个人中心
个人中心
添加客服WX
客服
添加客服WX
添加客服WX
关注微信公众号
公众号
关注微信公众号
关注微信公众号
升级会员
升级会员
返回顶部
3楼基坑土钉墙支护施工方案(8页)
3楼基坑土钉墙支护施工方案(8页).doc
下载文档 下载文档
其它文档
上传人:正*** 编号:436335 2022-07-07 7页 102.50KB
1、measures planned implementation of technical protection measures and security schemes, the problems should be promptly reported to the Manager. 37th: carbon supervisor leadership and head of the company should periodically check the anti-accident measures planned, security technology protection meas2、ures planned in implementation of measures against accidents and guarantee schemes, security technology protection measures planned in implementation. Seventh article 38th of education and training: new factory (company) production staff (including internships, commissioned officer), must be approve3、d by the factory (company), workshop and team level safety education upon passing the examination before entering production site. Tertiary-level education after card registration, by the companys production technology section recovery archive, and reported to the company trade unions, safety record4、. Training and examinations including the safe work procedures as well as relevant safety regulations, work environment and jobs there are risk factors, preventive measures and emergency treatment, and so on. The 39th article: new producers must receive the following training and qualified posts: (a5、) the operating personnel, scheduling, must pass through the field point, institutional learning, on-site training and classes practice; (B) the maintenance, including technical staff, must undergo maintenance, technical specifications for learning and class practice; (C) special operations personne6、l, must pass the national professional training, after obtaining a special operations qualifications before they can post. 40th: on-the-job training of production personnel: (I) post production staff should regularly carry out targeted of technical questions and answers, an accident expected on site7、 training and anti-accident; (B) from running post 1 month and above the main post on duty or leave transportation . Drive system and security studies, arranged by upper management or organization of the examination. The 42nd article: June of every year once regulatory and safety procedures of the c8、ompany system of examinations, examination the failed again, still not eligible waiting list study. Article 43rd: every year in June the work ticket issuer, assignee, licensee of work training, after passing the examination, as a formal announcement are eligible to work as ticket issuer, head of ins9、pection, work permits and the right to a separate high-pressure equipment list, and reported to the Management Department. Failing the exam may not serve as a two person, stop classes, examinations before they can post. 44th: for breach of discipline system caused the accident, a kind of disorder an10、d attempted serious responsibility for the accident, in addition to the relevant provisions dealing with should also be tasked to learn about a point system, and after passing the exam, before they can post. Article 45th: units of the company using the security video, slide projector, television, co11、mputer, multimedia, radio, Billboard, artifacts, photo exhibitions, as well as security knowledge exam, lectures, contests, and other forms of advocacy, popularize the knowledge of security technology, targeted, Visual training, enhancing workers safety awareness and self-protection ability. Article12、 46th一、工程概况 淮南康城房地产有限公司拟在淮南市蔡家岗夏郢孜路与谢李路交叉口东北侧兴建“熙城春天一期”, A号、C号、4号、3#楼四栋楼高层设一层地下室。