个人中心
个人中心
添加客服WX
客服
添加客服WX
添加客服WX
关注微信公众号
公众号
关注微信公众号
关注微信公众号
升级会员
升级会员
返回顶部
施工电梯基础处理及外防护方案(9页)
施工电梯基础处理及外防护方案(9页).doc
下载文档 下载文档
其它文档
上传人:正*** 编号:442256 2022-07-11 9页 385.50KB
1、management systems and measures established by, and a number of pragmatic, combined part-time workforce education information, the protection of the digital campus construction and sustainable development. Six Bureau attaches great importance to information technology security, information technolog2、y security, entrust XX City Center for educational information and equipment dedicated to the work. Network security leading group was set up, chaired by the Education Bureau Chief, head, for XX education Metro-network and information security emergency response leadership. Deputy group leader for X3、X educational metropolitan area network and information security emergency response coordination, command. The team assist leader and deputy leader, responsible for network XX network security and information . Team. Information security work Conference held each semester, and deployment of informat4、ion security of documents issued on a regular basis. Information security assessment is included in the annual index. Strictly implement the information security budget to ensure information security of investment. By XX, education information and equipment Centre XX network network security and inf5、ormation security. According to the information technology security requirements, issued a document requires schools (units) implement, defined the information security guidelines, specific work practices, procedures, and requirements. Clear industry information security incidents (accidents) to det6、ect, report and disposal processes. According to self-examination, the school (units) basic established has network security management system; the school (units) according to this units actual, established has units personnel management, information system room management, and equipment management,7、 and media management, and network security construction management, and shipped dimension management, and service outsourcing, management system; developed has computer and the network of network security responsibility held system, signed has network security responsibility; website of information8、 management personnel is responsible for confidential management, password management, on computer enjoys independent right, User name and password of the computer for its proprietary, and release of provisions is prohibited, such as leaks, investigated for responsibility. According to who is in cha9、rge of whos in charge, who is running and who is responsible for, who uses principles of who is in charge of management schools (units) defined the roles and responsibilities of information security, assurance responsibilities to schools. XX city schools (units) total site 20, 19 of which were not c10、lassified security protection assessment, of which 1 (XX education and resource network) for classified security protection levels, without third-level information systems. Total education information systems 1 (XX education cloud platform), contains features with e-Government, resource library, tes11、t database, mail services, such as e-books, all intranet services. No for grade protection grading record and evaluation of school (units), requirements the school (units) according to information security grade protection about policy and standard, organization carried out information security grad12、e protection security management system construction, and technology measures construction and grade evaluation, implementation