个人中心
个人中心
添加客服WX
客服
添加客服WX
添加客服WX
关注微信公众号
公众号
关注微信公众号
关注微信公众号
升级会员
升级会员
返回顶部
碱厂深基坑支护施工方案(135页)
碱厂深基坑支护施工方案(135页).doc
下载文档 下载文档
施工方案
上传人:木** 编号:421095 2022-06-27 134页 1.18MB
1、天津碱厂深基坑支护施工方案1.工程概述1.1、工程简介天津碱厂搬迁改造工程新区位于天津市临港工业区内。本工程为原、燃煤储运系统转运站、输煤栈桥深基坑的支护工程。设计采用退台卸荷+钻孔灌注桩+内支撑进行支护方案。采用单排深层水泥土搅拌桩作为止水帷幕。工程名称:天津碱厂搬迁改造工程原、燃煤储运系统转运站、输煤栈桥深基坑支护工程涉及项目:NO.1栈桥-NO.1转运站;NO.13栈桥-NO.8转运站-NO.12栈桥-NO.7转运站 建设单位:天津渤海化工有限责任公司天津碱厂 设计单位:天津市天勘建筑设计院1.2主要技术参数1.2.1主要实物量一览表序号单位工程名称桩型桩径(mm)桩数(根)桩长(m)12、七号运转站-十二号栈桥-八号运转站-十三号栈桥钻孔灌注桩80036716.5钻孔灌注桩8002416钻孔灌注桩6003814.5钻孔灌注桩6002611.5竖托桩7002615水泥搅拌桩双70095411.52一号运转站-一号栈桥钻孔灌注桩10006518.5钻孔灌注桩8001716钻孔灌注桩6003214.5水泥搅拌桩双70016014水泥搅拌桩双70014011.51.2.2基坑深度一览表序号单位工程名称0.000(大沽高程)基坑底标高(m)基坑深(m)1一号运转站4.15-12.6211.72一号栈桥4.15-9.8458.93七号运转站4.1-10.39.44十二号栈桥4.1-10.03、79.175八号运转站4.1-10.39.46十三号栈桥4.1-9.979.071.3、基坑围护设计简介本工程基坑围护方案由天津市天勘建筑设计院设计。设计支护方案为:退台卸荷+钻孔灌注桩+内支撑进行支护。采用单排深层水泥搅拌桩作为止水帷幕设计。支撑布局:在转运站范围的四角布置三角支撑梁与冠梁相连形成支撑体系; 栈桥部分沿长度方向等距离设置支撑梁与冠梁连成支撑体系。2、编制依据2.1 NO.1栈桥-NO.1转运站;NO.13栈桥-NO.8转运站-NO.12栈桥-NO.7转运站基坑支护施工图2.2施工合同2.3工程地质勘查报告2.4建筑桩基技术规范 JGJ94-20082.5建筑基坑支护技术规程 4、JGJ120-992.6工程测量规范 GB50026-20072.7建筑地基基础工程施工质量验收规范 GB50202-20022.8混凝土结构工程施工质量验收规范 GB50204-20022.9钢筋焊接及验收规程 JGJ18-20033、施工程序3.1分部工程施工工艺程序3.1.1钻孔灌注桩施工工艺流程桩位放样埋设护筒钻机就位钻进成孔一次清孔提升钻具下钢筋笼下 导 管二次清孔水下砼灌注拔出导管机具清理孔深测量钢筋笼制作桩顶测量砼拌制及运输泥浆循环钻机移位泥浆处理泥浆外运复测桩位桩孔回填场地平整3.1.2水泥搅拌桩施工工艺流程测放桩位桩机就位预搅拌下沉搅拌、提升、喷浆重复搅拌下沉重复搅拌、喷浆、5、提升施工完毕水泥浆拌制3.2施工顺序3.2.1总体施工顺序为:先施工钻孔灌注桩,再施工水泥搅拌桩。考虑施工进度及桩位布置的特点,安排从两处同时施工,即一处从七号运转站开始施工,另一处从八号运转站同时开始施工。3.2.2水泥搅拌桩因需要搭接,安排从一侧开始进行施工,即待八号运转站钻孔桩施工完后,即行进行水泥搅拌桩的施工。3.2.3钻孔灌注桩因桩间距较小,为确保施工质量,必须间隔跳打,即每隔三根桩施工一根。4、施工方法及技术措施4.1钻孔灌注桩施工方法及技术措施4.1.1钻孔灌注桩施工方法1) 施工准备在桩基施工前,清除桩基位置上的杂物,整平场地,用推土机碾压密实,使机械能顺利进出场,并保证施工中6、钻机稳定。进行桩位中心和标高控制点的测放,钻孔桩十字轴线上部设四个中心护桩,便于施工过程中进行中心复核及检查。2) 泥浆制备采用原土造浆。 3) 埋设护筒护筒内径比桩径大10cm,长度视土层情况而定,在粘性土中埋设深度一般不少于1米。顶部高出地面30cm,严防地表水渗入护筒。顶部准确竖直,护筒孔口平面位置与设计偏差按小于50mm控制,护筒竖向的倾斜度不大于1%L。4) 成孔钻机就位时用枕(方)木支垫平稳,将钻头中心线对准桩孔中心。旋转钻机的起重滑轮和固定钻杆的卡机,位于同一垂直线上,保持钻杆垂直。开钻时,低档慢速钻进,钻到护筒下1m后,再以正常速度钻进。5) 钻进成孔施工时注意起落钻头均匀,避7、免撞击孔壁;接卸钻杆时采取可靠措施,严防钻头脱落;钻杆拆除后,进行检查清理,涂油保养。钻孔过程中,孔内严格保持泥浆稠度适当、水位稳定,根据孔内泥浆的渗缺情况及时补充泥浆维持孔内水头差,防止坍孔。6) 第一次清孔钻孔至设计高程经检查后,立即进行清孔。清孔采用换浆法,在钻进至设计深度后,稍稍提起钻头,同时保持原有的泥浆比重进行循环浮碴,随着残存钻碴的不断浮出以达到清孔的目的。清孔的目的是使孔底沉碴厚度、泥浆浓度、泥浆中含钻碴量和孔壁厚度符合质量要求和设计要求,为灌注创造良好的条件。7) 钢筋笼吊装钢筋笼分段现场制作,利用吊装架进行现场吊装孔口焊接。钢筋笼安放时必须保证桩顶的设计标高,允许误差为108、mm,垂直偏差不大于1%。钢筋笼下放时,应对准孔位中心,一般采用正、反旋转慢慢地逐步下沉,防止碰撞,放至设计标高后应立即固定。起吊钢筋笼下笼时由人工辅助对准孔位,保持垂直、轻放、慢放,避免碰撞孔壁。下放过程中若遇到障碍应立即停止,查明原因后进行处理,严禁提高猛放和强制下入。下放钢筋笼时,技术员在场严格控制笼顶标高。钢筋笼应制作吊杆吊挂于井口钢管上,防止钢筋笼下沉或浇注混凝土时上浮。8) 导管安装导管安装前对导管作水压和接头密封性试验。导管直径250mm,采用螺丝紧固,每节中间加橡皮垫进行密封,底节长度大于4m。9) 二次清孔导管安放好后,测量孔底沉渣,进行二次清孔,利用混凝土导管向孔内压入比重9、小于1.15左右的泥浆,把在下钢筋笼和导管的过程中再次沉淀在孔底的钻渣置换出来。 10) 水下灌注混凝土必须具有良好的和易性,商品混凝土进入施工现场应对其进行检查验收,坍落度控制在160 mm220mm,并做好记录。采用导管法水下灌注混凝土。开始灌注混凝土时,导管距孔底距离为300mm500mm。灌注第一罐混凝土时保证能把导管埋入混凝土内1.0米以上。灌注混凝土在地层易塌孔、缩径处,应减慢提管速度,不大于1m/min。混凝土灌注应连续进行,灌注过程中必须有专人测量计算孔内混凝土面深度和导管在混凝土内的埋入深度,并做好记录,及时调整导管埋入深度,导管埋深宜为26m。严禁导管提出混凝土面。整个浇灌10、过程由专人负责记录混凝土用量,并最终计算该桩充盈系数,保证每根桩充盈系数不小于1。控制最后一次混凝土的灌注量,确保桩顶标高满足设计要求。4.1.2钻孔灌注桩针对性技术措施1) 保证孔径满足设计要求的技术措施经常检查钻头直径,磨损后及时更换,确保桩的充盈系数不小于1,配置优质泥浆,使钻孔泥浆比重控制在1.15左右,确保孔壁稳定,防止孔壁坍塌,缩径,使成孔孔径规则,并能保证大颗粒的泥屑悬浮而随泥浆排除。2) 保证钻孔垂直度的技术措施钻机就位准确,桩机底盘平稳找平。开孔时轻压、慢转。当地层变硬时,则降低钻进速度且轻压慢转,确保成孔精度,发现异常情况及时纠正。3) 保证孔深的技术措施埋设护筒后,根据孔11、口标高、桩底标高精确计算孔深(桩深)。准确丈量钻具,保证钻孔深度。在终孔后将钻头提高离孔底1030cm慢速空转,并配置优质泥浆补充进行第一次清孔,清孔时间不少于30分钟,下完导管后进行第二次清孔。4) 混凝土浇筑要检查导管及其接头的密闭性,确保密封良好。保证初灌后导管埋深不小于1m。灌注过程中按砼灌注量定时监测砼面高度,验算导管埋深。导管埋深一般控制在2m6m之间,严禁导管埋深过大或将导管提离砼面。当砼面接近钢筋笼底部时,严格控制导管埋深及砼灌注速度,以防钢筋笼上浮。保证桩顶标高及桩顶强度。随孔内混凝土上升,需逐节快速拆除导管,时间不超过15分钟。提升导管时,应尽量避免碰撞钢筋笼。混凝土上层存12、在一层浮浆需要凿除,砼实际浇灌标高须比设计标高高出50cm,在灌注混凝土结束时,要慢提导管并上下串动导管,防止出现空心。砼浇灌过程保持连续作业,不得中断,灌注完毕及时清理灌注现场,并整理原始记录。4.2水泥搅拌桩施工方法4.2.1测放桩位根据施工设计图纸进行桩位的测放并报监理单位和建设单位进行验收。4.2.2搅拌桩机就位搅拌桩机到达现场后,按照导向架标记桩位准确就位,使中心管(双轴搅拌桩机)中心对准桩位,桩位与设计图偏差不得大于50mm,同时必须严格调整好搅拌机的垂直度,垂直度可通过机械本身的铅垂线进行校正,误差控制在0.5%内,并不得超过50mm。4.2.3预搅下沉搅拌桩机运转正常后,启动搅13、拌机电机,放松起重机钢丝绳,使搅拌桩机导向架切土搅拌下沉,下沉速度控制在1m/min左右,可由电机的电流监测表控制。预搅下沉时不得采用冲水下沉,达到设计深度停止钻进。4.2.4制备水泥浆根据设计要求,搅拌桩水泥采用32.5矿渣水泥,水泥掺量不小于13%,水灰比0.450.55. 4.2.5提升喷浆搅拌深层搅拌机下沉到设计深度后,开启灰浆泵,水泥浆压入地基土中,此后边喷浆,边旋转,边提升搅拌机,直到设计桩顶标高。此时注意喷浆速率与提升速度相协调,以确保水泥浆沿桩长均匀分布,并使提升至桩顶后集料斗中的水泥浆正好排空,搅拌提升速度不得大于m/min。4.2.6沉钻复搅再次沉钻进行复搅,复搅下沉速度可14、控制在0.50.8m/min。4.2.7重复提升搅拌、复喷浆搅拌机再次下至设计桩底标高后,边旋转边提升搅拌机,同时喷水泥浆。重复搅拌至桩顶设计标高后,将钻头提出地面,以便移机施工新的桩体。4.2.8搅拌桩的搭接施工搅拌桩的搭接质量好坏关系到搅拌桩的隔水帷幕作用,为此,施工时采用连续式双孔复搅施工来确保搅拌桩的搭接质量。5、施工进度计划5.1施工部署5.1.1根据工期要求计划组织四台钻孔桩机进行钻孔灌注桩的施工,安排一台双轴搅拌桩机进行水泥搅拌桩的施工。5.1.2先进行钻孔灌注桩的施工然后进行水泥搅拌桩的施工。5.1.3根据场地条件,先施工7号运转站-12号栈桥-8号运转站-13号栈桥。第13415、页,共134页5.2施工进度计划6、降低施工成本措施6.1材料控制6.1.1加强现场的材料管理,尤其是水泥搅拌桩的水泥,严格按照设计确定的施工参数施工;6.1.2钻孔灌注桩的混凝土在灌注时避免浪费;6.1.3钢筋的使用要严格按设计图纸进行,避免浪费;6.2现场管理6.2.1加强现场的用电管理;6.2.2施工取水井作为现场的供水水源,不使用自来水,降低成本。6.2.3钻孔灌注桩和水泥搅拌桩交叉施工缩短工期减少消耗。7、质量保证措施7.1质量管理目标:钻孔灌注桩合格率100%;水泥搅拌桩合格率100%。7.2现场专业质量保证体系项目经理:专业质保师:现场施工质量检查员设备材料部技术负责人:各施工作16、业机组7.3设计图纸对施工质量的要求7.3.1钻孔灌注桩设计混凝土强度等级为C25;7.3.2水泥搅拌桩组内及组间咬合200mm,搅拌桩采用32.5级矿渣水泥,水泥掺入比13%,水灰比0.450.55。要求全程复喷复搅,必须确保搅拌均匀,桩体搭接严密,相邻桩施工间隔不得超过12小时。7.4施工过程质量控制措施7.4.1钻孔灌注桩施工过程质量控制措施1)进场材料应经严格按设计要求进行验收,不合格的材料严禁进场;进场材料应按规范规定送检,不合格的材料严禁使用。2)施工实施前,进行技术交底,让操作人员正确掌握各项施工技术参数,如钻进速度、成孔深度、提导管速度、泥浆性能、灌注速度等,使其能灵活运用。317、) 护筒埋设应准确、稳定,护筒中心与桩位中心的偏差在50mm之内。4)钻进过程中应检查钻机设置的导向装置,以保证桩垂直度。5)第一次清孔严格控制泥浆的比重、黏度以及孔底的沉渣厚度,达到要求后进行提钻。6)提钻时要控制提钻的速度,同时在卸杆之前上下提落钻头以探明是否有缩孔的部位,若发现及时进行扫孔处理。7)严格控制成孔质量,若孔出现垂直度、孔径不符合要求及时处理,避免下放钢筋笼受阻。8)钢筋笼的制作长度不宜过长,避免起吊时折弯,下放时要保持钢筋笼垂直,避免强行下笼。9)第二次清孔的时间不宜过长,确保孔内泥浆的比重达到灌注砼的要求。10)初罐砼的量要保证导管埋入混凝土内。11)混凝土的灌注要连续,18、拆卸导管前要有专人记录,避免砼埋入导管的深度不够。12)提升导管时,严禁挂拉钢筋笼。13)成桩后的桩顶标高、钢筋笼顶标高和混凝土保护层厚度,应符合设计和施工规范的规定。14)砼试块的制作、养护严格按照现行施工规范执行。16)吊放钢筋笼入孔时应对准孔位,保持垂直,轻放、慢放入孔不得左右旋转。17)灌注桩施工要求及检查方法:序号检查项目允许偏差检查方法1桩位允许偏差50 mm尺量检查2孔深+300mm测钻杆、套管长度或重锤测3桩径50mm尺量检查。5泥浆面标高(高于地下水位)0.51.0m观察检查7混凝土坍落度160220mm灌注前坍落度仪测量8钢筋笼安装深度100mm尺量检查9混凝土充盈系数1计19、量检查每根桩的实际灌注量与桩体积相比10桩顶标高30mm,50mm水准仪测量,扣除桩顶浮浆层及劣质桩体18)钢筋笼制作要求及检查方法:序号检查项目允许偏差检查方法1钢筋规格型号符合设计要求查合格证及检验报告2主筋间距l0mm尺量检查3钢筋笼长度50mm尺量检查4箍筋间距20mm尺量检查5钢筋笼直径l0mm尺量检查7.4.2深搅桩质量保证措施1)测量放线由专职人员负责测量放线及桩位的确定。布桩位置与设计误差不得大于2cm,成桩的桩位偏差不得大于5cm。2)桩机必须机况良好,安装就位端正、稳固,用经纬仪保持其垂直度。3) 浆液配制必须按规定的配合比进行配制,水泥采用矿渣水泥,标号为32.5级,对水20、泥掺量进行总量控制。4)为保证水泥土搅拌均匀,必须控制好下沉、提升速度。若出现堵管断浆现象,应立即停泵处理,待故障排除后须将钻具提升或下沉0.5m方能喷浆,防止断桩。5)水泥浆要有严格按设计的配合不拌制,制备好的水泥浆不得有离析现象,停置时间不宜过长。对停置时间超过2小时的水泥浆应降低标号使用。6)应控制重复搅拌时的下沉和提升速度,以保证加固深度范围内每一深度均得到充分的搅拌。7)搭接成壁的桩应连续施工,相邻的桩施工间隔不得超过12小时。相邻桩的施工重叠不得小于200mm。8)深层搅拌桩质量检验标准项目检查项目允许偏差或允许值检查方法主控项目加固体材料符合设计要求查产品合格证加固体材料的用量符21、合参数指标查看流量计一般项目机头提升速度(m/min)0.5量机头上升距离及时间桩底标高(mm)200测机头深度桩顶标高(mm)+100,-50水准仪桩位偏差(mm)50钢尺量垂直度(%)1.5搭接(mm)2007.5质量通病预控措施7.5.1钻孔灌注桩质量通病预控措施序号通病名称预控措施达到标准执行人责任人监督人1坍孔护筒周围用粘土填封紧密;钻进中及时添加新鲜泥浆,使其高于孔外水位;放慢进尺,减少空转时间。轻度坍孔,加大泥浆密度和提高水位,严重坍孔,用粘土泥浆投入,待孔壁稳定后采用低速钻进。不缩径,确保桩径张景华刘凯夏茂东王文模2钻孔漏浆适当加稠泥浆或倒入粘土慢速转动,适当控制孔内水头高度,22、不要使压力过大泥浆的正常循环张景华刘凯夏茂东王文模3钢筋笼偏位、变形、上浮钢筋笼分段制作,按规范要求设置混凝土保护层垫块;桩本身的偏斜应在下笼前往复扫孔纠正;浇灌混凝土时,应将钢筋笼固定在孔壁上或压住;混凝土导管应埋入钢筋笼底面以下1.5m以上钢筋笼的安放标高满足设计要求张景华刘凯夏茂东王文模4断桩混凝土浇灌要一次成功;控制进尺速度,保持孔壁稳定;导管联接处要密封,安放钢筋笼时,不使碰撞孔壁。桩身完整无缺陷张景华刘凯夏茂东王文模7.5.2水泥搅拌桩质量通病预控措施序号通病名称预控措施达到标准执行人责任人监督人1搅拌体不均匀选择合理的工艺;灰浆拌合搅拌时间应不少于2min,增加拌合次数,保证拌合23、均匀,不使浆液沉淀;降低钻进速度,边搅拌,边提升,提高拌合均匀性。桩体均匀李洋夏茂东王文模2喷浆不正常喷浆口采用逆止阀,不得倒灌水泥;注浆应连续进行不得中断,在钻头喷浆口上方设置越浆板,防止堵塞;选用合适的水灰比。搅拌的连续李洋夏茂东王文模3抱钻选择合理的工艺,遇较硬土层及较密实的粉质粘土可采用“输水搅动-输浆拌合-搅拌”工艺李洋夏茂东王文模7.6ABC三级质量控制检查点7.6.1钻孔灌注桩三级质量控制检查点ABC三级质量控制检查点表工序编码质检名称质检等级质量控制手段质量控制方法1测量定位放线复测BR测量量测法2泥浆性能指标C测量量测3成孔质量检查A测量量测4钢筋隐蔽检查B旁站试验5混凝土强24、度检验C试验试验6桩位轴线偏差、桩顶标高BR测量量测7测试检验B试验试验7.6.2水泥搅拌桩三级质量控制检查点ABC三级质量控制检查点表工序编码质检名称质检等级质量控制手段质量控制方法1测量定位放线复测BR测量量测2原材料质量检验C试验试验3桩位轴线偏差、桩顶标高BR测量量测4测试检验B试验试验附技术交底记录单位工程名称NO.1栈桥-NO.1转运站;NO.13栈桥-NO.8转运站-NO.12栈桥-NO.7转运站施工单位中化三建分部(项)工程名称深层搅拌桩工程施工班组搅拌桩班组工程内容、施工方法、使用材质等技术交底主要内容1、放线定位:根据平面布置总图及业主提供的坐标点,测放轴线及桩位,并报监理25、和业主验收。2、预搅下沉:启动搅拌电机,放松钢丝绳,使搅拌机沿导向架边搅拌、边切土下沉。下沉速度控制在1.0m/min之内,或由搅拌电机的电流控制,工作电流不应大于75A。3、制备水泥浆:待搅拌下沉到一定深度后,开始按设计要求的配合比拌制水泥浆,并测试水泥浆的比重。4、喷浆搅拌提升:搅拌下沉到最大桩长或电流值到达75A80A后,启动灰浆泵将灰浆通过钻杆中心压入地基土中,喷浆30秒后,再开始提升,边搅拌边提升,直至设计桩顶上500mm,提升速度控制在1.0m/min之内。5、重复搅拌下沉提升:待提升至桩顶设计标高以上500 mm处时集料斗中所制备水泥浆应正好排空,重复第步骤完成二喷四搅的施工程序26、。6、施工前让有关操作人员正确掌握各项施工技术参数,如水泥掺入比、水泥浆的比重、下沉速度、提钻速度、压浆量、桩顶设计标高及地面高程等,使其灵活运用。9、水泥浆的制备应在洁净的浆桶内进行,边向浆桶内注入300kg水边加入600kg的水泥,搅拌均匀后用比重计测出其比重。11、严格控制水泥的掺入比、0.5的水灰比。12、灰浆泵泵送前,应先泵送少量清水润滑管道,以利于输浆。13、施工中如桩机停钻时间过长,应把管内水泥浆冲掉,以防止再次开钻时造成堵管。14、预搅下沉时若遇到较硬土层而钻进缓慢时,不可冲水,应冲稀水泥浆润湿土体。15、在集料斗上部加细筛过滤水泥浆,以防造成堵管。16、预搅下沉速度应控制在127、.0m/min以内,提钻速度应控制在0.81.0m/min之间,复搅提升速度控制在1.0m/min之内。17、严格控制喷浆速率,确保灰浆分布均匀,并保证提升开始时间和喷浆时间一致。18、施工停浆面应高出桩顶设计标高500mm,以保证桩头质量。19、施工中如发生因故停浆或提升过快现象,应将搅拌桩机重新下沉至停浆面以下500mm处,重新注浆提升,以保证桩身完整。20、预搅下沉、提升及喷浆过程中要有专人做施工记录,记录误差不得大于50mm,时间不得大于5S,施工中出现的问题及采取处理的措施均应在记录中注明。21、施工中应认真复核桩位位置,确保成桩后的桩位偏差不大于50mm。交底人接受人日期2004-28、10-25单位工程编号施工图号单位工程名称NO.1栈桥-NO.1转运站;NO.13栈桥-NO.8转运站-NO.12栈桥-NO.7转运站施工单位中国化学工程第三建设有限公司分部(项)工程名称钻孔灌注桩施工班组钻孔灌注桩工程内容、施工方法、使用材质等技术交底主要内容1. 安装钻机应放置坚实平稳,钻杆的中心线偏斜应不大全高的1%,2. 钻机就位后,必须平整、稳固,确保在施工中不发生倾斜、移位。为了准确控制钻孔深度,机架上必须随时准备控制深度的标尺,以便施工中进行观测、记录。3.钻尖对准桩位,启动输浆泵,待泥浆输入钻孔后开始钻进。4. 开始钻进时,要均匀慢进,钻进中应根据不同地质情况进行进控制:在松软29、土层中钻进,应根据泥浆补给情况控制钻进速度;硬层中的钻进速度以钻机不发生跳动为准,避免卡钻,埋钻等现象;在淤泥和淤泥质粘土中不大于1m/min。钻进过程中如发生斜孔、塌孔和护筒周围冒浆时,应停钻,待采取相应措施后再行钻进。5. 在钻进过程中,每进尺三米至少检查一次钻杆垂直度,对垂直度进行调节和控制,并做好相应记录,垂直度偏差不得大于1%。6. 桩成孔验收:提前一小时上报现场监理人员,配合监理人员完成孔检测工作。验收合格后进行下一道工序的施工。7. 清孔 钻孔到桩底设计标高后,立即进行清孔,使钻机空转不进尺,同时射水。清孔过程中,及时补给足够的泥浆,保持浆面稳定。待孔底残渣磨成浆,泥浆比重控制在30、不大于1.2. 8. 提钻杆 提钻杆的速度要快,尽量缩短提杆的时间,在每次卸杆之前,应上下提落两次探孔,若发现缩孔,及时进行扫孔。提杆结束,进行成孔检测。9钢筋笼安放钢筋笼安放时要保证其垂直度避免刮碰孔壁,钢筋笼安放困难时严禁强行安放,应提起钢筋笼查明原因,必要时进行扫孔。 钢筋笼安放前必须经过现场技术员测量笼顶标高后才能安放,严格控制桩顶标高在规范范围5cm内。交底人接受人日期8、安全与环境保护施工技术措施8.1主要危害因素辨识、评价及控制措施序号作业活动危 险 因 素可能导致的事故危险级别控 制 措 施1.桩基和地基处理工程1.无安全技术措施施工方案各种伤害大按规定进行审核把关2.2.安全31、技术措施方案未经审批、审核,就采用各种伤害一般按规定进行审核把关3.3.施工前未进行安全交底各种伤害一般按规定进行审核把关4.4.违反安全技术措施方案各种伤害一般按规范审核把关5.5.设备设施未经验收就使用各种伤害大按安全管理手册,审核把关6.6.施工队未坚持每周安全会各种伤害一般按公司规定召开安全例会并进行检查7.7.班组未坚持班前安全会各种伤害一般检查班前快会记录8.8.允许无证人员操作各种伤害大检查特殊工种上岗证不准无证操作9.9.未按要求配备劳保用品各种伤害大现场检查把关10.10.高处作业不系安全带各种伤害大现场检查把关11.11.未使用或不正确使用与所进行的工作相适应的个人防护用品32、高处坠落机械伤害 大按规定进行审核把关12.钻孔灌注桩1施工用电触电大电气设备和配电箱应有良好的接地;采用三相五线制,安装漏电保护器,实行一机一闸一漏电保护;电缆线应保持完好,有破损处应及时处理,电缆接头应作好绝缘保护,并经常检查。拖地电缆应架空30cm以上;电气作业必须由合格的专业电工操作。13.2桩机倾倒倾倒伤人大桩机操作时应安放平稳,防止成孔时突然倾倒,造成人员伤亡 和设备损坏。14.3登高检修桩机高空坠落、物体打击大登高作业必须系牢安全带;严禁向下抛物。15.4桩孔空头坠落伤人大施工时浇注混凝土前及浇注后形成的空头应覆盖。16.6钢筋基础不合格、建筑物不安全大加强检查钢筋规格等符合设计33、要求;进行复试不合格的钢筋严禁使用。17.7混凝土基础不合格、建筑物不安全大混凝土强度等应符合设计要求,加强现场的检查;按规范的规定制作试块并进行实验。18.9钢筋笼制作弧光伤人一般电焊作业应对周围进行遮挡,施焊人员按规定佩戴防护用品19.10钢筋笼安装高空坠落、物体打击大吊装安放钢筋笼时应严格按规程进行操作由持证起重工指挥。20.11泥浆护壁塌孔一般按地质条件及土质条件配制护壁泥浆,按规程进行操作21.深层搅拌桩1桩机组装、拆卸高空坠落物体打击大按规程进行操作并对作业区域进行隔离严禁无关人员进入作业区域。22.2电器作业触电大挖孔桩孔口及孔底照明按规定采用低压电,并由持证电工进行操作;电气设34、备和配电箱应有良好的接地;采用三相五线制,安装漏电保护器,实行一机一闸一漏电保护;电缆线应保持完好,有破损处应及时处理,电缆接头应作好绝缘保护,并经常检查。拖地电缆应架空30cm以上;电气作业必须由合格的专业电工操作。23.3起重作业高处坠落物体打击大经常检查钻杆、动力头、卷扬机、滑轮及钢丝绳等紧固件及索具,有问题及时处理,严禁带病作业;施工人员应按规定配戴安全防护用品。24.4压浆搅拌爆裂伤人大操作人员尽量不要直接面对接头处;经常检查输送管道连接处。8.2环境影响因素辨识、评价及控制措施序号作业活动环境因素控制措施1水泥浆搅拌污水排放设沉淀池,清污分流2水泥进场、垃圾出场扬尘水泥运输表面覆盖35、建筑垃圾运输表面覆盖道路洒水,防止造成粉尘污染3现场清理建筑垃圾施工现场应设合格的卫生环保设施,施工垃圾集中分类堆放,严禁垃圾随意堆放抛撒4机械使用废油施工现场使用和维修机械时,应有防滴漏措施,严禁将机油等滴漏于地表,造成土地污染8.3施工安全技术措施8.3.1施工开工前,必须对所有施工人员进行安全技术交底并在技术交底卡上签字,让其了解和掌握现场的安全规定和要求;8.3.2每周一、三、五所有施工人员必须列队召开安全例会,各班组每天必须召开安全快会,总结安全工作,消除不安全因素,并布置安全工作任务;8.3.3施工场内一切电源,电路的安装和拆卸由持证电工操作,电器安装后经验收合格后方可使用,且严禁36、一闸多用;夜间施工照明必须满足施工要求;8.3.4作业中停机时间较长时切断电源及电路开关,使全部制动;8.3.5遇有大雨、六级以上大风等恶劣气候,应停止作业,当风力超过七级,应将打桩机械顺风向停置;8.3.6开钻前必须认真检查制动、滑车、吊索拉绳是否牢固有效,防护装置是否齐全;8.3.7卷扬机钢丝绳应经常处于润滑状态,防止干摩擦;8.3.8当钻进中出现钻杆急剧震动或卡钻等异常情况时,应立即停钻,分析确认原因后在提出钻杆,查明地下情况后再进行处理,不得强行钻进;8.3.9对机具应定期检查,严禁带病作业,对于桩机传动部分如销钉、钢丝绳、滑轮进行经常性检查,如发现不安全因素,立即进行排除;8.3.137、0桩机施工过程中注意高空坠落物,非施工人员严禁进入施工现场;8.3.11现场各种机械的传动机构、工作装置的制动器等均应紧固可靠,保证正常工作;8.3.12电缆应尽量架空设置,不能架起的绝缘电缆通过道路时应采取保护措施,钻机行走时应设专人提电缆通行;8.3.13钻机专业中,电缆应有专人负责收放,如遇停电,应将各控制器置于零位,切断电源,将钻头接触地面;8.3.14放置钢筋笼时,吊点应牢固可靠,严禁无关人员靠近。作业人员要随时观察,注意避让;8.3.15施工用电必须做到“一机一闸一漏”。电工每天巡检,发现问题及时处理。8.4安全保证体系项目经理:安全经理:现场施工安全员项目总工:各施工作业机组9、38、施工平面布置及文明施工技术措施9.1施工文明技术措施9.1.1设备和材料的管理:所有进入现场的设备和材料都应在指定的地点分类存放,其保管条件应符合有关的材料管理程序规定。9.1.2施工现场的环境与文明1) 在现场办公室设置垃圾箱做到垃圾集中堆放,并安排必要的清洁工对现场的施工和生活垃圾进行及时的清理,以保持现场环境的清洁;2) 在水泥浆搅拌池旁挖一集水坑防止水随地乱淌;3) 在施工现场及办公区设置垃圾箱,以容纳现场清理的垃圾,垃圾箱中的垃圾应定期外运以保持现场的环境整洁;4) 定期组织人员对施工现场进行大扫除;5) 现场由于维修机械和由于使用发电机而造成的废油和其他废物严禁乱扔乱洒,且严禁在现39、场焚烧;6) 在施工现场严禁抽烟,抽烟必须在指定的抽烟室及休息室;7) 施工过程中,保证场地平整、道路畅通、排水良好,现场无长流水、长明灯、长冒汽现象;8) 钻孔灌注桩的泥浆及时用泥浆车清理出施工现场,严禁泥浆溢出泥浆池;9) 作业班组对材料、边角废料、建筑垃圾、落地灰、零碎保温材料及各种包装物等,做到“落手清”,并在每日下班前15分钟左右对工机具、建筑垃圾进行一次集中清理,并按指定的地点分类堆置,保持现场清洁。