个人中心
个人中心
添加客服WX
客服
添加客服WX
添加客服WX
关注微信公众号
公众号
关注微信公众号
关注微信公众号
升级会员
升级会员
返回顶部
新型节能建筑材料产业项目可行性报告
新型节能建筑材料产业项目可行性报告.doc
下载文档 下载文档
可研专题
上传人:地** 编号:1251481 2024-10-19 31页 218KB
1、Selection.ParagraphFormat.LineSpacingLinesToPoints(2)Selection.ParagraphFormat.LineSpacingLinesToPointselection.ParagraaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaphFormat.LineSpacingLinesToPoints(2)Selection.ParagraphFormat.LineSpacingLinesToPoction.ParagraphForm Selection.ParagraphFormaaaaaaaaa2、aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaat.LineSpacingLinesToPoints(2)Selection.ParagraphFormat.LineSpacingLinesToPointselection.ParagraphFormat.LineSpacingLinesToPoints(2)Selection.ParagraphFormat.LineSpacingLinesToPoction.ParagraphFormat.LineSpacingLinesToPoints(2Selection.ParagraphFormat.LineSpacin3、gLinesToPoints(2)Selection.ParagraphFormat.LineSpacingLinesToPointselection.ParagraphFormat.LineSpacingLinesToPoints(2)Selection.ParagraphFormat.LineSpacingLinesToPoction.ParagraphFormat.LineSpacingLinesToPoints(2)Selection.ParagraphFaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa4、aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaahF第一章 项目概述第一节 项目名称、建设单位、项目负责人1、项目名称:新型节能建筑材料产业项目;2、项目规模:总投资6000万元;3、项目建设单位:惠东县现代预拌混凝土有限公司;4、项目负责人:潘冬年(法人代表);5、项目地址:惠东县大岭镇洪湖村湖底地段;6、建设性质:建筑材料生产、销售。第二节 项目提出的背景和必要性1、项目提出的背景我国是世界上最大的发展中国家,以占世界7%的耕地养育着占世界22%的人口,土地资源十分宝贵,城乡建设的迅猛发展需要大量的节能环保建筑材料,5、而传统建筑材料混凝土为现场搅拌,已不能保证建筑工程质量,而污染环境;实心粘土砖需要大量占地取土,与土地资源严重缺乏形成了严重的对比,为此,2003年,国家商务部、公安部、建设部、交通部发布了关于限期禁止在城市城区现场搅拌混凝土的通知,确定了124个禁止现场搅拌的城市,并且明确规定了城区现场搅拌的时间表。各地政府根据国家政策法规及本地实际情况,也纷纷出台叻相关文件, 大力鼓励和支持预拌混凝土,大大促进了建设单位和施工单位使用预拌混凝土。国务院办公厅关于进一步推进墙体材料革新和推广节能建筑的通知(国办发2005)33号)明确规定:“在国家城市住宅建设中禁止使用实心粘土砖瓦。已限期禁止生产、使用实心6、粘土砖(包括瓦,下同)的170个城市,要向逐步淘汰粘土制品推进,并向郊区城镇延伸。其他城市要按国家的统一部署,分期分批禁止或限制生产、使用实心粘土砖,禁止现场搅拌混凝土,并逐步向小城镇和农村延伸。其中,经济发达地区城市和人均耕地面积低于0.8亩的城市,要逐步禁止生产和使用实心粘土砖;粘土资源较为丰富的西部地区,要推广发展粘土水泥空心制品,限制生产和使用实心粘土砖;在新型墙体材料基本能够满足工程建设需要的地区,要禁止生产粘土砖。力争到2011年底,所有城市禁止使用实心粘土砖,全国实心粘土砖年产量控制在4000亿块以下。各地区和有关部门要积极推广使用新型墙体材料和预拌混凝土,凡财政拨款或补贴的行政7、机关办公用房、公共建筑、经济适用房、示范建筑小区和国家投资的生产性项目等,都要执行节能设计标准,选用和采购新型节能环保建筑材料。新建建筑要向强制执行国家已颁布的建筑节能设计标准推进,逐步提高新型墙体材料的生产和应用比例,增加节能建筑面积。力争到2011年,新建建筑严格执行建筑节能设计标准,有条件的城市率先执行节能率65%的地方标准。到2012年,新型墙体材料产量占墙体材料总量的比重到55%以上,建筑应用比例达到65%以上;严寒、寒冷地区应执行节能率65%的标准。”从保护土地,节约燃料,改善环境,造福子孙这一角度出发,用新型建材代替实心粘土砖,根据国务院办公厅关于进一步推进墙体材料革新和推广节能8、建筑的通知(国办发2005)33号)、国家发改委等四不委关于公布第二批限时禁止使用实心粘土砖城市名单的通知(发改环资2005)2656号)、广东省发展新型墙体材料条例和惠州市关于进一步加快我县新型墙体材料发展的实施意见和禁上使用现场预拌混凝土等法律法规规定,结合本县实际,大力推广全县新型墙体材料的广泛应用,加快惠东县新型墙体材料的发展步伐,有效保护耕地,特提出生产、销售新型节能建筑材料产业项目。