个人中心
个人中心
添加客服WX
客服
添加客服WX
添加客服WX
关注微信公众号
公众号
关注微信公众号
关注微信公众号
升级会员
升级会员
返回顶部
材料规格、性能表
材料规格、性能表.xls
下载文档 下载文档
地产表格
上传人:故事 编号:858559 2023-12-22 29页 109.04KB
1、矩形空心型钢的规格及截面特性回首页边长尺寸允许偏差壁厚理论重量截面面积惯性矩回转半径(mm)(mm)(cm4)(cm)AB普通精度 较高精度(mm)(kg/m)(cm2)IxIyrx251.21.3381.7055.5021.8751.7961.51.6502.1026.6532.2531.779501.000.502.52.8173.58911.2965.051.7743.03.3034.20812.8275.6961.745304.04.1985.31715.2396.6821.6882.53.2094.08917.9335.9982.0943.03.7744.80820.4966.7942、2.064604.04.8266.14724.6918.0452.0042.53.6024.58922.06911.7342.192401.200.603.04.2455.40825.37413.4362.1664.05.4546.94730.97416.2692.1113.05.1876.60844.04626.0992.58170504.06.7108.54754.66332.2102.5285.08.12910.35663.43537.1792.4742.54.3875.58945.10315.2552.84403.05.1876.60852.24617.5522.8114.06.7103、8.54764.78021.4742.752801.400.705.08.12910.35675.08024.5672.692603.06.1297.80870.04244.8862.9954.07.96610.14787.90556.1052.9435.09.69912.356103.24765.6342.893.05.6587.20870.48719.613.127404.07.3389.34787.89424.0773.0665.08.91411.356102.48727.6513.004901.500.753.06.1297.80881.84532.7353.237504.07.9664、10.147102.69640.6953.1815.09.69912.356120.5747.3453.123603.06.6008.40893.20349.7643.32990601.500.754.08.59410.947117.49962.3873.2765.010.48413.356138.65373.2183.2223.06.6008.408106.45136.0533.558100501.600.804.08.59410.947134.12444.9383.5005.010.48413.356158.15552.4293.4413.08.01310.208189.11364.3985、4.304604.010.47813.347240.72481.2354.2465.012.83916.356286.94195.9684.1881201.800.906.015.09719.232327.950 108.716 4.1293.08.95511.408230.189 123.430 4.491804.011.73414.947294.569 157.281 4.4395.014.40918.356353.108 187.747 4.3851201.800.906.016.98121.632405.998 214.977 4.3324.012.99016.547429.582 16、80.407 5.095140802.001.005.015.97920.356517.023 215.914 5.0396.018.86524.032596.935 247.905 4.9834.014.87418.947594.585 318.551 5.6011501005.018.33423.356719.164 383.988 5.5496.021.69127.632834.615 444.135 5.4952.401.208.028.09635.7911039.101 549.308 5.3884.014.24618.147597.691 203.532 5.738160805.07、17.54922.356721.650 244.080 5.6816.020.74926.432835.936 280.833 5.6238.026.84034.1911036.485 343.599 5.5054.016.75821.347926.020 373.879 6.5861801002.601.305.020.68926.3561124.156 451.738 6.5306.024.51731.2321809.531 523.767 6.4758.031.86440.5911643.149 651.132 6.3624.018.04122.9471199.680 410.764 78、.2302001002.601.305.022.25928.3561459.207 496.905 7.1736.026.40133.6321703.224 576.855 7.1168.034.37642.7912145.993 719.014 7.000截面模数扭转常数(cm3)ryWxWyIt(cm4)Wt(cm3)1.0482.2001.5004.5342.7801.0352.6611.8025.5193.4061.1864.5183.36611.6666.4701.1635.1303.79713.4017.5091.1176.0954.45516.2449.3201.2115.9779、3.99815.0547.8451.1886.8324.52917.3359.1291.1438.2305.36321.14111.4001.5997.3565.86725.04510.7201.5768.4586.17829.12112.5491.53010.3248.13436.29815.8801.98712.58410.43953.42618.7891.94115.61812.88467.61324.0401.89418.12414.87179.90828.7671.65211.2757.62737.46714.4701.62913.0618.77643.68016.9891.585110、6.19510.73754.78721.6401.54018.77012.28364.11025.7672.39717.5114.96288.11126.2292.35121.97618.701112.58333.8002.30425.81121.878134.50340.7671.64915.6639.80551.19319.2091.60419.53212.03864