9.2施工平面布置图分界线2号桩机七号运转站NO13栈桥NO12栈桥七号运转站钢筋笼制作场地、材料堆场钢筋笼制作场地、材料堆场泥浆池泥浆池1号桩机4号桩机配电盘196.331m10、劳40、动力需用量计划及技能要求施工管理人员表岗位姓名职称备注项目负责人工程师项目技术负责人工程师材料员技师机械员技师安全员施工员技师质量检查员技师劳动力需用量计划表 序号工种名称高峰人数2009年456789钻孔灌注桩施工1桩机操作工8822测量工33333试验员11114起重4425钢筋工8846电焊工4427电工2228机械工6639普工242412水泥搅拌桩施工1桩机操作工2222测量工3333电焊工1114电工1115普工88811、施工机具、计量器具及施工手段用料计划11.1建筑工程材料需用量计划建筑工程材料需用量计划表序号材料名称规格单位数量计划进场日期日期数量日期数量1混凝土C25m341、5000每日1002钢筋HPB235 8t43.464.543.463钢筋HRB335 16t21.2334.521.2334钢筋HRB400 18t23.284.523.285钢筋HRB400 20t3.5574.53.5576钢筋HRB400 25t423.464.5423.467水泥32.5级t11005.1190011.2施工机具设备需用量计划序号机具、设备名称型号、规格单位数量已有数量使用日期备注1钻孔桩机GZQ1250A台444.52砼浇注架DFH-300B台444.53双轴搅拌桩机GJB-60台115.103泥浆泵3PNL套665.104全站仪TCR-702架114.55水准仪342、”架224.56经纬仪J6架114.57钢筋切断机QJ40-1台224.58电焊机BX3-300-2台664.59泥浆运输车20m3辆224.510挖掘机1m3辆1111灰浆泵HB6-3型台225.1012水泥浆搅拌筒YJ340套225.1013灰浆拌制机200L套225.10(英文版 ) easily blame, to prevent the broken window effect. Supervise the leading cadres to play an exemplary role, take the lead in the strict implementation of t43、he and , lead to safeguard the solemnity and authority of the party discipline, ensure that the party discipline and the laws and regulations for implementation in place. Throughout the discipline in the daily supervision and management, strengthen supervision and inspection, from the thorough inves44、tigation of violations of discipline behavior. Strengthen to key areas, key departments and key projects as well as the masses reflect the concentration of the units and departments for supervision. - strengthening supervision, discipline inspection and supervision of cadres to set an example for co45、mpliance with the and is a man must be hexyl, blacksmith needs its own hardware. Discipline inspection organs as the executor of the party discipline, and supervisor of the defenders, for its supervision must be more strictly, discipline inspection and supervision of cadres to firmly establish the a46、wareness of Party Constitution, sense of discipline and rules consciousness, politics loyalty, sense obey. Action speak Ji Ordinance to set an example of the regulations of the rule of law, strengthen supervision and accept the supervision of the firmness and consciousness, do comply with and . To f47、irmly establish the discipline must first be disciplined, the supervisor will be subject to the supervision of concept, and consciously safeguard and implement party compasses party, take the lead in practicing three strict real strict, so loyal, clean, play. To be good at learning, the Constitution48、 and the as morality, politics and brought to fruition; to implement , do not want to, dare not, not with disciplinary ruler to supervision; to discipline a ruler, often the control inspection, and consciously in the ideological red line to draw the row Ming Good accumulation is indeed the bottom li49、ne, so that the heart has fear, said to have quit, the line has ended. Attached: indifferent to heart, calmly to the table in our life, there are many unpredictable things will happen, some good, some bad things, we cannot control is powerless to stop, but with time, you will find in life sometimes 50、turns out to be not good, some bad things finally turned out to be a good thing, but then we muddy however did not know, this is the life teach us things. 1, life can be complex, can also be simple. Want simple life of precipitation, to have enough time to reflect, to make Become more perfect. Life 51、is the most important thing is not to win, but the struggle; not to have conquered, but to have fought well. 2, the plain is the background of life. Live a plain life, give up on themselves is not a coward, but the wise answers; not disillusioned after the heart, such as ashes, but experience the st52、orm after the enlightenment; not unrewarding perfunctorily, but calm attitude of life of unrestrained self-confidence. Plain living, there is no noise noisy, no earthly troubles, more did not fill in the discontent of desire, some just a calm, a calm. 3, memory of heart will not good things to erase53、 the, life is a When no movie, pain is a beginning, the struggle is a kind of process, death is a kind of ending. Give up this giving up is the helpless, do not give up the abandoned, do not give up this giving up is ignorance, do not give up should not give up is persistent. 4, a thing figured is h54、eaven, think impassability is hell. Since the living, to live better. Sometimes we because of too narrow-minded, too care around the chores and penny wise and pound foolish, not worth the candle. Some things to attract trouble and worry, completely depends on how we look at and deal with it. Dont al55、ways take everything back to things, and dont get into a blind alley, dont want to face, dont be narrow-minded. Poke to care, is a kind of open-minded, a free and easy. 5, I am not afraid of others behind me a knife, I afraid to look back and see stab me, is my intention to treat people; I am not af56、raid of the truth to tell the best friend, Im afraid he turned to it as a joke to tell dont 6, when we are in a positive frame of mind, you will find many good things; and when we are in a negative state of mind, you will find many depressed things; life happy and worry, all is you of life attitude,57、 optimistic, good luck; loss of sink, Eritrea company. When you are in adversity, may wish to change a point of view to think everything over to the good Think, because good mentality decided the fate of the! 7, people are tired, rest; heart tired, calm. Grow up, mature, this society read. Tired and58、 sad, squat down, to their a hug. Because the world no one can sympathize with you, have mercy on you. You cry, tears is your own; you pain, no one can understand. Then you only tears to smile. 8, each people have youth,Each youth are a story, the life of the world never gets easier, I want what, wi59、sh the world all know, as has been the same; now want anything, for fear that others know, or like to lose the same. 9, the heart move, everything in the world is followed by birth, Rangrang, important thing is often the most difficult to open ones mouth, because words will reduce its importance; to60、 let strangers people care about your life in the good things, the original is not easy 10, do not blame, do not laugh at who, also dont envy who. Like a person is a kind of feeling, not like a person is true. The truth is easy to explain, I feel Is unspeakable. The best travel life is that you in a61、 strange place found a long lost touched. 11, happy life not in the bustling in, and in the peace of mind; no matter how many grievances, how uncomfortable, and ultimately to heal themselves or their own, others may got you to comfort, but never know your heart is how wanjianchuanxin. 12, maam, like62、 a movie, learn to appreciate, learn to be grateful, learn tolerance, and goodness, helping others. Instead of accusing the society, as into one; and an exception is better to give than to what 13, dont envy him A sum of, dont lose your life and the life, respectively is: the former is a we experien63、ced cannot escape in a day finally will last minute, while the latter is our persistent, we want to cherish the memory of those people and things. 14, learn to smile, learn to strong, the world you know so many people, so many people and you are, you cannot change also cant let everyone like you, so64、 also do not want to do. Life is too short to go crazy to love to go to waste, to chase the dream to regret. 15, when temper, a blessing to go. A wounding elegant people, the key is to control their own emotions. With the mouth is the most stupid behavior. A control negative emotions than a can take65、 a city more powerful water flow slow, language is expensive. People spent two years of time to learn to speak, but to spend a few years time to shut up. That is a kind of ability, that is a kind of wisdom. 16, life is not perfect, sometimes, growth is not a cry, not an eyeful of tears, there is no 66、trace of emotion, there is no gleam of hope, no desire, no action, no static, there is only one kind of downward sinking feeling, sink A murky? 6? 7? 6? 7 sink? 6? 7? 6? 7 toward the bottom of the sink. 17, in some way, do not go, you will not know the other side scenery is beautiful. To you is not 67、good, you do not mind too much, no one has an obligation to you; you learn knowledge, is you have weapons, you can start from scratch, but not unarmed; how do you treat people, does not represent how others treat you, if cannot see through this point, only inviting worry. 18, time is like a sponge i68、n the water, as long as you are willing to squeeze, the total water is still there. Every life, after the ups and downs The best test of live, to life, survival and continuation, do not stop the struggle in the joys and sorrows of life on the road, so that different soul to bear life beat, acceptanc69、e of suffering. 19, indifferent to heart, calmly in table, elegant and comfortable life, do not take what is so important. The pursuit will be disappointed; to be alive, you will have trouble. Life is the most afraid of what all want to care about, but also what all grasp is not firm, without scener70、y, separated populations, such as not to desire, all docked in the fate of the end. Why is too rigid, the natural, to go stay not to live, let go of obsession, revel is 20, if the fate of the broken Hopes of sailing, please dont despair, the coast is still, if the fate of the withered petals of the 71、beautiful, please do not sink, the spring is still, life will always be endless trouble, please dont helpless, because they are still alive, is still a dream, the sun still, we still. Lost, keep memories; to get, must work to; but the most important is good to cherish their own. 21, life, select the72、 complex, is to choose the pain; choose a simple, is choose to be happy. The complex world like aSignificance of pride. Hope is the ornate palace, outside people admiring the magnificent, living in the deep knowledge of living it to pay the price. Simple world as a simple log cabin outside ridiculed73、 shabby, the heart is willing to go live to know the joy. Suffering and joy is their own choice. 22, learn how to use a single powerful heart, let the past be the past, let the future come. Life is really the end of the end of an eagle is flying wings, life is constantly pursuit. Dont miss to regret74、, dont wait for old just miss. Time to return, seize every moment, again painstakingly again tired also Those struggling to fly. 23, life could not Yimapingchuan, even flat pavement, inevitably there will be a few pieces of roadblocks. Some of the rocks around the past, while others have to move it 75、out. Just move others put the stone is very easy, because the stone from the appearance we can discern; difficult to myself to move away the heart of stone head. Leave time to spend with her, often reflect my heart, so as to remove your heart of stone. 24, everything does not have to be demanding, c76、ome to, everything does not have to care about, over the past; failing to do not frown, laugh it laugh. Results Dont demand, do to; life is a simple, calm and peaceful. Always not to choose their own path and regret, life is like a train, the scenery and then the United States will retreat, the pass77、age of time and encounter will eventually drifting further and further away, before is always himself. 25, everyone has a weakness, weakness is true humanity. That has no weakness, a shallow person. That people think there is no weakness, mostly false. Life has shortcomings, there are shortcomings i78、s the real life. That no one regret, or childish or numbness or Self deception. It is in tolerance of weakness and so on to accept, people live happily.Hello, everyone! I am a party member. The title of my speech is: study and implement the partys two laws, doing practical play highway. 