1、implemented, the operating environment which does not comply with the safety requirements, workers have the right to refuse to work. Five, the lifting work safety license management 1. the lifting work safety license by the competent departments responsible for the management of the company. 2. this2、 by lifting the Unit received, and conscientiously implement the hoisting and lifting head, operations people, and according to the requirements for approval. 3. the safety operating permits are not allowed to transfer, alter, no off-site use, or expand the scope of uses. 4. the persons listed in th3、e safety operation card should be consistent with the field, when personnel changes should go through the signing procedures and related matters of the transition. 5. the certificate of safe operation of lifting operation does not complete within the allotted time, shall renew the certificate of saf4、e operation of lifting. 6. in the event of relevant meetings, breaks, night work and other special reasons, that corresponds to the job ticket must be issued after approval, the personnel and, other officers will be to replace 7. two promissory notes, exchange equipment Management Department, head o5、f the stock exchange operation. 8. work permits management should establish the ticket file (inventory), the ticket is kept for 3 years. Temporary power supply operation management system, to ensure that the companys safety, strengthen management of temporary electrical safety, avoid personal electr6、ical shock, fire, explosion and electrical hazards, safe, regulate electricity system is formulated. II, scope of application apply to temporary power of company-wide operations and foreign construction electric work. Third, the contents and requirements (a) temporary electrical safety requirements 7、1. Temporary electrical work must apply for temporary power operating license, no temporary power operating license are not allowed to work. 2. distribution boxes, metal boxes, metal switch box installation and electrical normal uncharged metal base, shell must do to protect, such as zero, zero and 8、the zero line should use a separate Terminal Board connections. 3. temporary electricity switchboard, distribution boxes with numbers and measures rain, lighting, must be able to secure close switchboard door, at all levels of distribution boxes shall not be stacked within a 2 m radius of debris and9、 rain protection measures. 4. each electrical device must have a machine, a gate, a leak and a box System. Switch box and the horizontal distance control of fixed electrical equipment should not be more than 3 meters, the protector should match the capacity under the control of the device. 5. when a10、 temporary electric lines overhead, cannot use bare wires, aerial height shall not be less than 2.5 m in the device, outside of not less than 3.5 metres, crossing roads shall not be less than 5 m; reliable protection measures are required when crossing a road, is strictly prohibited in the trees or 11、on scaffolding erected temporary power lines. 