6.45km农村公路新建工程总预算表.xlsx
下载文档
上传人:Le****97
编号:818984
2023-11-23
5页
26.77KB
该文档所属资源包:
农村公路新建项目施工图纸设计说明预算表格CAD全套资料
1、总总 预预 算算 表表建设项目名称:永川区2018年“四好农村路”(重要农村公路)青新路新建工程编 制 范 围:永川区2018年“四好农村路”(重要农村公路)青新路新建工程第 1 页共 5 页01 表项目节细目工程或费用名称单 位数 量预算金额(元)技术经济指标各项费用比例(%)备 注第一部分 建筑安装工程费公路公里6.45153,029,5278,220,357.6272.70一临时工程公路公里6.4511,491,707231,236.552.051临时道路km0.10015,659156,590.000.022临时电力线路km1.100290,115263,740.910.403拌合场、2、预制场m22500.000402,245160.900.554安全生产费项1.000783,688783,688.001.07 52245839*1.5%二路基工程km6.45128,106,8244,356,971.6338.531场地清理km6.451426,40366,098.740.581清理与掘除km6.451414,37964,234.850.571清除表土m24010.00013,1533.280.022伐树、挖根、除草棵10219.000401,22639.260.552挖除旧路面m3100.00012,024120.240.021挖除水泥混凝土路面m3100.00012,023、4120.240.022挖方m3325286.0007,912,98524.3310.851挖土方m378511.926635,8798.100.871挖路基土方m378511.926635,8798.100.872挖石方m3246774.4067,277,10629.499.981挖路基石方m3246774.4067,277,10629.499.983填方m3115311.000782,5526.791.071路基填方m3115311.000782,5526.791.071路基填土方m344388.000203,1304.580.282路基填石方m370923.000579,4228.1704、.794耕地填前夯实m24010.00015,8163.940.025特殊路基处理km6.4513,201,414496,266.324.391陡坡路堤或填挖交界处理工程m255380.000857,68915.491.182挖淤换填m311114.000644,21257.960.883低填浅挖路基工程m35812.000311,49153.590.434高填深挖工程m213680.000260,87819.070.365高填深挖路基工程m28276.0001,127,144136.191.551普通锚杆框架梁m23006.000504,962167.980.693挂网锚喷m25270.005、0622,182118.060.856排水工程m3/m3506.000/8902.0001,959,405558.87/220.112.691-1型边沟m3/m2356.070/6385.0001,417,519601.65/222.011.942-2型边沟m3/m0.420/610.00026,18162335.71/42.920.043-3型盖板沟m3/m65.780/110.00067,2441022.26/611.310.094-1型排水沟m3/m1055.200/1727.000426,435404.13/246.920.585-1型排水管50cmm70.00022,026314.66、60.037防护与加固工程km6.45113,808,2492,140,481.9418.93编制:黄长春复核:万媚总总 预预 算算 表表建设项目名称:永川区2018年“四好农村路”(重要农村公路)青新路新建工程编 制 范 围:永川区2018年“四好农村路”(重要农村公路)青新路新建工程第 2 页共 5 页01 表项目节细目工程或费用名称单 位数 量预算金额(元)技术经济指标各项费用比例(%)备 注1M7.5浆砌片石挡土墙m3/m16402.000/1908.0006,002,854365.98/3146.158.232C20片石砼衡重路肩墙m3/m12522.000/372.0007,7467、,693618.65/20824.4410.623鱼塘护坡工程m384.00058,702698.830.08三路面工程km6.45114,306,1742,217,667.6519.611路面工程m246953.00012,939,264275.5817.741路面底基层m234649.0002,107,76860.832.891厚220mm水泥稳定类底基层m234649.0002,107,76860.832.892路面基层m246953.0003,058,81865.154.191水泥稳定类基层m246953.0003,058,81865.154.191厚220mm水泥稳定碎石基层m2468、953.0003,058,81865.154.193混凝土路面m246953.0006,840,383145.699.38124cmC35混凝土路面m246953.0006,840,383145.699.384路槽、路肩及中央分隔带km6.451932,295144,519.451.281土路肩加固m31748.500873,578499.621.201现浇混凝土m31748.500873,578499.621.20250mmPVC塑料排水管m1295.20058,71