精品某河道治理工程可行性研究报告pdf版.pdf
下载文档
上传人:地**
编号:1238024
2024-10-18
63页
1.75MB
1、Selection.ParagraphFormat.LineSpacingLinesToPoints(2)Selection.ParagraphFormat.LineSpacing LinesToPo intselection.ParagraaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaphForm at.Lin eSpacingLi nesToPoints(2)Selection.ParagraphFo rmat.LineSpacingLinesToPoction.Paragraph FormSelection.ParagraphForm aa2、aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaat.LineSpacingLinesToPoi nts(2)Selection.ParagraphForm at.Lin eSpacingLi nesToPointselection.ParagraphFormat.LineSpacingLinesToPoints(2)Selection.ParagraphFormat.LineSp acingLinesToPo ction.ParagraphFormat.Li neSpacingLi nesToPoints(2Selection.ParagraphFo3、rmat.Li neSpacingLinesToPoints(2)Selection.ParagraphFormat.LineSpacingLinesToPoi ntselection.ParagraphForm at.LineSpacingLinesToPoints(2)Selection.ParagraphFormat.LineSpacingLinesToPoction.ParagraphFormat.LineSp acingLinesToPo ints(2)Selection.ParagraphFaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa4、aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaahFSelection.ParagraphFormat.LineSpacingLinesToPoints(2)Selection.ParagraphFormat.LineSpacing LinesToPo intselection.ParagraaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaphForm at.Lin eSpacingLi nesToPoints(2)Selection.5、ParagraphFo rmat.LineSpacingLinesToPoction.Paragraph FormSelection.ParagraphForm aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaat.LineSpacingLinesToPoi nts(2)Selection.ParagraphForm at.Lin eSpacingLi nesToPointselection.ParagraphFormat.LineSpacingLinesToPoints(2)Selection.ParagraphFormat.LineSp aci6、ngLinesToPo ction.ParagraphFormat.Li neSpacingLi nesToPoints(2Selection.ParagraphFormat.Li neSpacingLinesToPoints(2)Selection.ParagraphFormat.LineSpacingLinesToPoi ntselection.ParagraphForm at.LineSpacingLinesToPoints(2)Selection.ParagraphFormat.LineSpacingLinesToPoction.ParagraphFormat.LineSp acing7、LinesToPo ints(2)Selection.ParagraphFaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaahF北川河(北川河(北川河(北川河(西山西山西山西山桑家会桑家会桑家会桑家会段)段)段)段)河道治理工程可行性研究报告河道治理工程可行性研究报告河道治理工程可行性研究报告河道治理工程可行性研究报告设计证书号:建设部乙级设计证书号:建设部乙级某某省省某某市水利勘测设计研究院8、市水利勘测设计研究院二二 0 0 0 0 一一 0 0 0 0 年十月年十月1目目录录1、综合说明.11.1 项目区概况.11.2 水文.21.3 工程建设内容.31.4 工程规划.41.5 工程管理设计.41.6 施工组织设计.51.7 环境影响分析.61.8 工程投资估算.61.9 经济评价.71.10 结论.72水文.82.1 流域概况.82.2 气象.82.3 设计洪峰流量的计算.92.4 成果合理性分析.163、工程地质.173.1 地形地貌.173.2 地层岩性.173.3 水文地质.183.4 区域地质构造.1823.5 天然建筑材料.184、工程任务和规模.194.1 社会经济9、概况和工程建设的必要性.194.2 河道整治指导思想和规划原则.204.3 河道治理的目标.205 工程设计.205.1 设计依据.205.2 工程规划.215.3 河道整治规划设计.225.4 河堤工程设计.245.8 清淤疏浚工程设计.325.9 堤顶防洪道路设计.335.10 安全防护栏设计.336.工程管理.376.3 交通与通讯设施.376.4 防汛抢险设施.387施工组织设计.387.1 施工条件.387.2 建筑材料.387.3 施工导流.397.4 主体工程施工.397.5 施工交通运输.4037.6 施工总体布置.407.7 施工进度计划.418、环境影响评价.418.1 环10、境影响评价的目的与依据.418.2 环境影响分析.428.3 环境保护措施.438.4 结论.449、投资估算及资金筹措.459.1 编制说明.459.2 投资估算结果.479.3 资金筹措.4810工程经济评价.4910.1 概述.4910.2 评价依据.4910.3 国民经济评价.4910.4 国民经济评价指标.5111、结论与建议.5511.1 综合评价.5511.2 结论.5611.3 建议.57附:1、某县北川河(西山段)河道治理工程平面布置图2、某县北川河(西山段)河道治理工程横断面图43、某县北川河(西山段)河道治理工程纵断图4、某县北川河(西山段)河道治理工程防洪堤标准断面图。11、11 1 1 1、综合说明、综合说明1.11.1 项目区概况项目区概况某县位于山西省西部,吕梁山中段西翼,地理位置介于东经111o250-111o3430,北纬 37o365838o1027之间。某县南北长 62 公里,东西宽 46 公里,总土地面积为 1440 平方公里,地势东北高,西南低,位于县城东部与交城县横尖镇交界处的关帝山主峰南阳山(孝文山)最高,海拔 2831 米,大武镇武回庄村河谷最低,海拔 987 米,相对高差 1844 米。地貌东北部属土石山区,西南部为黄土丘陵沟壑区。土石山区面积 1170.3 平方公里,占总面积的 81.6%,该区山势雄伟,岩石裸露,峡谷陡峻,森林茂密,地12、势险要,沟壑密度为 1.73.3km/km2。天然草灌丛生,植被覆盖完好,共有天然林 68.47 万亩,其中乔木林 41.28万亩,灌木林 27.46 万亩,天然草地 4.22 万亩,林草覆盖率为 51.8%。黄土丘陵沟壑区面积 263.8 平方公里,占总面积的 18.4%。该区梁峁众多,谷深坡陡,沟坡植被很少,土壤贫瘠,沟壑密度为 3.8km/km2,林草覆盖率为 30%。某县共辖 5 镇 2 乡,169 个行政村。截至 2009 年底全县有 3.28万户,14.45 万人,其中农业人口 11.2 万人,农村劳动力 4.92 万个,其中男劳力 2.586 万个。人口密度为每平方公里 98 人13、,人均土地面积 14.8 亩,人均耕地面积 2.93 亩。