个人中心
个人中心
添加客服WX
客服
添加客服WX
添加客服WX
关注微信公众号
公众号
关注微信公众号
关注微信公众号
升级会员
升级会员
返回顶部
青岛小麦岛区域旅游度假项目设计及规划方案(36页)
青岛小麦岛区域旅游度假项目设计及规划方案(36页).pdf
下载文档 下载文档
旅游规划
上传人:十二 编号:901474 2024-03-19 36页 10.96MB
1、Nkey plan1?XIAOMAIDAO AREAQINGDAO,CHINA?X I A O M A I D A O A R E AQINGDAO,CHINA?Nkey plan1.table of contents2.aerial view3.design&planning narrative4.design&planning narrative(continued)5.design&planning narrative(continued)6.development summary(english)7.development summary(mandarin)8.aerial photo2、graphs9.xiaomaidao site photographs10.illustrative site plan11.district site plan12.district site plan13.reclamation diagrams14.circulation&use diagrams15.enlarged site plan-landside16.enlarged site plan-convention zone&cultural district17.enlarged site plan-marina village18.enlarged site plan-creek3、side¢ral park19.enlarged site plan-qingdao heights&beach residences20.enlarged site plan-beach residences21.enlarged site plan-xiaomai point22.view from cbd23.view of retail marina24.view of retail plaza25.view from creek of signature tower&business hotel26.view of business hotel from central pa4、rk27.view from convention center of signature tower28.view of signature tower29.enlarged views of convention center30.enlarged views of performing arts center31.enlarged views of multi-purpose facility&hotel32.enlarged views of retail,plaza&marina33.enlarged views of signature hotel tower34.enlarged5、 views of hotels&spa35.preliminary masterplan studies1.?2.?3.?4.?(?)5.?(?)6.?(?)7.?(?)8.?9.?10.?11.?12.?13.?14.?15.?16.?17.?18.?19.?20.?21.?22.?23.?24.?25.?26.?27.?28.?29.?30.?31.?32.?33.?34.?SPA?35.?1?XIAOMAIDAO AREAQINGDAO,CHINA?table of contents?Nkey plankey plan2?XIAOMAIDAO AREAQINGDAO,CHINA?aer6、ial view?Nkey planThe development of Xiaomaidao Area in Qingdao envisions a vibrant and world class destination of pub-lic and private uses in this dynamic city on Chinas east coast.The proposed development concept has evolved after an exhaustive study of existing conditions of this scenic land mass7、 and its surrounding context.In addition,an evaluation of a strategic business plan was explored,taking into consideration the mandate to create a premiere and iconic project for the city.Site GeographyThe 15 hectare island is currently inhabited by small institutional and research facilities and af8、fords a substantial coastal perimeter of rocky outcroppings with strategic views of the citys central busi-ness district,as well as its beaches and surrounding mountains.In addition there are uninterrupted ocean views in three directions.The central part of the site rises to a plateau(approximately 9、10m)and the geography includes relatively sparse vegetation and landscaping.A Weather station and a National Laboratory monitoring sea level datum are located on the island and need to be either preserved or relocated.Development ConceptAfter an initial review of market conditions and the citys Deve10、lopment Plans,it was decided to gener-ate a preliminary brief of potential uses on the site.The brief aimed to create a critical mass of func-tions that would constitute a unique destination and serve as a profitable venture for the citys rev-enue stream.Included within this brief was a multi functi11、on International Conference and Convention Center,a 2,000 seat Performing Arts Center,a 400 key business/resort hotel with associated multi-purpose Entertainment facilities,a major Spa and Fitness Center and a Festival Retail and Entertain-ment component that would define opportunities for shopping,12、dining and recreation superior to any-thing currently in the city.From the beginning,it was deemed necessary to expand the limited confines of the site to create a greater critical