grade protection system of the requirements, makes information system security management level obviouslyfacility up to 160 million Yuan, according to the standard, high qu13、ality planning XX educational metropolitan area network realizes Wan Zhaokuan to schools, hundreds of megabytes of broadband to the table, wire (ie: Web, video, audio) to the target, electronic whiteboards, multimedia classrooms, remote interactive video teaching system of modern educational equipme14、nt in the classroom. . With Intel company on XX Education City domain network of topic case design, relies on Cisco company thought Shu aid chuan project staff free provides has three years technology support, from 2009 began, according to high standards, and high of work thought, and manpower plann15、ing, and points step implementation, using school earthquake Hou reconstruction of opportunities, again planning elementary and middle schools campus network and education city domain network, and local broadcasting network company cooperation, using broadcast TV network, will physical fiber laying 16、to each school, to minimum of cost achieved has physical fiber school school pass; Each school construction standards of campus network and network access to all rooms; XX education metropolitan area network center machine room equipment in the Ministry of education standardization management platfo17、rm, the Central Library of audio-visual education resources, set up a Chinese teacher education cloud platform, implemented links the two platforms. At present, the citys primary and middle school students to computer 3198, vitality than 10:1; 809 equipment classes through the classroom (primary and18、 secondary); 36 of the campus network. The establishment of an advanced, practical Gigabit educational metropolitan area network, the citys schools have access to educational metropolitan area network, schools have computer networks, closed-circuit television network, broadcast networks into the cla19、ssrooms, realize the triple play. Schools share Internet bandwidth, can meet the needs of teaching of the school office and at any time. According to Ministry of education on full started implementation teaching points digital education resources full cover project of notification (taught technical 20、letter (2012) 74th,) and XX Province Department of education on issued XX province teaching points digital education resources full cover project implementation views of notification (chuan taught letter (2013) 18th,) requirements, I city 6 a teaching points implementation teaching points digital ed21、ucation resources full cover project, combined I city specific situation, developed issued has XX City Bureau on teaching points digital resources full cover project of implementation programme, Established XX, full coverage of digital resources in modern distance education teaching project leading 22、group, XX, chaired the Secretary for education. Established, digital resources in modern distance education teaching, XX full coverage project group, XX, Director of the Center for educational information and equipment chaired Zhu Guiyan, responsible for distance education digital resources covering23、 project work. Projects in XX city school digital resources in modern distance education teaching full-coverage project leading group, digital resources in modern distance education teaching, and XX full coverage project group leadership and organization, in accordance with the unified arrangement o24、f the whole province, responsible for university education digital resources covering project management and implementation. According to provinces arrangements, I Center has arrangements Gong天翼星公馆1、2、3#楼1#楼施工电梯基础加固及外防护施工方案一、编制依据1、施工图纸2、施工组织设计3、混凝土结构设计规范4、钢结构设计规范5、建筑施工扣件式钢管脚手架安全技术规范(JGJ130-2011);6、建25、筑施工高处作业安全技术规范(JGJ80-91);7、建筑施工安全检查标准(JGJ59-2011)8、河南省和漯河市的相关地方标准和要求二、工程概况漯河天翼星公馆工程主楼为剪力墙结构,地下一层为框架结构;地上部分由三栋主楼(1#2#3#楼)和商业组成;地下由地下车库相连(商业除外)。