基坑深度暂定为4.5米。根据施工现场实际情况,A号楼和4号楼采用部分土钉墙支护技术和挂铁丝网喷浆防护措施对基坑边坡进行保护,3号楼东侧采用部分预应力土钉墙支护技术和挂铁丝网喷浆防护措施对基坑边坡进行保护,C号楼采用挂铁丝网喷浆防护措施对基坑边坡进行保护。为防止周边构筑物随着地基的开挖出现事故问题,确保周边的安全,结合该工程地质现场勘察的地质情况,遵循安全可靠、技术可行、经济合理、节约工期的原则,该工程土方开挖时,结合设计根据现场实际情13、况开挖放坡为1:0.330.55。 地基土的构成及岩性特征, 详见淮南市建筑勘察设计研究院出具的岩土工程勘察报告。二、预应力土钉墙工艺简介及素喷说明预应力土钉墙支护随基坑逐层开挖,逐层进行支护,直至坑底,施工时在基坑开挖坡面,用洛阳铲人工成孔或机械成孔,孔内放锚杆并注入水泥浆,在坡面安装钢筋网,喷射强度等级不低于 C20的混凝土,使土体、土钉锚杆及喷射混凝土面层结合,为深基坑土钉支护。其技术原理是利用岩土介质的自承能力,借助土钉与周围土体的摩擦力和粘聚力,将不稳定土体和深部稳定土层连在一起形成稳定的组合体,土钉端与钢筋网相互连接,之后喷射混凝土,土钉与土体形成复合体,提高了边坡整体稳定和承受坡14、顶超载能力,增强土体破坏延性,改变边坡突然坍方性质。有利于安全施工,由于该技术具有施工简便、灵活机动、适用性强、隔水防渗等优点,近年来在我国的应用日益广泛,在建筑基础工程技术政策(19962010)中,被列为积极开发的支护技术。素喷护坡随基坑逐层开挖,逐层进行支护,直至坑底,施工时在基坑开挖坡面,采用直接将锚杆砸入土内,在坡面安装钢筋网,喷射强度等级不低于 C15的混凝土,使土体、钢筋网和喷射混凝土面层结合,将不稳定土体连在一起形成稳定的组合体,提高了边坡整体稳定,增强土体破坏延性,改变边坡突然坍方性质。 三、施工组织 健全施工组织机构是保证施工质量和进度的关键,工程实行项目管理,管理人员应履15、行各自职责。 加强组织管理,根据工程需要实行例会制。施工班组由具有丰富施工经验的劳务队组成,劳动力合理调整,确保各阶段施工人员及时到位。 作业层施工人员组成情况见附表1。施工人员组成情况表(附表1)序号 工 序 工 种 数 量 备 注 12345678边坡修整 成孔安装土钉锚杆安装钢筋网片注浆喷射混凝土 辅助施工 力工专业专业钢筋工专业专业电焊工机械工 53252511四、主要施工机械设备 主要施工机械设备表(附表2) 序号名 称单 位数 量备 注123456789101112空气压缩机混凝土喷射机砂浆搅拌机注浆机锚杆钻孔切割机电焊机输料管风管洛阳铲铁锹辅助工具 台台台台台台台米把把1111116、1230201020若干17m3/m3.5m3/h 五、工艺流程及施工方法 从保证工程质量的重要性来看土钉墙施工是关键环节,其特点表现为作业时间长,施工难度大,受土体影响大。施工应根据土方开挖情况、降水情况进行。开挖一步,支护一步,直至基坑底。施工前设置位移观测点,施工期间应连续观测,直至施工完毕。 1、工艺流程 : 2、主要技术参数: (1)土钉孔径150mm,孔内注浆体强度等级M15; (2)钻孔深度(自上而下分两排):第一排:7.5m第二排:6m第三排:4.5m(3)钻孔间距:水平间距1.5m,竖向间距1.21.3m; (4)土钉锚杆: HRB335级热轧带肋钢筋18。 (5)土钉布置形17、式:网格形;(6)网片钢筋:HPB2356.5, 间距200mm;(7)喷射混凝土强度等级分 C20;C15两种;(8)喷射混凝土厚度: 100mm;(9)坡顶混凝土:外延1.5m,作好护坡顶排水;3、施工方法 : A 、材料:矿渣硅酸盐32.5级水泥,5mm碎石,中砂, HPB235级6.5钢筋。 B 、施工: 1、挖土应按土钉垂直间距挖土并修坡面。机械挖土时应预留0.1m,之后人工修整,根据边坡土质情况,可采取全面或分段挖土支护。 2、土钉定位成孔:按设计孔深,人工或机械成孔。 3、注浆:按配比制浆,注浆采用底部注浆法,注浆管应插入距孔底250500mm处,随浆液的注入缓慢匀速拔出,为保证18、注浆饱满,孔口宜设止浆塞或止浆袋。 4、铺设钢筋网片:网片筋应顺直,按设计间距绑扎牢固。在每步工作面上的网片筋应预留与下一步工作面网筋搭接长度。钢筋网应与土钉连接牢固。埋设控制喷层混凝土厚度的标志。 5、喷射混凝土:按配合比要求拌制混凝土干料。为使回弹率减少到最低限度,喷头与受喷面应保持垂直,喷头与作业面间距宜为0.61.0m。喷射顺序应自下而上,喷射时应控制用水量,使喷射面层无干斑或移流现象。 喷射混凝土终凝2h后,应喷水养护,养护时间根据气温确定,宜为37d 。 以此类推,下一步工作面重复16工序循环,直至支护到基坑底标高。 注:基础施工前应设置坡顶和坡脚排水设施。 六、质量保证措施 (一19、)、技术准备 1、了解地质情况和地下管网、构筑物情况,认真编制基坑支护的设计、施工方案,做好施工前的技术交底和安全交底。根据现场实际情况,对可能出现的突发情况采取有效措施防范,必要时现场商定调整技术参数应急施工。 2、提前计算施工用材料量,以便备料。 3、根据水泥浆和混凝土的强度及工艺要求,提前做好配合比的试配和优选。 4、严格按照基坑支护施工方案精心施工,技术人员跟班指导作业,确保每道工序符合要求。 5、严把钢材、水泥、砂、石等材料的质量关,原材料应具有合格证。 6、对每个施工环节严格把关,质检员必须对工作认真、及时到位,对施工质量进行监督检查,检查合格后方可进行下道工序施工。 7、设专人对20、坡顶水平位移、坡顶沉降观测点进行测量,每天将测量结果反馈给责任工程师以指导施工。 七、安全生产、文明施工的技术组织措施 该支护工程具有离周边建筑物近、地质条件复杂、交叉作业、工期紧等特点,安全工作十分重要,严禁施工中在坡顶堆放材料及重物以免造成未成形的坡体滑移,各级管理人员应引起高度重视。 1、施工现场必须认真贯彻“安全第一,预防为主”的方针,坚持“管生产,必须管安全”的原则。建立安全管理生产责任制。 2、建立并认真执行安全交底制度,班前安全活动制度。 3、进入施工现场施工人员必须戴好安全帽,现场临时搭设的脚手架,支撑杆必须稳固。 4、土方坍落和滑坡是本工程最容易发生的安全隐患。在危险处设置醒21、目警示标志。施工过程中设专人对边坡进行监测。 5、施工前应提前做好防雨准备工作,遇雨天应停止施工,对施工用材料、机具及坡面进行覆盖防护,雨后复工须认真检查边坡情况。决定是否有必要采取措施,之后才能施工。 6、施工现场要做到及时清理,保持场容整洁,道路畅通。 7、施工期间严格遵守安全用电操作规程。 8、认真贯彻执行国家有关安全生产和文明施工的规定,确保支护施工的顺利进行。 八、施工中注意的问题 1、土方开挖、支护施工应分段进行,土方开挖后应尽量减少基坑边坡暴露时间,遇雨天应大面积覆盖,同时在坡脚堆载以防止滑坡。 