mass of development opportunities.This was manifested,in the form of additional land reclamation creating a 15 hectare 13、new“Crescent”.This new land will be located approximately 150m away from the southern coast of the site,creating a new breakwater,facilitating a calm water Creek be-tween the two land masses.The new crescent could be devoted to more upscale,and exclusive residen-tial and hotel facilities overlooking14、 the existing site.4003?XIAOMAIDAO AREAQINGDAO,CHINA?design&planning narrative?Nkey planThe MixThe Masterplan for Xiaomaidao Area and The Crescent envisages the following components:Xiaomaidao A 40,000 sm International Convention and Conference Center.This is planned to be a two level facility will 15、include a variety of Ballrooms and Banqueting facilities(ranging from 2,500sm to 5,000sm),galleries and small exhibit areas,several meeting and function rooms with food service facilities and large pre-function areas opening up to the Boardwalk.A 20,000 sm 1,500 seat Performance Hall and a 500 seat 16、Auditorium with state of the art facilities.A 2,000 seat outdoor Amphitheater and Concert Venue with sloped lawn,tiered stadium seating,and large LED digital screens.A 25,000 sm 400 key Business Hotel in a terraced configuration with attached Spa and Fitness Center.A 10,000 sm Multi-purpose Entertai17、nment facility with adaptability for conversion to accomo-date a multitude of facilities.A 50,000 sm multi-level Retail and Entertainment Center including boutique shops,fashion stores,a 12 screen Cineplex,a 3D IMAX theater,several food and beverage facilities(ranging from 1,000 sm to 2,500sm),an Ic18、e Skating rink and a large outdoor reflecting pool with synchronized musical fountain shows and venues for festival celebrations.Support services/mechanical/5,000 sm Marina,Boardwalk and Central ParkTotal Development:150,000 smThe Crescent A 175m tall iconic 400 key Luxury Hotel(36,000 sm)Boutique H19、otels and upscale Serviced Apartments with facilities for Retreats,private functions,spas and wellness centers(500 units/75,000 sm)Upscale Restaurants and F and B facilities Total Crescent Development:110,000 smLandside Three upscale Residential Towers ranging in height from 80m to 120m accommodatin20、g 500+units(60,000 sm)6 level 3,000 space Parking Deck and Transit Center(90,000 sm)Total Landside:150,000 smTotal Comprehensive Development:410,000 sm4004?XIAOMAIDAO AREAQINGDAO,CHINA?design&planning narrative?Nkey planDevelopment Strategy and ConceptThe comprehensive development of Xiaomaidao area21、 and The Crescent is based on the strategy of cre-ating a unique destination with a critical mass of complementary uses and mix.The planning and lo-cation of the various components is based on their strategic adjacencies and aspects.The Confer-ence Center,Performing Arts Center and the outdoor Amphi22、theater are located on the West side of the site guaranteeing strategic visibility from the approach drive and the city center.The Retail,Hotels,Entertainment facilities and the Marina are located on the East and South sides facing the citys beaches,the Creek and The Crescent.An expansive contiguous23、 waterfront public promenade and Boardwalk connects all the uses from the tip of the Retail Center to the culmination at the Confer-ence Center.The nucleus of the project is the Central Park,the crest at the nucleus of the site,embellished by trails,“stramps”,lush landscaping and the grand Spanish S24、teps descending toward the Conference and Performing Arts Center.The Crescent is designed to be a more exclusive and private component of the development accommo-dating up to 500 luxury residential units in four cascading slab like buildings