主体高度81.70M;总建筑面积39085.58m2(其中地上建筑面积33362.04 m2,地下建筑面积5723.54 m2);结构0.00相当于绝对标高61.9M,室内外高差0.30M.基础形式为CFG桩+抗水底板.主楼以外筏板基础局部增设下柱墩。本工程建筑抗震设防类别为丙类,抗震烈度为6度,设计地震分组为第一组26、,结构使用年限50年。结构安全等级为二级,基础设计等级为甲级,建筑场地类别为三类,框架一区的抗震等级为三级,抗震构造措施按抗震等级三级执行,二区抗震等级为四级,抗震构造措施按抗震等级四级执行.三、总体策划结合本工程结构形式、实际施工特点,结合建筑面积,每栋楼采用一部施工电梯,满足施工现场的需求。本工程地下室只有一层,考虑上人和上料的方便,考虑在地下室顶板上支设施工电梯。本工程的地下室为人防工程顶板为250厚,C40P6混凝土,配筋为双层双向三级直径12150。地下室平时为停车库,战时为人防,地下室基础采用整体式防水筏板。顶板设计活荷载为20KN/m2,建筑安全等级为二级。施工电梯经设备采用SC27、D200/200型施工升降机,该升降机是一种采用齿轮、齿条驱动方式的垂直运输机械。并较其它提升机械具有性能稳定,安全可靠,不另设机房、井道,拆装方便等特点。本工程采用升降机标准产品导架高度为90米。主要参数:每只吊笼额定载重量2T,额定安装重量1T,安装吊杆额定其重量200kg,吊笼净尺寸为3*1.3*2.2m,最大提升高度为151m(本工程为81.5米),额定提升速度为34.4m/min。防坠安全器制动力矩大于3000N.m,动作速度为51.6m/min,标准节规格立柱管中心距为0.65*0.65,高度为1.508m,(本工程采用55个标准节)围栏重量为1170kg,每只吊笼重量(包括传动机28、构)为1300kg。四、基础设计及加固1、荷载合计 荷载重量 围栏重量:1170kg吊笼重量:1300*22600吊笼载重量2000*24000导架总重量:191*6011460以上五项重量合计:19230kg 附墙架、动力电缆、电缆导向装置、钢丝绳、头架紧固件等重量约占导架重量的30=3438kg 用过道竖杆和过桥连杆的附墙结构的重量增加约为导架总重量的45=5157kg,以上合计静载合计27825kg,考虑在施工过程中的动荷载约为静荷载的2倍。所以基础所承受最大的荷载值为55650kg 结构需要承受的力为55650*9.8kg545KN 2、基础加固本工程施工电梯直接放置在地下室顶板上,考29、虑顶板自身所承受的荷载值不能满足施工电梯的荷载值,需要用顶板进行加固。(1)基础的尺寸为6700*4700mm见附图:(2)在混凝土上搭设立杆,立杆间距为1000*1000,水平杆为1000mm,扫地杆离地200mm,立杆下部垫上方木,立杆上部全部采用顶托,顶托内必须放置钢管且钢管不得偏离中心10mm。(3)沿立杆四周必须搭设一圈封闭的剪刀撑。剪刀撑与立杆采用旋转扣件牢固连接。3、施工电梯基础直接放置顶板上,顶板地脚加固:在顶板上放100*100*8的钢板,四角并采用M25螺栓进行固定。钢板上放置外径直径50高100的套筒,直径采用M30-深70。施工电梯标准节采用M30地脚螺栓与基础固定。预30、埋地架,标准节下面四角地脚采用地架进行连接一起。长边采用L75*50*6-910的角铁,短边采用L75*50*6-330的角铁,中间对角线采用L75*50*6-985的角铁一道,各种零件材料之间均采用连接焊连接。五、外防护施工电梯入料口采用双排单立杆架进行防护,并安设防护门。第一排立杆紧靠建筑物外挑檐,第二排立杆处在建筑物边梁内侧,与第一排立杆间距600mm,第一道水平杆2.1m,上下加设一道水平杆。在楼层处上下设置小横杆,与建筑物可靠的连接。立杆未经许可,任何人不得进行拆除。见附图:入料口向两侧安设建筑物临边防护架,与入料口的第一排立杆相连接。临边除防护门外,必须采用密目式安全网进行封闭。入31、料口与建筑物之间的缝隙处必须采用木板进行固定在楼层的小横杆上,用22#铁丝扎牢。外立杆应刷成黄色,电梯防护门作好安全标语以及楼层号并采用22#铁丝与防护门牢固绑扎。电梯防护门都刷成黄色漆。见附图。六、安装和拆除方案见单独方案。七、安全通道施工电梯前室必须搭设牢固的安全通道。挑空两根立杆、跨越三步三跨,大小为4.5m4.5m(宽高)。出入口处再搭设6.0m4.5m6.0m (长宽高)的防护棚,上铺5cm厚的双层脚手板,具体见下图。在出入口两侧的内、外排单立杆处分别增设一根辅立杆,并高于门洞口一步,立柱用短管斜撑相互联系。上方悬空双排架立柱处各增加一根斜杆,斜杆与各主节点相交处用扣件固定。洞口上方32、增设两道横向支撑,应伸出斜腹杆的端部,以保证立柱悬空处的整体性。门洞两侧分别增加两根斜腹杆,并用旋转扣件固定在与之相交的小横杆的伸出端上,旋转扣件中心线至主节点的距离在15cm内。当斜腹杆在1跨内跨越2个步距时,应在相交的大横杆处增设一根小横杆,将斜腹杆固定在其伸出端上;斜腹杆宜采用通长杆件,必须接长时用对接扣件连接。增设门洞处上升斜杆、平行弦杆桁架示意详见下图。施工电梯加固计算书支架的计算依据建筑施工扣件式钢管脚手架安全技术规范(JGJ130-2011)、混凝土结构设计规范GB50010-2010、建筑结构荷载规范(GB 50009-2012)、钢结构设计规范(GB 50017-2003)等33、规范编制。一、参数信息:1.支架参数横向间距或排距(m):1;纵距(m):1;步距(m):1.00;立杆上端伸出至模板支撑点长度(m):0.30;模板支架搭设高度(m):3.65;采用的钢管(mm):483.5 ;板底支撑连接方式:钢管支撑;立杆承重连接方式:可调托座;板底钢管的间隔距离(mm):1000;板底支撑采用钢管支架。托梁材料为:钢管(双钢管) :48 3.5;2.荷载参数施工均布荷载标准值(kN/m2):1.000;结构需要承受的力为545KN,折合面荷载545(6.24.2)20.93KN/m2,楼板自身所承受的荷载为20 KN/m2,则加固支撑架所承受的面荷载为0.93KN/m34、2。取单位宽度1m的面板作为计算单元 图2 支撑架荷载计算单元二、纵向支撑钢管的计算:纵向钢管按照均布荷载下连续梁计算,截面力学参数为截面抵抗矩 w=5.08cm3;截面惯性矩 I=12.19cm4; 计算简图1.荷载的计算:(1)q10.9310.93 KN/m (2)活荷载q2 = 11 =1 kN/m;2.强度验算:最大弯矩考虑为三跨连续梁均布荷载作用下的弯矩。最大弯矩考虑为静荷载与活荷载的计算值最不利分配的弯矩和,计算公式如下:最大弯矩计算公式如下: 静荷载:q1 = 1.2 0.93= 1.11kN/m;活荷载:q2 = 1.41= 1.4 kN/m;最大弯距 Mmax = (0.135、1.11+0.1171.4 ) 0.62 = 0.099 kN.M; 最大支座力 N = ( 1.1 1.11+ 1.21.4)0.6 = 1.74 kN ;最大应力计算值 = M / W =0.2345106/5080 = 46.1 N/mm2; 纵向钢管的抗压强度设计值 f=205.0 N/mm2;纵向钢管的最大应力计算值为 46.1 N/mm2小于 纵向钢管的抗压强度设计值 205.0 N/mm2,满足要求!3.挠度验算:最大挠度考虑为三跨连续梁均布荷载作用下的挠度计算公式如下: 静荷载 q1 =14.18 kN/m活荷载 q2 = 1 kN/m三跨连续梁均布荷载作用下的最大挠度V= (36、0.6777.662+0.9900.6)6004/( 10020.610812.19 ) =0.5 mm;支撑钢管的最大挠度小于1000/150与10 mm,满足要求!