房屋土建、装修及门窗工程量自动计算表.xls
下载文档
上传人:q**
编号:774043
2023-10-19
35页
99.54KB
1、序号 单位 层数 间数面积部位或轴线轴线长左跨右跨计算长度(L)部位或轴线左支座 右支座 左支座 右支座一层1m21329.77门厅26001301001001302860门厅2m21515.59阳台42001301001001304200阳台3m2112.67阳台36001301001001303600阳台4m21281.752/8轴1100013010010013011260A*C5m21138.7010/16轴1040013010010013010660B*D6m211108.921/9轴1460013010010013014600C*G7m211219.779/25轴2920013012、0010013029460D*H一层小计497.17二至六层467.118m25582.79阳台420013001001304460阳台9m25114.33阳台360013001001303860阳台10m252401.982/8轴1100013010010013011260A-C11m251545.701/9轴1460013010013010014630C-G12m251191.8810/16轴1040013010010013010660B-D13m2511098.869/25轴2920013010010013029460D-H二至六层小计2335.54一至六层合计2832.712823.33、19.40实际5656.17-18.29图纸5637.88轴线长左跨右跨计算长度(B)左支座 右支座 左支座 右支座360000130100347016000200115115148516000200115115148536001301001301003630360013010013010036307200130100100130746072001301001001307460160000115115148516000011511514853600100130100130357072001301001001307460360010013010013036007200130100100130744、60工程量计算表(房间表)工程名称:编号房间名称部位计算式相同层数相同间数水平距离 垂直距离单间面积单间墙周长小计面积小计周长1-5层同m2mm2m主卧室G4,7513360456015.3215.8476.6179.2主卧前室5196018601.795.648.9328.2卧室G1,3513060456013.9515.2469.7776.2卧室G3,4512760456012.5914.6462.9373.2客厅G2,5514260420017.8912.6689.4663.351500200.010.020.050.1餐厅G1,4516060336020.3613.82101.81695、.1走道G4,651230012402.855.3414.2626.7厨房G1,251206030606.3010.2431.5251.2主卫生间G5,651156030804.809.2824.0246.4次卫生间G-751228018604.248.2821.2041.4阳台G1,351330013804.556.0622.7730.3阳台G4,752348013804.804.8648.0248.6主卧室H7,10513360456015.3215.8476.6179.2主卧前室5196018601.795.648.9328.2卧室H10,11533060456013.9515.24206、9.30228.6卧室H11,13523060456013.9515.24139.54152.4卧室H23,25513060456013.9515.2469.7776.2客厅H9,12534560420019.1512.96287.28194.453500200.010.020.150.3餐厅H9,12536360336021.3714.12320.54211.8走道H8,1053230012402.855.3442.7880.1厨房H12,1353206030606.3010.2494.55153.6主卫生间H8,953156030804.809.2872.07139.2次卫生间H7-5327、28018604.248.2863.61124.2阳台H23,2551330013804.556.0622.7730.3阳台H7,1055348013804.804.86120.06121.5梯间522360540012.7415.52127.44155.2梯间外12236015003.547.727.0815.44工程量计算表(门窗面积)工程名称:编号门窗洞尺寸洞口面积每层数量樘数小计面积洞口面积宽高m21层2层3层4层5层6层露台m2m2M1150021003.1530000039.459.45M290021001.8912121212121272136.08136.08M380021008、1.6812121212121272120.96120.96TLM1180024504.4166666030132.30132.30TLM2180021003.78000006622.6822.68FM1乙100021002.106666663675.6075.60C190012501.135555553033.7533.75C2120015001.8066666636127.0164.80C316006751.0830000033.243.24C4150015002.2511111111111166148.50148.50C5200015003.00111111618.0018.00C6129、0015001.800333301221.6021.60C7240014003.36000003310.0810.08门窗洞口面积M13.15C11.13C73.36M21.