2、项目建设的必要性(1)建立预拌混凝土搅拌站,已可保证建筑工程质量,还可达到节能环保的要求,以及发展新型墙体材料,是保护耕地和节约能源的迫切需要。我过耕地面积仅占国土面积10%强,不到世界平均水平的一9、半。我国房屋建筑材料中70%是墙体材料,其中粘土砖占据主导地位。国家从1992年以国务院66号文件为标志,开始大力推行新型墙体材料替代实心粘土砖。但迄今为止,粘土砖生产企业大约还有9万多家,占地500万亩。每年粘土砖生产量还达6000多亿块,耕用粘土资源13亿立方米,相当于废田70万亩左右。尤其是一些耕地本来就十分紧缺的地区和粮食生产区,由于粘土砖的大量生产,局部地区已经到了无土可挖、无土可用的地步,这种情况将直接影响到我们未来的生存环境。我县人均耕地面积低于世界粮农组织划定的1.4亩警戒线,保护土地资源和生态环境任务十分艰巨和迫切。所以,我县推行新型混凝土墙体加工产业,发展新型墙体材料,是我10、县加快建设资源节约型社会的一项重要工作,不仅能制止毁田烧砖的行为,节约大量土地,而且能利用废弃资源,做到综合利用,对促进资源集约利用,实现可持续发展具有重要意义。(2)建立预拌混凝土搅拌站及发展新型墙体材料,是节能减排、改善环境的重要措施,是可持续发展的重要内容,是坚持以人为本,构建和谐社会的迫切需要。我国生产粘土砖每年在耕用粘土资源达13多亿立方米,约相当于毁田70万亩的同时,每年生产粘土砖还要消耗7000多万吨标准煤,排放大量的SO2,造成空气环境污染。如果实心粘土砖产量继续增长,不仅增加墙体材料的生产能耗,而且导致新建建筑的采暖和空调能耗大幅度增加,将严重加剧能源供需矛盾。节约能源、保护11、环境的任务十分艰巨和迫切。所以,发展新型节能混凝土墙体加工材料,是我县积极推进节能减排、加快建设能源节约型社会的一项重要工作,不仅能制止毁田烧砖行为,节约大量地,而且能利用废弃资源,做到综合利用,使之节能降耗,促进资源集约利用,实现人与社会的和谐发展。 (3)发展新型节能建筑体材料,是确保建筑工程质量、提高资源利用效率和保护环境的重要措施。采用预拌混凝土和优质新型墙体材料建造房屋,建筑功能将得到有效改善,适度显著上升,可以提高建筑的质量和居住条件,满足经济社会发展和人民生活水平提高的需要。另一方面,我国每年产生各类工业固体废物1亿多吨,累计堆存量已达几十亿吨,不仅占用了大量土地,其中所含的有害12、物质严重污染着周围的土壤、水体和大气环境。加快发展以媒矸石、粉煤灰、建筑渣土、治金和化工废渣等固体废物为原料的新型墙体材料,是提高资源利用率改善环境、促进循环经济发展的重要途径。 (4)发展新型节能环保建筑材料,是美化环境,服务于我县经济建设的需要。惠东县地理位置优越,资源丰富,交通运输便利繁忙。城乡建筑市场繁忙,发展空间广阔,新型节能混凝土墙材需求将越来越大,为我县的新型墙材发展带来了生机。目前,是发展新型节能混凝土墙体加工产业有利于时机,为发展循环经济,综合利用,服务于民,服务于惠东县经济发展,项目建设单位立足与惠东新型墙体材料发展的需要,着眼于广惠东县城乡建筑市场需求,拟在大岭镇洪湖村湖13、底地段建立新型节能建筑材料产业基地项目。该项目采用页岩石、煤喳灰、矿粉、水泥、河砂、石灰等作为原材料,购置先进的预拌混凝土多孔烧结砖、免烧砖加工设备,建设大节能建筑型材料生产规模,提高新型墙体材质量和档次,适应新形势下惠东建筑市场的发展。本项目的建成,不仅可以作为推动惠东及周边地区新型墙材产业发展的平台。而且也将成为积极带动区域新型墙材产业快速发展的领头羊,有利于地方经济发展,实现我县经济优势互补,改善项目区群众生产生活环境。第二章 项目建设的依据 1、国家商务部、公安部、建设部、交通部发布了关于限期禁止在城市区现场搅拌混凝土的通知2、国务院办公厅关于进一步推进墙体材料革新和推广节能建筑的通知14、(国办发200533号)3、中华人民共和国建设部早前发布关于进一步加强禁止使用实心粘土砖工作的通知(建科200774号)4、国家发展和改革委员资源综合利用目录(2003年修订)(发改环资200473号)5、财政部、国家发展改革委关于印发新型墙体材料专项基金征收使用管理办法的通知(财综200777号)6、财政部、国家税务局享受税收优惠政策新型墙体材料目录7、财政部、国家贸委关于部分资源综合利用及其他产品增值税政策问题的通知(财税2001198号)8、中华人民共和国国家标准烧结普通砖(标准号GB510193代替标准号代替GB510185)9、国家产业指导目录10、惠东县国民经济和社会发展十一五规划15、纲要第三章 新型墙体材料目录及标准第一节 新型墙体材料目录新型墙体材料,是指非粘土为主原料生产的,具有资源综合利用、环境保护、节约土地和能源等特性,符合国家产业政策的墙体材料。新型墙体材料不以消耗耕地、破坏生态和污染环境为代价,适应建筑部品工业化、施工机械化、减少施工现场湿作业、改善建筑功能等现代建筑发展的要求,所产生的墙体料根据财政部财综200355号文件规定,新型墙体材料有以下六大类:1、非粘土砖: (1)空洞率大于25%非粘土烧结多孔砖和空心砖。 (2)混凝土空心砖和空心砖砌块。 (3)烧结页岩砖。2、建筑砌块:(1)普通混凝土小型空心砌块。(2)轻集料混凝土小型空心砌块。(3)蒸压加气16、混凝土砌块。(4)石膏砌块。 3、建筑板材(1)玻璃纤维增强水泥轻质多孔隔墙条板(简称grc板)。(2)纤维增强低碱度水泥建筑平板。(3)蒸压加气混凝土板。(4)轻集料混凝土条板(参照行业标准住宅内隔墙轻质条板Jc/t30291995的技术要求)。(5)钢丝网架水泥夹芯板。(6)石膏墙板(包括纸面石膏板、石膏空心条板)。其中:纸面石膏板;石膏空心条板。(7)金属面夹芯板(包括金属面聚苯乙烯夹芯板、金属面硬质聚氨酯夹芯板和金属面岩棉、矿渣棉夹芯板)其中:金属面聚苯乙烯夹芯板;金属金属面硬质聚氨酯夹芯板;金属面岩棉、矿渣棉夹芯板。(8)复合轻质夹芯隔墙板、条板(所用板材为以上所列几种墙板和空心条板17、,复合板符合建设部建筑轻质板、隔墙板施工及验收规程的技术要求)。 