6. underground lines must be installed to the flag and safety signs. Cables shall be not less than 0.7 meters deep, through roads likely to be lots of mechanical injuries should take protective sleeve, cover plate, and so on. 7. portable lighting, places12、 such as basements, metal containers, wet, when you must use a safe voltage up to 36V. Transformer 36V prohibited the use of . 3. the temporary electrical permit 30KW or more issued by the engineering equipment management, 30KW electric Management Department opened in four copies, a Security Ministr13、y archives, one for electric charge, a copy to the electricity sector, an electrician.We will continue to improve the companys internal control system, and steady improvement in ability to manage and control, optimize business processes, to ensure smooth processes, responsibilities in place; to furt14、her strengthen internal controls, play a control post independent oversight role of evaluation complying with third-party responsibility; to actively make use of internal audit tools detect potential management, streamline, standardize related transactions, strengthening operations in accordance wit15、h law. Deepening the information management to ensure full communication zero resistance. To constantly perfect ERP, and BFS+, and PI, and MIS, and SCM, information system based construction, full integration information system, achieved information resources shared; to expand Portal system applicat16、ion of breadth and depth, play information system on enterprise of Assistant role; to perfect daily run maintenance operation of records, promote problem reasons analysis and system handover; to strengthening BFS+, and ERP, and SCM, technology application of training, improve employees application i17、nformation system of capacity and level. Humanistic care to ensure zero. To strengthening Humanities care, continues to foster company wind clear, and gas are, and heart Shun of culture atmosphere; strengthening love helped trapped, care difficult employees; carried out style activities, rich employ18、ees life; strengthening health and labour protection, organization career health medical, control career against; continues to implementation psychological warning prevention system, training employees health of character, and stable of mood and enterprising of attitude, created friendly fraternity 19、of Humanities environment. To strengthen risk management, ensure that the business of zero risk. To strengthened business plans management, will business business plans cover to all level, ensure the business can control in control; to close concern financial, and coal electric linkage, and energy-s20、aving scheduling, national policy trends, strengthening track, active should; to implementation State-owned