2、成孔时遇砾石、砖块、管网或地下构筑物时,孔位及其下倾角可以调整,如遇到砾石层可改22、用钢管做锚杆。 3、护坡坡脚的处理:喷射混凝土面层伸入基坑底标高下至少0.2m,以形成护脚。 4、基坑支护完毕,甲方应及时进行后序施工,同时做好有序排水,防止水浸渗入坡脚底下。 九、应急措施 支护施工完成至基坑回填之前,如遇暴雨洪水等,甲方必须将施工人员设备撤离现场,支护坡面上需覆盖蓬布以免造成塌方,同时增加监测次数,并做好相应的措施(如临时回填或在坡脚增加堆载)防止滑坡。如遇重物垂落,需要修复的地方,重新喷射砼或抹水泥砂浆,防止雨水灌入,造成不必要的损失。 regular issuance system of internal and external accident cases, org23、anizational learning, analysis and discussion on a regular basis, and educate the persons concerned in a timely manner. 47th article: strengthening the safety of staff, establishing the concept of legalization of production safety, establish a people-oriented concept, three do no harm (dont hurt you24、rself, no harm to others, not to be hurt). 48th eighth day routine: pre-shift and post-shift monitor organizations, safety assist. Before class: succession (started), combined with shift operation and tasks for better risk analysis, arranged security account considerations. After class: summarizing 25、comment on duty and the security situation, praise good deeds criticism ignored safety, illegal operations and other adverse phenomena, and completes the record. 49th: safety day event organized by the monitor, safety help, workshop leaders and checking activities. Classes (groups) or rotating a saf26、ety day event a week, activities to learn more about the superior file and the spirit of the meeting, informed of the accident, analysis of the company, workshop and fewer security incidents, as well as the typical illegal team, analysis of operation environment, there may be a risk factor for the m27、ain content. 50th: security analysis companies every quarter of a security analysis; shop at least once a month analysis, comprehensive analysis of production trends, sum up lessons learned from and the weakness in safety management, accident prevention measures in the study. Meeting was chaired by 28、enterprise security responsibility, concerning the participation of Heads of Department, workshop. Formation meeting and made public. 51st: security check for carbon companys periodic and non-periodic safety checks should be carried out. Periodic inspection includes fall and spring security checks, 29、security checks should be combined with spring or autumn season characteristics and accident law . 52nd: security analysis companies should all be actively involved in the preparation of security advisories, bulletins, integrated security, analysis of accident law, drawing on lessons learned from. 530、3rd: the companys safety safety month activities each year according to the Governments requirements and deployment of the group, safety month activities focus on advocacy efforts to improve production safety and strengthen company-wide awareness of work safety, improve the safety awareness, improvi31、ng the companys safety culture. 54th: units of the company in relation to the units actual, active use of risk analysis method, and is actively exploring new management tools for enterprises and job site safety analysis, identify weaknesses and potential accidents and take preventive measures in a t32、imely manner. 55th: units of the company against the possibility of seriously affecting the safety of emergency contingency plans, and actively prepared for the critical work, ensure that the critical situation occurred after relief, rescue and recovery work in an orderly manner. 56th Nineth day construction project: company or project, the implementation of construction projects legal and construction team joint management of construction site safety of principle. Identified under the project bear this organizing, coordinating and oversight responsibilities;- 7 -