appointed by expansive undulating balconies.Associated fac25、ilities accommodating spas,wellness centers and upscale corpo-rate retreats are integrated with the Residential buildings.The“piece de resistance”of the project is a sculptural 175m high 400 key five star Hotel tower designed to exhibit an eye catching twisting and rotating profile on the Qingdao sk26、yline,with the potential of being the citys icon and brand.The tow-er is envisioned to suggest several metaphors ranging from a“celestial stairway”,a vertical nautilus or a sea creature.Accessibility and Traffic MitigationA project of this magnitude needs to be carefully orchestrated in terms of acc27、essibility and egress.The“big picture”concept for this development is to restrict or minimize the inflow of private automo-biles to the island by providing a 3,000 space,six level parking deck on the“landside”of the project and incorporate a shuttle people mover or monorail system of transportation 28、within the main island.Strategic stops at all the key buildings will provide public accessibility without the influx of traffic and related parking.A four lane access road will provide access to buses,public transportation,li-mos and taxis as well as service and emergency vehicles without the encumb29、rance of private automo-biles.Access to the Crescent will be primarily by limousines and taxis,given the exclusive nature of the development.Architectural CharacterThe architectural and design vocabulary of this development can exude an eclectic language and function as a“kit of parts”that are inher30、ently in harmony with the sites context.The majority of the buildings could be low-rise and ensconced within the geographic setting with an average height of 25m.The Convention Center and the Performing arts Center could express a strong contemporary flavor,while the retail and entertainment facilit31、ies could display a maritime vocabulary interspersed with a Mediterranean hill town analogy.The iconic hotel tower,on the other hand could define a strong visual statement representative of the citys status and recognition.The designs of the various facilities could integrate environmentally friendl32、y components like green roofs and recyclable materi-als to ensure a sustainable development,in keeping with the countrys push toward Green strategies.ConclusionThe proposed development concept for Xiaomaidao and the Crescent purports to provide an exuberant and dynamic mix of retail,hospitality and 33、cultural facilities on a scale unprecedented within the cur-rent context of the city of Qingdao.The development affords the opportunities of integrating revenue generating and public uses within this unique site,to the ultimate benefit of citizens and tourists alike while simultaneously providing th34、e city with an invigorating and iconic architectural statement.5?XIAOMAIDAO AREAQINGDAO,CHINA?design&planning narrative?Nkey plan6?XIAOMAIDAO AREAQINGDAO,CHINA?development summary?Nkey plan7?XIAOMAIDAO AREAQINGDAO,CHINA?development summary?Nkey planaerial site photograph?qingdao-center city?mountain35、s?xiaomaidao area?aerial site photograph?8?XIAOMAIDAO AREAQINGDAO,CHINA?aerial photographs?Nkey planaerial site photograph?abcedcdeab9?XIAOMAIDAO AREAQINGDAO,CHINA?xiaomaidao site photographs?Nkey plan10?XIAOMAIDAO AREAQINGDAO,CHINA?illustrative site plan?050 100200Nkey planlandsideconvention zonecu36、ltural districtmarina villagecentral parkcreeksidebeach residences ICONIC HOTELxiaomai pointa world class,state of the art facility for conventions,conferences,&functionsfacilities for showcasing qingdaos cultural heritage,from music and opera to dance and dramaa gateway to the development,setting