某县国民生产总值 2009 年达到 120350 万元,农业总产值 80582万元。2009 年粮食总产量 2520 万公斤,油料产量为 221.2 万公斤。农民人均纯收入 1485 元。农村经济走上了协调发展的轨道,农村产业结构初步趋向合理,农业基础地位得到明显巩固。1.1.1.1.2 2 2 2 水文水文1.2.1 河道概况北川河是三川河的一级支流,位于吕梁山脉中段西侧,地理位置介于东经 111250-1113430,北纬 373658371027之间。发源于某县最北部的麻地渠村,由北向南纵贯某县。北川河流域地形东部、西部为山地和丘14、陵,中部切割下陷为河川。地势东北高,西南低,以关帝山为最高,海拨 2831 米,流域中部为北川河河谷,平均坡降 5.65,滩谷宽在 12 公里之间,滩面平坦,人口相对密集,是本流域主要的工农业生产区域。本次治理的河段为某县圪洞镇的西山村至桑家会村河段,全长2400m,西山村断面处控制流域面积 639.7km2,桑家会村断面处控制流域面积 767.8km2。1.2.2 设计洪水成果设计洪峰流量计算河段为圪洞镇的西山村至桑家会村。由于中间有圪洞沟的汇入,将设计河段从圪洞沟的汇入口分为上下两段,上段为西山村段、下段为桑家会村段。根据防洪标准,确定设计河段乡村防护区的防洪标准为 20年一遇。3本次分析15、采用了三种计算方法,水文比拟法、山西省暴雨洪水计算实用手册(以下简称手册)中的经验公式法和推理公式法。同一断面三种结果互相对照检验,上下游断面纵向比较,同时采用资料系列的延长更能反映流域的真实状况,使分析成果较之以前更为合理。各断面不同方法设计洪峰流量计算结果表单位:m3/s序号断面名称频率(P)设计洪峰流量不同计算方法结果采用值采用值经验公式法水文比拟法推理公式法1西山5%72646011804602桑家会5%519.5519.5在推理公式法、经验公式法、水文比拟法三种计算方法所得结果中,推理公式法与其他方法所得成果相差较大,而经验公式法在面积较小的流域应用效果较好,故本次分析各断面设计洪峰16、流量采用水文比拟法计算结果。1.31.3 工程建设内容工程建设内容1.3.1 河道治理任务工程建设范围为某县圪洞镇的西山村至桑家会村,全长 2400m,主要建设内容包括:河道清淤 2400 m、浆砌石河堤 4800m(其中西山村段 1000m,桑家会村段 3800 m),堤顶防洪道路 4800m,安全防护栏4800m。1.3.2 防洪标准和工程等级4根据防洪标准(GB5020194)及堤防工程师设计规范(GB5028698)中的规定,按 20 年洪水标准。1.1.1.1.4 4 4 4 工程规划工程规划1.4.1 工程规划设计中,按照因地制宜,就地取材,结合工程地质条件、水流条件、施工条件、投17、资、管理运行因素,确定规划方案。北川河河道治理工程主要包括河槽疏浚工程、堤防工程、堤顶防洪道路工程、安全防护栏工程。1.4.2 河道纵坡和过水断面设计河道纵坡:根据实测本段河道上段纵坡为 0.0095、下段纵坡为0.0069。过水断面:河道设计底宽采用山西省水利水电勘测设计研究院1999 年 5 月提出的 60 米的宽度,采用明渠均匀流公式计算各段设计水深。1.1.1.1.5 5 5 5 工程管理设计工程管理设计为加强河道工程管理,保证河道行洪顺畅和工程安全运行。由某县水利局和镇政府共同组建管理机构,由专人负责对工程进行维护、保养。结合工程所在地的实际情况,交通工具考虑配置工具车一辆,生产管理18、通讯采用无线通讯方式。为了工程维修及防汛抢险的需要,在堤防工程的重要堤段及险工段的背水侧设堆料平台,并储备一定量的砂卵石料及堆石料,河槽整治的砂卵石开挖料直接运至堆料平台,用于防汛抢险备用。51.1.1.1.6 6 6 6 施工组织设计施工组织设计1.6.1 施工条件建筑材料:砂石骨料、块石、卵石混凝土料可就近购买,施工用水可抽取河水,施工用电采用自备电源。工程沿线有 209 国道,进入施工各地段,可利用现有乡村道路通行。施工点范围内可沿河道修临时便道满足施工材料及弃料的运输要求。1.6.2 施工导流本工程河槽段的施工安排在非汛期施工,以减小导流费用。堤防工程布置在河道两岸,临近主河槽施工时需19、进行导流。1.6.3 主体工程施工本工程采用机械化或半机械化施工。选择有相应施工经验的专业施工队伍承担,严格按施工技术要求进行。1.6.4 施工交通运输工程区沿线有 209 国道,对外交通比较方便,沿河两岸有乡村道路相通,沿堤线地段需修筑临时施工道路,用于工程建筑材料的进出施工现场。1.6.5 施工进度计划本工程总工期二年,第一年的 10 月至第二年 3 月为施工准备期,完成施工道路、临建、水电及施工围堰等项目,第二年 3 月至 10 月为上段主体工程施工期,完成该主体工程的施工任务;第二年 10 月至第三年的 7 月为下段主体工程施工期,第三年的 7 月至 10 月为完建期,完成工程验收和其20、它扫尾工程。61.1.1.1.7 7 7 7 环境影响分析环境影响分析河道整治工程是一项社会公益性质的项目,其对环境的不利影响主要表现在施工期,这些不利影响不仅是短暂的,而且通过采用相应的环境保护措施,这些不利影响可最大限度地减小或避免。河道整治工程完成后,河道防洪能力将大大提高,周边环境将会有大的改观,对社会和谐和安定起到保障作用,因此,从环境影响方面来看,本区河道整治工程是必要和可行的。1.1.1.1.8 8 8 8 工程投资估算工程投资估算本工程主要包括河道疏浚工程、堤防工程、堤顶防洪道路和安全防护栏。主要工程量为:河卵石开挖 40.5 万 m3,河卵石回填 4.78 万 m3,浆砌石 21、5.049 万 m3,伸缩缝 0.101 万 m2。主要材料量为:柴油 254.6T,块石 5.453 万 m3,砂 2.35 万 m3,水泥 0.73 万 T。工程建设工期 2 年,总用工 59.59 万工时,折合工日 7.45 万工日。工程估算总投资 2940.59 万元,其中:建筑工程 2443.05 万元,独立费用 230.21 万元,基本预备费 267.33 万元。2010 年总投资 1305 万元,争取省补 650 万元,市配套 325 万元,县配套 330 万元;2011 年总投资 1635.59 万元。71.1.1.1.9 9 9 9 经济评价经济评价本次经济评价的基本依据为:22、1、国家计划委员会和建设部联合下发的计投资1993的 530 号建设项目经济评价方法与参数(以下简称方法与参数2、水利部 1994 年 3 月发布的水利建设项目经济评价规范SL7294 进行项目经济评价。该项目经济分析期取 30 年,由于本工程属于社会公益性质的水利建设项目,按照规范社会折现率采用 7%,基准点为开工第一年年初。经计算该工程运行期的年运行费为 52.93 万元,年效益为 345 万元。计算结果为:经济净现值:653 万元经济内部收益率:9.14%投资回收期:19.78 年1.11.11.11.10 0 0 0 结论结论该项目的实施,不仅可以提高河道的防洪标准,而且还可以改善当地23、生态环境,促进各行业的全面发展,因此,该项目的实施是非常必要的。项目实施期为二年,总投资 2940.59 万元;当社会折现率为 7时,经济内部收益率为 9.14,经济净现值为 653 万元,投资回收期19.78 年。8根据以上分析,该项目的建设是十分必要的,在技术、社会、环境上是可行的,经济上是合理的,各级政府和人民群众对此非常重视,建议尽快立项实施。2 2 2 2水文水文2.12.12.12.1 流域概况流域概况北川河是三川河的一级支流,位于吕梁山脉中段西侧,地理位置介于东经 111250-1113430,北纬 373658371027之间。发源于某县最北边的麻地渠村,由北向南纵贯某全县,在24、某县境内流长80 公里,流域面积 1315.4 平方公里,出大武流进离石区,在柳林县汇入黄河。多年径流总量为 6951 万 m3。北川河流域地形东部、西部为山地和丘陵,中部切割下陷为河川。地势东北高,西南低,以关帝山为最高,海拨 2831 米,山上多为花岗岩和古老变质岩分布,森林茂密,天然草灌丛生,1800 米以下为不同厚度的黄土覆盖,植被稀疏,支离破碎,水土流失严重。流域中部为北川河河谷,平均坡降 5.65,滩谷宽在 12 公里之间,滩面平坦,人口相对密集,是本流域主要的工农业生产区域。2.22.22.22.2 气象气象某县属于暖温带大陆性季风气候区,四季分明。由于夏季多受副热带海洋气团影响25、,冬季受极地大陆性气团控制,四季气候差异悬殊,形成春季干旱、多风少雨;夏季炎热,多暴雨;秋季凉爽,阴雨连绵;9冬季寒冷,雨量稀少的气候特点。