三、托梁材料计算:托梁按照集中荷载作用下的三跨连续梁计算;托梁采用:钢管(双钢管) :48 3.5;W=10.16 cm3;I=24.38 cm4;集中荷载P取纵向板底支撑传递力,P = 6.673 kN; 此集中力直接传递到顶托材料上,由顶托向下作用与立杆上,所以托梁材料本身的强度和变形满足要求。四、模板支架立杆荷载标准值(轴力):作用于模板支架的荷载包括静荷载和活荷载。1.静荷载标准值包括以下内容:静荷载标准值 NG = 137、4.1811 = 14.18 kN;2.活荷载为施工荷载活荷载标准值 NQ = 111 = 1 kN;3.立杆的轴向压力设计值计算公式 N = 1.2NG + 1.4NQ = 18.416kN;五、立杆的稳定性计算:立杆的稳定性计算公式 其中 N - 立杆的轴心压力设计值(kN) :N = 18.416kN; - 轴心受压立杆的稳定系数,由长细比 Lo/i 查表得到; i - 计算立杆的截面回转半径(cm) :i = 1.58 cm; A - 立杆净截面面积(cm2):A = 4.89 cm2; W - 立杆净截面模量(抵抗矩)(cm3):W=5.08 cm3; - 钢管立杆受压应力计算值 (38、N/mm2); f- 钢管立杆抗压强度设计值 :f =205 N/mm2; L0- 计算长度 (m);如果完全参照扣件式规范,由下式计算: l0 = h+2a a - 立杆上端伸出顶层横杆中心线至模板支撑点的长度;a = 0.3 m;得到计算结果:立杆计算长度 L0 = h + 2a = 1+20.3 = 1.6 m ;L0 / i = 1600 / 15.8=101 ;由长细比 lo/i 的结果查表得到轴心受压立杆的稳定系数= 0.58 ;钢管立杆受压应力计算值;=18416/(0.58489) = 64.93 N/mm2;立杆稳定性计算 = 64.93 N/mm2 小于 钢管立杆抗压强度设39、计值 f= 205 N/mm2,满足要求!消火栓给水系统和自动喷淋给水系统由设在地下二层的消火栓给水泵和自动喷淋给水泵经消防水池到消防给水泵,再向大楼各层消火栓和喷淋管网供水。同时消火栓给水系统和自动喷淋给水系统管网均与屋顶设置的生活、消防共用水箱相连、并通过屋顶设置的消防稳压设备进行稳压。improve, security prevention capacity obviously enhanced, security hidden and security accident obviously reduced, effective guarantees information health40、 development. XX Education Centre regularly carry out day-to-day network security monitoring information and equipment. By the appropriate technical staff, XX network engine room maintenance staff on site management and maintenance on a regular basis, scheduled viewing of networks, systems, database41、s and associated equipment operating conditions, and make a record. Computer lab maintenance managers regularly run a variety of devices in the school information system parameters, server systems and various data backup, so that there was a hardware failure in a system crash can resume quickly and 42、efficiently. Computer lab maintenance managers establish a network antivirus system, Avira Virus system on a regular basis, and anti-virus software security assessment, time to upgrade. Computer lab maintenance management for all equipment in the room a regular dust, replace the old label. Regularly43、 host servers, network switches, core routing, firewalls, hardware maintenance, such as equipment failure, should be processed in a timely manner in order to ensure safe and reliable operation of the system. In XX city information and equipment was established within the Centre, educational metropol44、itan area network center machine room XX. Servers and data stores and applications to set up in XX City metropolitan area network center machine room. WindowsServer2003, windowsServer2008, windowsServer2012, Linux, the operating system, the database for SQL Server2008, Office software, such as Micro45、soft Office software. Schools (units) of computer, information system security products for domestic products, including the use of 360 and kingsoft Internet security software. XX education metropolitan area network used by the server for HP, firewall and information security product for Huawei and 46、Cisco products. In their daily work, to publicize related knowledge and information security considerations. Enhanced global awareness of network and information security, and strive to achieve network everyone knows security and virus before the guard, to improve network and information security, e47、nsure that the XX education system network and information system security. Tracking reporting system requires all parties to strengthen collaboration, work closely with emergency safety plan developed XX education metropolitan area network, regularly carry out emergency drills, and carried out spec48、ial funds every year to protect the security of information. Annual 2-3 professional training for network