4、原料中掺有不少于30%的工业废渣、农作物桔杆、垃圾、江河(湖、海)淤泥的墙体材料产品。5、预制及现浇混凝土墙体。6、钢结构和玻璃幕墙。新型墙体材料具有节土、节能、利废、轻质等特点,有利于环保、提高施工效率、降低工程成本、改善建筑功能、提高使用面积。随着全国各地禁止使用实心粘土的实施,新型墙体材料得到了进一步的发展和应用,新兴墙体材料已进入了前所未有的兴旺时期。同时也为新型墙体材料的发展创造了良好的机遇。庞大的中国建筑市场,在建筑材料变革中的需求特别是满足国家产业改革要求的新型建材,起其需求量大的惊人!虽然近十年来,在建筑材料18、业出现了各样的新型墙体材料,但几乎没有摆脱几千年来秦砖汉瓦的施工模式和材料功能,直接制约了中国建筑行业向工业化装配式干法施工的进程。降低墙体材料消耗,减少环境污染和破坏,已引起全社会和科技界专家的高度重视和关注。如何降低工程总成本,减少施工环节和周期,提高工业化装配式干法施工水平已成为国家和建筑行业关注的重点。本项目是着眼于市场未来发展趋势,以国家现有墙该政策为基础,以科技创新为生产开发平台,以建设、施工单位为营销对象,通过充分利用再生资源,根据绿色建材的要求进行生产定位。第二节 新型节能建筑材料标准1、预拌混凝土(GB/T14902-2003)2、砖(1) 烧结多孔砖(GB 1354420019、0)(2) 烧结空心砖(GB 135452003)(3) 蒸压灰砂砖(GB 119451999)(4) 烧结普通砖(烧结页岩砖、烧结煤矸石砖、烧结煤灰砖)(JC51011998)(5) 蒸压灰砂空心砖(JC/T 6371996)(6) 混凝土多孔砖(JC 9432004)(7) 粉煤灰砖(JC 23991(96)(8) 蒸压灰砂空心砖(JC/T 6371996)3、砌砖(1)普通混凝土小型空心砌块(GB 82391997)(2)粉煤灰砌块(JC 23891(96)(3)轻集料混凝土小型空心砌块(GB 1522994)(4)石膏砌块(JC/T 6981998) (5)蒸压加气混凝土砌块(GB/T20、 119681997) (6)粉煤灰小型空心砌块(JC 8622000) (7)装饰混凝土砌块(JC/T 6411996) (8)烧结空心砌块(GB 1354592)4、板材 (1)纸面石膏板(GB/T 97751999) (2)纤维增强硅酸钙板(JC/T 5642000) (3)工业灰渣混凝土空心条板(JC 30631999) (4)金属面硬质聚氨酯夹芯板(JC/T 8682000) (5)金属面聚苯乙烯夹芯板(JC 6891999) (6)硅镁加气混凝土空心轻质隔墙板(JC 6801997) (7)玻璃纤维增强水泥轻质多孔隔墙条板(JC 6661997) (8)纤维增强低碱度水泥建筑平板(21、JC/T 6261996) (9)钢丝网架水泥聚苯乙稀夹芯板(JC 6231996)(10)住宅内内隔墙轻质条板(JC/T 30291995)(11)住宅混凝土内墙板与隔墙板(GB/T 149081996)第三节 主要指标及技术性质1、预拌混凝土根据国家标准GB/T149022003预拌混凝土的规定,主要原材料:水泥(P.O)、砂(S)、石(GD)、粉煤灰外加剂(F.H)。2、烧结普通砖 根据国家标准GB 51012003烧结普通砖的规定,烧结普通砖按其主要原料分为粘土砖()、页岩砖(Y)、煤矸石砖(M)和粉煤灰砖(F)。烧结普通砖的规格为240mm115mm53mm(公称尺寸)的直角度六面体22、。在烧结普通砖砌体中,加上灰缝10mm,每4块砖长、8块砖宽或16块砖厚均为1m。1m3砌体需用砖512块。根据GB 51012001,烧结普通砖的技术要求包括:尺寸偏差、外观质量、强度、抗风化性能、泛霜、石灰爆裂及欠火砖、酥砖和螺纹砖(过火砖)等,并划分为不同强度等级和优等品(A)、一等品(B)和合格()三个质量等级。强度。烧结普通砖根据10块试样抗压强度的实验结果,分为五个强度等级(表-1)不符合为不合格品。尺寸偏差。烧结普通砖根据20块试样的公称尺寸检验结果,分为优等品(A)、一等品(B)和合格()(表11-2)否则不符合,为不合格品。表-1 烧结普通砖及多孔砖的轻度 单位:Mpa强度等23、级抗压强度平均值f,不小于变异系数0.21变异系数0.21抗压强度标准fk,不小于单块最小抗压强度度fmin,不小于MU3030.022.025.0MU2525.018.022.0MU2020.014.016.0MU1515.010.012.0MU1010.06.57.5表-2 烧结普通砖的尺寸允许偏差 单位mm公称尺寸优等品一等品合格品样本平均偏差样本极差样本平均偏差样本极差样本平均偏差样本极差长度2402.062.573.08宽度1151.552.062.57厚度5310.41.652.06表-3 烧结普通砖的外观质量要求 单位mm项目优等品一等品合格两条面度差234弯曲234杂质凸出度224、34缺棱掉角的三个破坏尺寸不得同时大于52030裂纹长度a.大面上宽度方向及其延伸至条面的长度306080b.大面上长度方向及其延伸至顶面的长度或条顶面上水平裂纹的长度5060100完整面不得少于二条面和二项面一条面和一项面一颜色基本一致一一注:为装饰而施加的色差,凹凸纹、拉毛、压花等不算作缺陷。凡有下列缺陷之一者,不得称为完整面。a)缺损在条面或顶面上造成的破坏尺寸同时大于10mm10mm。b)条面或顶面上裂纹宽度大于1mm,其长度超过30mm.c)压陷、粘底、焦华在条面或顶面上的凹陷或凸出超过2mm,区域尺寸同时大于10mm10mm。表4 抗风化性能 单位:mm砖种类严重风化区非严重风化区25、5h沸煮吸水率/%饱和系数5h沸煮吸水率/%饱和系数平均值单块最大值平均值单块最大值平均值单块最大值平均值单块最大值粘土砖18200.850.8719200.880.9粉煤灰砖21232325页岩砖16180.740.7718200.780.8煤矸石砖注:粉煤灰掺入量(体积化)小于30%时,按粘土砖规定判定。