2019龙湖金融中心项目景观概念设计方案(109页).pdf
下载文档
上传人:十二
编号:825615
2023-11-29
109页
57.39MB
1、2019.068 号.14 号楼景观概念设计方案Landscape Conceptual Design龙湖金融中心项目LONGHU FINANCIAL CENTER PROJECT景观方案分析Landscape Design1设计目标及策略Design objectives and Strategies项目背景Background23 T8 号景观概念设计Landscape Design Scheme T14 号景观概念设计Landscape Design Scheme45目 录 CONTENTS11.1 区位分析 Location analysis1.2 周边动线分析 Analysis of2、 Peripheral Moving Line项目背景Background区位分析Site analysisLonghu financial island in Zhengzhou is one of the main components of the core function area of financial agglomeration in Zhengdong New Area.Its overall positioning is regional financial center.The financial core agglomeration area in Central Pl3、ains Economic Zone is also an important engine of the construction of Central Plains Economic Zone.On the orientation of master plan,according to the direction of celebration nature of city software,a new type of urban space is formed,which is designed to be inspired by Qingming Shanghe Tu.It reads 4、various elements of activities related to river and expresses them with modern technology,so as to realize the celebration nature.The space is imported into this design.在总体规划的定位上,根据“城市的庆典性质”软件的指导方向而形成的新型城市空间,设计的着手于“清明上河图”为灵感源,读取其中的与运河相关的各式各样的活动要素并以现代技术进行表现,从而实现将带有庆典性质的空间导入本设计中。郑州龙湖金融岛,郑东新区金融集聚核心功能区主5、要组成部分之一,整体定位是“区域级金融中心”,中原经济区的金融核心集聚区,亦是中原经济区建设的重要引擎。Site analysisSite analysisSite analysisSite analysisSite analysisSite analysisSite analysisSite analysis轻轨车站轻轨车站轻轨车站码头地铁车站码头地铁车站轻轨车站复合双塔高端酒店服务型公寓优化金融办公楼滨湖商业裙房Site analysisSite analysisSite analysisSite analysisSite analysis岛上交通主要以公交、空中轨道、地铁和负一层立体化道6、路为主。地面 B1 层交通中环主线、中环外辅道全线及中环辅道大道为逆时针。(仅辅道中断处为顺时针)周边动线分析Analysis of Peripheral Moving LineThe main traffic modes on the island are bus,air track,subway and negative one-storey three-dimensional road.On the ground level B1,the main road of the Central Ring Road,the outer auxiliary road of the Central 7、Ring Road and the auxiliary road of the Central Ring Road are counterclockwise.(Clockwise only at the break of the auxiliary road)对标案例Landscape Zoning曼哈顿是纽约市中心部位的岛。介于哈得孙河和东河之间,为纽约市五个区中最小的曼哈顿区。长 20 公里,宽 4 公里,面积 57.7 平方公里。前寒武纪古老坚硬的片岩出露地表,为高层建筑提供了基础。纽约市金融、商业中心地。南端的华尔街是许多大银行、大交易所和大垄断组织聚集中心。Manhattan曼哈顿岛8、2设计策略design strategy强烈的空间辨识性Distinctive Characteristic优雅大气的办公场所Elegant office space活力丰富的商业空间Vigorous Business Space高端精致的公寓环境Exquisite apartment environment设计策略Design strategy人性化场所步行友好型场所情景氛围型场所多样化场所体验空间可辨识性丰富的主题空间趣味的多功能弹性空间场地解读设计策略概念设计方案概念设计效果景观分析Green ecological design1高品质的场所体验High Quality Place Ex9、perience以人为本的设计原则People-oriented design principles23以人为本的设计原则打造舒适的人性化场所建立交通友好型空间环境塑造可切换的空间氛围模式多样化场所体验空间辨识性丰富的主题空间趣味的多功能弹性空间绿色生态设计引入雨林花园系统提供舒适的绿意空间无覆土条件下营造观赏性屋顶花园3.11.8 号楼景观概念方案 Landscape Concept Scheme of Building 81.1.场地解读 Site Interpretation1.2 设计策略 Design strategy1.3 概念设计方案 Conceptual design sche10、me1.4 概念设计效果 Conceptual design effect景观分析Landscape Design Scheme项目(TC3-08)主要功能定位是办公及商业,位于龙湖金融中心外环建筑群,西侧临近龙湖外湖及沿湖景观带,东侧为内环建筑群及内湖,南北两侧均为金融办公建筑。