t37、he stage with three upscale residential towers,parking,&transit cenera multi-tiered retail&entertainment experience with a variety of the best boutiques&fashion stores along with a cineplex&diningat the end of the crescent experience the best&most exclusive resaurants featuring world-class cuisineen38、joy views of the creek from the business hotel&muli-purpose facilitythe very best of luxurious beach living is available to hotel guests and residentsworld class,iconic,ultra-luxury hotelwith a calming get-away for spa indulgence&health as well as areas for corporate retreata lush,pastoral setting o39、f natural beauty traversed by paths or to be enjoyed as a place of respite11?XIAOMAIDAO AREAQINGDAO,CHINA?district site plan?Nkey plan?beach residences?district site plan?district site plan?12?XIAOMAIDAO AREAQINGDAO,CHINA?Nkey plan?existing geographyphase one reclamationphase two/complete reclamatio40、nnew breakwater?new marinaconfiguration?new crescent configurationnew landside?reclamation diagrams?reclamation diagrams?13?XIAOMAIDAO AREAQINGDAO,CHINA?Nkey planvehicular circulation?monorail circulation?drop-off zones?service zones?pedestrian circulation?green space?14?XIAOMAIDAO AREAQINGDAO,CHINA41、?circulation&use diagrams?n.t.s.Nkey planexisting marina145236LegendL Landsideandside1.Realigned Access Road 2.3,000 space 6 level Parking structure and Transit Center 3.Restaurants 4.500 unit Residential Towers 5.4 Lane Entry Drive and Bridge 6.One Way Monorail Loop Xiaomaidao Xiaomaidao 7.Internat42、ional Convention and Conference Center 8.2,000 Seat Performing Arts Center 9.2,000 seat Outdoor Amphitheater 10.Central Park and Spanish Steps 11.Monorail Stops 12.Covered Pedestrian Connectors 13.Multi Purpose Entertainment Center and Spa 14.400 key Business/Resort Terraced Hotel 15.Boardwalk and P43、edestrian Promenades 16.Festival Plaza/Entertainment Lagoon Performances 17.Skating Rink and Indoor Entertainment 18.4 Level Retail,Entertainment and Dining Center 19.12 Screen Cineplex 20.3D IMAX Theater 21.Feature Restaurant 22.Lighthouse23.Marina24.The Creek T The Crescent he Crescent 25.175m 40044、 key Luxury Hotel Tower 26.Hotel Drop Off and Porte-cochere 27.XX Luxury Residences/Cabanas 28.Spa/Wellness Centers/Retreat Facilities 29.Theme Restaurant 30.Private Beaches 31.Pivoted Pedestrian Bridge 32.Suspended Bridge and Limited Entry Private Drive 33.Loop Road 34.Pedestrian Walk 35.Breakwater45、15?XIAOMAIDAO AREAQINGDAO,CHINA?enlarged site planlandside?Nkey plan 7 9 810101511111112LegendL Landsideandside1.Realigned Access Road 2.3,000 space 6 level Parking structure and Transit Center 3.Restaurants 4.500 unit Residential Towers 5.4 Lane Entry Drive and Bridge 6.One Way Monorail Loop Xiaoma46、idao Xiaomaidao 7.International Convention and Conference Center 8.2,000 Seat Performing Arts Center 9.2,000 seat Outdoor Amphitheater 10.Central Park and Spanish Steps 11.Monorail Stops 12.Covered Pedestrian Connectors 13.Multi Purpose Entertainment Center and Spa 14.400 key Business/Resort Terrace47、d Hotel 15.Boardwalk and Pedestrian Promenades 16.Festival Plaza/Entertainment Lagoon Performances 17.Skating Rink and Indoor Entertainment 18.4 Level Retail,Entertainment and Dining Center 19.12 Screen Cineplex 20.3D IMAX Theater 21.Feature Restaurant 22.Lighthouse23.Marina24.The Creek T The Cresce48、nt he Crescent 25.175m 400 key Luxury Hotel Tower 26.Hotel Drop Off and Porte-cochere 27.XX Luxury Residences/Cabanas 28.Spa/Wellness Centers/Retreat Facilities 29.Theme Restaurant 30.Private Beaches 31.Pivoted Pedestrian Bridge 32.Suspended Bridge and Limited Entry Private Drive 33.Loop Road 34.Ped49、estrian Walk 35.Breakwater16?XIAOMAIDAO