3、烧结多孔砖烧结多孔砖为大面有孔的真角六面体,孔多而小,孔洞庭湖垂直于受压面。砖的主要规格有M型:190mm190mm90mm及P型240mm115mm90mm。国家标准GB135442000烧结多孔砖规定,根据抗压强度,烧结多孔砖分为MU30、MU25、MU20、MU15、MU10五个26、强度等级(见表1)。根据砖的尺寸偏差、外观质量、强度等级和物理性能(冻融、泛霜、石灰爆裂、吸水率等)分为优等品(A)、一等品(B)、和合格品(C)三个质量等级。烧结多孔砖的孔洞率有25%以上,表观密度约为1400kg/m3左右。常被用于砌筑六层以下的承重墙。4、烧结空心砖和空心砌块烧结空心砖为顶面有孔洞的直角六面体,孔大而少,孔洞钜形条孔(或其他孔形),平行于大面和条面,在与砂浆的接合面上下班,设有增加结合力的深度为1mm以上的凹线槽。根据国家标准GB135452003烧结空心砖和空心砌块的规定,空心砖和砌块的规格尺寸(长度、宽度及高度)应符合390、290、240、190、180(175)、27、140、115、90mm的系列(也可由供需双方商定)。按砖及砌块的表观密度,分为800、900、1000、及1100(kg/m3)四个表观密度等级。按其抗压强度分为MU10.0、MU5.0、MU3.5及MU2.5四个强度等级。表5 烧结空心砖及空心砌块的强度指标强度等级抗压强度平均值f抗压强度/MPm密度等级范围(kg/m3)变异系数0.21变异系数0.21抗压强度标准值fk单块最小抗压强度fminMU7.57.5 5.0 5.8 1100MU5.05.0 3.5 4.0 MU3.53.5 2.5 2.8 MU2.52.5 1.6 1.8 MU7.57.5 5.0 5.8 800对于强度、密度28、抗风化性及放射性物质合格的空心砖及砌块,根据尺寸偏差、外观质量、孔洞排列及其结构、泛霜、石灰爆裂及吸水率,分为优等品(A)、一等品(B)和合格品(C)三个质量等级。烧结空心砖和空心砌块,孔洞率一般在40%以上,质量较轻,强度不高,因而多用作非承重墙,如多层建筑内隔墙或框架结构的填充墙等。5、非烧结蒸压灰砂砖(简称灰砂砖)国家标准GB119451989蒸压灰砂砖规定,按砖浸水24h后的抗压强度和抗折强度分为MU25、MU20、MU15、MU10四个等级。避免用于长期受热高于200C、受急冷急热交替作用或有酸性介质侵蚀的建筑部位。原因:灰砂砖中的一些组分如水化硅酸钙、氢氧化钙等不耐酸,也不耐热,29、免有流水冲刷的地方此外,原因:砖中的氢氧化钙等组分会被流水冲失。6、百烧结蒸养粉煤灰砖(简称粉煤灰砖)以粉煤灰、石灰为主要原料,加入适量石膏、外加剂、颜料和集料等,经坯料制备、压制成型、常压或高压蒸气养护而成的实心砖。国家建材局标准JC2392001粉煤灰砖根据砖的抗压强度和抗折强度将其分为MU30、MU25、MU20、MU15、MU10五个强度等级。并根据尺寸偏差、外观质量及干燥收缩性质分为优等品(A)、一等品(B)和合格品(C)三个质量等级。7、蒸压加气混凝土砌块以钙质材料和硅质材料以及加气剂、少量调节剂,经配料、搅拌、浇注成型、切割和蒸压养护而成的多也轾质块体材料。钙质材料:石灰硅质材料30、可分别采用、水泥、矿渣、粉煤灰、砂等。国家标准GB/T1196897蒸压加气混凝土砌块规定,砌块的规格(公称尺寸),长度(L)有:600mm;宽度(B)有:100、125、300mm等多种。砌块的质量,按其尺寸偏差、外观质量、表观密度级别分为:优等品(A)、一等品(B)和合格品(C)三个质量等级。砌块强度级别按100mm100mm100mm立方体试件抗压强度值(MPa)划分为七个强度级别。见表117的规定。砌块表观密度级别,按其干燥表观密度分为:B03、B04、B05、B06、B07及B08六个级别。不同质量等级砌块的干燥表观密度值应符合表8的规定。不同质量等级的不同表现密度的砌块强度级别应符31、合表9的规定。表6 砌块是用于建筑的人造材,外形多为直角六面体,也有异形的。按尺寸(mm)分类按密实程度分类按主要原材料分类大型砌块(主规格高度180)实心砌块普通混凝土砌块中型砌块(主规格高度380980)空心砌块空心率 , party implementing the guiding ideology of opinions to determine the objectives and requirements, step method, in accordance with the look in the mirror, dress up, wash bath, cure treatm32、ent, the general requirements of for the people pragmatic honest people as the theme, in carrying forward the spirit of Zhuanglang Zhuang, improve their work style, service to the masses of the people, the foundation of consolidating grassroots, promote transformation across efforts, to further impl33、ement the central eight regulations and The opposition party and government austerity waste regulations , double section provincial regulations, municipal provisions of the twelve plan and the implementation measures for on improving the work