89C21.80M31.68C31.08TLM14.41C42.25TLM23.78C53.00FM1乙2.1C61.80序号位置相同层数相同个数墙做法轴线长(mm)左支座(mm)右支座(mm)中支座(mm)单墙净长Lmm层高(mm)梁高(mm)墙净高(mm)S1234567=3-4-58910=8-9一A1型11-3.7-9.15-17.17-19.23-25/G6523030002005002750290045024510、023-5.5-7.13-15.19-21.21-23/G66230430025015003900290045024503G-C/1.2562230720020020030065002900400250041-2.8-9.24-25/C63230180020010001500290040025005C-A/2.8.16.18.24652303600200200032002900400250062-4.6-8.10-12.14-16.18-20.22-24/A55230420020020003800290050024007152304200200200038002900500240084-6.111、2-14.20-22/A43230260010010002400290045024509G-C1/5.13.21632305700115200400498529004002500104-5.5-6.12-13.13-14.20-21.21-22/D1662301300300115088529004002500111C-1A/4.6.12.14.20.22662305100300200046002900500240012662301600010001500290040025001316230210020000190029000290014H-D/176123079003002004007000212、900400250015G-E/3.7.15.19.236510032002002000280029004502450163-4.6-7.14-15.19-20.22-23/G16510021005050020002900450245017G-E/4.6.14.20.226510032005050031002900450245018E/4-5.5-6.13-14.20-21.21-226510028001501500250029004502450A2型199/H-C6123092002002001000780029004002500209-11/H6123030002002500255029013、045024502311-13/H61230430050150041002900450245024D-B/106123036002002000320029004002500259-10/D6123024002001000210029004502450269-11/F611003000115500283529004502450279-12/F16110030001155002835290045024502810/F-F1611001800505001700290045024502911/E-D61100220010020001900290040025003031老虎窗1623034000003414、00121201212230230513.17513.1710010088.2388.2388拉拉结结筋筋kgkg3046.373046.37单墙壁体积(m3)扣门、窗及空洞面积(m2)扣过梁体积(m3)扣门窗体积(m3)单墙体净体积(m3)总总墙墙体体净净体体积积(m3)总总墙墙体体净净体体积积(m3)拉结筋单长拉结筋根数柱子面11=2*7*1012131415=11-13-14 16=15*1*S16=15*1*S1.552.250.521.0330.968201222.202.930.671.5254.908201223.7400.003.7444.858201240.862.250.515、20.356.218201221.840.001.8455.208201222.104.411.011.0827.088201222.103.780.871.236.148201221.351.800.410.9411.268201222.8700.002.8751.598201230.5100.000.5118.328201212.542.10.482.0674.028201220.8600.000.8631.058201211.2700.001.277.608201414.030.004.0324.158201250.691.890.020.6720.018201220.491.680.016、20.4714.208201200.761.680.020.7422.288201200.6100.000.6118.388201214.4900.004.4926.918201281.442.250.520.925.528201222.313.000.032.2813.688201221.840.000.001.8411.048201221.181.800.021.176.998201220.691.890.020.684.058211200.691.680.020.684.078221200.421.680.020.402.408231200.480.000.000.482.858251217、20.950.955.69汇总拉结筋kg8229.32275.19186.57139.92233.21187.8637.5791.73209.89139.92270.52139.9226.43116.60229.320.000.00114.66186.5745.8645.8646.6445.860.000.000.0046.933046.37门窗洞口面积M13.15C11.13C73.36M21.89C21.80M31.68C31.08TLM14.41C42.25TLM23.78C53.00FM1乙2.1C61.80户户型型 