TC3-08SITE建筑风格Architectural AnalysisThe main function orientation of the project is office and commerce.It is located in the outer ring building complex of Lon11、ghu Financial Center.The west side is near the outer lake of Longhu Lake and the landscape belt along the lake.The east side is the inner ring building group and the inner lake.Both sides are financial office buildings.建筑分析Architectural AnalysisSeven vertical lines,seven rhythmic windows to the lake12、七分竖向线条,以七个节奏变化的窗口探向湖面视觉重点视觉重点122视觉焦点视觉焦点视觉焦点12场地周边视线分析Analysis of the Line of Sight around the SiteOffice Main EntranceCommercial entrance and exit办公主入口商业出入口对标案例Landscape ZoningCASE STUDIES2.12ONE CENTRAL PARK垂直绿化公寓250 多种澳洲植物和花卉种植和攀爬在大楼上,从底层到最顶层,让大楼成为这个新世纪的绿色之树,并重新定义悉尼天际线、这个 64000 平方米的项目在郁郁葱葱中如同纽约中央13、公园般宁静。茂密的树丛,开敞的草坪,还有泳池,都是与家人和朋友放松的极好场所。室外甚至还设有露天电影院,同时也支持举办临时集市和音乐节。ICHIGAYA FOREST千岛森林“Ichigaya Forest”是 Dai Nippon Printing Company 在新宿区新建的 5.4 公顷全球总部的私人拥有,可公开访问的主要开放空间。超过一半的土地现在种植了原生树木,灌木和地面覆盖物,创造了一个独特的城市森林,拥有宁静的小径和小广场,可容纳 10,000 名 DNP 员工及其 Ichigaya 邻居。参考:办公空间、公共开放空间、生态景观Reference:urban complex,m14、ulti-purpose space,public art,ecological garden对标案例Landscape ZoningBESTSELLER OFFICE COMPLEX丹麦奥胡斯时尚集团办公楼这是一座为 800 名雇员设计的综合办公建筑,它由几组不同层数的体量组成,之间通过一系列的室外空间,如中庭、庭院、平台、屋顶花园等相互连接。参考:办公空间、时尚简洁、室内外空间连接、线性景观Reference:office space,stylish simplicity,indoor and outdoor space connection,Linear landscape对标案例Lan15、dscape ZoningBEIJING KITA SEKI SCIENCE PARK北京北七家科技园区北京北部的城郊建立起的一片极具前瞻性的大型综合社区。社区内包含住宅区,办公楼以及零售空间。项目的景观空间被进一步细分为商业办公、开放公园与居住区三个功能各异的部分。线性的景观元素以铺地、植被形态、街道家具、照明形式与入口构筑物等不同的方式呈现参考:线性的景观元素、中轴景观空间、住宅与办公结合Reference:linear landscape elements,central axis landscape space,residential and office combination对标案16、例Landscape Zoning场地现状分析Site status analysis采光井人防楼梯疏散口出地面风井建筑红线Daylighting wellCivil Air Defense StaircaseEvacuation PortMLPLandscape red line N51020m场地标高分析Site elevation analysis92.7492.6092.6092.5099.8593.00101.85101.45(结)101.45(结)98.50(结)5.70(结)14.70(结)10.20(结)5.70(结)-1.65(结)14.70(结)19.20(结)10.20(17、结)93.0095.1092.4092.8893.0992.80内庭院屋顶休息平台地下车库顶点标高屋顶休息平台裙房场内标高场外标高自行车坡道On-site elevationOff-site elevationOff-site elevationLandscape red line 0.000.00建筑红线N51020m消防分析Fire Analysis消防通道消防登高面Fire exitsOff-site elevationLandscape red line 建筑红线场地西侧办公主入口处为呈长矩形,消防登高面占比较大,对景观限制较大,需结合移动树箱和外摆等设施丰富场地空间。N51020mT18、he entrance of the main office on the west side of the site is long and rectangular,and the fire climbing area accounts for a large proportion,which restricts the landscape greatly.It is necessary to enrich the space of the site by combining the mobile tree box and outward swing facilities.车行交通分析Tra19、ffic analysis车行路线Driving routes 办公出入口商业出入口地下车库On-site elevationOn-site elevationUnderground garage N51020m外环路人行路线Pedestrian route项目优势Project AdvantageLandscape conceptOpen up the lakeside scenerySome people flow from the light rail direction to the direction of convergence,conducive to the developme20、nt of commercial space on the first floor123部分人流由轻轨方向汇入方向,利于一层商业活动开阔临湖景色临近轻轨,交通便利轻轨车站车流方向1132Light Rail StationVehicle flow direction内湖景观Inner Lake Landscape项目劣势Weakness322It is difficult to form a strong influence because of the small site area and the weak sense of commercial volume.Lighting wells21、,air wells and fire conditions inside the site have a great influence on streamlines and landscape design possibilities.Both sides of the building are financial office buildings,and the space function tends to be the same.It is difficult to form an independent and distinctive landscape environment.122、23左右两侧建筑性质均为金融办公建筑,且空间功能趋于一致,较难形成独立、特色的景观环境。