style of close ties with the masses law, highlight style 34、building, carry out the whole wind spirit, resolutely oppose formalism, bureaucracy, hedonism and wasteful extravagance to solve the problems, Party members and cadres of the style and the masses of people strong, the Ministry of Party members and cadres to further improve their thinking and underst35、anding, to further change the style of the wind, the masses to close, honest and pragmatic people honest image to further establish the foundation to further reinforce the basic level. Style of the building of the new results to promote the construction of a powerful force of the county and the ecol36、ogical culture of the county and county construction.In educational practice activities of the unit is mainly: the county and below county departments under the organs, enterprises and institutions directly under the township, street, and community, village, non-public economic organizations, social37、 organizations and other grass-roots organizations. Agencies and branches, each single unit, follow the rules on internal institutions. Educational practice with step by step.To adhere to the county leadership, leadership and leading cadres to focus on outstanding catch to directly contact the servi38、ce of the masses of law supervision departments and window units, service industry, educational practice, pay attention to grasp the heavy towns, streets and villages, community education activities and the masses of grassroots groups in close contact to strengthen, and the majority of Party members39、, cadres and the mass line line Marx doctrine view of the masses and the partys education.Always speak seriously as a basic attitude, adhere to positive education, to carry out criticism and self criticism group, adhere to the pragmatic, more emphasis on leadership, pay more attention to the layers 40、of the demonstration, more focus on the four winds, solve the problem, pay more attention to open the door, the participation of the masses, pay more attention to the classification guidance. Orderly, pay more attention to the cooperation and cohesion driven, more strict requirements on injection, r41、eally supervision practice, ensure education practice is not empty is not empty is not partial, not as a mere formality.Two, the key point of the taskThe main task of the countys education practice is to seize against four wind this focus on centralized solve outstanding problems asked County, towns42、hip leadership and leading cadres of the four