AREAQINGDAO,CHINA?enlarged site planconvention zone&cultural district?Nkey plan222015181716121211241923151121LegendL Landsideandside1.Realigned Access Road 2.3,000 space 6 level Parking structure and Transit Center 3.Restaurants 4.500 unit Residential Towers 550、.4 Lane Entry Drive and Bridge 6.One Way Monorail Loop Xiaomaidao Xiaomaidao 7.International Convention and Conference Center 8.2,000 Seat Performing Arts Center 9.2,000 seat Outdoor Amphitheater 10.Central Park and Spanish Steps 11.Monorail Stops 12.Covered Pedestrian Connectors 13.Multi Purpose En51、tertainment Center and Spa 14.400 key Business/Resort Terraced Hotel 15.Boardwalk and Pedestrian Promenades 16.Festival Plaza/Entertainment Lagoon Performances 17.Skating Rink and Indoor Entertainment 18.4 Level Retail,Entertainment and Dining Center 19.12 Screen Cineplex 20.3D IMAX Theater 21.Featu52、re Restaurant 22.Lighthouse23.Marina24.The Creek T The Crescent he Crescent 25.175m 400 key Luxury Hotel Tower 26.Hotel Drop Off and Porte-cochere 27.XX Luxury Residences/Cabanas 28.Spa/Wellness Centers/Retreat Facilities 29.Theme Restaurant 30.Private Beaches 31.Pivoted Pedestrian Bridge 32.Suspend53、ed Bridge and Limited Entry Private Drive 33.Loop Road 34.Pedestrian Walk 35.Breakwater17?XIAOMAIDAO AREAQINGDAO,CHINA?enlarged site planmarina village?Nkey plan 8101413241011111112 91515LegendL Landsideandside1.Realigned Access Road 2.3,000 space 6 level Parking structure and Transit Center 3.Resta54、urants 4.500 unit Residential Towers 5.4 Lane Entry Drive and Bridge 6.One Way Monorail Loop Xiaomaidao Xiaomaidao 7.International Convention and Conference Center 8.2,000 Seat Performing Arts Center 9.2,000 seat Outdoor Amphitheater 10.Central Park and Spanish Steps 11.Monorail Stops 12.Covered Ped55、estrian Connectors 13.Multi Purpose Entertainment Center and Spa 14.400 key Business/Resort Terraced Hotel 15.Boardwalk and Pedestrian Promenades 16.Festival Plaza/Entertainment Lagoon Performances 17.Skating Rink and Indoor Entertainment 18.4 Level Retail,Entertainment and Dining Center 19.12 Scree56、n Cineplex 20.3D IMAX Theater 21.Feature Restaurant 22.Lighthouse23.Marina24.The Creek T The Crescent he Crescent 25.175m 400 key Luxury Hotel Tower 26.Hotel Drop Off and Porte-cochere 27.XX Luxury Residences/Cabanas 28.Spa/Wellness Centers/Retreat Facilities 29.Theme Restaurant 30.Private Beaches 357、1.Pivoted Pedestrian Bridge 32.Suspended Bridge and Limited Entry Private Drive 33.Loop Road 34.Pedestrian Walk 35.Breakwater18?XIAOMAIDAO AREAQINGDAO,CHINA?enlarged site plancreekside¢ral park?Nkey plan25272726322426LegendL Landsideandside1.Realigned Access Road 2.3,000 space 6 level Parking st58、ructure and Transit Center 3.Restaurants 4.500 unit Residential Towers 5.4 Lane Entry Drive and Bridge 6.One Way Monorail Loop Xiaomaidao Xiaomaidao 7.International Convention and Conference Center 8.2,000 Seat Performing Arts Center 9.2,000 seat Outdoor Amphitheater 10.Central Park and Spanish Step59、s 11.Monorail Stops 12.Covered Pedestrian Connectors 13.Multi Purpose Entertainment Center and Spa 14.400 key Business/Resort Terraced Hotel 15.Boardwalk and Pedestrian Promenades 16.Festival Plaza/Entertainment Lagoon Performances 17.Skating Rink and Indoor Entertainment 18.4 Level Retail,Entertain60、ment and Dining Center 19.12 Screen Cineplex 20.3D IMAX Theater 21.Feature Restaurant 22.Lighthouse23.Marina24.The Creek T The Crescent he Crescent 25.175m 400 key Luxury Hotel Tower 26.Hotel Drop Off and Porte-cochere 27.XX Luxury Residences/Cabanas 28.Spa/Wellness Centers/Retreat Facilities 29.The61、me Restaurant 30.Private Beaches 31.Pivoted Pedestrian Bridge 32.Suspended Bridge and Limited Entry Private Drive 