.3224.5201.5622.77413.82575.42629.2672.04718.18713.09476.43324.4292.00222.82116.27897.16231.4001.95726.79318.938111、15.43637.7672.43220.71116.588104.55229.6492.38726.11120.795133.85238.2802.34130.81124.406160.27346.2672.07021.29014.42188.32227.2492.02626.82417.975112.40935.0801.98131.63120.97133.75842.2672.51131.51821.466156.02939.9092.46640.12027.078200.40751.7202.42247.82331.989240.86962.7672.37754.65836.23827712、.36173.0373.28938.36430.857255.12853.9493.24349.09439.320330.43870.2803.19858.85146.936400.73585.7673.51267.66653.744465.940100.397回转半径3.30161.36845.101410.71382.4403.25673.86053.978498.815100.7673.21185.27661.976580.919118.1574.10079.27863.710660.613111.8804.05495.88876.797806.733137.2674.009111.2813、288.827945.022161.5973.917138.546109.8611197.701207.0463.34874.71150.883493.12994.6003.30490.20661.020599.475115.7673.259104.49270.208698.884135.9173.170129.56085.899876.599173.1264.184102.89174.775852.708134.9204.140124.90690.3471042.589165.7674.095145.503104.7531222.933195.4374.005182.572130.2261514、54.606251.2064.223119.96882.152984.151150.2804.186145.92099.3811203.928184.7674.141170.322115.3711412.986217.9974.052214.599143.8021798.554280.646热轧等边角钢(YB166-65)回首页角钢尺寸(mm)截面理论重量外表参考数值面积X9.81面积x-xx0-x0号数bdrcm2N/mM2/mIx(cm4)ix(cm)Wx(cm3)Ix0(cm4)2.02031.1320.8890.0780.40.590.290.6341.4591.1450.0770.515、0.580.360.782.52533.5 1.4321.1240.0980.820.760.461.2941.8591.4590.0971.030.740.591.623.03031.7491.3730.1171.460.910.682.3142.2761.7860.1171.840.90.872.9234.5 2.1091.6560.1412.581.110.994.093.63642.7562.1630.1413.291.091.285.2253.3822.6540.1413.951.081.566.2432.3591.8520.1573.591.231.235.694.04043.0816、62.4220.1574.61.221.67.2953.7912.9760.1565.531.211.968.76352.6592.0880.1775.171.41.588.24.54543.4862.7360.1776.651.382.0510.5654.2923.3690.1768.041.372.5112.7465.0763.9850.1769.331.362.9514.7632.9712.3320.1977.181.551.9611.375.05045.5 3.8973.0590.1979.621.542.5614.754.8033.770.19611.211.533.1317.79617、5.6884.4650.19613.051.523.6820.6833.3432.6240.22110.191.752.4816.145.656464.393.4460.2213.181.733.2420.9255.4154.2510.2216.021.723.9725.4288.3676.5680.21923.631.686.0337.3744.9783.9070.24819.031.964.1330.1756.1434.8220.24823.171.945.0836.776.363677.2885.7210.24727.121.93643.0389.5157.4690.24734.461.18、97.7554.561011.6579.1510.24641.091.889.3964.8545.574.3720.27526.392.185.1441.856.8755.3970.27532.212.166.3251.087.070688.166.4060.27537.772.157.4859.9379.4247.3980.27543.092.148.5968.35810.6678.3730.27418.172.129.6876.3757.3675.8180.29539.972.337.3263.368.7976.9050.29446.952.318.6474.387.5757910.16719、.9760.29453.572.39.9384.96811.5039.030.29459.962.2811.295.071014.12611.0890.29371.982.2613.64113.9257.9126.2110.31548.792.488.4377.3369.3977.3760.31457.352.479.8790.988.0807910.868.5250.31465.582.4611.37104.07812.3039.6580.31473.492.4412.83116.61015.12611.8740.31388.432.4215.64140.09610.6378.350.35420、82.772.7912.61131.26712.3019.6560.35494.832.7814.54150.479.090810 13.94410.9460.353106.472.7616.42168.971017.16713.4760.353128.582.7420.07203.91220.30615.940.352149.222.7123.57236.21611.9329.3660.393114.953.0115.68181.98713.79610.830.393131.863.0918.1208.97815.63812.2760.393148.243.0820.47235.0710.021、 