2015 October79、 18, the Central Committee of the Communist Party of China promulgated the implementation of the and Chinese Communist Party discipline and punishment regulations. We Heyuan male passers-by to respond positively to the call of the Central Committee of the party, earnestly organize the study party tw80、o regulations, truly grasp the essence and gist, and in their respective positions, to hold the bottom line of the discipline, build a strong ideological line of defense, with the courage to play, the courage to fight tough and fearless spirit, at the crucial moment well to complete the task, with p81、ractical action to test the study and implement effect Because of discipline in the * * * * * * * * * * * story. Here, let me to cast a brick to attract jade, speak about our highway. Highway line section of the road surface transformation project, last year towards the country seized will be seized82、 one of the items. To complete this arduous task, as a project management office director Comrade, keep in mind from the Communist Party membership, recognize and identify the bottom line, strict management, and strict adherence to the quality of the project. He not only set an example, honesty and 83、self-discipline, but also requires the management of all the members of the O.K., do not eat the construction unit one meal, do not accept the construction unit a ceremony. In this way, they didnt really dare to adhere to the principle. No comrade, constantly put on reworking an emergency meeting to84、 Comrade Zhen to speak louder, management tube too strict. Remember in Dongguan Street, 400 meters long cement concrete surface layer, because of various reasons, the smoothness of the poor in the bottom cavity, covering film traces and car imprinting quality problems, * * * inquiries, immediately r85、ushed to the scene to understand and verify the situation, the convening of the management office, the construction units, supervision units, construction units, construction units construction time is tight, the economic loss and other reasons to intercede * unmoved. He said, now a popular word, to86、 the discipline and rules quite in front, there are no rules Radius, you construction team not accordance with the technical specifications, quality problems, it must be to carry out rectification. Engineering quality responsibility be weightier than Mount Tai, if we manage to this matterPavement qu87、ality quantity are placed the matter, we this time to learn two regulations have what use? Still what is the Communist Party? Finally, in his insisted, the road after rework, to solve these problems. In the construction of the new comrades and the project all the colleagues efforts, after four month88、s of fighting, the project the main project was finally completed and passed inspection. Thousands of miles of ice, thousands of miles Piao, this is a splendid and romantic scene. But snow for the highway, it is a disaster, a serious threat to the traffic safety. This year, a month, a century of col89、d wave swept from North to south, and the snow blowing to Guangdong, but also to bear the blow To * * * * the highway. In January on the evening of 23, Lianping county city temperatures dropped to minus 2 degrees, a wide range of sudden rain sleet, before and after the provincial S341 line in Jiulia90、nshan Mountain tunnel sections of the road appeared in the snow, lead to the passing vehicles skid, traffic is blocked. In the face of the sudden natural disasters, city and county highway department immediately launched the emergency plan for disaster prevention. As the front line of the main force91、, Lianping Highway Bureau of all Party members and cadres to remember the Party member responsibility, braving the biting cold wind, the first time rushed to the scene, on the icy pavement of salt disposal. Because the temperature is too low, just melt water immediately freezes, addition to the ice 92、work to increase the difficulty. To ensure In addition to the re organization of the depths of the traffic safety, road people braved the icy put reflective cones and warning signs, endure cold at minus 2,3 of Jiulianshan patrols until one in the morning. Just before dawn, Lianping Highway Bureau pe93、rsonnel on the icy road salt ice melting processing until ten oclock, ice melting ice success, the road gradually returned to normal traffic. In the cold winter night, which people do not miss the warm bed, which people do not miss the warm home. However, our highway on the road to the owners of the94、 masses can go home early, the night fighting to secure the avoidance of the road safety and smoothness, fulfill their responsibility. Xi General Secretary Every Party member cadre cautioned against said: blacksmith needs self hard . two regulations , is our own hard standard test, more exercise eve95、ry party members and cadres of the fire. We should continue to strengthen the party two regulations, conscientiously in practical work, practical play road, the road for the development of the cause of Heyuan and struggle.In the industry domain report the situation of road traffic in recent years, i96、n the province highway departments of the concern and support, our bureau management department based on the job, loyalty duty, best service, to further promote the highway management standardization, legal, scientific and information technology to improve the management level and service quality. T97、his will be my last work is as follows: first, around the center, go all out to greet the seizure in 2015, meet national examination is my bureau work. As the highway management department, we focus on the work of the center to strengthen road renovation and management as the focal point, further op98、timize the service environment, improve service levels. Inspection, the inspection group and the Ministry of transport, the Bureau under the leadership of the ministries and agencies highly evaluated and fully affirmed. (a) increase road area remediation efforts. The programme of work, strengthen th99、e organization and leadership. The timely development of the city of , along the road signs and markings, traffic safety facilities, on both sides of the green, advertising signs, control area illegal construction and implementation of remediation tasks to the relevant departments, clear work time o100、f the node to ensure rectification work timely. Set up road area special rectification work leading group, implement a bureau, the Bureau of the county (District), the project road site domain environment comprehensive improvement Mechanism. To ensure that the work carried out smoothly, the bureau a101、lso organized the city road managers participated in the regulation of road region and the relevant laws and regulations of the special training. 2. Active butt joint is reported, actively strive for the support of. Local Party committee and government support is the jobAs a magic weapon, I am one o102、f the Bureau of the principal leaders repeatedly attack inspection remediation and road area to the principal leaders of the municipal report. * * *, the Secretary of municipal Party committee, mayor * *, * * *, vice mayor of many times the rate of the relevant departments directly under the respons103、ible person in-depth National Highway G105 line, G205 line, provincial S341 line and the other highway project site, on-site office, coordination solve engineering construction and environmental comprehensive renovation in the presence of difficulties and problems. Last year, national highway along 104、the county (District) government led organizations deploy traffic, urban management, public security, land, environmental protection, industry and commerce, highways and other related departments, to carry out to dismantle illegal construction and ground structures, cleaning up illegal standard Reco105、rds label as the main content of the road domain integrated environmental remediation activities and achieved good results. 3. Pay attention to comprehensive management, improve the effectiveness of remediation. Road construction control management has been strengthened. According to the relevant pr106、ovisions of the laws and regulations of the and and so on, county * *, * * County Peoples Government on highway construction control area were delineated and issue a public notice, * * County Peoples government also approved by the executive meeting of the government through discussion, implementati107、on of road boundary markers of 73 million yuan of special funds input, stake setting. According to statistics, last year the city has erected building control zone peg 820, construction control area boundary markers 815 . the second is highway greening and beautification work enhance the road area r108、emediation effectiveness. Will highway greening and beautification work as road area remediation of a key, invite garden experts to guide the design of green, the implementation of high standards for ecological landscape highway activities to create, five years, I board greening mileage of more than109、 900 kilometers, appropriate road greening greening rate of 100%, effectively enhance the city road greening level and grade, adds a sharp scenery line for *. Third, rectification of illegal construction and occupation of the road has been checked. By through the town, crossing the road on many occa110、sions to carry out concentrated rectification actions, to clear the remnants of the wall, broken Archives of highways in strict accordance with the wall of building structures and the illegal deposits, remediation along the Jeeves, Jeeves placed advertisements and vehicle maintenance, car washing an111、d other acts, standardize and purification on both sides of the highway billboards and other non road signs, I city of national and provincial highway basic elimination of the dirty, chaotic, poor, blocking phenomenon, highway traffic environment purification, landscaping. (2) to strengthen the mana112、gement on the basic data management. The level of the archives management regulations, formulate the , the establishment of the road, the implementation of the file manager, file collection, filing, sorting, filing, confidentiality, custody, borrow, identification pin Destroy the standardization. 2,113、 standardized management, enhance service image (a) evaluation system to further improve in order to strengthen and standardize guidance and assessment of each county (area) bureau of highways management work, the Bureau developed a * City Highway Bureau highways management assessment implementation114、 measures (Trial). To regularly check for half a year, year-end assessment and irregular random sampling combined, taking the spot road inspections, sampling sections, listening to the reports, archives data check, for each county (area) bureau of highways management work implementation of the speci115、al assessment. According to the annual comprehensive assessment appraisal score results, evaluation of outstanding, excellent compliance and Not up to the standard of four grades. And in accordance with the level of assessment, the award on behalf of dial highway management funds. Total score is abo116、ve 95%, is excellent, 10 million yuan reward; total score of 90 - 94 for excellent, 8 million yuan reward; for the total score of 80 - 89 points for standard, reward 50000 yuan. On the total score is less than 79 points for non-compliance unit, circulate a notice of criticism. (II) Sheung inspection117、 work to further standardize a is in place to ensure the inspection. National and provincial trunk highway patrol monthly not less than 20 days, State Road a week of not less than 3 times, dart a week of not less than 2 times. The second is to explore and promote the electronic patrol monitoring.Cit118、y highway patrol vehicles are installed on the highway patrol vehicle monitoring system; highway law enforcement personnel are equipped with a recorder for law enforcement, on the process of supervision and law enforcement to ensure evidence has played an effective role. The third is unified and sta119、ndardized inspection ledger records, inspection equipment use and management of the electronic Patrol information storage utilization. The fourth is the establishment of highway maintenance and inspections mechanism. The citys 19 country and provincial trunk highway maintenance center equipped with 120、the CPPCC keeper, and to develop a road of the Chinese peoples Political Consultative Conference tube member responsibilities. According to statistics, in 2015 (on the road. Day. Stop the road mileage, 17 cases; clean up debris on both sides of the road 20 , demolition billboard 30, demolition chaot121、ic scaffolding house 3, clean Lane Hawking 15.) (3) road permit work to further strengthen the implementation of administrative licensing system, strengthen the supervision and administration of the licensing. Strict implementation of the . According to the provisions