1、温度多年平均气温介于 49之间,无霜期 90150 天,冰冻期 45个 月。全 年 0 的 活 动 积 温 28003700,10 积 温22003100。年均日照时数为 2738 小时,春季日照时数最多,在作物生长期的平均日照时数为 610 小时,属短日照地区。2、降水多年均降雨量为 440650 毫米,均值 524.9 毫米,雨量分布受地形地貌的影响十分明显,其分布规律是东北部最多,西南部最少。雨量年际变化悬殊,最多年和最少年相差 473 毫米。雨26、量季节变化较大,降雨主要集中在七、八、九三个月,占年降雨量的 63%,形成了年际、季节旱涝交错的气候状态。3、风向、风速最大风力 67 级,多年平均大风日数 67 天,最多 13 天,最少 2 天。多年平均风速为 2.9 米/秒,最大风速为 28.7 米/秒,其特点为:深秋至初春多为西北风,春夏多为东南风。4、蒸发量年平均蒸发量 1907mm,为年降水量的 3 倍多。最大年蒸发量为2039.9 mm,最小年蒸发量为 1770.5 mm,年平均蒸发量为 1852.3mm。2.32.32.32.3 设计洪峰流量的计算设计洪峰流量的计算设计洪峰流量的计算设计洪峰流量的计算设计河段下游约 1km 处设27、有 1 处圪洞水文站,控制面积 749km2。10结合设计河段两岸实际情况,根据防洪标准,确定设计防洪标准为 20 年一遇。2.3.1 计算方法北川河某段设计洪峰流量分析计算报告中指出,推理公式法与其他方法所得成果相差较大,而经验公式法在面积较小的流域应用效果较好,故本次分析各断面设计洪峰流量采用水文比拟法计算。11治理段122.3.2.3.2.3.2.3.2 2 2 2 计算公式计算公式:32)(参设参设FFQQPP=式中:Q设参设计断面频率为 P 时的洪峰流量(m3/s);Q设P参证站频率为 P 时的洪峰流量(m3/s);F设设计断面控制流域面积(km2);F参参证站控制流域面积(km2)28、。2.32.32.32.3.3.3.3.3 参证站不同频率洪峰流量的推求参证站不同频率洪峰流量的推求由于设计断面距离圪洞水文站较近,各断面的流域特征(流域面积、下垫面等因素)与圪洞水文站相近,所以可以将圪洞水文站做为各设计断面的参证站进行设计洪峰流量计算。2.3.2.3.2.3.2.3.3 3 3 3.1.1.1.1 水文站基本情况水文站基本情况圪洞站设立于三川河的一级支流北川河中游,属黄河流域黄河水系。位于山西省吕梁市某县圪洞镇圪洞村,地理坐标为东经 11114,北纬 3753。1957 年 1 月由黄河水利委员会设立峪口水文站,测验断面位于某县峪口镇南村(F=1133km2),1960 年29、 4 月,上迁 20km 至圪洞镇,改名为圪洞水文站,1965 年 4 月移交山西省水文总站。2.3.2.3.2.3.2.3.3.3.3.3.2 2 2 2 历史和实测洪水资料历史和实测洪水资料收集到1957年2007年实测系列洪水资料51年,其中1957年1959 年系峪口水文站实测,1960 年2007 年系圪洞水文站实测。历史调查洪峰流量为 1196m3/s(1875 年)、852m3/s(1917 年)。圪洞水文站与峪口水文站两站观测断面流域面积相差 384km2,但形成洪水的下垫面自然环境条件基本一致。峪口站 1957 年1959 年实测洪13峰流量按面积的三分之二次方修正;经修正与30、圪洞水文站实测洪峰流量系列合并为一个样本系列进行频率计算。2.3.2.3.2.3.2.3.3 3 3 3.3.3.3.3 水文资料的合理性检查分析水文资料的合理性检查分析1、可靠性分析实测洪水资料来源于中华人民共和国水文年鉴及刊印成果,圪洞水文站历史洪水资料来源于山西省洪水调查资料。2、一致性分析资料系列的一致性,就是要求所使用的资料系列必须在同一类型或在同一条件下产生的。该流域气象成因不存在差异,一般情况下洪水是在暴雨的情况下形成的。人类活动对水文的影响是十分复杂的,要搞清楚其影响规律及影响程度,是比较困难的,也是水文研究的重要内容。我们曾对圪洞水文站年降水量与年径流深点绘双累积曲线分析,其31、关系基本成直线,一定程度上说明人类活动影响是存在的,但不重要。3、代表性分析水文资料系列的代表性是样本相对于总体而言,一般资料系列越长,丰平枯齐全,其代表性也愈高。圪洞水文站实测洪水资料系列长达 48 年,具有一定的代表性。4、独立性分析上述资料系列(洪峰流量)都是按照年最大值法取样所得,所以该资料系列具备独立性。2.3.2.3.2.3.2.3.3 3 3 3.4.4.4.4 推求方法推求方法141 1 1 1、经验频率计算、经验频率计算将特大洪水与一般洪水构成的不连续系列,作为一个(不完全)样本,有下列计算公式:特大洪水特大洪水:1001+=NmPM式中:PM历史特大洪水流量或实测系列中的特32、大洪水流量经验频率(%);M历史特大洪水流量或实测系列中的特大洪水流量在调查期内的序位;N调查期年数。一般洪水一般洪水:1001)11(1+=lnlNaNamPim式中:Pm实测洪水流量经验频率(%);a特大洪水的项数;l实测洪水流量系列中按特大洪水流量处理的项数。2 2 2 2、统计参数的计算、统计参数的计算统计参数按矩法计算计算公式:QNQNanLQNiain L=+111()CNKNanLKviain L=+11112112()()2.3.2.3.2.3.2.3.3 3 3 3.5.5.5.5 设计洪峰流量推求结果设计洪峰流量推求结果按皮尔逊 P型曲线,离差平方和最小准则进行适线,使其点33、15线拟合最佳(见图 2-1),以此推求各种频率的设计洪峰流量值,推求结果为:圪洞水文站:圪洞水文站:Q Q Q Qp p p p,5%5%5%5%=511m=511m=511m=511m3 3 3 3/s/s/s/s。Q Q Q Qp p p p,10%10%10%10%=348m=348m=348m=348m3 3 3 3/s/s/s/s。图 2-1圪洞水文站洪峰流量频率曲线图2.3.2.3.2.3.2.3.4 4 4 4 各设计断面洪峰流量计算各设计断面洪峰流量计算在设计河段下游设有圪洞水文站,流域内各计算断面的流域特征与圪洞水文站基本相同,因此,各断面设计洪峰流量计算,以圪洞水文站为参34、证站,选取圪洞水站相应频率的洪峰流量计算,比拟法计算结果见表 2-1。16水文比拟法计算各断面设计洪峰结果表表 2-1单位:km2、m3/s断面名称频率(P)圪洞参证站流域面积(F)设计流量(Q)面积(F)流量(Q)西山5%749511639.7460桑家会5%749511767.8519.52.42.42.42.4 成果合理性分析成果合理性分析目前,我省设计洪峰流量的常用计算方法有淤地坝工程技术规范规定的方法、经验公式法、推理公式法和水文比拟法 4 种计算方法。每种计算方法各有其适用范围。1、淤地坝工程技术规范是山西省企业标准,于 1986 年 1 月1 日起实施,适用于我省水土流失地区,流35、域面积小于 50km2的小流域淤地坝工程。其计算结果与其他方法(经验公式法)接近。2、经验公式法对产汇流这一比较复杂的随机物理过程进行了简化甚至予以忽略,使其经验参数不稳定,其变幅较大,加之设计河段流域有几种地类组成,故一般不宜采用。而面积较小的流域,经验公式法所求得值效果还比较好。3、推理公式法的理论虽然比较完备,在我省有一套完整的运算系统,参数分析所选水文站资料均来自省内成果。但推理公式法与其他方法所得成果相差较大,其原因主要是流域产流地类的面积仅仅考虑地质条件,对流域植被、地形条件基本没有考虑。在具体的设计洪峰流量分析中,由于资料所限,流域地类划分难度大,亦不宜采用。4、水文比拟法的首要36、条件,要求参证站的水文下垫面条件与设17计断面以上流域水文下垫面基本相近。选用圪洞水文站作为参证站,为同一流域,其地类、暴雨等主要影响因素有着一致性,虽然二者面积有差异,但计算公式本身考虑了面积差异,故采用圪洞水文站作为参证站的水文比拟法比其它方法推算值更为合理。3 3 3 3、工程地质、工程地质3.13.13.13.1 地形地貌地形地貌该段河床主要为砂、砾石,河床稳定性较好。河流受地质构造的控制,在东西背斜之间循着褶皱走向,由北向南流去,由于谷狭坡大,河漫滩、二级阶地和洪积扇发育不好,一级阶地是河谷地貌的主要单元。河漫滩土质偏砂,并夹有砾石和砂滩,宽度在 50 米左右。一级阶地高出河床 2-37、6 米,阶面较平坦,微向河床倾斜,宽约 100 米,为近代河流洪积冲积物,上面是 1-3 米深的砂性黄土状物质,下部为砂砾石层,二元结构明显,保存完好。3.23.23.23.2 地层岩性地层岩性该区处于吕梁块隆的芦芽山赤坚岭梭形掀背斜南端,关帝山穹状隆起西缘,离石中阳菱形复向斜北端。