100 1012 19.26115.120.392179.513.0525.06284.681222.817.8980.391208.93.0329.48330.951426.25620.6110.391236.53333.73374.061629.62723.2570.39262.532.9837.82414.16715.19611.9280.433177.163.4122.05280.94817.23813.5320.433199.463.424.95316.4911.0 110 1012 21.26116.690.432242.13.3830.6384.391225.219.7820.22、431282.553.3536.05448.171429.05622.8090.431320.713.3241.35508.01819.7515.5040.492297.033.8832.52470.8912.5 125 1024.37319.1330.491361.673.8539.97573.891228.91222.6960.491423.163.8341.17671.441414 33.36726.1930.49481.653.854.16763.731027.37321.4880.551514.654.3450.58817.2714.0 140 1232.51225.5220.55123、603.684.3159.8958.791437.56729.490.55688.824.2868.751093.561642.53933.3930.549770.244.2677.461221.811031.50224.7290.63779.534.9866.71237.316.0 160 1216 37.44129.3910.63916.584.9578.981455.681443.29633.9870.6291048.364.9290.951665.021649.06738.5180.6291175.084.89102.631865.571242.24133.1590.711321.3524、5.59100.822100.118.0 180 1416 48.89638.3880.7091514.485.56116.252407.421655.46743.5420.7091700.995.54131.132703.371861.95548.6340.7081875.125.5145.642988.241454.64242.8940.7882103.556.2144.73343.261662.01348.680.7882366.156.18163.653760.8920.0 200 1818 69.30154.4010.7872620.646.15182.224164.542076.525、0560.0560.7872867.36.12200.424554.552490.66171.1680.7852338.256.07236.175294.97z0y0-y0 x1-x1ix0(cm)Wx0(cm3)Iy0(cm4)iy0(cm)Wyo(cm3)Ix1(cm4)cm0.750.450.170.390.20.810.60.730.550.220.380.241.090.640.950.730.340.490.331.570.730.930.930.430.480.42.110.761.151.090.610.590.512.710.851.131.370.770.580.623.626、30.891.391.611.070.710.764.6811.382.051.370.70.936.251.041.362.451.650.71.097.841.071.552.011.490.790.966.411.091.542.581.910.791.198.561.131.523.012.30.781.3910.741.171.762.582.140.91.249.121.221.743.322.750.891.5412.181.261.7243.330.881.8115.251.31.74.643.890.882.0618.361.331.963.222.9811.5712.51.27、341.944.163.820.991.9616.691.381.925.034.640.982.3120.91.421.915.855.420.982.6325.141.462.24.084.241.132.0217.561.482.185.285.461.112.5223.431.532.176.426.611.12.9829.331.572.119.449.891.094.1647.241.682.466.787.891.263.2933.351.72.458.259.571.253.941.731.742.439.6611.21.244.4650.141.782.412.2514.3328、1.235.4767.111.852.3614.5617.331.226.3684.311.932.748.4410.991.44.1745.741.862.7310.3213.341.394.9557.211.912.7112.1115.611.3856768.731.952.6913.8117.821.386.3480.291.992.6815.4319.981.376.9891.922.032.9211.9416.631.55.7770.562.042.914.0219.511.496.6784.552.072.8916.0222.181.487.4498.712.112.8817.9329、24.861.478.19112.972.152.8421.4830.051.469.56141.712.223.1313.6720.251.66.6685.362.153.1116.0823.721.597.65102.52.193.118.427.091.588.58119.72.233.0820.6130.391.579.46136.972.273.0424.7636.771.5611.08171.742.353.5120.6334.281.89.95145.872.443.523.6439.181.7811.19170.32.483.4826.5543.971.7812.35194.830、2.523.4532.0453.261.7614.52244.072.593.4137.1262.221.7516.49293.762.673.925.7447.92212.69200.072.673.8929.5554.741.9914.26233.542.713.8833.2461.411.9815.75267.092.763.8440.2674.351.9618.54334.482.843.8146.886.841.9521.08402.342.913.7752.9991.9423.44