assets method, further specification business financial management; to perfect risk tube control system, achieved risk recognition, and measure, and assessment, and report, and control feedbac21、k of closed ring management, improve risk prevention capacity. To further standardize trading, and strive to achieve according to law, standardize and fair. Innovation of performance management, to ensure that potential employees zero fly. To strengthen performance management, process control, enhan22、ce employee evaluation and levels of effective communication to improve performance management. To further quantify and refine employee standards . Work, full play party, and branch, and members in five type Enterprise construction in the of core role, and fighting fortress role and pioneer model ro23、le; to continues to strengthening four good leadership construction, full play levels cadres in enterprise development in the 防水工程施 工 方 案 北京市安达亿防水工程有限责任公司2014年11月28日 目 录各部位防水工程施工方案1一、工程概况1二、编制依据1三、编制目的1四、施工组织及目标1五、施工准备1六、施工流程2七、基本部位及节点防水施工处理方案9八、成品保护措施11九、安全保证及文明施工措施12十、质量保证措施12十一、工程维护及回访134. the pe24、rsons listed in the temporary electrical permit to work should be consistent with field personnel, when personnel changes should go through the signing procedures and related matters of the transition. 5. in the temporary electrical permit to work is not completed within the stipulated time of elect25、ricity operations, ground-breaking of the applicant to apply for temporary power operating license. 6. in the event of relevant meetings, breaks, night work and other special reasons, job ticket must be issued after approval, the request corresponds to staff and other officers will be in place. 7. w26、ork permits management should establish the ticket file (inventory), the ticket is kept for 3 years. High operation management system in the course of work, aimed at reducing high falls, objects to combat such incidents occur, ensure employee safety, regulations are formulated. II, scope of applicat27、ion apply to the company activities and project work scope of construction, but also into our external contractors and personnel. Three, responsibilities, company management is working at height safety management departments. D, contents, and request 1, referred to in this system fall at height refe28、rs to the height of 2 m above the base level (2 m) fall possible jobs. Working at height is divided into four levels: working at height at an altitude of 2-5 meters, called the high level operations; Height working height of more than 5 meters to 15 meters, as second class at height; Height working 29、height of more than 15 metres to 30 metres, known as the three levels of working at height; Working at height safety management regulations height working height is more than 30 meters, called super high job; Due to work reasons, the company only relates to one, working at height, there is no grade,30、 super high assignment. Once the work above there are three levels of the construction project, in accordance with the provisions of the relevant procedures. 