场地内部的采光井、风井和消防条件对流线和景观设计的可能性影响较大。场地面积较小,商业体量感较弱,很难形成较强的影响力。丰富的空间主题Rich spatial themesOutdoor dining outdoor space/shopping experienceOutdoor Recreation Space/Shared Communication PlatformOutdoor bars/commercial performances户外餐饮外摆空间/购物体验户外休憩空间/共享交流平台户外酒吧/商业23、演出设计策略Design strategy塑造空间辨识性Shaping Spatial IdentityVisual Guidance of Identifying Buildings Visual Guidance of the Atmosphere of Characteristic LightsComfortable and Unique Visual Focus of Courtyard Garden办公前场具有辨识度的构筑物视觉引导商业街特色灯柱、灯光的氛围视觉引导中庭舒适、独特的庭院花园视觉焦点设计策略Design strategy立面空间策略Facade Space Strate24、gy错落有致汲取建筑元素,风格统一特色水景衬托场地氛围。设计策略Design strategy趣味的多功能弹性空间Interesting Multifunctional Flexible Space错落有致汲取建筑元素,风格统一特色水景衬托场地氛围。设计策略Design strategy舒适的绿意空间Comfortable green spaceStrengthening Roof Garden Greening SystemStrengthen three-dimensional greening constructionFully Considering the Seasonal Chan25、ge of Plants加强屋顶花园绿化系统加强立体绿化营造充分考虑植物季相变化设计策略Design strategy景观分区Landscape Zoning办公入口广场Office Entrance Square屋顶休息平台Roof rest platform商业入口广场商业广场空间办公广场空间商业展示面Commercial Entrance SquareCommercial Plaza SpaceOffice Plaza SpaceCommercial Showcase商业展示面商业展示面N51020mCommercial ShowcaseCommercial Showcase方案一Opt26、ion 14.1景观概念设计Landscape Design Scheme设计灵感Landscape concept1234567水韵律动的节奏追光逐影的跳跃草图构思Walking Friendly Place“舞台追光灯”STAGESPOT LIGHTS景观概念Landscape conceptTo refine the elements of stage tracer and form the form of site pavement;Using the design of note rhythm in architecture,the sense of rhythm is extend27、ed to the green space in front of the commercial square.提炼“舞台追光灯”的元素,形成场地铺装形式;利用建筑“音符韵律”的设计,将节奏感延伸至商业广场前绿地空间概念方案平面Conceptual Scheme Plane办公前广场24 小时地下车库出入口商业出入口商业前广场裙房办公出入口绿化带特色水景屋顶休息平台外摆区艺术雕塑123456789101661078925334N51020m办公主入口效果图Office Main Entrance Effect Map效果图Conceptual Scheme Plane商业街效果图Concept28、ual Scheme Plane效果图Conceptual Scheme Plane效果图Conceptual Scheme Plane办公广场意向Office Square Intention办公广场意向Walking Friendly PlaceBusiness Plaza Intention商业广场意向方案二4.2景观概念设计Landscape Design SchemeOption 1+在水一方高山流水流淌的艺术雨过天晴云破处,千峰碧波翠色来“汝、官、哥、钧、定”五大名窑之首北宋时期主要代表是中华传统制瓷著名工艺之一有“汝窑为魁”之称似玉、非玉、而胜玉汝 窑彩釉从建筑留下,形成流淌的艺29、术。此刻,汝窑的工艺得以传承,建筑也成为了一件传世的珍品。流淌的艺术灵感源泉Design source元素落地Element landing冰裂流淌水汝交融的流淌艺术概念平面Conceptual planeN0 5 1025概念方案平面标注Conceptual Scheme Plane办公前广场24 小时地下车库出入口商业出入口商业前广场(昭示水景)裙房办公出入口线性绿化带特色水景屋顶休息平台外摆区艺术雕塑123456789101435677689102N51020m1432概念方案平面分区Conceptual Scheme PlaneN51020m效果图Rendering效果图Renderi30、ng效果图Rendering效果图Rendering植物空间意向Plant space intention雕塑意向Sculpture intention铺装意向Paving intention坐凳意向Sitting stool intention效果图Rendering水景意向Water view intention效果图Rendering效果图Rendering天台花园意向Roof garden intention植物空间意向Plant space intention天台酒吧Rooftop bar效果图Rendering效果图Rendering效果图Rendering效果图Rendering31、水景意向Water view intention景墙意向Intention of the wall立面意向Facade intention构架意向Architectural intention夜景平面Night scene建筑灯光Architectural lighting建筑灯光Architectural lighting5.11.14 号楼景观概念方案 Landscape Concept Scheme of Building 81.1.