of the road approval procedures122、 and processes to carry out road license, do according to the law, the license in accordance with the law, shall be subject to examination and approval of the. Implement the collective examination and approval, to strengthen supervision. Highways and approval of business implementation of technical 123、review of administrative approval and separation, the audit focused on the more complex involved in the road licensing matters, collective decision-making, to improve the scientific nature of the road administrative examination and approval, reduce approval corruption risks. Second is to promote the124、 In administrative permission of information technology to improve service quality. According to the and ministries and provincial and municipal government, I realized the butt of Guangdong Province highway information network and provincial network business hall * * * branch office highways licensi125、ng examination and approval work. Simplify the licensing process, and strengthen the office system, optimize the quality of service. (4) image of the team to further enhance a is grasp Windows image.2015 years, my bureau highways licensing in the city administrative service center settings window se126、rvice. According to the and , I Bureau for damaged highway capacity compensation standard, occupied by highway repair (lost) compensation expenses standards, in accordance with the law of administrative licensing items, the communications administrative license implementation procedures into the lin127、e on the wall publicity, in the service window is equipped with all kinds of application fill in sample, administrative licensing service guide brochure, in a conspicuous place public commitment to the system and advisory telephone complaints, for the masses provides warm and thoughtful service. Sec128、ond is to grasp the Four Unifications working in the citys highway law enforcement image. According to the Ministry of transport and the ministries of the Provincial Bureau of the relevant documents, I board in front of the June 2015 completed the identification of law enforcement, law enforcement s129、tation appearance, clothing of law enforcement, law enforcement documents four unification. (5) the AILU nursing atmosphere further formation of my bureau attaches great importance to the propaganda work of highway management road awareness month into * City Highway Bureau 2015 road administration w130、ork points. One is around the norms of law enforcement, improve the service theme road awareness month activities carried out. According to statistics, the citys highway system were deployed highways propaganda car 60 times, staff of highways 152 people, set point consulting 6, issued and publicity 131、Data of 8000, hanging banners 134; broadcast 60 hours / 20, update 7 inch high rod making permanent propaganda page 4; in 7th edition published , purchased and distributed , legal text, a total of 500 this. The second is to carry out 12.4 national legal advocacy day activities, the city road officer132、s go deep among the masses interpretation of highway Highways Management laws, regulations and policy advocacy, analysis for illegal construction at both sides of the road, a typical case of illegal advertising management, showing public road construction and maintenance of highways The actual resul133、ts of the management, the masses love protection consciousness and social awareness to further enhance the enforcement of highways.In recent years, I board in the highway management work were some beneficial explorations and the attempt, and achieved initial results, but there is still a certain gap134、 compared with requirements of the Provincial Bureau and other brothers City, we will to implement the partys spirit of the Fifth Plenary Session of the eighth session of the opportunity, and further increase the intensity of road management work, and constantly improve the overall quality of the wo135、rkforce and the ability to learn, and strive to achieve the new highway across.Today the topic of democratic life will I talk about the main to correctly treat leave turn ensure transition delicate gas is understanding, to carry out criticism and self-criticism, in-depth to find problems, profound a136、nalysis of the causes, through self analysis to find their own existence problem, to correctly understand their own, strengthen the party spirit training, to ensure that the election of smoothly and successfully completed. Below I talk about their own situation, please put forward valuable opinion. 137、Main understanding (a) serious discipline, to create a delicate gas is in the general environment in accordance with the Central Commission for discipline inspection organs, , municipal and county Party Committee Organization Department of the county Party Committee Organization Department files rel138、ated to the spirit of the requirements, earnestly implement the nine is prohibited, nine shall be the solemn discipline, I earnestly study the . , , and file, and a profound understanding of the nine is prohibited, a nine law discipline essence and firmly safeguard the election of serious Ensure the139、 unhealthy tendencies have successfully completed, and actively create a delicate gas is the election of environment, to ensure that the election, so as to further strengthen the town leadership and cadre team construction. Through the study, in-depth thinking, to a serious discipline the importance140、 and necessity of a more profound understanding. First, it is the iron discipline. The central put forward the nine is prohibited, nine shall be the reason for early serious general discipline, designated high-voltage wire, itself reflects the party committees at all levels of the reelection of atta141、ches great importance to the objective is bright resolute attitude, the implementation of effective measures, the same candidate to fight with discipline election of wind Discipline in gas is health. Secondly, this is prevenient. From some typical cases, we can see that individual cadres election to142、 engage in speculative hack canvassing votes, in violation of discipline, and ultimately paid a high price. The destruction of Hengyang election case and Nanchong canvassing bribery case that strengthen election discipline, serious election discipline of necessity and importance. The discipline of p143、ublicity to the public, wide report, that is, early warning, early hit precautionary needle, tell the cadres should do what shouldnt do, what to do and what not to do, and better education of cadres, warning cadres, and build a strong line of defense, to avoid the occurrence of similar problems. The144、re is duty. Serious discipline, with a strong team is an important starting point. As the leadership of the party members and cadres, take the lead in the implementation and take the lead in upholding the election of discipline, which is a major political responsibility. Must be clear requirements, 145、strict constraints themselves, cherish the honor, safeguard the image of the organization; promote righteousness, play an exemplary role. Especially as deputy Township, but also to give a full play to its role, always stand in the discipline of first-line maintenance. The wind Su Ji through the elec146、tion of the work of the whole process. (II) serious discipline, treat correctly leave turn as a cadre of the party, whether it is in, is back, stay, turn are organizationMetabolism of entrepreneurial career, need and development need. So, his first with a broad mind to treat leave turn. The position147、 is officer positions, power for the people service tools. Different positions of the partys cause, plays a decisive role, the same important. To ability strong, style of comrade to important positions and applause, is full of vigor and vitality and promising young cadres in leadership and cheer for148、 their own leave turn and calmly face, calm place. Second is to a healthy state of mind to treat leave turn. The personnel of metabolic, between the past and the present. Cadre new old alternant, team, push In the party constitution control strict working to career development objective need, is nev149、er the end of the historical process. Each a cadre must face up to the laws of nature to think we also took the former relay baton go on leadership post, regardless of the current positions, positions and responsibilities have what change, can do for peace of mind and mood, such as water, in a happy150、 mood. (3) carefully and find out the problem, correct understanding of themselves, even though they do conscientious, serious attitude, honesty in politics, but high standard , the control standard, especially control learning, striving for excellent activities emerge in large numbers of advanced c151、haracters, advanced deeds Static not consciously practice the strict three real and strengthen the party spirit accomplishment to find the gap, swing is insufficient, a clear direction, mainly manifested in the following aspects: one is the learning initiative and self-consciousness. Often busy with152、 work as an excuse, not consciously take the initiative to spare time to learn. Is often superior to learn what to learn what, and work closely to learn, and working relationship is not less to learn. Mainly manifested in the theoretical study is not thorough, system is not thorough, the Marxism Len153、inism, Mao Zedong thought, Deng Xiaoping Theory and Three Represents important thought, the scientific concept of development and learning, general secretary of the series of speech learning, just from the surface on learning In the less less less and not deep enough, not from the deeper study, to s154、tudy, to understand, to sentiment, to use, to guide the work. The second is to investigate the research. This year their participation in the county, the county governments important meeting, the town Party work time is more, coupled with the specific affairs busy, in-depth primary research time red155、uced. The inspection was carried out research activities, there are surface examination, thematic research, listen to reports and discussion research, the general requirements and specific guidance, in a certain extent, affected the timely discovery and solve. Third is the level of leadership, leade156、rship and need to be further improved. Stroke the personnel selection is positive, work coordination and cooperation cant to the best effect; in the coordination to deal with some complex problems, the approach is not enough. Especially encountered, time is tight, the task is heavy, is often the sol157、diers to be blocked, the water to soil cover, struggling to cope with. The global and forward-looking innovation is not enough. (4) to ensure that the transition delicate gas selected loyal to the party loyal to the people of leading cadres (recommended) for the county to provide accurate informatio158、n to ensure the transition in the air, after the general election of work have a greater change. The second is balanced, promote the work in an orderly manner. In the future a period of time, the transition will be in the county under the leadership of the Extended surface. And breeding industry and159、 the construction of key projects also in actively, they have to seriously consider, overall transition and key projects to promote. Education team members and the town, village cadres actively participate in industry cultivate the work, with outstanding achievements to accept the assessment of test160、 of the organization and the masses of the people, in the town set up promising is a strong general business and the right atmosphere general election, do election and projects to promote the two not mistake, the promotion of two. Second, the rectification measuresOne is to enhance learning, awarene161、ss raising, he will continue to strengthen learning, improve the level of awareness, their own unity of thought and action to the county, township party committee of arrangements for the election. The second is correctly, strengthen discipline, own the right of transition, a matter of personal leave162、 turn, as a town, deputy secretary of Party committee, themselves are