自然地貌为变质岩褶皱断裂、岩浆岩剥露穹隆中山、山间黄土谷地和梁峁状黄土丘陵四种类型。区内出露地层由老至新为:中太古界界河口群奥家滩组(Ar2a)和上太古界吕梁山群赤坚岭组(Ar3c)、杜家湾组(Ar3d)、宁家湾组(Ar3n)及混合杂岩带(Mr)。18下元古界野鸡山群的青杨树湾组(Ptlqy)和白龙山组(Ptlb)38、。震旦亚界长城系的汉高山组(Zchn)。古生界寒武系()、奥陶系(O)、石炭系(C)及二迭系(P)。新生界第三系(N)和第四系(Q)。3.33.33.33.3 水文地质水文地质某县地质发展史与整个华北大陆一致,前震旦系地层为巨厚的混合花岗岩及其它古老变质岩,分布在东部关帝山周围,为隆起褶皱区。大武杨家会以北大部分地区以太古界、元古界地层为主,主要有吕梁山群野鸡山群变质岩、混合花岗岩。古生界寒武系、碳酸岩和石炭二迭系碎屑岩分布于石站头,张家塔及杨家会以南地区。新生界、第三纪地层覆盖于各地层之上。第四系地层沉积于北川河河道与沟谷地带。3.43.43.43.4 区域地质构造区域地质构造据山西省地震活39、动资料,本区在离石以东田家会附近于 1829 年 4月发生 5.25 级地震一次,据 1:400 万 中国地震烈度区划图(1990)(山西部分),本区地震烈度为 6 度。3.53.53.53.5 天然建筑材料天然建筑材料本工程建设需用建筑材料种类为:块石、水泥和清砂。水泥:在某县水泥厂购买。某县水泥厂位于某县大武镇东坡村。块石:在潘家坂石料厂购买,潘家坂石料厂位于某县圪洞镇潘家19坂村。清砂:项目区上游有采砂场,产量能满足要求。4 4 4 4、工程任务和规模、工程任务和规模4.14.14.14.1 社会经济概况和工程建设的必要性社会经济概况和工程建设的必要性4.1.14.1.14.1.14.140、.1 社会经济概况社会经济概况项目区共涉及某县圪洞镇的西山和桑家会两个行政村,共 192户,636 口人,劳动力 288 个,现有耕地面积 1272 亩。区内以农业生产为主,2009 年农业产值 57.24 万元,生产粮食38.2 万 kg,农民人均纯收入 1450 元。4.1.24.1.24.1.24.1.2 河道治理现状及存在的主要问题河道治理现状及存在的主要问题(1)治理情况该区群众历来就有治河造地的习惯,虽然治理标准低、规模小、系统性差,但在开发滩地促进经济发展方面确实起到了积极作用。(2)、河道现状及存在的主要问题1、河段大部分河道的行洪能力不足 5 年一遇的防洪标准。2、支流汇入口41、没有工程设施,水流紊乱,破坏堤防。3、河道淤积严重。4.1.34.1.34.1.34.1.3 工程建设的必要性工程建设的必要性经过多年治理,项目区防洪除涝工作已取得巨大成绩,但由于自然地理特点和经济社会条件限制,防洪减灾体系尚不完善,防洪能力偏低,防洪保护区的防洪标准与社会和经济发展的要求还不相适应。随着经济的快速发展,社会的不断进步,资产与财富也在快速积20累。人民群众对于提高防御洪涝灾害的能力,享有防洪安全保障的要求不断提高。项目区河段的这一现状与两岸群众生命财产及社会经济发展越来越高的防洪保安的要求形成了十分尖锐的矛盾。对河道进行彻底整治,解决河道两岸的防洪问题已势在必行,刻不容缓。4.42、24.24.24.2 河道整治指导思想和规划原则河道整治指导思想和规划原则以邓小平理论和“三个代表”重要思想为指导,以科学发展观为统领,针对北川河突出的洪涝问题和防洪最薄弱环节,以保障人民群众生命财产的安全为根本,以提高城乡防洪减灾能力为目的,以河道疏浚防护等工程措施为手段,通过河道治理,保障区域防洪安全和粮食安全,促进社会主义新农村建设,支撑区域经济社会可持续发展。4.34.34.34.3 河道治理的目标河道治理的目标本次治理的目标是:通过治理,使洪水威胁严重、洪涝灾害较频繁、损失较大、严重影响区域经济社会发展的重点河段的防洪能力得到增强,区域内人民生命财产和经济社会发展的防洪安全保障问题得43、到初步解决。5 5 5 5 工程设计工程设计5.15.15.15.1 设计依据设计依据5.1.1 设计标准21根据防洪标准(GB5020194)及堤防工程师设计规范(GB5028698)中的规定,设防标准如表 41,按 20 年重现期设防。表 41分段防护等级防洪标准洪水重现期(年)堤防级别治理段2045.1.2 设计依据1 中华人民共和国国家标准防洪标准GB50201-94;2 中华人民共和国国家标准 SL44-93水利水电工程设计洪水计算规范;3 中华人民共和国行业标准公路工程水文勘测设计规范JTGC30-2002;4 中华人民共和国国家标准堤防工程设计规范GB50286-98;5 中华人44、民共和国行业标准城市防洪工程设计规范;6 中华人民共和国水利行业标准 SL379-2007水工挡土墙设计规范等。5.25.25.25.2 工程规划工程规划根据现有堤防和河道建筑物工程水毁的各种经验教训,综合考虑地质条件,水流条件、施工条件、投资、管理运行等方面的因素,按照因地制宜,就地取材的原则,确定治理规划方案。河道整治工程主要包括堤防工程、河槽疏浚工程。以 20 年一遇22洪水标准设计,堤防等级为 4 级。5.35.35.35.3 河道整治规划设计河道整治规划设计5.3.1 河道治导线设计河道治理的目标就是确定合理的治导线最终形成固定而平顺的河床,使两岸形成固定的河岸。治导线是否合理,直接45、关系到河道整治中工程规模,投资多少和整治后河流的稳定情况,因此治导线的确定是河道规划中一项重要内容,本次河道治理治导线的规划遵守了以下原则。1、因势利导,顺应天然河流的流势,尤其是比较稳定的河段,它们是流域水沙和河床边界长期作用的产物,是确定治导线的基本依据。2、河槽尽量顺直,但应遵循河流走势的自然规律,保持必要的弯道,不强求裁弯取直。3、结合河道岸边的特点,在可能的情况下尽量使河道依托在基岩、陡岸,以便减少工程量,降低工程投资。4、以河道主河堤间中心点和主要建筑物中点作为河道治理设计横断面的中心点。5、尽可能利用已建堤坝,节约投资,但已建工程影响到行洪要求时,应予以拆除。5.3.2 河道纵坡46、设计河道纵坡设计和河道中心线的设计皆为河道整治规划设计的重中之重,其设计的原则是:1、规划的河道纵坡要和原河道纵坡基本一致,可以在局部地段进行调整,使河道纵坡变化趋小,纵坡趋于更合理。2、河道纵坡设计要兼顾上下游,尽可能使河道纵坡变化小一些,23较陡和较缓的坡段要给于适当的调整,以利水流平稳过渡,避免出现流态发生大的不均匀性,以利于河床的相对稳定。3、考虑到近年来,降雨偏少,没有发生过较大的洪水,河道多数是淤积,而不是下切的情况,在设计纵坡时,尽可能不要填方或少数地点填方,挖深一般控制在 2m 左右。纵坡从上游到下游依次为0.0095、0.0069。4、河道纵坡变化起始端不允许放在弯道内,尽可47、能远离弯道。5.3.3 河道过水断面的设计河道设计采用明渠均匀流公式计算出设计水深。计算结果见表51。计算公式:RICQ=式中:Q河道设计洪水流量(m3/s);河道过水断面积(m2);C谢才系数6/11RnC=;n过水断面糙率,河床为砂砾或卵石组成,底坡较均匀n=0.04;R水力半径;I河道纵坡;设计综合纵坡过水水力流速流量糙率i断面半径V(m3/s)nWXR(m/s)1西山4600.040.0095602.04122.464.081.913.762桑家会519.50.040.0069602.5150652.313.46表5-1序号分 段河宽b(m)水深h(m)湿周245.45.45.45.448、 河堤工程设计河堤工程设计5.4.1 堤顶高程根据堤防工程设计规范,堤顶高程为设计水深加堤顶超高确定。堤顶超高按计算公式为:Y=R+e+A式中:Y 堤顶超高(m)Rp设计波浪爬高(m)e设计风壅增水高度(m)A安全加高,根据堤防工程设计规范(GB5028698)表 2.2.1,4 级堤防安全加高为 0.6m。5.4.1.1 设计波浪爬高公式采用:河坝内坡比 m=0.1 故采用 m1.25 时,Rp=KKvKpR0H(c.3.12)进行计算。式中:K斜坡的糙率及渗透性系数,查表 C.3.11 K=0.8Kv经验系数,可根据风速 V=13(m/s)、水深(m)、重力加速度 g=9.8(m/s2)组49、成的无维量 V/gd查表 C.3.12 得:d=2.0 时Kv=1.213d=2.5 时Kv=1.176Kp爬高累积频率换算系数,据/H d和累计频率查表求得。R0无风情况下,光滑不透水护面(K=1)、H=1m 时的爬高值,按表C.3.14 确定。