470.752.993.7458.57110.891.9425.65539.83.064.336.1231、73.382.217.51310.642.964.2840.6982.422.1919.39355.23.014.2549.4299.982.1722.91444.653.094.2257.62116.932.1526.15534.63.164.1865.31133.42.1429.14625.163.244.8853.28123.162.525.86521.013.374.8564.93149.462.4830.62651.933.454.8275.96174.462.4635.03783.423.534.7886.41199.572.4539.13915.613.615.4682.562132、2.042.7839.2915.113.825.4396.85248.572.7645.021099.283.95.4110.47284.062.7550.451284.223.985.36123.42318.672.7455.551470.074.066.27109.36321.763.252.761365.334.316.24128.67377.493.1860.741639.574.396.2147.17431.73.1668.2441914.684.476.17164.89484.593.1475.312190.824.557.05165542.613.5878.412332.84.833、97.02189.14625.533.5688.382723.484.976.98212.4698.63.5597.833115.295.056.94234.78762.013.51105.143502.435.137.82236.4863.833.98111.823734.15.467.79265.93971.413.96123.964270.395.547.75294.481076.743.94135.524808.135.627.72322.061180.043.93146.555347.515.697.64374.411381.533.9166.556457.165.87安字牌部分抽芯34、铆钉技术数据型号规格钉体材料钉芯材料最小抗剪强度开口型抽芯铝铆钉5X730mm低镁合金铝 低碳钢990N开口型抽芯铝铆钉5X730mm高镁合金铝 中碳钢2000N开口型不锈钢抽芯铆钉 4.8X726mm 304不锈钢中碳钢4230N不锈钢环槽铆钉5X418mm304不锈钢钉帽材料304不锈钢9000N开口型抽芯铝铆钉6.4X1035mm 低镁合金铝 低碳钢1460N开口型抽芯铝铆钉6.4X1035mm 高镁合金铝 中碳钢3120N开口型不锈钢抽芯铆钉 6.4X1018mm 304不锈钢中碳钢6500N回首页最小抗拉强度1150N2500N5340N7000N2050N4090N8850N热轧普35、通工字钢(GB706-65)回首页截面面积 理论重量参考数值尺寸(mm)x9.81x-x型号IxWxhbdtrr1cm2N/mcm4cm310100684.57.66.53.314.311.22454912.61267458.473.518.114.2488.4377.52914140805.59.17.53.821.516.9712102161608869.98426.120.5113014118180946.510.78.54.330.624.1116018520a200100711.494.535.527.9237023720b200102911.494.539.531.1250025036、22a2201107.512.39.54.84233340030922b2201129.512.39.54.846.436.4357032525a25011681310548.538.15023.54401.8825b250118101310553.5425283.96422.7228a2801228.513.710.55.355.4543.47114.14508.1528b28012410.513.710.55.361.0547.97480534.2932a3201309.51511.55.867.0552.711075.5692.232b32013211.51511.55.873.455737、.711621.4726.3332c32013413.51511.55.879.9562.812167.5760.4736a3601361015.812676.359.91576087536b3601381215.812683.565.61653091936c3601401415.812690.771.21731096240a40014210.516.512.56.386.167.621720109040b40014412.516.512.56.394.173.822780114040c40014614.516.512.56.310280.123850119045a45015011.5181338、.56.810280.432240143045b45015213.51813.56.811187.433760150045c45015415.51813.56.812094.535280157050a500158122014711993.646470186050b500160142014712910148560194050c500162162014713910950640208056a56016612.52114.57.3135.25106.265585.62342.3156b56016814.52114.57.3146.4511568512.52446.8956c56017016.5211439、.57.3157.85123.971439.42551.4163a6301761322157.5154.9121.693916.22981.4763b6301781522157.5167.5131.598083.63163.9863c6301801722157.5180.1141102251.1 3298.42注:1.工字钢长度:1018号,长519m,2063号,长619m.2.