33.Loop Road 34.Pedestrian Walk 35.Breakwater19?XIAOMAIDAO AREAQINGDAO,CHINA?enlarged site planiconic hotel&beach residences?Nkey plan2834283331352428303034LegendL Landsideandside1.Reali62、gned Access Road 2.3,000 space 6 level Parking structure and Transit Center 3.Restaurants 4.500 unit Residential Towers 5.4 Lane Entry Drive and Bridge 6.One Way Monorail Loop Xiaomaidao Xiaomaidao 7.International Convention and Conference Center 8.2,000 Seat Performing Arts Center 9.2,000 seat Outd63、oor Amphitheater 10.Central Park and Spanish Steps 11.Monorail Stops 12.Covered Pedestrian Connectors 13.Multi Purpose Entertainment Center and Spa 14.400 key Business/Resort Terraced Hotel 15.Boardwalk and Pedestrian Promenades 16.Festival Plaza/Entertainment Lagoon Performances 17.Skating Rink and64、 Indoor Entertainment 18.4 Level Retail,Entertainment and Dining Center 19.12 Screen Cineplex 20.3D IMAX Theater 21.Feature Restaurant 22.Lighthouse23.Marina24.The Creek T The Crescent he Crescent 25.175m 400 key Luxury Hotel Tower 26.Hotel Drop Off and Porte-cochere 27.XX Luxury Residences/Cabanas 65、28.Spa/Wellness Centers/Retreat Facilities 29.Theme Restaurant 30.Private Beaches 31.Pivoted Pedestrian Bridge 32.Suspended Bridge and Limited Entry Private Drive 33.Loop Road 34.Pedestrian Walk 35.Breakwater20?XIAOMAIDAO AREAQINGDAO,CHINA?enlarged site planbeach residences?Nkey plan2924233534Legend66、L Landsideandside1.Realigned Access Road 2.3,000 space 6 level Parking structure and Transit Center 3.Restaurants 4.500 unit Residential Towers 5.4 Lane Entry Drive and Bridge 6.One Way Monorail Loop Xiaomaidao Xiaomaidao 7.International Convention and Conference Center 8.2,000 Seat Performing Arts 67、Center 9.2,000 seat Outdoor Amphitheater 10.Central Park and Spanish Steps 11.Monorail Stops 12.Covered Pedestrian Connectors 13.Multi Purpose Entertainment Center and Spa 14.400 key Business/Resort Terraced Hotel 15.Boardwalk and Pedestrian Promenades 16.Festival Plaza/Entertainment Lagoon Performa68、nces 17.Skating Rink and Indoor Entertainment 18.4 Level Retail,Entertainment and Dining Center 19.12 Screen Cineplex 20.3D IMAX Theater 21.Feature Restaurant 22.Lighthouse23.Marina24.The Creek T The Crescent he Crescent 25.175m 400 key Luxury Hotel Tower 26.Hotel Drop Off and Porte-cochere 27.XX Lu69、xury Residences/Cabanas 28.Spa/Wellness Centers/Retreat Facilities 29.Theme Restaurant 30.Private Beaches 31.Pivoted Pedestrian Bridge 32.Suspended Bridge and Limited Entry Private Drive 33.Loop Road 34.Pedestrian Walk 35.Breakwater21?XIAOMAIDAO AREAQINGDAO,CHINA?enlarged site planxiaomai point?Nkey70、 plan22?XIAOMAIDAO AREAQINGDAO,CHINA?view from cbd?Nkey plankey plan23?XIAOMAIDAO AREAQINGDAO,CHINA?view of business hotel from park?Nkey plan24?XIAOMAIDAO AREAQINGDAO,CHINA?enlarged views ofretail,plaza&marina?Nkey plankey plan25?XIAOMAIDAO AREAQINGDAO,CHINA?view of retail marina?Nkey plan26?XIAOMA71、IDAO AREAQINGDAO,CHINA?enlarged views ofmulti-purpose facility&hotel?Nkey plankey plan27?XIAOMAIDAO AREAQINGDAO,CHINA?view from creek of signature tower&business hotel?Nkey plan28?XIAOMAIDAO AREAQINGDAO,CHINA?enlarged views of hotels,luxury residences&spa?SPA?Nkey plankey plan29?XIAOMAIDAO AREAQINGD72、AO,CHINA?view of retail plaza?Nkey plan30?XIAOMAIDAO AREAQINGDAO,CHINA?enlarged views ofsignature tower?Nkey plankey plan31?XIAOMAIDAO AREAQINGDAO,CHINA?view of signature tower?Nkey plan32?XIAOMAIDAO AREAQINGDAO,CHINA?enlarged views ofperforming arts center?Nkey plan33?XIAOMAIDAO AREAQINGDAO,CHINA?enlarged views ofconvention center?Nkey plankey plan34?XIAOMAIDAO AREAQINGDAO,CHINA?view from convention center of signature tower?Nkey plan35?XIAOMAIDAO AREAQINGDAO,CHINA?