查表得:R0=1.282H 堤前波浪的平均坡高(m)0.45220.7220.0018()*0.13 0.7()0.13 0.7()0.7gFvgdvHththgdgvthv=式中:25d水深(m)V计算风速(m/s),取 13m/sF风区长度(m),取 60mg重力加速度,取 9.81m/s2经计算 d=2.0 时H=0.0612d=2.5 时H=50、0.0614d=2.0 时/H d=0.0612/2.0=0.0306d=2.5 时/H d=0.0614/2.5=0.0246/H d0.1 故:Kp=2.07计算得:d=2.0 时 Rp=0.81.2132.071.2820.0612=0.16md=2.5 时 Rp=0.81.1762.071.2820.0614=0.15m5.4.1.2 风雍水面高度计算公式:2cos2Kv Fegd=(c.2.1)式中:e计算点的风壅水面高度(m);K综合壅阻系数,可取 K=3.610-6;V设计风速,按计算波浪的的风速确定,V=13m/s;F计算点逆风向量到对岸的距离(m),取 60m;d水域平均水深51、;风向与垂直于坝轴线法线的夹角,取 45。将以上数据代入公式计算得:d=2.0 时,风雍水面高度为:e=0.0009md=2.5 时,风雍水面高度为:e=0.0007m5.4.1.3 堤顶超高西山段,d=2.0,Y=0.16+0.0009+0.6=0.7609 m桑家会段,d=2.5,Y=0.15+0.0007+0.6=0.7507 m取 Y=0.8m。265.4.1.4 河堤高度堤高=设计水深+堤顶超高。计算结果见下表表 5-2河段设计水深(m)堤顶超高(m)堤高(m)桑家会段2.50.83.3西山段2.00.82.85.4.2、坝基埋深1、水流平行于岸边的冲刷计算。计算公式采用堤防工程设计52、规范(D2.2-1)()1cpnBpVhhV=+允式中:hB局部冲刷深度(m),从水面算起;hp冲刷处的水深(m);Vcp平均流速(m/s);V允河床面上允许不冲流速(m/s),河槽水深在 2.5m左右。河床按小卵石考虑,查 水力计算手册 表 2-1-10,取 Vh=1.5m3/s;n与防护岸坡在平面上的形状有关,一般取 n=1/4。计算结果见表 5-3河坝冲刷深度计算(水流平行于岸坡)工程名称冲深(m)局部冲刷深 hB(m)冲刷处水深 hp(m)Vcp(m/s)V允(m/s)nVcp/V允(Vcp/V允)n1西山段0.262.32.043.761.50.252.50.2627桑家会段0.2553、2.752.53.631.50.252.420.252、基础深度的确定基础埋深应为计算局部冲刷深度加上安全深度。即:H基=h冲深B+,安全深度可取 22.5m,各段河坝的基础确定见表 54坝基埋深表表 5-4工程名称冲深(m)基础埋深西山段0.262.52.8桑家会段0.252.52.85.4.3、坝型、结构浆砌石堤防型式为重力式,共规划堤防工程 4800m,其中:西山段堤防长 1000 m,桑家会堤防 3800 m,堤防工程顶宽 0.5 m,迎水坡直立,背水坡 1:0.4,具体结构尺寸详见附图。5.4.4 稳定计算(以桑家会村段为例进行计算)1、土压力计算土压力 Pa2=1/2H2KaB(土54、力学P103)式中:H坝后回填土高度,取 H=4.9m;坝后回填土容重,取=1.7T/m3B 计算长度,取 B=1.0mKa主动土压力系数,Ka=tg2(35-/2)=0.271回填土摩擦角,取=35282、坝体受力计算,具体计算结果见表 5-5。3、地基应力验算maxminGMPAW=式中:maxminp河坝基底应力的最大值或最小值(kpa);G作用在河坝上全部垂直于水平面的荷载(kN),G=28.64kN,M作用于河坝上全部垂直于水平面平行前墙墙面方向形心轴的力矩之和(kNm)。M=12.04kNm;A河坝基底面的面积(m2),A=2.66m2;W河坝基底面对于基底面平行前墙墙面方向形心轴55、的截面矩(m3),216WLB=B=2.661=2.66m2,W=12.662/6=1.18m3maxminGMPAW=28.64/2.6612.04/1.18=20.97/0.564=25t/m2地基满足要求。4、抗滑验算:CfGKH=式中:Kc河坝沿基底面的抗滑稳定安全系数;f 河坝基底面与地基之间的摩擦系数,取 0.35;G同上,G=28.64kN,H作用于河坝上全部平行于基底面的荷载(kN),H=5.53 kN;CfGKH=0.3528.64/5.53=1.813Ke=1.151.05,29抗滑满足要求。5、抗倾验算0VHMKM=式中:K0河堤抗倾覆稳定安全系数;Mv对河堤基底前趾的抗56、倾覆力矩(kNm),Mv=35.08 kNmMH对河堤基地前趾的倾覆力矩(kNm),MH=9.03 kNm。0VHMKM=35.08/9.03=3.885Ko=1.31.4,抗倾稳定满足要求。30重力式坝稳定分析计算表重力式坝稳定分析计算表表 5-5受力名称符号计算式作用力(T)对 O点力臂对 O 点力矩对 A 点力臂对 A 点力矩垂直力水平力自重G10.55.42.46.481.087.000.251.62G2(1/2)2.165.42.414.000.111.541.2217.08土重W1(1/2)1.964.91.78.160.685.532.00716.38土压力Pa2(1/2)1.757、4.920.2715.531.639.031.6339.0328.645.5312.049.0335.08315.4.5 弯道设计本次设计基本维持原河床弯道,只对局部地段稍作调整,并保证弯道半径不小于倍水面宽。此次河道整治工程设计共有弯道 3 处。5.4.5.1 弯道横向水位差计算弯道横向水位差是水流在弯道内作曲线运动时,引起的横断面上凹岸与凸岸水位之差,计算公式采用水力计算手册P565 公式进行计算。2221()112mvBhBgRR=+式中:h弯道横向水位差(m)B弯道水面宽度(m)R弯道断面中心线的曲率半径(m)v断面中心平均流速(m/s)具体计算见表 5-6。5.4.5.2 弯道最大冲58、深值计算计算公式采用水力计算手册P566 公式进行计算:max112mHBHR=+式中:maxH最大冲深值(m)(从水面算起);mH计算断面平均水深(m);mH=/B,其中:为过水断面面积(m2)B 为河面宽(m)1R凹岸曲率半径(m)。具体计算见表 5-7。5.4.5.3 弯道左右堤长度计算32180RL=式中:弯道弧度对应的园心角。R圆弧半径。具体计算见表 5-8。5.4.7 其它设计1、伸缩缝砌石河堤每 50m 设一条伸缩缝,伸缩缝用沥青木板塞缝。2、堤后排水河堤后设两排排水管,分别在离河槽底 1.0m、2.0m 高处,排水管口设反滤料。5.5.5.5.8 8 8 8 清淤疏浚工程设计清59、淤疏浚工程设计对河道治理范围内河床进行清淤疏浚,清淤疏浚工程遵守了以下原则。1、河道行洪能力达到 20 年一遇防洪标准。2、设计河道清淤要尽量与上下游进、出口河段平顺连接,尽量维持河道自然坡度。不对河道作过多挖填,不过大改变河道自然纵坡。3、对河道内部分地段进行裁弯取直,疏浚后的河底高程需满足现有桥梁基础的防护。4、对河道内已有的但未经河道管理部门及防汛部门批准的影响行洪的建筑物予以拆除。335.5.5.5.9 9 9 9 堤顶防洪道路堤顶防洪道路设计设计堤顶防洪道路布置在河堤两侧,道路宽 5m,长 4.8km,先铺 0.2m砂砾石垫层,再现浇 C20 混凝土 0.3m,路面与堤顶同高。5.560、.5.5.10101010 安全防护栏安全防护栏设计设计由于堤防两岸是居民区,堤防工程较高,为了安全,在堤防工程顶部设安全防护栏 4.8km。34弯道横向水位差计算表(假定平均流速发生在断面中线,比能与断面为定值时的横向水位差)表 5-6序号桩号h流速 v(m/s)v2gv2/g弯曲方向中心线半径 R(m)水面宽B(m)1+B2/12R21/编号10+00020+2100.2873.7614.149.811.44左300601.00330.99730+2900.4293.7614.149.811.44右200601.00750.99340+8900.1743.4611.979.811.22右461、20601.00170.99835弯道最大冲深值计算表表 5-7序号桩号冲刷深 h(m)Hmax(m)Hm(m)过水断面面积(m)凹岸水深h1(m)凸岸水深h2(m)河面宽B(m)凹岸半径R1(m)备注10+00020+2100.7422.7822.04122.42.181.96033030+2901.0643.1042.04122.42.251.836023040+8900.6673.1672.51502.592.416045036弯道左、右岸坝长度计算表表 5-8序号桩号弯道方向性(凹)弯道中心线长度(m)凹岸长度(m)凸岸长度(m)弯曲角凹岸半径R1(m)凸岸半径R2(m)备注10+0062、020+210左193.63213174.273733027030+290右80.2492.2868.212323017040+890右395.64423.9367.385445039037376.6.6.6.