2, where there is one, working at height, of the communication construction safety rules must be strictly adhered to. 3, and all personnel inv31、olved in the construction of working at height must be trained and the climbing permits, without training and aerial work permit-free personnel for aerial work is strictly prohibited. 4, and all had high blood pressure, heart disease, anemia, epilepsy is not suitable for working at height and other 32、personnel shall not engage in working at height. 5, high operating personnel must fasten your seat belt, helmet, clothing to flexible, banned the wearing of hard bottom and nails easy slip-on shoes for working at height. 6, seat belts must be hung on the fixed objects, hanging low, must be higher th33、an the waist, prohibited the use of any substitute in place of seat belts. 7, in adjacent areas, with release of toxic, harmful gases and dust outside the allowed concentrations of chimney and equipment is prohibited for working at height. In the allowed range, should also take effective protective 34、measures. In the more than six-level wind and lightning, heavy rain, fog and other adverse weather conditions affect safety during construction,of backbone backbone role; to full strengthening members youth work, full play youth employees in company development in the of force role; to improve indep35、endent Commission against corruption work level, strengthening on enterprise business key link of effectiveness monitored. , And maintain stability. To further strengthen publicity and education, improve the overall legal system. We must strengthen safety management, establish and improve the educat36、ion, supervision, and evaluation as one of the traffic safety management mechanism. To conscientiously sum up the Olympic security controls, promoting integrated management to a higher level, higher standards, a higher level of development. Employees, today is lunar calendar on December 24, the ox B37、ell is about to ring, at this time of year, we clearly feel the pulse of the XX power generation company to flourish, to more clearly hear XX power generation companies mature and symmetry breathing. Recalling past one another across a railing, we are enthusiastic and full of confidence. Future deve38、lopment opportunities, we more exciting fight more spirited. Employees, let us together across 2013 full of challenges and opportunities, to create a green, low-cost operation, full of humane care of a world-class power generation company and work hard! The occasion of the Spring Festival, my sincer39、e wish that you and the families of the staff in the new year, good health, happy, happy各部位防水工程施工方案一、工程概况工程名称:XX工程防水施工范围如下:屋面、地下室侧墙、底板、顶板;卫生间、阳台等有要求的顶棚、卫生间内墙面、空中花园楼面、阳台入户花园局部楼面、外墙二、编制依据屋面工程质量验收规范(GB50207-2012)屋面工程技术规范(GB50345-2012)地下防水工程质量验收规范(GB50208-2011)建筑工程施工质量验收统一标准(GB/T50300-2013)三、编制目的编制施工组织设40、计是为了对本防水工程施工的全过程中每一个影响进度、质量、安全的因素和施工步骤进行有效控制,保证合同约定工程质量,满足设计图纸、国家有关标准、规程、规范等对防水工程的要求。