managers in the city, forming technology with a strong professional and technical team, school network managers on common network failures and be capable of solving security issues. Issues that 49、cannot be resolved, timely forms of meetings, such as meetings, analysis, and solutions through a meeting, without rolling up the ability to solve problems, and feedback to superiors in writing departments to resolve. Through self-examination, we are well aware, relative lack of investment in educat50、ion, facilities and equipment for further updates, education development is still uneven, new education concepts need to be further enhanced to some extent and restricting the development of city education. We will take the opportunity of government supervision, to strive for the province education 51、demonstration counties as a driving force, further increase input in education, efforts to promote thelong wing, and Li Wanfu, and Michael Jenkins, and Chen Jian, and Song and xiaochuanyun, 7 bit comrade participate in province backbone face-to-face or network learning, do each teaching points are h52、as teachers participate in training, October 17, 2013, issued XX city education information and equipment Center on requirements the teaching points school for good satellite ground station installation prepared of notification, requirements school related management personnel familiar XX province t53、eaching points digital education resources full cover project construction management manual, Particularly with regard to installation preparation parts according to the point of XX province full coverage of digital educational resources in the project construction management manual . Devices are ab54、le to receive TV signals and IP data, the schools have school training and school-based application to use good. Actively organize implementation of a division of a class, a teacher in one class activity. XX in XX city first to complete full registration of teachers working in this city, XX, Sun cla55、ss rate of 54 per cent respectively, the forefront. In XX, a division of a class, a class a total ranked first in Division activities, was awarded the national ministerial one, 2 provincial second prize, third prize at the provincial level 3. Actively organize implementation of the e-learning space 56、the work of everyone. At present, in the open space of public service platform of provincial educational resources teachers number 2444, 83 to the total number of teachers, student number is 6569 of the open space, the citys total students 18.31 to (junior high school students in 30 above, students 57、not required), registration number to meet the requirements of teachers and students, in XX in first place. Five, information technology application capability as a means to boost teaching of teachers to use information, Education Bureau of XX title and modern educational technology teacher assessme58、nt levels linked to the examination; launched a provincial model school of modern education technology selection, advanced unit in education a year (individual) award. To expedite education informatization work, the city established the school running level of supervision and assessment system. Info59、rmation education in school performance evaluation, education assessment information work more than to cut weight 10. Practice is a regular room supervision, education information steering, steering, steering with the end, principals of education information into performance assessment and school le60、vel monitoring and evaluation, to develop a scientific, operational education information steering