会员尊享权益 会员尊享权益 会员尊享权益
500万份文档
500万份文档 免费下载
10万资源包
10万资源包 一键下载
4万份资料
4万份资料 打包下载
24小时客服
24小时客服 会员专属
开通 VIP
升级会员
  • 周热门排行

  • 月热门排行

  • 季热门排行

  1. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  2. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  3. 陕西化学工业公司招聘管理与职业发展管理手册30页.doc
  4. 动火作业安全告知卡(1页).docx
  5. 高处作业安全告知卡(1页).docx
  6. 广场工程建设项目施工招标评标报告表格(24页).pdf
  7. 原油码头消防工程维保方案(39页).docx
  8. 建筑工程外脚手架专项施工方案(悬挑式脚手架、落地式脚手架)(25页).doc
  9. 2020柏向堂房地产公司材料标准化手册3.0(143页).pdf
  10. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  11. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  12. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  13. 房地产开发贷款实操指南(5页).pdf
  14. 学校宿舍楼建设工程施工方案【153页】.docx
  15. 住宅小区工程施工方案【234页】.docx
  16. 鄂尔多斯空港物流园区总体规划方案(2017-2030)环境影响评价报告书(23页).doc
  17. 规划兰园西路道路工程环境方案环境影响评价报告书(89页).pdf
  18. 屋面圆弧形穹顶结构高支模施工方案(40米)(47页).doc
  19. 埋石混凝土挡土墙施工方案(23页).doc
  20. 重庆市五小水利工程建设规划报告(64页).doc
  21. 厂区至矿区管网蒸汽管道系统扩容改造工程施工组织设计方案(105页).doc
  22. 超高纯氦气厂建设项目办公楼、变电站、水泵房及消防水池、门卫、厂房、仓库、配套工程施工组织设计方案(140页).doc
  1. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  2. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  3. 2024大楼室内精装修工程专业分包投标文件(393页).docx
  4. 苏州水秀天地商业项目购物中心100%室内设计方案(158页).pptx
  5. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  6. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  7. 室内移动式操作平台工程施工方案(19页).doc
  8. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  9. 矿山治理工程施工组织设计方案(240页).docx
  10. 老旧小区改造工程施工方案及技术措施(364页).doc
  11. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  12. 川主寺城镇风貌整治景观规划设计方案(60页).pdf
  13. 建筑工程三级安全教育内容(24页).doc
  14. 新疆风电十三间房二期工程49.5mw风电项目可行性研究报告(附表)(239页).pdf
  15. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  16. 四川凉山攀西灵山国际度假区小镇活力中心商业业态规划方案建议书(33页).pdf
  17. 埋石混凝土挡土墙施工方案(23页).doc
  18. 地下停车场环氧地坪漆施工方案(45页).doc
  19. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  20. 住宅定价策略及价格表制定培训课件.ppt
  21. 西安名京九合院商业项目招商手册(28页).pdf
  22. 2010-2030年湖北咸宁市城市总体规划(32页).doc
  1. 建筑工程夜间施工专项施工方案(18页).doc
  2. 赣州无动力亲子乐园景观设计方案(111页).pdf
  3. 2016泰安乡村旅游规划建设示范案例(165页).pdf
  4. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  5. 龙山县里耶文化生态景区里耶古城片区旅游修建性详细规划2015奇创.pdf
  6. 连云港市土地利用总体规划2006-2020年调整方案文本图集(78页).pdf
  7. 850亩项目塑钢门窗工程施工组织设计方案(34页).doc
  8. 老旧小区改造工程施工方案及技术措施(364页).doc
  9. 城市更新项目地价公式测算表.xlsx
  10. 房地产项目规划前期投资收益测算模板带公式.xls
  11. 存储器基地项目及配套设施建筑工程临时用水施工方案(40页).docx
  12. 铁路客运枢纽项目站前框构中桥工程路基注浆加固专项施工方案(19页).doc
  13. 室内移动式操作平台工程施工方案(19页).doc
  14. 装配式结构工业厂房基础、主体结构、门窗及装饰工程施工方案(83页).doc
  15. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  16. 施工工程安全教育培训技术交底(13页).doc
  17. 老旧小区改造施工方案及技术措施(365页).doc
  18. 新建贵广铁路线下工程沉降变形观测及评估监理实施细则(126页).doc
  19. 消防火灾应急疏散演练预案(12页).doc
  20. 矿山治理工程施工组织设计方案(240页).docx
  21. 崖城站悬臂式挡墙施工方案(92页).doc
  22. 北京科技园公寓建设项目整体报告方案.ppt