四、施工组织及目标1、劳动力准备劳动力组织方面,根据总进度计划的安排,在保证质量和工期的情况下,组成多个作业班,由项目经理根据各阶段生产任务安排,提高劳动力计划,确保工程进度。2、工程质量目标工程质量达到国家规定的合格标准工程质量达到合同规定的标准3、安全目标轻伤事故频率年度控制在1.5,重伤事故频率年度控制在0.5,重大伤亡事故频率控制为零。4、工期目标我公司将根据总包单位总施工进度计划的要求,集中人力、财力、物力,确保工期41、,按照计划要求,按期完成防水施工任务。五、施工准备1、施工部位及材料准备序号产品名称使用部位产品类型技术要求1防水材料屋面防水砂浆20厚1:2水泥砂浆惨入水泥重量3%的硅质密实剂细石砼防水40厚C15细石砼刚性防水层,内掺UEA砼微膨胀剂防水卷材2厚PET防水卷材湿铺法防水涂料1.5厚聚合物水泥基防水涂料(兼作粘接层)卫生间、阳台等有防水要求的顶棚防水涂料外墙防水涂料卫生间内墙面防水涂料1.5/2厚聚合物水泥基防水涂料空中花园楼面、阳台入户花园局部楼面防水涂料1.5厚聚合物水泥基防水涂料(内掺渗透结晶)防水楼面(卫生间、厨房局部)防水涂料1.5厚JS聚合物柔性防水涂膜 2.0厚聚合物防水涂料(42、内掺渗透结晶)车道坡道地面防水涂膜水泥基渗透结晶型防水涂膜地下室顶板细石砼防水40厚C20细石砼刚性防水层,内掺UEA砼微膨胀剂防水卷材3.0厚BAC防水卷材湿铺法地下室侧板防水卷材2.0厚PET防水卷材湿铺法地下室底板防水卷材3.0厚BAC防水卷材湿铺法外墙防水涂料1.5厚聚合物水泥基复合防水涂料2、施工机具:橡胶刮板、油漆涮、铲刀、抹子、喷灯、墨线盒、小平铲、扫帚、滚刷、角桶、剪刀、卷尺。六、施工流程1、屋面防水施工:(1)基层要求A、基层已符合以下条件,并办理验收、工作面移交手续: B、清除基层表面杂物、油污、砂子,凸出表面的石子、砂浆疙瘩等应清理干净,清扫工作必须在施工中随时进行,并修43、补平整表面。 C、阴阳角采用水泥砂浆抹成圆弧角,阴角最小半径50mm,阳角最小半径20mm。 D、对基层含水率无要求,基面若有明水,扫除即可施工。 E、各种预埋件已安装并固定完毕。2)工艺流程 基层清理、湿润定位、弹线涂刷聚合物水泥基防水涂料节点加强处理大面铺贴PET防水卷材提浆、排气长、短边搭接粘结组织验收3)施工方法A.基层清理、湿润:用扫帚、铁铲等工具将基层表面的灰尘、杂物清理干净,干燥的基面需预先洒水润湿,但不得残留积水。B 抹水泥(砂)浆:其厚度视基层平整情况而定,铺抹时应注意压实、抹平。在阴角处,应抹成半径为50mm以上的圆角。铺抹水泥(砂)浆的宽度比卷材的长、短边宜各宽出100344、00mm,并在铺抹过程中注意保证平整度。C节点加强处理:在节点部位(如:阴阳角、施工缝、后浇带、变形缝、穿墙管道)先做加强层。D 大面铺贴PET防水卷材:揭除自粘防水卷材下表面隔离膜,将卷材铺贴在已涂刷聚合物水泥基防水涂料的基层上。第一幅卷材铺贴完毕后,再涂刷聚合物水泥基防水涂料,铺设第二幅卷材,以此类推。(边涂刷聚合物水泥基防水涂料、边铺贴PET防水卷材)E提浆、排气:用木抹子或橡胶板拍打卷材表面,提浆,排出卷材下表面的空气,使卷材与聚合物水泥基防水涂料紧密贴合。F 长、短边搭接粘结:根据现场情况,可选择铺贴卷材时进行搭接或在水泥浆具有足够强度时再进行搭接。搭接时,将位于下层的卷材搭接部位的45、透明隔离膜揭起,将上层卷材平服粘贴在下层卷材上,卷材搭接宽度不小于60mm。G 卷材铺贴完毕后,将卷材收头、管道包裹等部位可用密封膏密封。2、地下室(顶板、侧板、底板)施工:(1)、地下室防水工艺流程混凝土垫层(含无条基部分) 1:3水泥砂浆找平层 转角处附加层 铺平面卷材 铺立面卷 检查验收合格 保护层。(2)、卷材粘贴采用空铺法或湿铺法施工。A、混凝土垫层本工程采用的是条形基础,局部位置无基础,为防水需要,在无基础部分同样按有基础部分施工同样强度的混凝土垫层。B、找平层找平层采用1:3水泥砂浆。找平层必须平整,无梭角或突出尖锐部分,有转角部位作成圆弧。C、铺卷材(湿铺法)基层检验、清理涂刷46、基层处理剂或水泥砂浆粘接剂试铺、定位、弹基准线抹水泥砂浆铺贴BAC防水卷材辊压、排气搭接缝密封材料封边收头固定、密封(保护层施工)清理、检查、验收。a、基层处理: 施工前要认真清扫基层余渣、尘土及杂物,同时基层要求洁净、平整,干燥,含水率在9%以内,干燥排水坡度应符合设计要求。b、 阴阳角处理:基层阴阳角处应做成R=5cm的倒角,且整齐平顺。c、涂刷水泥砂浆:在干燥的基层上涂刷水泥砂浆,要求均匀一致,一次涂好。d、卷材铺贴: 先把防水卷材按位置摆正,剥开卷材脊面的隔离纸,将卷材粘贴与基层表面,卷材长边和短边塔接宽度均应保持100mm,上下层及相邻两幅卷材铺贴的塔接缝应错开,卷材要求保持自然状态47、,不要拉的过紧,卷材铺贴后,立即用压辊全面压实,垂直部位用橡胶榔头敲实。e、 随后用压辊滚压,使卷材与基层或与卷材粘贴牢固,滚压时不要卷入空气和异物,要求压实压平,不得有空鼓、皱折。f、端头和收头密封:可用密封膏或橡胶沥青胶粘剂与填料现场配置,嵌填后抹平,必须保证嵌填密实、连续、饱满、粘贴牢固,无气泡、开裂、脱落,缝边应顺直,表面应平滑,无凹凸不平的现象。(3)、保护层卷材部分验收合格后,施工20mm厚1:2.5水泥砂浆保护层。表面应抹平压光,分格缝间距1.5m。3、卷材防水的施工及质量预控铺贴卷材时要处理好细部节点、泛水收头的包裹和封口处理。应根据细部节点的实际形状放样,将同一类型的细部节点48、防水卷材割成统一的外形尺寸。做到细部附加层不外露,搭接缝位置顺当合理。a、水落处封口处理:先贴节点附加层,将长度与出水口长度相同的卷材伸入口内满贴,入口周边留置80mm宽的卷材封口,再用屋面卷材层覆盖水落口,使卷材接缝位置设在洞口棱角上使封口严密不翘边。b、楼梯间的根部:先铺节点附加层,附加层铺在屋面上的宽度100mm,贴在墙根立面上的高度200mm,再用屋面卷材层覆盖,收头高度250mm,收头裁割平直,并用压条钉压,钉距均匀800mm。4、细部施工处理措施:附加层卷材宽度一般为250 mm,可依据具体情况适当增加。附加层卷材铺贴时,不要拉紧,要自然松铺无皱折即可。阴阳角处附加一道卷材,详见附49、图。阴阳角处的基层涂胶后要用密封膏涂封距角每边100mm,再铺一层卷材附加层,附加层卷材要剪成如下图形状。铺贴后剪缝处用密封膏封固。