工程管理工程管理6.1 管理机构为加强河道工程管理,保证河道行洪顺畅和工程安全运行。根据水利工程管理单位编制定员试行标准(SL705-81),本工程应建立专门的工程管理站,负责工程的正常安全运行、工程防汛、工程养护维修、开展绿化等综合经营工作,由某县水利局和圪洞镇镇政府共同组建管理机构,由专人负责对工程进行维护、保养。6.2.2 工程管理范围堤防工程外坡脚 20 米以内为工程的管理范围。63、使用权为工程管理单位,管理范围的边界线和保护范围的边界线设置界限标志。任何单位和个人不得在其范围内从事任何危害工程安全的任何活动。6.2.3 工程观测根据河道的水文、气象等条件,每年汛期都应对工程进行安全监测,对堤防工程应进行定期和不定期的检查,检查险工险段堤岸有无崩塌现象发生,检查河床冲刷情况,检查建筑物基础有无损坏,检查河床流路的摆动情况,特别是发生大洪水等非常情况时,要加大检查的频率和力度,及时发现存在问题,及时上报上级主管部门,及时补救、恢复。6.36.36.36.3 交通与通讯设施交通与通讯设施结合工程所在地的实际情况,工程管理充分利用现有交通道路,不再新修,交通工具按有关规定,考虑64、配置工具车一辆。由于河道较长,未设内部通讯系统,生产管理通讯采用无线通讯方式。386.46.46.46.4 防汛抢险设施防汛抢险设施为了工程维修及防汛抢险的需要,在堤防工程的重要堤段及险工段的背水侧设堆料平台,并储备一定量的砂卵石料及堆石料,河槽整治的砂卵石开挖料直接运至堆料平台,用于防汛抢险备用。7 7 7 7施工组织设计施工组织设计7.17.17.17.1 施工条件施工条件工程所在地属暖温带大陆性季风气候区,四季分明。其气候特征是春季干旱、多风少雨;夏季炎热,多暴雨;秋季凉爽,阴雨连绵;冬季寒冷,雨量稀少。多年平均气温介于 49之间,无霜期 90150天,冰冻期 45 个月,冻土厚 10065、cm。多年均降雨量为 440650 毫米,均值 524.9 毫米。7.27.27.27.2 建筑材料建筑材料河道整治工程,主要建筑材料是块石、砂、水泥和少量砼粗骨料。石料供应主要来源为潘家坂石料厂。潘家坂石料厂位于某县圪洞镇潘家坂村,石料厂的块石储量可满足施工用料。料场的石料为砂岩,经试验硬度强度抗风化均符合要求。平均运距 20km。砂子料场:横泉水库上游有采砂厂,储量可满足工程用料量的要求。平均运距 10km。水泥统一使用某县中盛水泥厂的 32.5 级国标水泥,年生产能力为 70 万吨。平均运距 25km。397.37.37.37.3 施工导流施工导流本工程河槽段的施工安排在非汛期施工,以减66、小导流费用。堤防工程布置在河道两岸,临近主河槽施工时需进行导流。围堰采用土石围堰,堰高平均 0.51m,堰顶宽 0.5m,填筑坡度1:1.5,局部流速较大地段的纵向围堰需做防护,采用编织袋装土进行护坡、护底。7.47.47.47.4 主体工程施工主体工程施工工程项目均可采用机械化或半机械化施工。选择有相应施工经验的专业施工队伍承担,严格按施工技术要求进行。7.4.1 浆砌石河堤工程河堤基坑的土方开挖采用 1.0 m 的挖掘机开挖,土方运输配备自卸汽车拉运,基坑排水采用 4 吋水泵。在进行河堤基坑开挖时,应当有一定厚度进行人工开挖,以确保设计基底保持原状,不被扰动。基坑在排干渗水后,应把基底面夯67、实,方可进行砌石。河堤浆砌石工程量较大,石料运输用自卸汽车与手推车,砌筑砂浆用移动式搅拌机拌制,胶轮车动输,人工浆砌石的方法施工。要将选取的砌石表面泥污、水锈等刷洗干净,采用挤浆法砌筑,即先在基础表面铺一层厚3cm的浆,再将石料放在砂浆上,石料放好后用脚踩或锤击,使之紧密结合,然后给竖缝灌砂浆,至缝深2/3厚后,向缝内挤片石并用铁锤捣实,使砂浆与石块紧密结合。砂浆配制必须按设计的配合比调和,稠度适中,过干不易捣实,过稀降低质量。砌筑时上、下两层竖缝必须错开8cm以上,砌石缝宽为3cm,石料较平整的40一面放在迎水面,以利水流。浆砌石的外露砂浆,在砂浆未凝固前,应将虚浆挖去23cm深,再用水泥砂68、浆勾缝,勾缝前要先用水将接缝洒湿。灰缝初凝前不能填土,震动,更不能排水,以免水流冲去砂浆造成漏水。水泥砂浆砌石体要进行洒水养护,表面用草袋覆盖,洒水次数根据气温和风力而定,要使砌体经常保持湿润状态,暂不加砌的,至少要养护7天。正在砌筑的表面,严禁敲打、震动。7.4.2 河道清淤疏浚工程河道清淤疏浚工程开挖范围为河道治理河段的全宽度河道内,施工场地开阔,采用推土机配合挖掘机、装载机挖装,3.5t 或 5t 自卸汽车出渣,运至指定的弃料场。对于因河道开挖形成的深坑及低于设计河床处,必须用砂砾料回填,经碾压达到设计要求的密实度,不得留有淤泥夹层。7.57.57.57.5 施工交通运输施工交通运输工程69、区沿线有 209 国道,对外交通比较方便,沿堤线地段需修筑临时施工道路,用于工程建筑材料的进出施工现场,临时施工道路长约 1km。7.67.67.67.6 施工总体布置施工总体布置施工场地布置主要指料厂、施工库房、工棚、工具房及搅拌机、水箱、发电机等的布置。地方材料场可以安排在河道内;搅拌机、发电机、水泥库房及工具房应安排在河道外。在进行施工场地布置时,一是要方便施工,二要保障施工安全。施工用料最好随用随进,按施工进度进料,以免造成二次搬运。41施工用水:在施工点设蓄水池,用水泵从北川河或水井抽水至蓄水池供施工及生活用水。施工用电:各施工点配备一台柴油发电机作为施工用电。临建房屋:施工人员的生70、活住房 90%租赁民房,在施工点新建少量施工用房、仓库工棚等。各施工点均分布在沿河两岸,场地开阔平坦,场内施工道路可自然形成,或稍平整即可,施工道路长约 8km。通信因工期短,不架设专用通信线路,指挥部与施工工区和施工点的联系用移动通信电话。7.77.77.77.7 施工进度计划施工进度计划本工程总工期二年,第一年的 10 月至第二年 3 月为施工准备期,完成施工道路、临建、水电及施工围堰等项目,第二年 3 月至 10 月为上段主体工程施工期,完成该主体工程的施工任务;第二年 10 月至第三年的 7 月为下段主体工程施工期,第三年的 7 月至 10 月为完建期,完成工程验收和其它扫尾工程。8 71、8 8 8、环境影响评价、环境影响评价8.18.18.18.1 环境影响评价的目的与依据环境影响评价的目的与依据8.1.1 环境影响评价的目的1.查清工程建设区环境特征、环境现状、主要污染和主要污染物的种类、分布等情况;2预测河道综合治理完工后对当地自然、社会和生态环境产生的影响及程度。423依据环保和水保的法规、标准和当地环境规划功能目标要求,制定防止、减免环境污染和破坏的对策措施,使工程对环境的负面影响降低至最低。4从环境角度阐述工程建设的可行性,为环保管理部门提供管理依据。8.1.2 环境影响评价的依据1 中华人民共和国环境保护法1989 年 12 月;2 建设项目环境管理条例1998 72、年 11 月;3 中华人民共和国水土保持法1988 年;4开发建设基础工业环境影响管理实施指南(山西省环保局);8.28.28.28.2 环境影响分析环境影响分析本工程为河道治理项目,建成后,可以提高河道的防洪标准,改善当地的生态环境,是一项公益性工程。8.2.1 工程兴建对环境的有利影响1、河道治理后,防洪标准将提高到 20 年一遇洪水设计,沿河两岸人民群众的生命财产将得以保障,当地的社会环境将得以改善。2、工程建成后,沿河地带水土流失量减少,局部气候得以改善,随着植被类型的多样化,生态环境必将得到改善。8.2.2 工程兴建对环境的主要不利影响1、施工人员生活垃圾和生活污水的处理;2、施工运73、输车辆产生的噪声、废水、废气的处理;3、土方开挖工程及车辆运输产生的粉尘和飘尘的处理;4、施工队伍驻地对当地社会治安影响的防治。因施工队伍主要43来源是当地民工,只要加强管理,妥善处理与附近群众的关系,对当地社会治安影响也不大。河道整治工程量较大,施工期也较长,这对当地的工业、商业、服务业、运输业将带来一定的商机,也为附近村民提供了很大数量的就业务工机会,应属有利的环境影响。