施工组织设计中英文摘要(1页).doc
下载文档
上传人:正***
编号:544852
2022-08-15
1页
69.50KB
1、施工组织设计摘要摘 要:本施工组织设计作为主导施工的依据,编制时对目标工期、工程质量、项目管理机构设置、劳动力组织、施工进度计划控制、机械设备及周转材料配备、主要分部分项工程施工方法、安全保证措施、文明施工及环境保护措施、降低成本措施等诸多因素尽可能充分考虑,突出科学性及可行性。 关键词: 现场施工 组织设计construction organization designAbstract:This construction organization design Be predominant the basis of construction, expect to the target wor2、k while drawing up, engineering quality, item management organization constitution, labor force organization, construction the progress plan a control, machine equipments and turnover material an equipment, main divide parts of item engineering construction method, safety assurance measure, civilization construction and environmental protection measure, decline low cost measure etc. many factors to consider possibly and well, outstanding science and possibility.Keyword:The spot starts construction The organization designs