5、卫生间墙面、空中花园楼面、阳台入户花园局部楼面、防水楼面、外墙施工工艺(聚合物水泥基防水涂料)(一)施工工艺流程:(二)施工工具:清理基面工具:开刀、凿子、锤子、钢丝刷、扫帚、抹布;取料配料工具:台秤、水桶、称料桶、拌料桶、搅拌器、剪、刀;涂覆工具:滚子(用于涂覆较稀的料和大面积平面施工)刷子(用于涂覆较稠的料及小面积局部施工)(三)基面要求: 基面要求必须平整、牢固、干净、无明水、无渗漏、凹凸不平及裂缝处须先找平,阴阳角、女儿墙、下水管及卫生间内排水设施等重50、要防水部分应作特殊专项处理。(四)材料配比:按重量配合比为:液料:粉料=1:1.5,先将液料用搅拌器搅拌,边搅拌边徐徐加入粉料,充分搅拌均匀直至不含直至不含团料。搅拌均后须在1小时内用完,以防沉淀结皮,而影响施工效果。(五)施工方法:用滚子或刷子涂覆,按照设计要求该工程防水层为1.5mm厚,按JS防水涂料施工要求1.5mm厚由至少两遍涂膜组成。由底层(第一层)上层(第二层或第三层)的次序逐层完成。各层之间的时间间隔以前一层涂膜干固不粘为准(不上人施工约需3小时,上人施工约需5小时)。现场温度低,湿度大,通风差,干固时间长些,反之短些。涂覆时应注意以下事项:a:施工前一定要清理干净基面,使找平层51、面层无松散杂物和积水。若涂料(尤其是打底料)有沉淀随时搅拌均匀,每次蘸料时,先在桶底部搅动几下,以免沉淀;b:涂覆要尽量均匀,不能有局部沉积;并要求多滚刷几次使涂料与基层之间不留气泡,粘结严实;c:阴阳角位置做无纺布加强层铺贴时一定要粘贴平整,不得有起泡或打皱现象。d:每层涂覆必须按规定用量取料,切不能过厚或过薄,若最后防水层厚度不够,可加涂一层或数层。e:建筑物阴角位置施工找平层时应做成圆弧,以便无纺布铺贴平整。(六)、聚合物水泥防水施工大样图如下(墙面):注:空中花园楼面、阳台入户花园局部楼面所用材料为聚合物水泥基渗透结晶型防水涂料(内掺渗透结晶),施工方法同上。6、车道坡道地面(水泥基渗52、透结晶型防水涂料)(1)、基面要求:基面要求必须平整、牢固、干净、无明水、无渗漏、凹凸不平及裂缝处须先找平,渗漏处须先进行堵漏处理,阴阳角、下水管排水设施等重要防水部分应作特殊专项处理。(2)、施工工具:清理基面工具:开刀、凿子、锤子、钢丝刷、扫帚、拖把;取料配料工具:水桶、拌料桶、搅拌器、剪、刀;涂覆工具:滚子(用于涂覆较稀的料和大面积平面施工)刷子(用于涂覆较稠的料及小面积局部施工)(3)、材料调配:先在拌料桶中加入1/3桶水,边搅拌边徐徐加入粉料,充分搅拌均匀直至不含团料。搅拌均匀后须在1小时内用完,以防沉淀结皮,而影响施工效果。(4)、施工方法:a、用滚子或刷子涂覆,一般作为迎水面及背53、水面防水涂刷两遍,由底层(第一层)上层的次序逐层完成。b、各层之间的时间间隔以前一层涂膜干固不粘为准(不上人施工约需3小时,上人施工约需5小时)。c、现场温度低,湿度大,通风差,干固时间长些,反之短些。d、该工程设计迎水面防水层厚度为1mm,背水面防水层厚度为0.8mm。依现施工方法,涂刷两遍可以达到设计要求。如若厚度不够,可以加涂一层或数层。(5)、涂覆时应注意以下事项:a、施工前一定要清理干净基面,无松散杂物和积水,若基面过于干燥洒少许水湿润。b、底层涂料比面层涂料搅料要略稀,面层涂料略稠些。c、涂料(尤其是打底料)有沉淀随时搅拌均匀,每次蘸料时,先在桶底部搅动几下,以免沉淀。d、涂覆要尽54、量均匀,不能有局部沉积;并要求多滚刷几次使涂料与基层之间不留气泡,粘结严实。e、每层涂覆必须按规定用量取料(每次拌料不超过一包粉料用量),切忌一次搅料过多,已凝固的浆料不可加水搅拌后再用。施工完f、6小时后视情况应加强养护(养护三天),每天用喷雾器洒水养护两七、基本部位及节点防水施工处理方案1、基本部位(1) 裂缝处理(若有)首先对基层严格检查,查找出宽度大于0.4mm裂缝,作出明显标志。将裂缝凿成“V”型槽,孔距300mm500mm埋设注浆咀进行压力注浆注入改性环氧树脂浆液,再用聚合物砂浆进行抹平“V”型槽,见下图。(2) 阴阳角处理阴阳角处用聚合物砂浆做成50园角,增设300300防水附加55、层一道。2、节点部位(1) 预埋套管穿墙面防水处理穿过防水层的管道预理套管,套管中间焊接止水钢板,管道安装完成后,用石棉水泥填实,两端用胶泥密封材料密封,迎水面设附加防水层一道。 (2) 变形缝大样(3) 管道穿楼板防水处理穿过防水层的管道四周找平层应按规范要求施工,与基层交接处预留凹槽,填密封油膏,再将管道四周除锈、打光、然后在管口四周300mm范围内及管面100mm高范围内做聚氨脂防水附加层一道。八、成品保护措施成品保护是防水工程成败的关键,为确保防水工程达到理想的效果,对于成品保护必须特别注意:1、在防水层施工中或防水层已完成而保护层未完成时,是成品保护的最关键时期。在此其间,严禁任何无56、关人员进入现场,严禁穿带铁钉、铁掌的鞋进入现场,以免扎伤防水层。必须的人员、物料进入,必须遵守轻拿轻放的原则,严禁尖锐物体撞击扎伤防水层。2、在保护层完成之前,其它工序的工人未经允许,严禁进入防水施工现场。3、防水层施工完毕后,严禁在防水层上随意开洞或钻孔安装机器设备。如不得已必须在防水层上开洞、钻孔的,必须先征得防水公司同意,并安排妥善的修补工作。4、落水口处应经常清理,以免堵塞,造成排水不畅,以减少防水层的压力。5、在使用过程中,如发现防水层遭到破损,应尽快通知有关方面及时安排维修。6、穿过墙体的管根,施工中不得碰撞变位。7、防水层施工完成后,应及时做好保护层、保护墙。九、安全保证及文明施57、工措施1、“安全生产,预防为主”是施工现场的基本方针。严格执行国家有关安全生产的规定,按照“建设工程施工现场管理规定”实施细则执行。2、认真贯彻安全生产防火制度。防水材料是易燃品,要设防火标志,施工现场要建立用火申请制度。3、不得在雨天或三级以上大风条件下进行外墙防水施工。4、所有操作人员要穿统一服装,服装要有明显的标志。5、全体现场施工人员必须衣着整齐,不得赤膊、穿背心、穿拖鞋开工,不得抽烟、讲粗话、随地吐痰、随地大小便等。十、质量保证措施1、严格按照操作规程、技术方案施工,对施工过程中出现的技术问题及时处理,严格把好质量关。2、所有进场的防水材料,必须有检验合格证、产品检验证。3、大面积施58、工应先做样板,待建设单位认可后才能大面积施工。4、设专人负责技术工作,确保涂刮环节或喷洒环节操作质量,发现问题及时处理。5、施工完的防水层,表面不得脱落、开裂、起鼓等现象。6、节点密封严密,做法符合施工组织设计要求。7、防水工程验收,其中“保证项目,检查项目,实测项目”必须严格按照技术规程要求进行验收。8、防水工程完毕后,应将防水资料整理成册,装档移交建设单位存档。十一、工程维护及回访本公司承诺,讲信誉,信守合同,工程质量实行五年保证期制度。在保证期内每年雨季对工程进行回访。如有问题,及时处理,同时也要求建设单位建立制度,专人管理,合理使用,防止人为的造成破损和渗漏,减少不应有的经济损失。第 13 页