fully aware of the only serious work, strict demands on themselves in order to not negative expectations of organizations and the masses, so that individuals can well deal with good transition in personal leave turn. Three people 163、on the election promise as Deputy Secretary of the Party committee, in the election of my solemn commitment to Catch: if a is strictly abide by and take the lead in the implementation of the nine is prohibited, nine transition discipline, not to engage in cliques, not to engage in canvassing votes b164、uying and selling, buying, and no fraud swindlers officer, do not intercede say hello, not illegal, not to run gas leak, do not interfere with changing times, accomplish strict discipline, warning, with iron discipline firmly put unhealthy trends, promote delicate gas to ensure transition in the hea165、lthy and orderly development; the second is resolutely obey organization arrangement, and resolutely to stress the party spirit, principle, discuss overall situation, correctly treat personal leave turn, the correct treatment the election results and focus on their careers, from start to finish, ens166、ure the normal and orderly develop.For in-depth study and implement the partys eighteen, the eighth session of the fourth, the spirit of the fifth plenary session, the implementation of comprehensive strictly required, a solid grasp of the construction of Party member team, in accordance with the re167、quirements of the county Party Committee Organization Department No. 3 (2016) Luo Zufa. According to the requirements of the and the central work of education for the party members, combined with actual town, 2016 Party member education and training scheme is formulated. The guiding ideology adhere 168、to a comprehensive study of implementing the scientific development view as guidance, in-depth study and implement the partys eighteen, the eighth session of the fourth, fifth plenary session and the General Secretary Xi Jinping series important Speech adhere to the application for promoting learnin169、g, and strive to improve our ideological and political quality of Party members; firmly establish catch a party to build pipe must be members, tube members first catch education of ideological understanding, close to the Party members ideological and practical work, strive to build a party regular e170、ducation work mechanism, promote the party members play a vanguard and exemplary role; firmly grasp the construction of ability of administration of strengthening the party, advanced nature and purity of construction of the main line, adhere to to enhanced grasp the party building work consciousness171、, strengthen the self construction of the party organizations as the fundamental starting point, for the towns economic and social development provided for ideological and political guarantee of the strong and powerful organization guarantee. Second, target 201 The main task of 6 years of education 172、and training of Party members is earnestly implement the (Luo Wei do 2015 121) to further strengthen the work of the education and training of Party members request, to training the town, the grassroots party members and common. From 5 January 2016, through a variety of channels in a variety of form173、s in a planned, step by step, to focus on the organization to carry out the education and training of Party members. A party spirit idea generally enhanced. Through education and training, prompting the majority of Party members to further strengthen the ideal and faith, enhance the party concept, c174、onsciously practice the agency will socialist core value system. To further enhance the confidence of the road of socialism with Chinese characteristics, theoretical system of self-confidence and confidence. (II) Party members working ability greatly improved. Through the development of education an175、d training, to boost the knowledge structure of Party members transformation and upgrading, improve the party to use the Marxist stand, viewpoints and methods of analysis and problem solving ability, adapt to the new situation and new tasks. (3) play an effective role of Party member model. Through 176、the development of training and education, promote the party members in theProduction, work, learning and service to the community in give full play to the exemplary vanguard role, and actively striving to take the lead in learning to improve and take the lead in striving for success, serving the ma177、sses to take the lead and lead law-abiding, take the lead in promoting the healthy atmosphere model. (4) the building of grassroots organizations strong impetus. Through the development of education and training, the Party member troop overall quality and ability to serve the people increased, grass178、-roots party organizations creativity, cohesion and combat effectiveness of the improved. Contents and measures according to different type of the town, at different levels, the actual needs of the different positions of Party members, hierarchical class to carry out the education and training of Pa179、rty members. Adhere to the town overall and please tutoring, please Come in and sent down the combination, to the party spirit education and ability cultivation as the center, overall constitution and discipline, the core value system, political theory, domestic and international situation in town s180、ituation, party organization construction, legal education, culture, science and technology, industrial development, management, resource management and protection, social management innovation in the aspects, to village (unit) as a unit, to all members of the organization a above rotation activitie181、s. Focus on Township and village committee cadres straight unit leading Party group secretary, activist of join or be admitted to the party, the education and training of village class mothball cadre training, efforts to strengthen the parties organization Secretary of party spirit accomplishment, d182、o a good job of the consciousness of the party building work, enhanced the Party activist , people in rural areas to promote rural economic development of practical abilities. At the same time, through the development of the theme of practical training, autonomous learning training, make full use of183、 the party members and cadres of modern distance education network etc., for the party members in various fields to carry out the classification of rotation, party spirit training, tobe grind quality, improve quality. Organizational Leadership (a) strengthen leadership, implement the responsibility.184、 Town Party committee to the work of the education and training of Party members into the party building work important content, the overall responsibility of the Secretary of the Party committee, vice secretary of the lead and the implementation of specific members of the organization, the organiza185、tional Secretary of the parties to personally plan, personally deploy, supervise the implementation; the education and training of Party members to carry out into the grass-roots party Construction work responsibility system and the building of grassroots organizations special assessment, directly w186、ith the grass-roots party organizations Pingxianpingyou link, to strengthen the organization and leadership to do a good job of work to implement. (II) the overall progress, implement the plan. Ensure that the deployment, according to the arrangement of the 2016 Party member education and training p187、lans, based on the actual needs of the party, on-demand rationing; do supervision and guidance, strengthen the supervision of the work of the education and training of Party members, guidance and services to help solve the difficulties and problems in the training; assessment, by listening to the re188、port, information search, evaluation, etc., with emphasis on the assessment of the implementation of the plan, Party members to participate in training proportion and effect, indeed Protect task implementation. (3) the typical guide, step up publicity. Pay attention to cultivate advanced and typical189、, timely promotion and the typical experience of the characteristics of the practice. The work of the education and training of Party members as the focus of the grass-roots party building and the sector skills training for communication and advocacy, by setting the column, offering special journals190、 and other forms of propaganda, to create a strong atmosphere of public opinion, promote the orderly conduct of the work and achieved certain results.In order to further implement the General Secretary Xi Jinping series of major speeches about the partys work style and clean government and anti-corr191、uption struggle spirit and the central, province, city, County Commission for Discipline Inspection and the spirit of the plenary session, to further strengthen the awareness of the loyal party members and cadres, sense of purpose, sense of responsibility and a sense of discipline, boost the countys192、 economic and social development. In accordance with the ensemble of Ji Qing 2016) spirit of the document No. 3, combined with my bureau actual, make this program of activities, and a theme of learning party discipline, strict discipline, boosting Qingshen development.Second, activity time April 201193、6 1 - April 30, three, activity content (a) carry out party discipline learning activities. Global organization of cadres and workers to focus on learning, network learning, self-study and other forms of strengthen constitution , and other relevant information learning. Education for Party members a194、nd cadres to as the ruler, combined with its work, measure, control and their own ideas and practical test, take the initiative to conduct Lianzheng is affirmatory consciously practice commitment, achieve the hearts of the party, Zun Jishou Confessions of readings of the Si confessions to carry out 195、the hearts of the people, in the heart has the responsibility, in the heart has quit, maintain the partys advanced nature and purity. (2) to carry out special warning education activities. In the global read writing experience, the concept of warning education independent micro film reflections, pri196、sons and courtroom free as the main content of the special warning education activities. Use of the weekly worker will focus to watch a warning education. The , cadres and workers to write their feelings, reflections, and the clean publicity column posted; 4 month global organization of Party member197、s and cadres to the eyebrow delta prison visits to detainees xianshenshuifa education of cadres and workers With low-cost combined with special method. (3) to teach a class of anti-corruption initiate cheap course. By the leaders of anti corruption and financial supervision and administration of sta198、te-owned assets of explain the profound things in a simple way to explain, so that all staff of honest business, according to the law to act in a more profound understanding, so as to enhance staffs sense of responsibility and sense of mission. (4) to promote innovation to help the family activities199、. To carry out the party members and cadres motto, bright family traditions activities for family education into harmony, filial piety, encouraging learning, goodness, thrifty, inspirational, cultivation of excellent genes to guide Party members and cadres to good tradition folk, with a good traditi200、on being honest, with good tradition promote political winds, creating a delicate gas is the general atmosphere. Four activities (a) to strengthen leadership, careful organization. One is the establishment of the independent warning education month activities leading group of the state owned Financi201、al Bureau, bureau leading Party group secretary of the leader, board members of the team to serve as deputy head. The second is making determine promotional content, clear steps, truly understanding, measures, and put in place, ensure the effectiveness of the activities. (II) take all factors into c202、onsideration, pay attention to actual effect. According to strict three real special education and two studies do activities, in based on the provisions of the action without aliasing, and