论600MW机组火力发电厂主体结构施工方案优化(8页).doc
下载文档
上传人:正***
编号:345713
2022-04-13
8页
44.50KB
1、论论 600MW600MW 机组火力发电厂主体结构施工方案优化机组火力发电厂主体结构施工方案优化梁君(安徽电力建设第一工程公司合肥230088)摘要:火力发电厂建设越来越多地追求快、好、省。要做到在限定的工期内圆满完成项目建设,需要优化施工方案,合理组织调配资源,使得劳动力投入波动小,防止出现“窝工”和“赶工”现象。持续、科学的施工管理是实现工程目标的关键。以马鞍山第三发电厂新建工程为例:叙述主体结构关键项目的优化方案和均衡施工,并制定合理的资源投入和合理的工期,以供参考。关键词:火力发电厂主体结构施工方案优化Abstract: Many thermal power plant constru2、ction in pursuit of moreand more quickly, better and cheaper. To be limited to the successfulcompletion of the project construction period, necessary to optimize theimplementation plan, a reasonable allocation of resources, organizations,making the small fluctuations in labor input, to prevent run i3、dleandrush job situation. Sustained, the construction management ofscience are the key to achieve the project goal.The Maanshan third power plant new construction as an example:This paper describes the key items such as the optimization program anda balanced construction about the main body structure, and to developreasonable resources and reasonable period for reference.Key words:Thermal power pl