745.330.082顺接道路m485.000463,956956.610.641挖方m3757.0002,1192.802填9、方m31937.0008,8654.580.013路面基层m22015.000109,50854.350.151水泥稳定类基层m22015.000109,50854.350.151厚180mm水泥稳定碎石基层m22015.000109,50854.350.154混凝土路面m22163.000224,490103.790.31120cmC30混凝土路面m22163.000224,490103.790.315排水工程m3164.000118,974725.450.161M7.5浆砌片石边沟m3164.00048,264294.290.075-1型排水管50cmm140.00070,710505.010、70.103改路工程m446.000902,9542,024.561.241挖方m316506.000272,20516.490.372填方m3185.0001,1116.013路面基层m23156.000171,51354.350.241水泥稳定类基层m23156.000171,51354.350.241厚180mm水泥稳定碎石基层m23156.000171,51354.350.244混凝土路面m23156.000327,545103.780.45120cmC30混凝土路面m23156.000327,545103.780.455排水工程m3426.000130,580306.530.181M11、7.5浆砌片石边沟m3426.000125,366294.290.175-1型排水管50cmm10.0005,214521.400.01编制:黄长春复核:万媚总总 预预 算算 表表建设项目名称:永川区2018年“四好农村路”(重要农村公路)青新路新建工程编 制 范 围:永川区2018年“四好农村路”(重要农村公路)青新路新建工程第 3 页共 5 页01 表项目节细目工程或费用名称单 位数 量预算金额(元)技术经济指标各项费用比例(%)备 注四桥梁涵洞工程km6.4512,611,191404,773.063.581涵洞工程道26.0002,611,191100,430.423.581圆管涵1.12、0m/道159.000/13.000745,2044686.82/57323.381.022盖板涵2x2m/道238.000/11.0001,865,9877840.28/169635.182.56五交叉工程处1.00068,69068,690.000.091挖方m3145.0004643.202填方m3700.0004,2106.010.013路面底基层m2118.0007,17760.820.011厚220mm水泥稳定类底基层m2118.0007,17760.820.014路面基层m2118.0007,78866.000.011水泥稳定类基层m2118.0007,78866.000.01113、厚220mm水泥稳定碎石基层m2118.0007,78866.000.015混凝土路面m2118.00014,510122.970.02124cmC30混凝土路面m2118.00014,510122.970.026路槽、路肩及中央分隔带km6.56723,1183,520.330.031土路肩加固m345.00022,483499.620.031现浇混凝土m345.00022,483499.620.03250mmPVC塑料排水管m14.00063545.367排水工程m332.80011,423348.260.021C25混凝土边沟m31.000828828.002M7.5浆砌片石边沟m33614、.00010,595294.310.01七公路设施及预埋管线工程公路公里6.4512,726,719422,681.603.741安全设施公路公里6.4511,421,422220,341.341.951波形钢板护栏m6.567918,047139,797.021.261Gr-C-4Em3344.000630,917188.670.862Gr-C-2Em1192.000287,130240.880.392钢筋混凝土护栏m150.000142,913952.750.202公路标线m23624.000174,34348.110.241热熔标线m23214.000126,42439.340.172震15、荡标线m2410.00047,919116.880.073里程碑、百米桩、公路界碑块129.0006,52850.600.011里程碑块7.0001,054150.572百米桩块58.0001,77930.673公路界碑块64.0003,69557.730.014道口标块10.0002,824282.405各类标志牌块46.000131,5082,858.870.181单柱式标志牌(一)块16.00020,1071,256.690.032单柱式标志牌(二)块5.0006,6161,323.200.01编制:黄长春复核:万媚总总 预预 算算 表表建设项目名称:永川区2018年“四好农村路”(重要16、农村公路)青新路新建工程编 制 范 围:永川区2018年“四好农村路”(重要农村公路)青新路新建工程第 4 页共 5 页01 表项目节细目工程或费用名称单 位数 量预算金额(元)技术经济指标各项费用比例(%)备 