winds, the disadvantages of the style, scale behavior to a large scale investigation, overhaul, cleaning greatly. At the same time, respond to the concerns of the masses, safeguard the interests of the masses, pay attention to solve practical problems, s43、olve the people around the unwholesome tendencies especially on eat, take the card, Yong lazy luxury, extravagance and waste fees, privileges and other issues, timely and effective, without any discount to solve, to improve the style of real implementation of the requirements of real to the grassroo44、ts, real let group Benefit the public.(a) focus on solving the four winds outstanding issuesThe central and provincial requirements, the county leadership and leading cadres of key performance concept is not correct, do not dare to play, to engage in image project, political project, a leadership gu45、ide, a set of ideas, orders and prohibitions, and a policy, there are countermeasures county. The units directly under the heavy focus on solving Yung lazy drag, buck passing skin, work is not implemented, the service is not active. The dynamic problem of law enforcement and supervision departments 46、and window units, service industry mainly solve the door hard, ugly face, something difficult, and arbitrary charges, fines, levies, and breach of privilege, chinakayao, not the problem of law. The township, street The collar of leading bodies and leading cadres to solve key does nottheir own condit47、ions to develop the correct road, the maximum to avoid investment risk, gain profit.(three) vigorously promote the brand. To establish brand awareness, awareness of the use of brand, brand value, brand acquisition performance, enhance the competitive strength. Concentrated manpower, careful planning48、, packaging and publicity of a number of unique, market influence and coverage of the brand, the implementation of key breakthroughs, to enhance the competitive strength, walking business road the competition of alienation and characteristics, the pursuit of stability and development of the market.(49、four) to promote the integration of resources. To further broaden their horizons, effective integration of resources within the group, the city resources, other industries and regional resources, mutual trust, mutual benefit, seeking win-win principle, in the framework of national policies and regul50、ations, strict inspection and argumentation, legal consultation, examination and approval procedures, strict regulation of economic activities, attract injection the social investment to the industry group, to achieve leveraging the development, ensure that the value of state-owned assets.