测量放样锚杆桩施工工艺流程(5页)
测量放样锚杆桩施工工艺流程(5页).doc
下载文档 下载文档
其它文档
上传人:正*** 编号:878856 2024-01-09 6页 18.50KB
1、测量放样锚杆桩施工工艺流程Survey setting anchor pile construction process由于受桥桩空间(最低处净空2. 0 m)及设备本身高度的限制,复合锚杆桩在施工前,先开挖2 mBecause of the pile space (the lowest clearance 2 m) and their height limit device, composite bolt pile before construction, the 2 m first excavation宽、1. 5 m深的基槽(施工完成后回填混凝土,恢复至原地面高程),以加大操作空间,便于2、施工作业。成孔后竖向锚杆及支撑采用分节连接,每节长2 m,用接驳器连接,地面多余钢筋待施工完成后截除。1.5 m wide, deep trench (after the completion of construction of concrete, restore to the original ground elevation), in order to increase the operating space, convenient construction operation. After the hole of vertical anchor and supported by the3、 section connection, each section of length 2 m, connected by the connector, ground of excess steel to be after the completion of construction of amputation.(1)施工准备。根据设计要求做好桩位的轴线标记和测量放样,按桩位施工。为了确保锚杆桩的精确定位,需使用特制的定位器进行定位。(1) the construction preparation. Do the axis marking and measuring the lofting o4、f the pile position according to the design requirements, according to a pile construction. In order to ensure accurate positioning of anchor pile, require special positioner positioning.(2)钻机夯进。采用sh-1030钻机(需对其进行局部改造)冲击、套管跟进成孔。钻机在设计桩位安装就位后,检查冲击杆是否垂直;然后用150钻头开口34m,下127mm套管,螺旋开挖成孔;当套管跟进到设计深度后终孔。(2) in5、to the drill rammer. Using the sh-1030 drilling rig (for local transformation of its impact, follow-up sleeve hole). Rig in the design of pile position after installation, check the impact rod is vertical; then 150 bit opening under 34m, 127mm casing, spiral excavation hole; when the casing to the d6、esigned depth after the final hole(3)复合锚杆制作和安装。(3) the production and installation of composite bolt.复合锚杆制作。先用3根20螺纹钢组成一个钢筋笼。另由12钢筋围成一个内径30 mmProduction of composite bolt. The first 3 Phi 20 steel is composed of a steel cage. The other by phi 12 steel round into a diameter of 30 mm的钢筋笼隔离环,纵向每米1环与钢筋及7、定位支撑焊接。定位支撑由18螺纹钢筋弯成宽40 mm,高200 mm的环行。The reinforcement cage spacer ring, vertical 1 metres per ring and bar and a positioning supporting welding. Positioning is supported by a 18 bar bent into a width of 40 mm, 200 mm ring采用简易支撑架吊放,人工配合就位。Using simple support dipping, artificial.(4)注浆加固。复合锚杆就位后,拔出钻8、孔套管准备注浆。注浆采用3根注浆管, 乳化液泵站每根注浆管出口范围距底端4 m,注浆管直径为20 mm,出浆孔直径为4 mm,四孔竖向错开150 mm。注浆管竖向安装时,第一根注浆管端不封闭,其他两根管端封闭,并且第二根注浆管比第一根、第三根短4 m,给第一根管注浆时,第二根、第三根管的出浆孔用浆液隔离塑料胶带粘贴,防止注浆时封堵出浆孔。注浆采用施压密注浆,注浆分3次:第1次注浆采用常压注浆,注浆压力为0. 40. 6 mpa,孔口溢浆时结束本次注浆,水泥浆水灰比为0. 51;第2次注浆采用中高压注浆,在第1次注浆完成后1015 h进行,注浆压力为1. 05mpa,水泥浆水灰比为0. 751;9、第3次注浆压力为1. 52. 0mpa, 复合土工膜在第2次注浆完成后510 h进行,水泥浆水灰比为0. 751。所有注浆材料采用普通硅酸盐52. 5级水泥。合锚杆桩是利用锚杆技术及其机理而衍生出的一种新的基础加固技术,以其工艺简单、加固效果好、经济合理等特点。(4) the grouting reinforcement. Composite anchor in place, pull out the borehole casing for grouting. Grouting adopts 3 grouting pipe, each grouting pipe exports from th10、e bottom of the 4 m, the grouting pipe diameter of 20 mm, a slurry outlet hole diameter of 4 mm, four hole of the vertical staggered 150 mm. The grouting pipe vertical installation, the first root grouting pipe end is not closed, the other two ends closed tube, and the second root grouting pipe than11、 the first root, third short 4 m, to the first tube grouting, second root, third root canals with plastic tape pulp slurry isolation to prevent hole, grouting and plugging up grouting hole. Pressure Grouting grouting, grouting is divided into 3 times: first times of common pressure grouting, groutin12、g pressure of 0 40., 6 MPa, orifice grout when the end of the grouting, grout water cement ratio is 0.5 1; second grouting with high pressure grouting in, 1015 in first h after grouting, grouting pressure 1 05mpa, water slurry water-cement ratio of 0.75 1; third grouting pressure was 1 52. 0mpa, 51013、 in second h after grouting, grout water cement ratio is 0.75 1. All the grouting material with ordinary portland cement 52.5 level. Composite anchor pile is a new foundation reinforcement technology using the technology and mechanism of bolt and the derived, with the characteristics of simple process, good reinforcement effect, economic and reasonable.
会员尊享权益 会员尊享权益 会员尊享权益
500万份文档
500万份文档 免费下载
10万资源包
10万资源包 一键下载
4万份资料
4万份资料 打包下载
24小时客服
24小时客服 会员专属
开通 VIP
升级会员
  • 周热门排行