8.38.38.38.3 环境保护措施环境保护措施8.3.1 施工期环境保护措施施工期间,环境保护的主要措施有:施工生活区建立临时性的公共卫生场所,粪便集中处理、定期外运,保证施工人员有一个整洁卫生的施工和生活环境;弃渣堆74、放要统一规划,满足环境和水保的要求,不仅要采取工程措施防护,而且要采取生物措施进行防护和绿化美化;在生活区和施工区之间要建立防护带,对受噪声影响较大的一线施工人员,要配戴防声头盔或隔声耳塞,把噪声危害降到最低程度;工程如果夜间施工,必须严格控制噪声污染,噪声等级不得大于夜间四类标准 55dB,以免影响附近居民正常生活。为防止粉尘污染,施工单位在混凝土拌和过程中,搅拌机除尘应采用高效除尘器,交通道路需定期洒水;为保护施工区的大气环境质量,减少 CO、NOX、SO2等有害气体的排放量,大型汽车、挖掘机、装载机等燃油机械应配备尾气净化器;对施工人员定期检疫,发现传染病人立即进行隔离治疗;施工队伍要与75、当地卫生防疫部门积极配合,定期服用预防药或注射疫苗;加强卫生防疫,对饮用水和食品要严格管理,并积极宣传 食品卫生法,防止传染病流行;44施工期基坑开挖废水要经过沉淀处理方可排出。加强施工期水质、大气、噪声监测,发现异常及时处理;作好环境监理工作,制定严格的规章制度,定期上报;采取措施,作好施工迹地的景观恢复及绿化工作。8.3.2 运行期环境保护措施1、水质保护措施控制河道沿线工业和生活污染源的产生,不准新建、扩建向水体排放污染物的建设项目;禁止向河道排放未经处理的污水,禁止在河道两岸堆置和存放工业废渣、生活垃圾、粪便及其它废弃物;禁止在河道附近使用剧毒和高残留农药,不得滥用化肥,不得使用炸药,76、毒品捕杀鱼类;禁止在河道内从事放牧、洗涤车辆、衣物等污染水库水质的活动;大力开展植树造林活动,防治水土流失,减少水库泥沙淤积;定期监测并分析水质污染状况,及时上报;2、生态环境保护措施贯彻森林法、环境保护法、水土保持法、等法律法规,采取各种方式进行广泛深入的宣传教育,增强河道两岸居民的环境保护意识;强化各级政府和领导干部对生态平衡和水土保持工作重要性的认识,因地制宜地开展生态环境保护和水土保持工作;从生物措施入手,结合工程措施,全面规划,综合治理,特别要推广投资少、见效快的户包小流域分区治理方法;8.48.48.48.4 结论结论综上所述,该工程对环境的不利影响主要表现在施工期,这些不45利影77、响不仅是短暂的,而且通过采用相应的环境保护措施,这些不利影响可最大限度地减小或避免。河道整治工程完成后,河道防洪能力将大大提高,周边环境将会有大的改观,对社会和谐和安定起到保障作用,因此,从环境影响方面来看,本区河道整治工程是必要和可行的。9 9、投资估算及资金筹措、投资估算及资金筹措9.19.1 编制说明编制说明9.1.19.1.1 工程概况工程概况本工程为河道整治工程,工程建设范围为某县圪洞镇的西山村至桑家会村,全长 2400m,工程以 20 年一遇洪水标准设计,堤防等级为 4 级,主要建设内容包括:河道清淤 2400 m、浆砌石河堤 4800m(其中西山村段 1000m,桑家会村段 3878、00 m),堤顶防洪道路 4800m,安全防护栏 4800m。9.1.29.1.2 投资主要指标投资主要指标本估算编制原则采用晋水规计(2003)716 号文“关于发布山西省水利水电工程设计概(估)算编制规定的通知”。材料价格按2010 年第二季度价格水平,施工总工期安排 2 年,总用工 59.59 万工时。工程估算总投资 2940.59 万元。9.1.39.1.3 编制原则和依据编制原则和依据 水利部文件水总(2002)116 号文“关于发布水利建筑工程46预算定额、水利建筑工程概算定额、水利工程施工机械台时费定额及水利工程设计概(估)算编制规定的通知”。山西省水利厅文件晋水规计(2003)79、716 号文“关于发布山西省水利水电工程设计概(估)算编制规定的通知”。(2002)水利建筑工程概算定额;(2002)水利建筑工程预算定额。(2005)山西省建筑工程预算定额。(2002)水利工程施工机械台时费定额。晋水规计(2002)589 号文“关于水利水电工程勘测设计收费标准有关问题的通知”。工程勘察设计收费标准(2002 年修订本)。(1992)价费字 479 号文“国家物价局、建设部关于发布工程建设监理费有关规定的通知”。工程设计、施工组织设计及其它有关规定。9.1.49.1.4 编制办法编制办法 人工工资预算单价:按晋水规计(2003)716 号文计列,本工程为河道工程,人工基本工80、资标准为:工长 385 元/月,高级工 350元/月,中级工 280 元/月,初级工 190 元/月,经计算人工工资为:工长 5.36 元/工时,高级工 5.0 元/工时,中级工 4.29 元/工时,初级工 2.27 元/工时。施工用电、风、水单价:根据施工组织设计,工程综合电价 0.847元/kWh,风价 0.15 元/m3,水价 4.3 元/m3。主要材料预算价格:以市场实际调查价格为原价,加运杂费、运输保险费、采购及保管费作为材料预算价格,其它材料价格参考吕梁市二一年第二季度指导价格(详见主要材料预算价格汇总表)。次要材料预算价格:参考吕梁市二一年第二季度指导价格,缺项的以市场实际调查价81、格作为材料预算价格(详见次要材料预算价格汇总表)。独立费用计算标准:按晋水规计(2003)716 号文计算。其中:工程建设监理费按(1992)价费字 479 号文“国家物价局、建设部关于发布工程建设监理费有关规定的通知”计算;勘察费、设计费按 2002 年国家发展计划委员会、建设部颁发的工程勘察设计收费标准和山西省水利厅晋水规计(2002)589 号“关于水利水电工程勘察设计收费标准有关问题的通知”计算。预备费:基本预备费费率取 10%;价差预备费根据晋计设字(1999)608 号关于转发国家计委关于加强对基本建设大中型项目概算中“价差预备费”管理有关问题的通知的通知,投资价格指数一律按零计算82、,所以不计价差预备费。其他需要说明的问题:由于本工程块石、碎石、砂的材料预算价格超过 70 元/m3,按编规规定,超过部分计取材差和税金。9.29.2 投资估算结果投资估算结果工程估算总投资 2940.59 万元,其中:建筑工程 2443.05 万元,48独立费用 230.21 万元,基本预备费 267.33 万元。主要工程量为:河卵石开挖 40.5 万 m3,河卵石回填 4.78 万 m3,浆砌石 5.049 万 m3,伸缩缝 0.101 万 m2。主要材料量为:柴油 254.6T,块石 5.453 万 m3,砂 2.35 万 m3,水泥 0.73 万 T。工程建设工期 2 年,总用工 5983、.59 万工时,折合工日 7.45 万工日。详见概算表。9.9.3 3 资金筹措资金筹措本项目总投资 2940.59 万元,其中:2010 年总投资 1305 万元,争取省补 650 万元,市配套 325 万元,县配套 330 万元;2011 年总投资1635.59 万元。4910101010工程经济评价工程经济评价10.110.110.110.1 概述概述北川河为三川河干流之一,发源于某县开府乡麻地渠山脚下,由北向南纵贯某县境内 80 公里,流域面积 1315.43 平方公里,沿途汇集 7 条支流,入离石境内汇入三川河,从柳林县注入黄河。本工程治理范围为某县圪洞镇的西山村至桑家会村,全长 284、400m。工程建成后能有效地提高河道的行洪标准,使治理段北川河河道的防洪标准达到20 年一遇标准,保护了区域内的工矿企业、耕地和桥梁,保证了两岸群众的生命财产安全,社会效益、经济效益十分显著。10.210.210.210.2 评价依据评价依据1、国家计划委员会和建设部联合下发的计投资1993的 530 号建设项目经济评价方法与参数(以下简称方法与参数2、水利部 1994 年 3 月发布的水利建设项目经济评价规范SL7294 进行项目经济评价。10.310.310.310.3 国民经济评价国民经济评价国民经济评价是从国家整体角度出发,采用影子价格。据规定,对于流域或区域规划项目的可行性研究,其经85、济评价可适当简化。又因本项目为社会公益性质的建设项目,因此进行国民经济评价,不进行财务评价。进行国民经济评价时,投入物和产出物直接采用现行价格,不采用影子价格,并只分析计算项目的主50要经济评价指标。10.3.1 主要参数和计算条件1、社会折现率:7%2、固定用工的影子换算系数为 1,临时工的影子换算系数为 0.5,贸易费用率采用 6%。3、计算期和折现基准点:运行期按 30 年考虑,折现计算基准点在建设期年初。建设期为一年。10.3.2 费用估算水利建设项目的费用包括项目新投入的固定资产投资、原投入资金、流动资金和年运行费等。