阳澄湖科技园概念规划中心湖城市设计.pdf
下载文档
上传人:新****库
编号:121095
2021-05-08
223页
53.39MB
1、YANCHENG TECHNOLOGY DISTRICT CONCEPTUAL MASTER PLAN Suzhou Singapore Indus- trial Park is located in the west of the site and the site is only 35 km away from Suzhou city center. Kunshan City Master Plan is based on the principles of “ strengthen- ing the core, developing the axial space, zoning”, w2、hich aims to form a spatial layout structure with one core and five areas. The central part of Kunshan is composed of High-tech Zone (Yushan district), Huaqiao Business Park, Kunshan Economic and Technological Devel- opment Zone, Zhang Pu and Zhou shi districts. 昆山市区 Kunshan Downtown 昆山高新区(玉山分区) Kun3、shan High-tech 张浦分区 Zhangpu Subregion 花桥商务城 Huaqiao Business Zone 昆山经济技术开发区 Economic Technological Development Zone 周市分区 Zhoushi Subregion 高新区中心湖地块 城市结构图 Urban Structure 昆山城市结构 URBAN STRUCTURE 8 凭借公园式的环境和越发完善的配套,昆山西部新城成为昆 山人心目中的名片级居住地。 六大主题公园聚集,以昆山最佳的生活环境成就昆山人心目 中最理想的家庭居住地。 昆山行政副中心,中国千强镇玉山镇政府所在地,昆山公权 力圈层主要聚集地 。 昆山文体中心,集合昆山最顶级最现代的大型文化和体育配 套。 昆山教育中心,幼儿园到大学一站式著名教育机构云集,为 昆山孩子提供最佳的学习环境。 西部医疗中心国家一星级绿色建筑