注3单柱式标志牌(三)块4.0005,0301,257.500.014单悬臂标志牌(一)块19.00085,3294,491.000.125单悬臂标志牌(二)块2.00014,4267,213.000.026凸面镜块3.0005,2121,737.330.017线形诱导标块31.00040,0471,291.840.052招呼站站亭个3.000190,34263,447.330.26117、招呼站(含栏杆、盖板)个3.000177,24359,081.000.242红砂岩铺地m278.0009,948127.540.013挖填方m3211.0003,15114.933停车区、观景平台工程m22310.0001,114,955482.661.53八绿化及环境保护工程公路公里6.4513,718,222576,379.175.101绿化工程km6.451685,945106,331.580.941撒播草种和铺植草皮m220643.000400,66819.410.551撒播草种m220643.000400,66819.410.552种植乔、灌木株2789.000285,277102.18、290.391种植乔木株2789.000285,277102.290.391香樟树(干径35cm)株2789.000285,277102.290.392取、弃土场防护亩29.0003,032,277104,561.284.161C20片石砼挡渣墙m3/m2894.000/130.0001,709,951590.86/13153.472.342M7.5浆砌片石排水沟m3/m696.000/940.000225,263323.65/239.640.313盲沟m430.00066,777155.300.094碾压土石方m3225000.0001,030,2864.581.41第二部分 设备及工具、器19、具购置费公路公里6.45114,9662,319.950.02三办公及生活用家具购置公路公里6.45114,9662,319.950.02第三部分 工程建设其他费用公路公里6.45117,771,4942,754,843.2824.36一土地征用及拆迁补偿费公路公里6.45114,330,5652,221,448.6119.65 永川府发201345号1土地征用补偿公路公里6.45112,694,3801,967,815.8417.401征地补偿费亩199.72010,984,60055,000.0015.062弃土场占地亩29.000478,50016,500.000.663公路临时占地亩320、.72018,6005,000.000.034青苗等补偿亩173.2401,212,6807,000.001.661菜地、林地、旱地、水田亩173.2401,212,6807,000.001.662赔偿树木、青苗公路公里6.4511,408,765218,379.321.931冠30cm株713.000128,340180.000.18210cm冠30cm株1497.000187,125125.000.263冠10cm株7214.000721,400100.000.994经济林株796.000278,600350.000.385竹林笼311.00093,300300.000.13编制:黄长春复21、核:万媚总总 预预 算算 表表建设项目名称:永川区2018年“四好农村路”(重要农村公路)青新路新建工程编 制 范 围:永川区2018年“四好农村路”(重要农村公路)青新路新建工程第 5 页共 5 页01 表项目节细目工程或费用名称单 位数 量预算金额(元)技术经济指标各项费用比例(%)备 注3拆迁建筑物公路公里6.451172,90026,802.050.241砖混结构m280.00045,600570.000.062砖瓦结构m2315.000113,400360.000.163坟座5.0007,5001,500.000.014地坝、花台m2160.0002,40015.005鱼塘m280.22、0004,00050.000.014拆迁电力及其它管线公路公里6.45154,5208,451.400.071砼电力杆(低压)根4.000720180.002电力线(低压)m800.00012,00015.000.023砼电讯杆根4.000600150.004通讯线缆m400.0003,2008.005砼电力杆(高压)m2.0006,0003,000.000.016电力线(高压)m400.00032,00080.000.04二建设项目管理费公路公里6.4512,914,414451,777.094.001建设单位(业主)管理费公路公里6.4511,238,243191,945.901.70 123、2382432工程监理费公路公里6.4511,590,886246,610.762.18 53029527*3%3设计文件审查费公路公里6.45153,0308,220.430.07 53029527*0.1%4竣(交)工验收试验检测费公路公里6.45132,2555,000.000.04四建设项目前期工作费项1.000500,000500,000.000.691勘察设计费项1.000500,000500,000.000.69八联合试运转费公路公里6.45126,5154,110.220.04 53029527*0.05%第一、二、三部分 费用合计公路公里6.45170,815,98710,977,520.8597.09 53029527+14966+17771494预备费公路公里6.4512,124,480329,325.692.912.基本预备费公路公里6.4512,124,480329,325.692.91 70815987*3%新增加费用项目(不作预备费基数)公路公里6.451概(预)算总金额公路公里6.45172,940,46711,306,846.54100.00 70815987+2124480+0其中:回收金额公路公里6.451公路基本造价公路公里6.45172,940,46711,306,846.54100.00 72940467-0编制:黄长春复核:万媚
CAD图纸
上传时间:2023-11-23
91份