creativity to carry out various forms, rich and colorful activities, and strive to Pay attention to actual effe203、ct, and resolutely prevent, going through the motions, really promote the party members and cadres from the depths of the ideological solidating abide by discipline regulations of the defence. (3) strengthening propaganda, to create atmosphere. To make full use of the column publicity, propaganda po204、sition of network, increase publicity efforts, expand warning education activities of the coverage and influence.Today, we hold the citys precise technology to poverty alleviation and project work to promote the meeting, the main purpose is to further promote the task of aiding the poor with technol205、ogy roots and accelerate all kinds of scientific and technological projects. Last year, this year, the citys scientific and technological work has made remarkable achievements, such as the convening of national poverty alleviation of science and technology on the spot will, cultivate high-tech enter206、prises, Bashan scholar training and the introduction of scientific and technical personnel incentives, listing national agricultural science and Technology Park, science and technology incubator building. Just now, Huangli In recent years city science and technology to help the poor and science and 207、technology project effectiveness, the main problems were analyzed, and in a period of time in the future, the citys precise technology to poverty alleviation and science and technology project work arrangements, I agree, I hope everyone to earnestly implement. Here, I stressed the three points.Learn208、ing learning, to carry out the learning and doing education as the citys innovation and development of an important driving force. The Party Central Committee decided to 2016 years in all Party members to carry out learning the party constitution, party rules, a series of speech, do a qualified part209、y member education (referred to as learning to do). Some time ago, I called the learning the party constitution, party rules, a series of speech, do a qualified party member education and mobilization, the province carried out within the two a learning education mobilization. Municipal Party committ210、ee will soon be held a mobilization will make arrangements for the deployment. To carry out the two a study and education, based on learning , key in do . As the science and Technology Department of cadres and workers, to (benchmark for two pilot demonstration study through studying the party consti211、tution of party compasses, a series of speech, not only to do a qualified party members, to do a good job of science and technology innovation. Next week, I as the citys county-level leading cadres reading class open cooperation and innovation driven study group members went to Mianyang, Meishan nat212、ional innovation driven development characteristics and the provinces Innovation Driven Development Zone work experience, a great harvest, feeling very deep. Mianyang, Meishan city innovation driven strength is very great, especially is Mianyang has become civil military integration, a comprehensive213、 reform and innovation, our benchmarking in Mianyang, the gap is very large. Mianyang Science and technology city construction as the basis, built around the Five goal of building Hotbed of innovation of construction science and technology, military and civilian fusion demonstration, collecting and 214、distributing center of scientific and technological achievements, innovative talents convergence and high technology industry concentration), vigorously promote to military and civilian fusion for the characteristics of comprehensive reform pilot innovation, and achieved remarkable results, is towar215、d the national civil military integration innovation demonstration area, the national innovation driven development characteristics demonstration area and western economic development growth emerging great step forward. The expanding Park, stronger innovation platform; incubated enterprises, cultiva216、te innovation; poly talent, to improve the ability of innovation; promoting fusion, highlighting the characteristics of the innovation; catch open, form innovation efforts of the experience is worth learning from. Benchmarking advanced, we have to struggling to The amount of weight is to grasp to ca217、tch the strategic innovation. To improve the target oriented system. The innovation actually placed in the core position, firmly establish the grasping innovation development, seek innovation is to seek the future, innovation is not backward, slow innovation also will lag behind concept, accelerate 218、factor driven to innovation driven change. City Branch Bureau to actively seek the city management system emphasizing the innovation driven development, focus on strengthening the scientific and technological enterprise incubator construction, scientific and technological innovation platform, techno219、logy oriented small and medium-sized enterprises to cultivate, high and new technology industry output value and product evaluation. Second, we must built innovation and Entrepreneurship platform. The city will be in Pakistan and the open area to build the whole To confidence, double center, the new220、 industrial park for a period, the city public entrepreneurship Park Phase II, Qin Ba electricity supplier industry park for three period, incubation area of more than 50 million square meters. The county (District) to take advantage of idle assets of construction science and technology enterprise i221、ncubator, a passenger space and other new public record space, the formation of a, a, a, to create vivid situation. Third, we must foster technological innovation subject. To vigorously implement the high and new technology enterprise doubling plan and science and technology oriented small and mediu222、m-sized enterprises to cultivate plan, to honor the implementation of tax incentives, financial subsidies, such as a package of policies to support, so that high technology enterprise indomitable spirit, let the small and medium-sized enterprise overwhelming. To increase investment in science and te223、chnology innovation. To actively seek special funds for the development of Municipal Science and technology part for cashing innovation drive the development of financial subsidy policy, transfer a portion of funds for science and technology enterprises of loan guarantees and interest subsidies. Enc224、ourage banking institutions set up science and technology branch of the franchise, push the patent pledge loan, for the small and medium sized enterprises of science and technology provide financing services tailored. Fifth, we must strengthen science and technology personnel. To attract more techno225、logy military personnel and high-end talent with technology, project, with funds to Bazhong Lingban or joint science and technology enterprises, encourage and support both inside and outside the citycomrades and the5 years of college graduates and college students to a new public space, science and 226、technology business incubator innovation and entrepreneurship.Second, it is necessary to promote the precision technology poverty alleviation as the important content of the scientific and technological work. To build a well-off society in an all-round way by 2020 is the partys eighteen to the whole227、 Party and the people throughout the country to make a solemn commitment. Lead the city people out of poverty to become rich go straight towards well-off, Party committees at all levels, political responsibility and mission of the times of the governments major political, technology sector is also t228、he bounden responsibility. Municipal three tenth plenary session made , proposed to further promote the five a group of precise action to help the poor, six precision and 1 + 6 poverty alleviation projects, clear the add Great science and technology achievement transformation efforts, accelerate the229、 construction science and technology poverty demonstration village and demonstration households, give full play to the role of modern information network, for the impoverished village poor households to provide production technology, market information, policy advice, encourage scientific and techni230、cal personnel to the poor village launched a to one helping and guiding the development of income industrial projects, strengthen technical training and propaganda of popular science, highlighting grasp large breeding, family farmers, agricultural co-operatives are the backbone of the training techn231、ical poverty alleviation mission. The citys science and technology sector must be from the political height, the assault fortified positions that help deficient up as the most important task, the most urgent work. The most arduous mission, to science and technology for precise poverty alleviation pr232、omote to speed up a well-off society in an all-round way Decision to deploy, boost the process to precise technology to poverty alleviation and the effectiveness of a well off society in an all round way. One should obey the overall situation. The citys scientific and technological system of cadres 233、and workers, especially leading cadres, should have the political consciousness, ideological conscious action conscious, in accordance with the central, provincial and municipal deployment requirements, to strengthen the organization and leadership, reasonable arrangement of time, carefully study th234、e deployment, to ensure poverty. There must be resolutely implement the political position and character, poverty alleviation and the attitude to be distinctive, poverty alleviation action should be strong, to politics, to understand the overall situation, re implementation, see results. To lock the235、 target. In accordance with the provincial Party committee and the municipal Party committee, municipal government, lock 2 provincial-level General requirements for the completion of the goal of poverty alleviation poverty alleviation poverty alleviation poverty alleviation poverty alleviation pover236、ty alleviation and Technology Demonstration County, four provincial science and technology demonstration towns, 10 provincial science and technology demonstration village and a municipal science and technology demonstration area, 2 Municipal Science and technology demonstration towns, five municipal237、 science and technology demonstration village and the five one precise technology to poverty alleviation and special operations tasks, inverted duration, wall chart battle, set the time, tasks, measures, staff, given the responsibility to ensure high quality precision technology poverty alleviation 238、task. To focus on the key. To focus on precise poverty and accurate out of poverty, detailed measures, clear job responsibilities, to develop targeted and operable precise technology to implement poverty alleviation program. Prominent precise poverty technical training, poor village informatization 239、construction, technology oriented poverty reduction model village and demonstration households construction precision technology poverty alleviation focus, in a precise sense, precise attitude, precise style, go all out to fight the precise technology of poverty alleviation and battle.Three, it is n240、ecessary to strengthen science and technology funds supervision as an important means to enhance the quality of the project. Science and technology project fund supervision is the key to the implementation of the project of science and technology. In recent years, especially during the Twelfth Five 241、Year Plan period, the system of science and technology management in the city vigorously to declare the implementation of the country and province science and technology projects, science and technology demonstration lead brought obvious effect and improve the scientific and technological innovation242、 capability of enterprises, boosting the characteristics and advantages of industrial development, science and technology support to the economic and social leading role improved significantly. In the project management of science and technology, in addition to seriously implement the