设计方案(38页).pdf
下载文档
上传人:偷****
编号:398079
2022-06-01
38页
44.16MB
该文档所属资源包:
大道绿化带街道公园院落道路轴线城市景观与规划设计方案资料
1、澳派澳派绿地济南国际花都市政绿化带Greenland Jinan International Garden Municipal Greenbelt景观概念设计Landscape Concept Design澳派四季种植Four Seasons PlantingBackground01背景分析澳派设计范围Design AreaGreenland Jinan International Garden is located in Huaiyin district, Jinan, south of La Mountain. The proposed land area covers a total a2、rea of 121,300 square meters (approximately 182 Mu). This is one of Greenland groups initial developments in Jinan.With the theme of “International Garden”, the site will be developed into a high quality international ecological community with local Jinan flavor. The landscape design extends to the 3、2 municipal greenbelts along Liu Chang Shan Road and Dang Yang Road, endeavoring to create a green impression and international community image for the residents. The Liu Chang Shan Road Greenbelt is 6m wide and 300m long, while the Dang Yang Road Greenbelt is 15m wide and 328m long.绿地济南国际花都项目位于济南槐荫区腊山南侧,规划建设净用地面积121,300平方米,约合182亩,为绿地在济南开发一揽子项目中的其中之一。项目的主题定位为“国际花都”,汇聚多国文化艺术精粹,将国际先进设计理念与当地地域文脉相融合而打