assessment methods, tracking management of education information and applications. By March 2016, 100 of the teachers, I participated in a national educational technology training for primary and secon61、dary school teachers, the teachers have made to cut 80 primary and middle school teachers educational technology proficiency test certificate. At present, all schools have access to broadband networks. Training classification training of teachers, school teachers, academic leaders, information techn62、ology, teacher training and network management personnel from the County, within the school back to school training once training is complete. Through this mode of classification training, information technology application capability training of teachers in our city reached 100. XX series of effective information河南宝鼎建设工程有限公司天翼星公馆项目部 第 9 页 共 9 页
会员尊享权益 会员尊享权益 会员尊享权益
500万份文档
500万份文档 免费下载
10万资源包
10万资源包 一键下载
4万份资料
4万份资料 打包下载
24小时客服
24小时客服 会员专属
开通 VIP
升级会员
  • 周热门排行

  • 月热门排行

  • 季热门排行

  1. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  2. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  3. 陕西化学工业公司招聘管理与职业发展管理手册30页.doc
  4. 动火作业安全告知卡(1页).docx
  5. 高处作业安全告知卡(1页).docx
  6. 广场工程建设项目施工招标评标报告表格(24页).pdf
  7. 原油码头消防工程维保方案(39页).docx
  8. 建筑工程外脚手架专项施工方案(悬挑式脚手架、落地式脚手架)(25页).doc
  9. 2020柏向堂房地产公司材料标准化手册3.0(143页).pdf
  10. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  11. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  12. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  13. 房地产开发贷款实操指南(5页).pdf
  14. 学校宿舍楼建设工程施工方案【153页】.docx
  15. 住宅小区工程施工方案【234页】.docx
  16. 鄂尔多斯空港物流园区总体规划方案(2017-2030)环境影响评价报告书(23页).doc
  17. 规划兰园西路道路工程环境方案环境影响评价报告书(89页).pdf
  18. 屋面圆弧形穹顶结构高支模施工方案(40米)(47页).doc
  19. 埋石混凝土挡土墙施工方案(23页).doc
  20. 重庆市五小水利工程建设规划报告(64页).doc
  21. 厂区至矿区管网蒸汽管道系统扩容改造工程施工组织设计方案(105页).doc
  22. 超高纯氦气厂建设项目办公楼、变电站、水泵房及消防水池、门卫、厂房、仓库、配套工程施工组织设计方案(140页).doc
  1. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  2. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  3. 2024大楼室内精装修工程专业分包投标文件(393页).docx
  4. 苏州水秀天地商业项目购物中心100%室内设计方案(158页).pptx
  5. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  6. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  7. 室内移动式操作平台工程施工方案(19页).doc
  8. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  9. 矿山治理工程施工组织设计方案(240页).docx
  10. 老旧小区改造工程施工方案及技术措施(364页).doc
  11. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  12. 川主寺城镇风貌整治景观规划设计方案(60页).pdf
  13. 建筑工程三级安全教育内容(24页).doc
  14. 新疆风电十三间房二期工程49.5mw风电项目可行性研究报告(附表)(239页).pdf
  15. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  16. 四川凉山攀西灵山国际度假区小镇活力中心商业业态规划方案建议书(33页).pdf
  17. 埋石混凝土挡土墙施工方案(23页).doc
  18. 地下停车场环氧地坪漆施工方案(45页).doc
  19. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  20. 住宅定价策略及价格表制定培训课件.ppt
  21. 西安名京九合院商业项目招商手册(28页).pdf
  22. 2010-2030年湖北咸宁市城市总体规划(32页).doc
  1. 建筑工程夜间施工专项施工方案(18页).doc
  2. 赣州无动力亲子乐园景观设计方案(111页).pdf
  3. 2016泰安乡村旅游规划建设示范案例(165页).pdf
  4. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  5. 龙山县里耶文化生态景区里耶古城片区旅游修建性详细规划2015奇创.pdf
  6. 连云港市土地利用总体规划2006-2020年调整方案文本图集(78页).pdf
  7. 850亩项目塑钢门窗工程施工组织设计方案(34页).doc
  8. 老旧小区改造工程施工方案及技术措施(364页).doc
  9. 城市更新项目地价公式测算表.xlsx
  10. 房地产项目规划前期投资收益测算模板带公式.xls
  11. 存储器基地项目及配套设施建筑工程临时用水施工方案(40页).docx
  12. 铁路客运枢纽项目站前框构中桥工程路基注浆加固专项施工方案(19页).doc
  13. 室内移动式操作平台工程施工方案(19页).doc
  14. 装配式结构工业厂房基础、主体结构、门窗及装饰工程施工方案(83页).doc
  15. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  16. 施工工程安全教育培训技术交底(13页).doc
  17. 老旧小区改造施工方案及技术措施(365页).doc
  18. 新建贵广铁路线下工程沉降变形观测及评估监理实施细则(126页).doc
  19. 消防火灾应急疏散演练预案(12页).doc
  20. 矿山治理工程施工组织设计方案(240页).docx
  21. 崖城站悬臂式挡墙施工方案(92页).doc
  22. 北京科技园公寓建设项目整体报告方案.ppt