state, provinc243、ial science and technology project management rules and regulations, and the actual Bazhong, established the access system of science and technology projects, the project of science and technology commissioner system, science and technology Project credit system and scientific and technological proj244、ects honest commitment system, and the Municipal Finance Bureau jointly issued the Bazhong City Science and technology development funds management approach, formulated the trilogy of seven science and technology project implementation specification, these are worth fully affirmed. However, we shoul245、d also see clearly, we in the science and technology project management still exist account of the special accounts, earmarking system is no effective implementation and other issues. In particular, this year the Audit Commission Chengdu Tepai ban on Bazhong confidence found in the audit of science 246、and technology business incubatorProblem has certain representativeness. The audit to us sounded the alarm, should cause everyone vigilance. Here, I will strengthen science and technology project budget supervision put forward four requirements: a strict project reporting, prevent fraud. Implementat247、ion of the project to declare the competition mechanism, the annual financial support to science and technology projects oriented society Bulletin, conditions open content, open competition to declare, open field investigation, public presentations, the public assessment of the decision, do full ope248、n and transparent, fair, accept social supervision. To those who resort to deceit or something real is not clear, suspected of defrauding, impersonator national subsidy funds, once found immediately cancel Declaration of qualification, recovery of funds subsidy and discipline in accordance with the 249、law strictly held responsible. Second, we must innovation funds supervision. In county finance to establish science and technology project account, the project undertaking entity in accordance with the key nodes task completion by formal invoice to apply for funding and audited by the Department of 250、science and technology, the Ministry of finance funds, and resolutely put an end to project funds are retained, misuse and misappropriation. Third, we need to strengthen scientific and technological project supervision. Department in charge of science and technology to strengthen project inspections251、 to check or checks, of ineffective implementation to strengthen the supervision and the existence of violations of responsibility into the project undertaker rectification. To establish a scientific and technological project, black list system, the Project implementation quality particularly poor r252、ecorded in the black list, stage or permanent abolition of the applicant country, province, city science and technology project qualification. Fourth, it is necessary to carry out training funds management. Science City Bureau to the initiative to meet with the finance department, organize project u253、nit commitment held science and technology project funds management training, of country, provincial and municipal science and technology project funds management of the relevant policies, financial acceptance specification, mid supervision points, budget review points and key contents were training254、 system, to ensure the use of project funds safe and reasonable.Thank you all!To implement the central, provincial, city and county to make important decision about the grass-roots party construction work in the deployment, push forward the county public security organs in the work of Party building255、, further strengthen the party secretary of the governing party and party liability, according to requirements, according to the arrangement of the Bureau of the party work. Today, the organization held the county public security organs party secretary grasping grass-roots party construction work in256、 the debriefing will. The implementation of this is a powerful measure to the Secretary of the party organization construction of the party, and is learning to carry out the partys spirit of the Fifth Plenary Session of the eighth session of the, grasp the new situation of Party building work under 257、the rules, pushing Public security party building services in the public security center of the inevitable requirement.Just now, the 3 Juzhu unit Party branch secretary of debriefing, below I on the 3 party organization work one by one review.Party branch of the Political DepartmentGood: first, stre258、ngthen ideological and political work, pay close attention to the work of the implementation. The Political Department of the Party branch strictly in accordance with the requirements of bureau Party committee, to strict three real special education as the main line, take effective measures, pay clo259、se attention to the ideological and political work of the implementation, strengthen the education of Party members and the police thought, improve the Police Ideological and political consciousness, make a solid foundation for public security work smooth development of health. Second, strict manage260、ment team, boost the morale of the team. Strict implementation of Police Ideological Trend of periodic analysis, timely grasp the ideological situation of the personnel; strictly implement the system of check on work attendance, strengthen the daily management; cash rewards and punishments, continue261、 to boost the morale of the team. The third is The intensification of police training, improve the police actual combat skill. Seriously and actively carry out a series of training activities and learning activities, the majority of police in the political quality, physical quality, professional qua262、lity, policing skills improved. The fourth is to adhere to the preferential treatment from the police, the warm pool police. According to thRequirements, and actively do a good job of personnel management work, to run within the scope of the policy, help the police solve the practical difficulties, 263、the police systemic heart into work. The fifth is strengthening propaganda, promote righteousness. Around the center of the public security work, actively do a good job in the publicity, fully display the spirit of good public security team. Six is to fulfill the responsibility of Party building, do264、 a good job of education and management of Party member team. Sound and perfect three class, Party of democratic appraisal, commendation and reward system, effectively enhance the branch of the creativity, cohesion and fighting capacity.Shortcomings: is ideological and political work still can not a265、dapt to the new situation, new task, in the form of a single, innovation is not enough, lack of learning education of the appeal and study the effect of education needs to be improved, the political department to strengthen the guidance to the grass-roots units. The second is the branch of organizat266、ional life will implement the is not good enough to play an exemplary role.Traffic Police Brigade Party branchSystem of good practice: one is grasping the implementation of the work of Party building system, enhanced branch team cohesion, combat force. The brigade Party branch always pay close atten267、tion to the work of Party building and would not let go, conscientiously perform their duties, strict implementation of democratic life etc., to develop the branch of learning plan, all equipped with learning record the experience and experience the and organize regular inspection learning, ensures 268、that the learning plan, implement, effect. Second is to carry out the strict three real special education. The development of special education learning scheme, held a party branch focus on learning and the level of consultation forum, deputy director in charge of, brigade leader for the party membe269、rs and the police on the lectures, deployed to carry out Ban Zicheng throughout the Yan Zhenchang Yang Shuicai to relive the oath to join the party, visit the memorial hall, learning advanced characters, micro lectures attention and learning characteristics of the activities, and to develop measures270、 for rectification. Three is to pay attention to the party building work into the public security work. The brigade Party branch and always will be the work of Party building in 9.3 security, national civilized city re examination, the SCO security meeting, the focus of illegal investigation, sword,271、 anti terrorist violence, to ensure safety, five wave, camp turn non bus, detoxification, the focus of the work, in a timely manner to carry out the pre war mobilization, wartime dynamically judged, the post-war award in recognition of a series of measures Members always fighting in the first line o272、f traffic management, all traffic police has always maintained a high state of mind, a strong impetus to the work carried out.Shortcomings: first, there is a hand hard and soft phenomenon. Of work of Party building under the new situation is not enough emphasis, focus on light business building, re 273、form light effects. The second is measures are not enough effective. In particular, catch a party to build working innovation consciousness is not strong, measures and methods used in the experience of the old, old practices and effectiveness needs to be further strengthened. The third is three less274、on not very good insist, life of the party organization to carry out less often.Zhao police station Party branchGood practice: one is to strengthen the study and education. To strict three real special education as an opportunity to take leadership lectures, seminars, individual learning, exchange o275、f experience in various forms, the police organization learning leaders at all levels of the spirit of the important speech, in the constitution as well as the side of corruption cases and asked party members and the police carefully recorded study notes, writing experiences, join and pay attention 276、to the micro lectures, according to the control requirements of inspection, enhance their own, to ensure that the learning effect. The second is to strengthen the leadership responsibility. Party branch secretary as the first responsibility of honest government, earnestly implement the four person ,277、 and insisted on the important work personally Department Department, major issues personally intervene, personally key aspects of coordination, supervision of important cases personally , Party branch members always strict demands on themselves, play an exemplary role model. Third, strengthen the s278、ervice for the people. Every act of the masses for the warm reception, carefully recorded masses anti reflect each a problem, and make the resistancee bureau Party committeeHeart to answer, and constantly improve the quality of service. Combined with the one village, one police work, police organiza279、tion carefully touch row all may affect the stability of the unstable factors, resolve conflicts and disputes, and arrange for the police with daily visits, issued security leaflets, collecting sites, personnel information, promote the harmony police.Existing problems: a party branch team party affa280、irs knowledge is not rich enough, on some of the procedural provisions are not familiar with, in a certain extent restricted the work carried out. The second is regular ideological education is not deep enough, the ideological trends of the police command is not timely and accurate. Third, there is 281、a need to improve the management level of refinement, police standardization awareness is not strong enough, daily habit is not quite self-conscious.Since this year, bureau unit Party branch to strict three real special education as the main line, to the service center, troop construction as the foc282、us, adhere to the combination of ideological building of the party and the system of the party, solid to carry out the comprehensive strictly required, to further standardize the construction of the party organization, continuously improving the quality of Party members and police, continue to stren283、gthen the party building innovation, service building execution significantly improved, has made remarkable