一般采用材料:A2,A3,A5,A3F.y-yixIx:SxIyWyiycmcmcm4cm3cm4.148.59339.721.525.19510.8546.90612.6771.6095.761264.416.1140、.736.5813.893.121.21.897.3615.41222628.1517.215831.52.127.9616.916933.12.068.9918.922540.92.318.7818.723942.72.2710.1821.58280.04648.2832.4039.93821.27309.29752.4232.40411.3224.62345.05156.5652.49511.0824.24379.49661.2092.49312.8427.46459.9370.7582.61912.5827.09501.5375.9892.61412.3426.77543.8181.1641、62.60814.430.755281.22.6914.130.358284.32.6413.829.961287.42.615.934.166093.22.7715.633.669296.22.7115.233.272799.62.6517.738.68551142.8917.4388941182.8417.137.69381222.7919.742.811201423.0719.442.411701463.011941.812201512.9622.0247.731370.16165.083.18221.6347.171486.75174.253.16221.2746.661558.39142、83.343.15824.6254.171700.55193.243.31424.253.511812.07203.63.28923.8252.921924.91213.883.268热轧普通槽钢(GB707-65)回首页截面面积 理论重量 参考数值尺寸(mm)x9.81x-x型号WxIxhbdtrr1cm2N/mcm3cm4550374.5773.56.935.4410.4266.363404.87.57.53.758.4446.6316.12350.78688043588410.248.0425.3101.310100485.38.58.54.2512.741039.7198.312.6143、26535.5994.515.6912.3762.137391.46614a1405869.59.54.7518.5114.5380.5563.714b1406089.59.54.7521.3116.7387.1609.416a160636.51010521.9517.23108.3866.216b160658.51010525.1519.74116.8934.518a18068710.510.55.2525.6920.17141.41272.718b18070910.510.55.2529.2922.99152.21369.920a20073711115.528.8322.63178178044、.420b20075911115.532.8325.77191.41913.722a22077711.511.55.7531.8424.99217.62393.922b22079911.511.55.7536.2428.45233.82571.425a2507871212634.9127.47269.5973369.6225b2508091212639.9131.39282.4023530.0425c25082111212644.9135.32295.2363690.4528a280827.512.512.56.2540.0231.42340.3284764.5928b280849.512.545、12.56.2545.6235.81366.465130.4528c2808611.512.512.56.2551.2240.21392.5945496.3232a3208881414748.738.22474.8797598.0632b32090101414755.143.25509.0128144.232c32092121414761.548.28543.1458690.3336a3609691616860.8947.8659.711874.236b36098111616868.0953.45702.912651.836c360100131616875.2950.1746.113429.446、40a40010010.51818975.0558.91878.917577.940b40010212.51818983.0565.19932.218644.540c40010414.51818991.0571.47985.619711.2注:1.槽钢长度:58号,长512m,1018号,长519m;2040号,长619m。2.一般采用材料:A2,A3,A5,A3F.y-yyo-yozoixWyIyiyIyocmcm3cm4cmcm4cm1.943.558.31.120.91.352.45311.8721.18528.381.363.155.7916.61.2737.41.433.957.8247、5.61.4154.91.524.95310.24237.991.56777.091.595.5213.0153.21.7107.11.715.3514.1261.11.69120.61.676.2816.373.31.83144.11.86.117.5583.41.82160.81.757.0420.0398.61.96189.71.886.8421.521111.95210.11.847.8624.21282.112442.017.6425.88143.62.09268.41.958.6728.17157.82.23298.22.18.4230.05176.42.21326.32.039.48、82330.607175.5292.243322.2562.0659.40532.657196.4212.218353.1871.9829.06535.926218.4152.206384.1331.92110.9135.718217.9892.333387.5662.09710.637.929242.1442.304427.5892.01610.3540.301267.6022.286426.5971.95112.4946.473304.7872.502552.312.24212.1549.157336.3322.471592.9332.15811.8852.642374.1752.467649、43.2992.09213.9763.544552.73818.42.4413.6366.85496.72.7880.42.3713.3670.02536.42.67947.92.3415.378.835922.811067.72.4914.9882.526402.781135.62.4414.7186.19687.82.751220.72.42热轧不等边角钢(YB167-65)回首页角钢尺寸(mm)截面理论重量外表参考数值面积X9.81面积x-x号数Bbdrcm2N/mM2/mIx(cm4)ix(cm)Wx(cm3)2.5/1.6251631.1620.9120.0800.70.780.4350、43.51.4991.1760.0790.880.770.553.2/2322031.4921.1710.1021.531.010.7241.9391.5220.1011.9310.934/2.54025341.891.4840.1273.081.281.1542.4671.9360.1273.931.261.494.5/2.84528352.1491.6870.1434.451.441.4742.8062.2030.1435.691.421.915/3.2503235.52.4311.9080.1616.241.61.8443.1772.4940.168.021.592.3932.7432.51、1530.1818