房房间间名名称称部部位位相相同同层层数数相相同同个个数数长长(横横)18、宽宽(纵纵)层层高高楼楼地地天天面面减减(柱柱墙墙)加加(洞洞口口处处)地地面面合合计计(M2)厨房地1卫生间地11-6层A1A1一一层层卧室G/1-3652800300029008.400.00客厅E-C/1-56571003800290026.980.00主卧室C-A/2-45540003800290015.200.00主卧室C-A/2-41540003800290015.200.00卫生间G/3-4651925192529003.7118.53卫生间前室651500120029001.80厨房652050300029006.1530.7565600120029000.723.601-6层19、B2B2卧室H-F/9-11612800300029008.400.00 主卧室 D-B/10-125134003400290011.560.00 主卧室 D-B/10-131134003400290011.560.00客厅H-D/11-136143007200290030.960.00卫生间611650160029002.642.64卫生间前室611200180029002.16厨房612850205029005.845.84阳台564000160029006.40阳台164000160029006.40楼梯间6323705100290012.09老虎窗132560300012128.62坡20、顶面111053930.05.合计.40.1921.17.#0.00楼楼梯梯楼楼面面(M2)楼楼面面合合计计(M2)顶顶面面减减(柱柱墙墙)加加(梁梁侧侧面面)地3阳台楼梯间地面楼面合计(M2)卫生间厨房阳台楼梯间楼面42.00252.008.402.80134.90809.4026.985.3976.00380.0015.200.0076.0076.0015.200.00111.173.710.009.0054.001.800.00184.506.150.0021.600.720.008.4050.408.403.5211.5657.8011.562.9511.5611.5611.562.921、530.96185.7630.960.0015.842.640.002.1612.962.161.9835.065.840.0038.40192.006.405.4038.4038.406.405.4036.26217.5712.09地地面面合合计计(M2)0.05402.5476.8036.261889.88127.01241.16230.40217.57顶顶棚棚(M2)墙墙面面墙墙面面净净高高(H)墙墙周周长长(L)减减(门门窗窗洞洞口口)加加洞洞侧侧面面内内墙墙面面(M2)刮腻子厨及卫顶1公共顶1顶2阳台梯间厨卫内2内1阳台外侧墙梯间336.0024.642.88.84.140.996122、5.00970.9538.182.7913.74.352.191014.93380.0032.482.811.66.301.54654.5076.0043.682.815.65.671.38190.05111.1721.642.817.72.810.93564.9654.0010.922.83.95.25170.10184.5028.382.8110.11.800.93797.4321.606.742.812.41.680.46151.9271.5224.082.88.64.140.99119.6472.5528.562.810.24.411.54120.7514.5128.562.810.223、3.781.3824.78185.7645.902.7916.56.992.27233.4315.8418.272.816.501.680.5099.5124.8411.762.84.205.2539.0635.0627.542.819.803.480.93144.35354.005.082.821.8152.2870.809.022.823.254.14217.5743.332.914.95.880.46 674.03682.2425.8613.481.21211.10.05368.16 316.46 2186.18 552.24674.03 1758.173182.25 206.4268224、.24厨卫内2内1阳台内644.701080.51693.03196.95592.92170.10825.39165.84125.58128.4626.16247.03102.5139.06149.94152.2854.14刮腻子1836.60 3351.57206.42外外贴贴面面砖砖构构件件名名称称工工序序层层高高宽宽墙墙侧侧边边增增加加 阳阳台台侧侧边边增增加加 剪剪扣扣门门窗窗面面积积 门门窗窗两两侧侧面面积积增增加加M MM MM2M2M2M2M2M2M2M21-251-25立立面面1 117.417.442.642.6285.36285.36167.04167.04265.682625、5.6826.73626.73625-125-1立立面面1 117.417.443.843.8186.75186.7523.2823.28H-AH-A立立面面1 117.417.41313A-HA-H立立面面1 117.417.41111门门楼楼2.582.5812.612.6汇汇总总宽高洞口面积外外墙墙贴贴面面C190012501.13M2M2C2120015001.80954.696954.696C316006751.08C4150015002.25598.65598.65C5200015003.00C6120015001.80226.2226.2C7240014003.36TLM1180024504.41191.4191.4TLM2180021003.7832.5132.512003.4542003.454
地产规划
上传时间:2024-10-10
163份