场地解读 Site Interpretation1.2 设计策略 Design strategy1.3 概念设计方案 Conceptual design s32、cheme1.4 概念设计效果 Conceptual design effect景观设计方案Landscape Design Scheme建筑风格Architectural styleMetal curtain wall,high and low density combination of layers,create a slender,transparent screen effect金属材质的幕墙,高低密度的层次组合,营造纤细、透明的纱幕效果幕墙中点缀活泼的彩色百叶墙面,配合照明系统形成节日模式TC3-14SITEThe curtain wall is decorated with li33、vely color louvers to form a festival pattern with lighting system.场地周边视线分析Analysis of the Line of Sight around the Site12办公主入口商业出入口视觉焦点视觉重点1视觉焦点视觉重点2eyecatcherVisual FocuseyecatcherVisual FocusOffice Main EntranceCommercial entrance and exit场地现状分析Site status analysis场地现状分析Site status analysisShop采光34、井疏散口出地面风井建筑红线Daylighting wellEvacuation PortMLPLandscape red line N51020m消防分析Fire AnalysisShop消防通道消防登高面Fire exitsOff-site elevationLandscape red line 建筑红线N51020m场地标高分析Site elevation analysis-0.15-0.02-14.90-14.9091.56-0.02-0.15-0.150.0014.70(结)92.36-0.15(结)场内标高场外标高On-site elevationOff-site elevation35、Landscape red line 0.000.00建筑红线N51020m人行路线分析Pedestrian route analysis安全疏通出入口室外走廊商铺ShopShopAtrium green spaceOutdoor corridor商铺中庭绿地人行路线Landscape red line公寓出入口Apartment entrance商业出入口Commercial entranceN51020m项目优势Project Advantage333Landscape conceptThe best viewing point is the lake view,while the wes36、t side is also covered by tall buildings,sitting in the city landscape.Lakefront commerce is conducive to creating good urban space and enhancing commercial value.1123临湖商业,有利于营造良好的城市空间以及提升商业价值。最佳观景视角部位,饱览湖景,同时西侧亦高楼遮挡,坐拥城市景观。临近轻轨,交通便利内湖景观Inner Lake Landscape外湖景观Outer Lake Landscape2车流方向Vehicle flow d37、irection人流方向Flow direction项目劣势Weakness1The space of the site is relatively narrow and long,and it is difficult to form a strong landscape influence.Lighting wells,air wells and fire conditions inside the site have a great influence on streamlines and landscape design possibilities.The venue is close38、 to the main road of the city and the hotel,which is affected by noise.12333场地内部的采光井、风井和消防条件对流线和景观设计的可能性影响较大。公寓靠近城市主干道,临近商业酒店,存在噪音影响。场地空间较为狭长,较难形成较强的景观影响力。车流方向Vehicle flow direction设计灵感Landscape concept蒙德里安的红白蓝几何艺术构图Mondrians Red,White and Blue Geometric Art Composition草图构思Sketch conception“经纬交错的编织感39、”WARP AND WEFT 丰富的空间主题Rich spatial themesOutdoor dining outdoor space/shopping experienceOutdoor Recreation Space/Shared Communication PlatformOutdoor bars/commercial performances户外餐饮外摆空间/购物体验户外休憩空间/共享交流平台户外酒吧/商业演出可切换性空间氛围模式Switchable Spatial Atmosphere ModelWarming lamp deviceMovable atmosphere dec40、orationColour projection lamp暖灯装置可移动氛围装饰彩色投影灯舒适的绿意空间Comfortable green spaceStrengthening Roof Garden Greening SystemStrengthen three-dimensional greening constructionFully Considering the Seasonal Change of Plants加强屋顶花园绿化系统加强立体绿化营造充分考虑植物季相变化概念方案平面Conceptual Scheme PlaneN51020m办公前广场24 小时地下车库出入口商业出入口商业前广场裙房办公出入口绿化带特色水景屋顶休息平台外摆区艺术雕塑125567768103399123456789104效果图Conceptual Scheme Plane效果图Conceptual Scheme Plane效果图Conceptual Scheme Plane效果图Conceptual Scheme Plane效果图Conceptual Scheme Plane办公广场意向Business Plaza IntentionTHANKS.
CAD图纸
上传时间:2023-11-24
13份
CAD图纸
上传时间:2023-11-27
14份