.881.82.325.6/3.65636463.592.8180.1811.451.793.0354.4153.4660.1813.861.773.7144.0583.1850.20216.492.023.876.3/46340574.9933.920.20220.0224.7465.9084.6380.20123.361.965.5976.8025.3390.20126.531.986.444.5473.570.22623.172.264.867/4.5704557.55.6094.4030.22527.952.235.9266.6475.2180.22532.542.252、16.9577.6576.0110.22537.222.28.0356.1254.8080.24534.862.396.837.5/57550687.20065.6990.24541.122.388.1289.4677.4310.24452.392.3510.521011.599.0980.24462.712.3312.7956.7355.0050.25541.962.567.78858050687.565.9350.25549.492.569.2588.7246.8480.25556.162.5410.58109.8677.7450.25462.832.5211.9257.2125.661053、.28760.452.99.929/5.69056698.5576.7170.28671.032.8811.7479.887.7560.28681.012.8613.49811.1838.7790.28691.032.8515.2769.6177.550.3299.063.2114.6410/6.31006371011.1118.7220.32113.453.2916.88812.5849.8780.319127.373.1819.081015.46712.1420.319153.813.1523.32610.6378.350.354107.043.1715.1910810080712.30154、9.6560.354122.733.1617.52813.94410.9460.353137.923.1419.811017.16713.4760.353166.873.1224.2461010.6378.350.354133.373.5417.8511711070712.3019.6560.3541533.5320.6813.94410.9460.353172.043.5123.31017.16713.4760.353208.393.4828.54714.09611.0660.403227.984.0226.8612.5/81258081115.98912.5510.403256.774.055、130.411019.71215.4740.402312.043.9837.331223.35118.330.402364.413.9544.01818.03814.160.453365.644.538.4814914090101222.26117.7450.452445.54.4747.311226.420.7240.451521.594.4455.871430.45623.9080.451594.14.4264.181025.31519.8720.512668.695.1462.131610160100121330.05423.5920.511784.915.1173.491434.70956、27.2470.51896.35.0884.561639.28130.8350.511003.045.0595.331028.37322.2730.571956.255.878.9618111801101233.71226.4640.5711124.725.7893.531438.96730.5890.571286.915.75107.76161444.13934.6490.5691443.065.72121.641237.91229.7610.6411570.96.44116.7320/12.5 2001251443.86734.4360.641800.976.41134.651649.7357、939.0450.6392023.356.38152.181855.52643.5880.6392238.36.35169.33y-yx1-x1y1-y1u-uIy(cm4)iy(cm)Wy(cm3)Ix1(cm4)y0(cm)Iy1(cm4)x0(cm)Iu(cm4)iu(cm)Wu(cm3)0.220.440.191.560.860.430.420.140.340.160.270.430.242.090.90.590.460.170.340.20.460.550.33.271.080.820.490.280.430.250.570.540.394.371.121.120.530.350.458、20.320.930.70.496.391.321.590.590.560.540.41.180.690.638.531.372.140.630.710.540.521.340.790.629.11.472.230.640.80.610.511.70.780.812.131.5130.681.020.60.662.020.910.8212.491.63.310.731.20.70.682.580.91.0616.651.654.450.771.530.690.872.921.031.0517.541.784.70.81.730.790.873.761.021.3723.391.826.330.59、852.230.791.134.491.011.6529.251.877.940.882.670.781.365.231.141.733.32.048.630.923.120.881.46.311.122.7141.632.0810.860.953.760.871.717.291.112.4349.982.1213.120.994.340.861.998.241.12.7858.072.1515.471.034.970.862.297.551.292.1745.922.2412.261.024.40.981.779.131.282.6557.12.2815.391.065.40.982.19160、0.621.263.1268.352.3218.581.096.350.982.5912.011.253.5779.992.3621.841.137.160.972.9412.611.443.3702.421.041.177.411.12.7414.71.423.8884.32.4425.371.218.541.083.1918.531.44.99112.52.5234.231.2910.871.074.121.961.386.04140.82.643.431.3613.11.064.9912.821.423.3285.212.621.061.147.661.12.7414.951.413.961、1102.532.6525.411.188.851.083.216.961.394