会员尊享权益 会员尊享权益 会员尊享权益
500万份文档
500万份文档 免费下载
10万资源包
10万资源包 一键下载
4万份资料
4万份资料 打包下载
24小时客服
24小时客服 会员专属
开通 VIP
升级会员
  • 周热门排行

  • 月热门排行

  • 季热门排行

  1. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  2. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  3. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  4. 陕西化学工业公司招聘管理与职业发展管理手册30页.doc
  5. 动火作业安全告知卡(1页).docx
  6. 高处作业安全告知卡(1页).docx
  7. 广场工程建设项目施工招标评标报告表格(24页).pdf
  8. 原油码头消防工程维保方案(39页).docx
  9. 建筑工程外脚手架专项施工方案(悬挑式脚手架、落地式脚手架)(25页).doc
  10. 2020柏向堂房地产公司材料标准化手册3.0(143页).pdf
  11. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  12. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  13. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  14. 新规下的户型增值秘籍.ppt(22页)
  15. 房地产开发贷款实操指南(5页).pdf
  16. 鄂尔多斯空港物流园区总体规划方案(2017-2030)环境影响评价报告书(23页).doc
  17. 规划兰园西路道路工程环境方案环境影响评价报告书(89页).pdf
  18. 屋面圆弧形穹顶结构高支模施工方案(40米)(47页).doc
  19. 埋石混凝土挡土墙施工方案(23页).doc
  20. 重庆市五小水利工程建设规划报告(64页).doc
  21. 厂区至矿区管网蒸汽管道系统扩容改造工程施工组织设计方案(105页).doc
  22. 超高纯氦气厂建设项目办公楼、变电站、水泵房及消防水池、门卫、厂房、仓库、配套工程施工组织设计方案(140页).doc
  1. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  2. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  3. 2024大楼室内精装修工程专业分包投标文件(393页).docx
  4. 苏州水秀天地商业项目购物中心100%室内设计方案(158页).pptx
  5. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  6. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  7. 室内移动式操作平台工程施工方案(19页).doc
  8. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  9. 矿山治理工程施工组织设计方案(240页).docx
  10. 老旧小区改造工程施工方案及技术措施(364页).doc
  11. 北京科技园公寓建设项目整体报告方案.ppt
  12. 建筑工程三级安全教育内容(24页).doc
  13. 新疆风电十三间房二期工程49.5mw风电项目可行性研究报告(附表)(239页).pdf
  14. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  15. 四川凉山攀西灵山国际度假区小镇活力中心商业业态规划方案建议书(33页).pdf
  16. 埋石混凝土挡土墙施工方案(23页).doc
  17. 地下停车场环氧地坪漆施工方案(45页).doc
  18. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  19. 地铁深基坑及钢筋笼吊装安全专项施工方案【98页】.doc
  20. 住宅定价策略及价格表制定培训课件.ppt
  21. 西安名京九合院商业项目招商手册(28页).pdf
  22. 2010-2030年湖北咸宁市城市总体规划(32页).doc
  1. 建筑工程夜间施工专项施工方案(18页).doc
  2. 赣州无动力亲子乐园景观设计方案(111页).pdf
  3. 2016泰安乡村旅游规划建设示范案例(165页).pdf
  4. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  5. 龙山县里耶文化生态景区里耶古城片区旅游修建性详细规划2015奇创.pdf
  6. 连云港市土地利用总体规划2006-2020年调整方案文本图集(78页).pdf
  7. 850亩项目塑钢门窗工程施工组织设计方案(34页).doc
  8. 老旧小区改造工程施工方案及技术措施(364页).doc
  9. 城市更新项目地价公式测算表.xlsx
  10. 房地产项目规划前期投资收益测算模板带公式.xls
  11. 存储器基地项目及配套设施建筑工程临时用水施工方案(40页).docx
  12. 铁路客运枢纽项目站前框构中桥工程路基注浆加固专项施工方案(19页).doc
  13. 室内移动式操作平台工程施工方案(19页).doc
  14. 装配式结构工业厂房基础、主体结构、门窗及装饰工程施工方案(83页).doc
  15. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  16. 施工工程安全教育培训技术交底(13页).doc
  17. 老旧小区改造施工方案及技术措施(365页).doc
  18. 新建贵广铁路线下工程沉降变形观测及评估监理实施细则(126页).doc
  19. 消防火灾应急疏散演练预案(12页).doc
  20. 矿山治理工程施工组织设计方案(240页).docx
  21. 崖城站悬臂式挡墙施工方案(92页).doc
  22. 北京科技园公寓建设项目整体报告方案.ppt