(five) to 51、strengthen the construction management personnel. Strengthen the management of education and training of cadres and workers of the existing business, firmly establish the concept of the market, enhance the sense of crisis to adapt to market competition, the sense of urgency, improve the ability to r52、espond to market competition, improve management and operation of the market. At the same time, according to the need of industrial development, vigorously the introduction of high-quality management management personnel, and strive to build a high-quality professional management team, hard work, an53、d promote the entire workforce knowledge structure, age structure, structure optimization and upgrading ability, enhance core competitiveness, adapt to the need of market competition.(six) seriously study the policy for policy. Serious research about social support the development of cultural undert54、akings in the country and the XX policy, especially the policy of industrial development, financial investment policy, financial policy and tax policy, and actively seek policy, projects and funds, enterprise and industry group mission to promote leapfrog development.31Selection.ParagraphFormat.Line55、SpacingLinesToPoints(2)Selection.ParagraphFormat.LineSpacingLinesToPointselection.ParagraaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaphFormat.LineSpacingLinesToPoints(2)Selection.ParagraphFormat.LineSpacingLinesToPoction.ParagraphForm Selection.ParagraphFormaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa56、aaaaaaaaat.LineSpacingLinesToPoints(2)Selection.ParagraphFormat.LineSpacingLinesToPointselection.ParagraphFormat.LineSpacingLinesToPoints(2)Selection.ParagraphFormat.LineSpacingLinesToPoction.ParagraphFormat.LineSpacingLinesToPoints(2Selection.ParagraphFormat.LineSpacingLinesToPoints(2)Selection.Par57、agraphFormat.LineSpacingLinesToPointselection.ParagraphFormat.LineSpacingLinesToPoints(2)Selection.ParagraphFormat.LineSpacingLinesToPoction.ParagraphFormat.LineSpacingLinesToPoints(2)Selection.ParagraphFaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaahF
会员尊享权益 会员尊享权益 会员尊享权益
500万份文档
500万份文档 免费下载
10万资源包
10万资源包 一键下载
4万份资料
4万份资料 打包下载
24小时客服
24小时客服 会员专属
开通 VIP
升级会员
  • 周热门排行

  • 月热门排行

  • 季热门排行

  1. 2024全民健身中心项目水上运动用房及附属工程可行性研究报告(162页).pdf
  2. 新疆风力发电场新建工程项目可行性研究报告130页.doc
  3. 经济开发区6MWp厂房屋顶分布式光伏发电项目可研报告附财务评价194页.docx