.48119.332.6929.821.2110.181.083.718.851.385.03136.412.7334.321.2511.381.074.1618.321.594.21121.322.9129.531.2510.981.233.4921.421.584.96145.592.9535.581.2912.91.234.1824.361.575.7169.66341.711.3314.671.224.7227.151.566.41194.173.0447.931.3616.341.215.2930.9462、1.796.35199.713.2450.51.4318.421.385.2535.261.787.292333.2859.141.47211.386.0239.391.778.21266.323.3267.881.523.51.376.7847.121.749.98333.063.485.731.5828.331.358.2461.242.410.16199.382.95102.681.9731.651.728.3770.082.3911.71233.23119.982.0136.171.729.678.582.3713.21266.613.04137.372.0540.581.7110.863、94.652.3516.12333.633.12172.482.1349.11.6913.1242.922.017.9265.783.5369.081.5725.361.546.5349.0129.09310.073.5780.821.6128.951.537.554.871.9810.25354.393.6292.71.6532.451.538.4565.881.9612.48443.133.7116.831.7239.21.5110.2974.422.312.01451.994.01120.321.843.811.769.9283.492.2813.56519.994.06137.851.64、8449.151.7511.18100.67 2.2616.56650.094.14173.41.9259.451.7413.64116.67 2.2419.43780.394.22209.67269.351.7216.01120.69 2.5917.34730.534.5195.792.0470.831.9814.31146.03 2.5621.22913.24.58245.922.1285.821.9617.48169.79 2.5424.951096.094.66296.892.19100.211.9520.54192.12.5128.541279.264.74348.822.2711465、.131.9423.52205.03 2.8526.561362.895.24336.592.28121.742.1921.92239.06 2.8231.281635.565.32405.942.36142.332.1725.79271.22.835.881908.55.4476.422.43162.232.1629.56301.62.7740.242181.795.48548.222.51182.572.1633.44278.11 3.1332.491940.45.89447.222.44166.52.4226.88325.033.138.322328.385.98538.942.521966、4.872.431.66369.55 3.0843.972716.66.06631.952.59222.32.3936.32411.85 3.0649.443105.156.14726.462.67248.942.3840.87483.16 3.5749.993193.856.54787.742.83285.792.7441.23550.83 3.5457.443726.176.62922.472.91326.582.7347.34615.44 3.5264.694258.866.71058.862.99366.212.7153.32677.19 3.4971.7447926.781197.167、33.06404.832.759.18tga0.3920.3810.3820.3740.3860.3810.3830.3810.4040.4020.4080.4080.4040.3980.3960.3930.3890.410.4070.4040.4020.4350.4350.4290.4230.3880.3870.3840.3810.3850.3840.3820.380.3940.3930.3910.3870.6270.6260.6250.6220.4030.4020.4010.3970.4080.4070.4040.40.4110.4090.4060.4030.390.3880.3850.368、820.3760.3740.3720.3690.3920.390.3880.3855.3.5玻璃幕墙材料的线膨胀系数a可按表5.3.5采用。材料的线膨胀系数a表5.3.5材料a混凝土1.0X10-5钢材1.2X10-5铝合金2.35X10-5玻璃1.0X10-5砖混0.5X10-5回首页5.3.4材料的弹性模量E(N/mm2)材料E玻璃0.72X105铝合金0.7X105钢、不锈钢2.1X105回首页5.3.2铝合金强度设计值可按表5.3.2采用铝合金强度设计值fa(N/mm2)表5.3.1合金类型受拉、受压受剪LD30CZ84.248.9CS191.1110.8LD31RCS84.248.969、CS138.380.25.3.3钢材强度设计值可按表5.3.3采用、钢材强度设计值fs(N/mm2)表5.3.1钢材品种厚度(mm)受拉、受压、受弯受剪I级钢=16215125Q235II级钢=1631518516Mn.16Mnq5.3.6混凝土强度设计值fc(N/mm2)表5.3.6强度类型混凝土强度等级C20C25C30轴心抗压fc1012.5155.3.7钢筋强度设计值fy可按表5.3.7采用。钢筋强度设计值fy(N/mm2)表5.3.7种类fy(N/mm2)热轧I级210热轧II级d=25mm3105.3.7碳素钢板的强度设计值可按表5.3.7取用表5.3.7 碳素钢板的强度设计值fs70、2(N/mm2)钢板抗拉、抗弯、抗压抗剪墙面承压3号钢,t20mm2151253205.3.8钢材的强度设计值可按表5.3.8取用表5.3.8钢材的强度设计值fs(N/mm2)钢材抗拉、抗压、抗弯 抗剪3号钢,棒材直径小于40mm型材厚度小于15mm215125钢板厚度小于16Mn钢,直径或厚度小于16mm315185回首页端面承压320445备注C35C40C4517.519.521.5C30以下供已建筑参考局部承压3204455.3.1玻璃强度设计值可按表5.3.1采用玻璃强度设计值fg(N/mm2)表5.3.1玻璃类型厚度(mm)板面强度边缘强度浮法玻璃5122819.51519201471、钢化玻璃5128458.815195941.3半钢化玻璃5125639夹丝玻璃6102114.7注:中空玻璃和夹层玻璃的强度可按所采用的玻璃类型取用其强度。回首页5.2.5常用幕墙结构材料的体积密度见表5.2.5。常用幕墙结构材料的自重(KN/m3)表5.2.5材料名称自重(KN/m3)浮法玻璃25.6夹丝玻璃26玻璃棉0.11.0铝合金27钢材78.5注:当采用吸水、吸湿性材料时,应考虑由于吸水、吸湿后自重的增大。回首页5.2.2板材单位面积重量标准值qk(N/m2)板材厚度(mm)qk(N/m2)板材 厚度(mm)单层铝板256不锈钢板1.52.567.523812.541123复合铝板345.7花岗石板1045512673.625蜂窝铝板64930(铝泊芯)105315702074回首页qk(N/m2)117.8157196.3235.5250-280300-336625-700750-840厚度(mm)