  • 月热门排行

  • 季热门排行

  1. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  2. 陕西化学工业公司招聘管理与职业发展管理手册30页.doc
  3. 建筑工程外脚手架专项施工方案(悬挑式脚手架、落地式脚手架)(25页).doc
  4. 2020柏向堂房地产公司材料标准化手册3.0(143页).pdf
  5. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  6. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  7. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  8. 桥梁工程深基坑开挖专项施工方案(24页).doc
  9. 深基坑土方开挖及基坑支护专项施工方案.doc
  10. 天碱商业区观山苑工程人防监理规划(43页).doc
  11. 工程变形测量之基坑监测培训课件(155页).ppt
  12. 房地产开发企业拿地操作指引方案.pdf
  13. 新规下的户型增值秘籍.ppt(22页)
  14. 房地产开发贷款实操指南(5页).pdf
  15. 鄂尔多斯空港物流园区总体规划方案(2017-2030)环境影响评价报告书(23页).doc
  16. 规划兰园西路道路工程环境方案环境影响评价报告书(89页).pdf
  17. 屋面圆弧形穹顶结构高支模施工方案(40米)(47页).doc
  18. 埋石混凝土挡土墙施工方案(23页).doc
  19. 重庆市五小水利工程建设规划报告(64页).doc
  20. 厂区至矿区管网蒸汽管道系统扩容改造工程施工组织设计方案(105页).doc
  21. 超高纯氦气厂建设项目办公楼、变电站、水泵房及消防水池、门卫、厂房、仓库、配套工程施工组织设计方案(140页).doc
  22. 园林景观投标方案施工组织设计方案技术标(115页).doc
  1. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  2. 2024大楼室内精装修工程专业分包投标文件(393页).docx
  3. 苏州水秀天地商业项目购物中心100%室内设计方案(158页).pptx
  4. 龙港市专业市场布局规划方案(2023-2035年)(草案)(61页).pdf
  5. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  6. 室内移动式操作平台工程施工方案(19页).doc
  7. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  8. 矿山治理工程施工组织设计方案(240页).docx
  9. 老旧小区改造工程施工方案及技术措施(364页).doc
  10. 北京科技园公寓建设项目整体报告方案.ppt
  11. 川主寺城镇风貌整治景观规划设计方案(60页).pdf
  12. 建筑工程三级安全教育内容(24页).doc
  13. 新疆风电十三间房二期工程49.5mw风电项目可行性研究报告(附表)(239页).pdf
  14. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  15. 四川凉山攀西灵山国际度假区小镇活力中心商业业态规划方案建议书(33页).pdf
  16. 埋石混凝土挡土墙施工方案(23页).doc
  17. 地下停车场环氧地坪漆施工方案(45页).doc
  18. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  19. 地铁深基坑及钢筋笼吊装安全专项施工方案【98页】.doc
  20. 住宅定价策略及价格表制定培训课件.ppt
  21. 西安名京九合院商业项目招商手册(28页).pdf
  22. 2010-2030年湖北咸宁市城市总体规划(32页).doc
  1. 建筑工程夜间施工专项施工方案(18页).doc
  2. 赣州无动力亲子乐园景观设计方案(111页).pdf
  3. 2016泰安乡村旅游规划建设示范案例(165页).pdf
  4. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  5. 龙山县里耶文化生态景区里耶古城片区旅游修建性详细规划2015奇创.pdf
  6. 连云港市土地利用总体规划2006-2020年调整方案文本图集(78页).pdf
  7. 850亩项目塑钢门窗工程施工组织设计方案(34页).doc
  8. 老旧小区改造工程施工方案及技术措施(364页).doc
  9. 城市更新项目地价公式测算表.xlsx
  10. 房地产项目规划前期投资收益测算模板带公式.xls
  11. 存储器基地项目及配套设施建筑工程临时用水施工方案(40页).docx
  12. 铁路客运枢纽项目站前框构中桥工程路基注浆加固专项施工方案(19页).doc
  13. 室内移动式操作平台工程施工方案(19页).doc
  14. 装配式结构工业厂房基础、主体结构、门窗及装饰工程施工方案(83页).doc
  15. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  16. 施工工程安全教育培训技术交底(13页).doc
  17. 老旧小区改造施工方案及技术措施(365页).doc
  18. 新建贵广铁路线下工程沉降变形观测及评估监理实施细则(126页).doc
  19. 消防火灾应急疏散演练预案(12页).doc
  20. 矿山治理工程施工组织设计方案(240页).docx
  21. 崖城站悬臂式挡墙施工方案(92页).doc
  22. 北京科技园公寓建设项目整体报告方案.ppt