  4. 城市园林绿化栽植造林工程场地平整及苗木栽植施工方案34页.doc
  5. 2023汽车工厂红线范围外第二回110千伏输电线路工程可行性研究报告(129页).doc
  6. 南充市高铁商务区配套基础设施PPP项目1路级配碎石垫层试验段施工方案()(37页).doc
  7. 1.2MWp分布式光伏发电示范工程项目可研性分析报告62页.doc
  8. XX县城供水管网改造工程可行性研究报告62页.doc
  9. 巴中市巴州区寺岭乡等十二个乡镇场镇污水处理站及配套管网建设项目可行性研究报告154页.doc
  10. 新疆阿克苏地区阿瓦提县5000吨气调保鲜库建设项目可研报告61页.doc
  11. 新疆伊犁州察布查尔县美利奴基地多胎肉羊纯繁建设项目可研报告91页.doc
  12. 南泥湾镇污水处理站工程项目可行性研究报告85页.doc
  13. 供电公司路灯管理所路灯照明工程项目可行性研究报告可行性研究报告54页.doc
  14. 阳泽河水库清淤工程建设项目可行性研究报告47页.doc
  15. 湖北高校框剪结构多层图书馆幕墙工程施工组织设计方案(幕墙安装)(101页).doc
  16. 什邡市八角镇爆竹园村贫困村灾后恢复重建道路硬化工程施工组织设计方案(105页).doc
  17. 武汉市大汉阳地区现代有轨电车试验线工程BT项目夏季施工专项方案(12页).docx
  18. 杭州地铁5号线工程基坑监测方案(92页).doc
  19. 内蒙古制药产业污水处理站建设项目可行性研究报告(48页).doc
  20. 白酒生产线建设项目可行性研究报告(119页).doc
  21. 北川河河道治理工程可行性研究报告(67页).doc
  22. 丰都县高家镇防洪工程项目可行性研究报告(55页).doc
  1. 48MW风电项目工程风机设备吊装专项施工方案86页.doc
  2. 2024质量技术交底范本汇编(679页).pdf
  3. 2025储能科技有限公司年产7GWh工商储生产线项目可行性研究报告(118页).pdf
  4. 2024全民健身中心项目水上运动用房及附属工程可行性研究报告(162页).pdf
  5. 2024平远县公共机构停车泊位新能源汽车充电桩建设项目可行性研究报告(183页).pdf
  6. 2024电船充电桩建设项目可行性研究报告(31页).pdf
  7. 新疆风力发电场新建工程项目可行性研究报告130页.doc
  8. 经济开发区6MWp厂房屋顶分布式光伏发电项目可研报告附财务评价194页.docx
  9. 城市园林绿化栽植造林工程场地平整及苗木栽植施工方案34页.doc
  10. 城市儿童中心食堂改造项目精装修及设备安装调试工程施工方案218页.docx
  11. 2023汽车工厂红线范围外第二回110千伏输电线路工程可行性研究报告(129页).doc
  12. 小流域水土保持综合治理项目施工组织设计方案(71页).doc
  13. 大型车间钢结构厂房施工方案设计(184页).pdf
  14. 光明路加油站改造工程加油站带防渗池施工组织设计方案(69页).doc
  15. 有限空间施工及应急紧急方案(29页).doc
  16. 榆林市档案馆消防工程施工组织设计方案(58页).doc
  17. 阳泽河水库清淤工程建设项目可行性研究报告47页.doc
  18. 襄樊电厂二期主厂房施工方案【202页】.doc
  19. 煤矿与建设机械装备生产制造基地项目锻压、下料厂房、热处理厂房、返修及涂装厂房吊车梁、屋架等预制构件制作及吊装工程施工方案【128页】.doc
  20. 房地产开发全流程培训.ppt
  21. 大剧院项目基坑支护深基坑支护设计方案【23页】.doc
  22. 达旗中学教学楼抗震加固工程施工方案【34页】.doc
  1. 建筑工程夜间施工专项施工方案(18页).doc
  2. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  3. 2024长隆北加油站建设项目可行性研究报告(145页).pdf
  4. 48MW风电项目工程风机设备吊装专项施工方案86页.doc
  5. 老旧小区改造施工方案及技术措施(365页).doc
  6. 房地产项目规划前期投资收益测算模板带公式.xls
  7. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  8. 2024大楼室内精装修工程专业分包投标文件(393页).docx
  9. 经济开发区6MWp厂房屋顶分布式光伏发电项目可研报告附财务评价194页.docx
  10. 苏州水秀天地商业项目购物中心100%室内设计方案(158页).pptx
  11. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  12. 龙港市专业市场布局规划方案(2023-2035年)(草案)(61页).pdf
  13. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  14. 铁路客运枢纽项目站前框构中桥工程路基注浆加固专项施工方案(19页).doc
  15. 室内移动式操作平台工程施工方案(19页).doc
  16. 装配式结构工业厂房基础、主体结构、门窗及装饰工程施工方案(83页).doc
  17. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  18. 施工工程安全教育培训技术交底(13页).doc
  19. 消防火灾应急疏散演练预案(12页).doc
  20. 矿山治理工程施工组织设计方案(240页).docx
  21. 老旧小区改造工程施工方案及技术措施(364页).doc
  22. 北京科技园公寓建设项目整体报告方案.ppt