会员尊享权益 会员尊享权益 会员尊享权益
500万份文档
500万份文档 免费下载
10万资源包
10万资源包 一键下载
4万份资料
4万份资料 打包下载
24小时客服
24小时客服 会员专属
开通 VIP
升级会员
  • 周热门排行

  • 月热门排行

  • 季热门排行

  1. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  2. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  3. 陕西化学工业公司招聘管理与职业发展管理手册30页.doc
  4. 动火作业安全告知卡(1页).docx
  5. 高处作业安全告知卡(1页).docx
  6. 广场工程建设项目施工招标评标报告表格(24页).pdf
  7. 建筑工程外脚手架专项施工方案(悬挑式脚手架、落地式脚手架)(25页).doc
  8. 2020柏向堂房地产公司材料标准化手册3.0(143页).pdf
  9. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  10. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  11. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  12. 工程变形测量之基坑监测培训课件(155页).ppt
  13. 房地产开发企业拿地操作指引方案.pdf
  14. 新规下的户型增值秘籍.ppt(22页)
  15. 房地产开发贷款实操指南(5页).pdf
  16. 鄂尔多斯空港物流园区总体规划方案(2017-2030)环境影响评价报告书(23页).doc
  17. 规划兰园西路道路工程环境方案环境影响评价报告书(89页).pdf
  18. 屋面圆弧形穹顶结构高支模施工方案(40米)(47页).doc
  19. 埋石混凝土挡土墙施工方案(23页).doc
  20. 重庆市五小水利工程建设规划报告(64页).doc
  21. 厂区至矿区管网蒸汽管道系统扩容改造工程施工组织设计方案(105页).doc
  22. 超高纯氦气厂建设项目办公楼、变电站、水泵房及消防水池、门卫、厂房、仓库、配套工程施工组织设计方案(140页).doc
  1. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  2. 2024大楼室内精装修工程专业分包投标文件(393页).docx
  3. 苏州水秀天地商业项目购物中心100%室内设计方案(158页).pptx
  4. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  5. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  6. 室内移动式操作平台工程施工方案(19页).doc
  7. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  8. 矿山治理工程施工组织设计方案(240页).docx
  9. 老旧小区改造工程施工方案及技术措施(364页).doc
  10. 北京科技园公寓建设项目整体报告方案.ppt
  11. 川主寺城镇风貌整治景观规划设计方案(60页).pdf
  12. 建筑工程三级安全教育内容(24页).doc
  13. 新疆风电十三间房二期工程49.5mw风电项目可行性研究报告(附表)(239页).pdf
  14. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  15. 四川凉山攀西灵山国际度假区小镇活力中心商业业态规划方案建议书(33页).pdf
  16. 埋石混凝土挡土墙施工方案(23页).doc
  17. 地下停车场环氧地坪漆施工方案(45页).doc
  18. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  19. 地铁深基坑及钢筋笼吊装安全专项施工方案【98页】.doc
  20. 住宅定价策略及价格表制定培训课件.ppt
  21. 西安名京九合院商业项目招商手册(28页).pdf
  22. 2010-2030年湖北咸宁市城市总体规划(32页).doc
  1. 建筑工程夜间施工专项施工方案(18页).doc
  2. 赣州无动力亲子乐园景观设计方案(111页).pdf
  3. 2016泰安乡村旅游规划建设示范案例(165页).pdf
  4. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  5. 龙山县里耶文化生态景区里耶古城片区旅游修建性详细规划2015奇创.pdf
  6. 连云港市土地利用总体规划2006-2020年调整方案文本图集(78页).pdf
  7. 850亩项目塑钢门窗工程施工组织设计方案(34页).doc
  8. 老旧小区改造工程施工方案及技术措施(364页).doc
  9. 城市更新项目地价公式测算表.xlsx
  10. 房地产项目规划前期投资收益测算模板带公式.xls
  11. 存储器基地项目及配套设施建筑工程临时用水施工方案(40页).docx
  12. 铁路客运枢纽项目站前框构中桥工程路基注浆加固专项施工方案(19页).doc
  13. 室内移动式操作平台工程施工方案(19页).doc
  14. 装配式结构工业厂房基础、主体结构、门窗及装饰工程施工方案(83页).doc
  15. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  16. 施工工程安全教育培训技术交底(13页).doc
  17. 老旧小区改造施工方案及技术措施(365页).doc
  18. 新建贵广铁路线下工程沉降变形观测及评估监理实施细则(126页).doc
  19. 消防火灾应急疏散演练预案(12页).doc
  20. 矿山治理工程施工组织设计方案(240页).docx
  21. 崖城站悬臂式挡墙施工方案(92页).doc
  22. 北京科技园公寓建设项目整体报告方案.ppt