achievements.Meeting debriefing of 3 units in the work of Party building problems in other units are also different degrees of existence to other units by the party building debriefing, draw o284、n the experience of face the problem, replicability, careful analysis of rectification, promote the sustained and healthy development of the work of Party building units.Below, to further strengthen the county public security organs party building work stressed the views of five points.One, improve 285、the ideological understanding, enhance the sense of political responsibility and historical missionFollow the basic construction of the partys eighteen years, Xi Jinping, general secretary: the series of important speech to the party put forward many new ideas, new judgment, the new requirements is 286、to promote grass-roots party building work. We should thoroughly study and understand, and consciously assume responsibility. One is to grasp the party building three questions of the new requirements. Xi, general secretary of the partys mass line education practice summary of the General Assembly o287、n the proposed the construction of three questions, namely: is not the party committees at all levels and the departments of Party committees (party) to achieve the sedulous catch a party to build is not at all levels of Party committee secretary, the Department of the party committees (party) secre288、tary become strictly administering the party secretary? Is not at all levels and all departments of the party Forced the construction of Party committees (party) members to fulfill the responsibilities strictly responsibility? General Secretary of the party building three questions , directed at the289、 crucial point, enlightening, three mirror placed in front of everyone, let you according to a photo, see a look, want to think about the conscious of it, is the three pieces of papers placed in front of us, it is clear to judge ourselves whether in to do their duty. Building three questions , urge 290、people to watch, thought-provoking, and convey a strong responsibility to ask signal. The second is to understand the building three no new judgment. Xi, general secretary of the partys mass line education practice summary congress pointed out that history and reality Are accounted for in the police291、 forces of discipline, do not do, is to stop the event tells us, not a clear responsibility to implement the responsibility, accountability, and strictly administering the party is not to . General Secretary of the three no , a clear responsibility to implement the responsibility, accountability, an292、d point out the key. The county public security organs is a team of the Communist Party as the main body, Party members and the vast majority of bureau of belonging to different units of the leadership cadres and backbone of the party members, the power and responsibility are relatively concentrated293、 in the partys construction, must be clear responsibilities, the implementation of responsibility, accountability, or catch a party to build is an empty word. Three is to clear the three grasping new initiatives. The total learning book Remember that catch a party to build must grasp the responsibil294、ity system, grasping accountability must grab the responsibility person, grasping the responsibility must catch the first responsible person. Why should we let the Bureau unit Party branch secretary of the debriefing is to implement general secretary put forward 3 catch. To seize the party organizat295、ions primary responsibility, seize the key issue.Two, the full implementation of the task of ideological construction, the theory of armed tasks implementedGeneral Secretary Xi Jinping in the mass line of educational practice summary congress put forward in the new period party building thought of t296、asks and requirements, to strengthen the construction of the Party pointed out the direction and path. One is to strengthen theoretical study. The urgent task is to fully understand the study and implement the spirit of the fifth plenary session of the eighth session of the significance of, the orga297、nization of Party members and the police through the focus on learning, self-study and special counseling and other forms of serious in-depth learning, adhere to the first step in learning, deep layer, accurately grasp the spirit of the Third Plenary Session of the Eleventh Central Committee, and do298、 the thinking and learning gains, use it. The second is to strengthen the party spirit temperance. Adhere to the school party constitution. Through the center of the group learning. Secretary of the party organization about lectures and other forms of learning the party constitution, enlightenment s299、pirit, guide Bureau unit Party branch and all members of the police to firmly establish the consciousness of the party. Persist in learning advanced. Vigorously carry forward the spirit of Jiao Yulu, Yang Shuicai spirit, seriously study the advanced deeds of Comrade Yan Zhenchang, deep fine shine Du300、sing the police party guided, to strengthen public opinion and public servant consciousness, consciously practice the strict three real. The third is to strengthen the party and Party discipline education. For the ideological construction of the party faces new tasks, new requirements, the emergence301、 of many new problems, new situations, and actively take the initiative to adapt to the constantly emancipate the mind, innovative ways, making use of the Internet, micro channel, micro Bo new platform for new, enrich the content of education, improve education forms, the constant reminder education302、, enhance the police Party discipline in awe, guide Party members and the police do political understanding discipline about the rules of the leaders. The fourth is to strengthen the ideological and moral education. Guide the party police exemplary practice the socialist core values, cultivate good 303、political and moral character, professional ethics, family virtue and morality, forming a strong atmosphere of moral construction. Pay attention to strengthen the positive guidance to the police party ideology, adhere to the diversification of the social ideology guided by the system of theories of 304、socialism with Chinese characteristics, improving and perfecting the Party members and the police thought The dynamic analysis of mechanism, providing an ideological guarantee for the purity and firmness of team members.Three, fully implement the strict requirements, the management and administratio305、n of the partys responsibility to implementGeneral Secretary Xi Jinping stressed that to implement strictly the responsibility, do a good job of Party building as the biggest achievement. Therefore, in my bureau implement comprehensive strictly required must be the party tube responsible party imple306、mented. First, to further implement the responsibility system in Party building. To establish and improve the party building responsibility assessment mechanism, at the beginning of the year to progressively signing party builds working target responsibility book. Party organizations at all levels i307、s mainly responsible for comrades to do a good job of Party building as the greatest achievements, adhere to the development wholeheartedly for, to concentrate its attention on the construction of the party, the party building work is included in the agenda, and business to work with the deployment,308、 with checks, with the implementation of, true to form Party grasping, Secretary to take the lead in efforts, in charge of the leadership Specific catch, catch a, layers of implementation pattern of Party building work. Is to improve the reporting and appraising system. In accordance with the debrie309、fing the party building, the appraisal rating of Party building, Party building assessment test, use of cadres at request of the party, CF county Party debriefing practice, and constantly improve the annual party built debriefing appraisal system, in particular, to the year debriefing appraisal eval310、uation and annual comprehensive examination closely together, the party builds the job evaluation results into the leading bodies and leading cadres of the annual comprehensive assessment system, strengthen the use of dynamic management and results of debriefing appraisal work, further enhance the d311、ebriefing appraisal of scientific, effective and directive The new integration business. Three is to improve the three class system. Three class system is to improve the partys organizational life, strict party member education management system, we must do a good job in the implementation and long-312、term persistence. According to the party secretary of the organization lectures, party members and cadres micro lectures and Thematic Party Day activities, innovation three class form, rich three class content, pay attention to the work of Party building with the public security work, the formation 313、of the same resonance frequency, the linkage of communion party organization life situation. At the same time, the three class system implementation of join or be admitted to the party organization committee debriefing appraisal of important content, strict grasp the three class system Real.Four, strict political discipline and political rules.Guide all Party members and the police in ideological political action always as the general secretary of the CPC Central Committee
会员尊享权益 会员尊享权益 会员尊享权益
500万份文档
500万份文档 免费下载
10万资源包
10万资源包 一键下载
4万份资料
4万份资料 打包下载
24小时客服
24小时客服 会员专属
开通 VIP
升级会员
  • 周热门排行

  • 月热门排行

  • 季热门排行

  1. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  2. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  3. 陕西化学工业公司招聘管理与职业发展管理手册30页.doc
  4. 动火作业安全告知卡(1页).docx
  5. 高处作业安全告知卡(1页).docx
  6. 广场工程建设项目施工招标评标报告表格(24页).pdf
  7. 原油码头消防工程维保方案(39页).docx
  8. 建筑工程外脚手架专项施工方案(悬挑式脚手架、落地式脚手架)(25页).doc
  9. 2020柏向堂房地产公司材料标准化手册3.0(143页).pdf
  10. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  11. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  12. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  13. 房地产开发贷款实操指南(5页).pdf
  14. 学校宿舍楼建设工程施工方案【153页】.docx
  15. 住宅小区工程施工方案【234页】.docx
  16. 鄂尔多斯空港物流园区总体规划方案(2017-2030)环境影响评价报告书(23页).doc
  17. 规划兰园西路道路工程环境方案环境影响评价报告书(89页).pdf
  18. 屋面圆弧形穹顶结构高支模施工方案(40米)(47页).doc
  19. 埋石混凝土挡土墙施工方案(23页).doc
  20. 重庆市五小水利工程建设规划报告(64页).doc
  21. 厂区至矿区管网蒸汽管道系统扩容改造工程施工组织设计方案(105页).doc
  22. 超高纯氦气厂建设项目办公楼、变电站、水泵房及消防水池、门卫、厂房、仓库、配套工程施工组织设计方案(140页).doc
  1. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  2. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  3. 2024大楼室内精装修工程专业分包投标文件(393页).docx
  4. 苏州水秀天地商业项目购物中心100%室内设计方案(158页).pptx
  5. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  6. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  7. 室内移动式操作平台工程施工方案(19页).doc
  8. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  9. 矿山治理工程施工组织设计方案(240页).docx
  10. 老旧小区改造工程施工方案及技术措施(364页).doc
  11. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  12. 川主寺城镇风貌整治景观规划设计方案(60页).pdf
  13. 建筑工程三级安全教育内容(24页).doc
  14. 新疆风电十三间房二期工程49.5mw风电项目可行性研究报告(附表)(239页).pdf
  15. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  16. 四川凉山攀西灵山国际度假区小镇活力中心商业业态规划方案建议书(33页).pdf
  17. 埋石混凝土挡土墙施工方案(23页).doc
  18. 地下停车场环氧地坪漆施工方案(45页).doc
  19. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  20. 住宅定价策略及价格表制定培训课件.ppt
  21. 西安名京九合院商业项目招商手册(28页).pdf
  22. 2010-2030年湖北咸宁市城市总体规划(32页).doc
  1. 建筑工程夜间施工专项施工方案(18页).doc
  2. 赣州无动力亲子乐园景观设计方案(111页).pdf
  3. 2016泰安乡村旅游规划建设示范案例(165页).pdf
  4. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  5. 龙山县里耶文化生态景区里耶古城片区旅游修建性详细规划2015奇创.pdf
  6. 连云港市土地利用总体规划2006-2020年调整方案文本图集(78页).pdf
  7. 850亩项目塑钢门窗工程施工组织设计方案(34页).doc
  8. 老旧小区改造工程施工方案及技术措施(364页).doc
  9. 城市更新项目地价公式测算表.xlsx
  10. 房地产项目规划前期投资收益测算模板带公式.xls
  11. 存储器基地项目及配套设施建筑工程临时用水施工方案(40页).docx
  12. 铁路客运枢纽项目站前框构中桥工程路基注浆加固专项施工方案(19页).doc
  13. 室内移动式操作平台工程施工方案(19页).doc
  14. 装配式结构工业厂房基础、主体结构、门窗及装饰工程施工方案(83页).doc
  15. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  16. 施工工程安全教育培训技术交底(13页).doc
  17. 老旧小区改造施工方案及技术措施(365页).doc
  18. 新建贵广铁路线下工程沉降变形观测及评估监理实施细则(126页).doc
  19. 消防火灾应急疏散演练预案(12页).doc
  20. 矿山治理工程施工组织设计方案(240页).docx
  21. 崖城站悬臂式挡墙施工方案(92页).doc
  22. 北京科技园公寓建设项目整体报告方案.ppt