10.3.2.1 固定资产投资本项目固定资产投资为 2940.5986、 万元,剔除静态投资中属于国民经济内部的转移支付来调整固定资产投资,影子价格换算系数为 0.9。故影子投资额为 2646.53 万元。10.3.2.2 年运行费该项目实施后,不增加管理人员,年运行费只计算工程维护费和材料费。工程维护费和材料费:按调整后投资以费率 2%计算,为 52.93万元。10.3.2.3 流动资金该项目生产流动资金按年运行费的 30%计为 15.88 万元,在运行期第一年一次投入,并在计算期末一次回收。5110.3.3 工程效益10.3.3.1 防洪效益防洪效益按可减免的洪灾损失值计算,采用有、无工程对比求得。采用典型年实际损失法计算多年平均洪灾损失,统计计列的实际损失包87、括该年份洪灾所造成的农、林、牧、副、工业、交通、水利设施、河堤、滩地、房屋、家庭财产等,累计各项损失为总的直接洪灾损失。此外,由于淹没区交通中断来原材料供应中断造成的损失,商品流通不畅,经济协调不顺的损失、恢复生产用工及生产资料再投入等间接损失按直接损失的 15%计入,作为防洪的间接效益。据统计资料,多年平均防洪效益为 300 万元。防洪间接经济效益按直接效益的 15%计为 45 万元,总的防洪效益为 345 万元。10.3.3.2 社会效益项目实施后,可以大大改善该区生态环境,建立人与自然和谐相处的新环境,群众收入提高、生活得以改善,推动经济社会实现可持续发展。该工程年效益为 345 万元。88、10.410.410.410.4 国民经济评价指标国民经济评价指标本次国民经济评价采用国民经济内部收益率(EIRR)、净效益现值(ENPV)、投资回收期(EN)三个指标进行分析。国民经济效益费用流量表见表 10-1。1、经济内部回收率(EIRR)经济内部回收率以工程计算期内各年净效益现值累计等于零时52的折现率表示。即:ENPV=(BC)t:(1+i)-t=0EIRR=IENPV1I/(IENPV1I+IENPV2I)(I2-i1)+i1式中EIRR经济内部回收率当经济内部收益率大于或等于社会折现率时,项目在经济上合理。经计算,当i=7%时,EIRR=9.14%72、经济净现值(ENPV)经济89、净现值是用7%的社会折现率,将项目计算期内各年的净效益折算到计算期期初的现值之和表示。其计算公式为:ENPV=(BC):(1+i)-t式中ENPV经济净现值(万元)t计算期各年的序号B年效益C年费用I社会折现率(取I=7%)当经济净现值ENPV0时,项目在经济上合理。经计算,当I=7%时,ENPV=65303、投资回收年限投资回收年限是指累计折算效益等于累计折算费用的年限。经计算投资回收年限为19.78年。53该工程国民经济内部收益率大于社会折现率 7%,净效益现值大于零,投资回收期小于使用期,表明该项目在经济上是合理的。54120102940.592940.59-2940.59-2940.690、-29412201152.9 15.968.81345345276.19258.1-26823201252.952.93345345292.07255.1-24274201352.952.93345345292.07238.4-21895201452.952.93345345292.07222.8-19666201552.952.93345345292.07208.2-17587201652.952.93345345292.07194.6-15638201752.952.93345345292.07181.9-13819201852.952.93345345292.07170.0-12111091、201952.952.93345345292.07158.9-105311202052.952.93345345292.07148.5-90412202152.952.93345345292.07138.8-76513202252.952.93345345292.07129.7-63614202352.952.93345345292.07121.2-51415202452.952.93345345292.07113.3-40116202552.952.93345345292.07105.9-29517202652.952.93345345292.0798.9-19618202752.952.992、3345345292.0792.5-10419202852.952.93345345292.0786.4-1720202952.952.93345345292.0780.86321203052.952.93345345292.0775.513922203152.952.93345345292.0770.520923203252.952.93345345292.0765.927524203352.952.93345345292.0761.633725203452.952.93345345292.0757.639426203552.952.93345345292.0753.84482720365293、.952.93345345292.0750.349928203752.952.93345345292.0747.054629203852.952.93345345292.0743.958930203952.952.93345345292.0741.163131204052.952.9334510115.9228174.7923.0653项目各项功能的效益表10-1建设经济费用和残值内部收益率EIRR=9.14%净现值ENPV=653万元投资回收期EN=19.78年回收流动资金效益小计净现值流量净现值流量累计流动资金费用小计年运行费回收固定资产余值国民经济评价指标计算国民经济评价指标计算单位:万94、元序号年号费用效益净现金流量社会折现率7%5511111111、结论与建议、结论与建议11.111.111.111.1 综合评价综合评价该项目的实施,不仅可以提高河道的防洪标准,而且还可以改善当地生态环境,促进各行业的全面发展,因此,该项目的实施是非常必要的。项目实施期为二年,总投资2940.59万元;当社会折现率为7时,经济内部收益率为9.14,经济净现值为653万元。现从社会、技术、经济、环境四个方面进行全面评价:1、社会影响较大项目的实施,将大大提高河道的行洪标准,使北川河治理段河道的防洪标准达到20年一遇标准,保护了区域内的工矿企业,保证了两岸群众的生命财产安全,社会效益十分显著。2、95、设计技术方案可行项目从建设的指导思想和措施的总体布局上,遵循自然规律和经济规律。体现了当地的自然特点和经济发展方向,充分发挥当地的自然资源优势,把河道整治工程建设与流域经济发展紧密接合起来,建设思路明确,措施布局合理,主要工程措施符合国家和地方有关行业标准、规范的规定,符合当地自然条件和生产实际需要。3、经济效益显著该工程在经济效益分析中充分考虑了现状、实施后达到的水平以及效益等多方面的因素,确定了较为合理的计算参数,通过分析计算,56工程投资内部收益率为9.14,经济净现值为653万元,工程建设经济可行。4、生态环境明显改善项目的实施将大大提高治理段河道的行洪标准,规范北川河河水的水流形态,96、全面提高当地水资源的利用率,生态环境趋向良性循环,干旱、洪水、风沙等自然灾害减轻。11.211.211.211.2 结论结论通过对该项目建设具备的条件、面临的形势、依托的各种措施及产生的预期效益等进行全面评价,得出以下结论:1、本项目是吕梁市所确定的河道治理的重点区域,在此开展河道治理是市政府和人民群众的整体需要。2、措施治理采取工程措施和非工程措施相结合,在合理确定河道的控导线、禁止侵占河道滩地的前提下合理提高治理标准;注重保护河流的生态功能,积极探索采取各种有效的生态治理措施,体现了项目建设的整体性和综合性,形成了完整的防治体系。3、项目投资估算结合当地实际情况,投资估算准确。提出的资金筹97、措方案符合当地实际和国家要求,比较合理。4、项目建设中,管理机构和管理办法健全,项目实施完成后,管护措施能够得到落实,经济、生态、社会效益相当可观,项目建设完全可行。因此,该项目的建设是十分必要的,在技术、社会、环境上是可57行的,经济上是合理的,各级政府和人民群众对此非常重视,建议尽快立项实施。11.311.311.311.3 建议建议1、河道整治工程一定要按总体规划设计分期分段实施,但必须坚持按统一规划设计标准施工,要坚持百年大计,工程质量第一的原则,严把工程质量关,确保工程效益达到预期目标。2、河道治理是一项综合性的工程,在对河道进行治理的同时,建议同时对沿线跨河桥梁进行建设,使河道与周98、边环境协调发展,尽量避免出现已治理河道范围同内进行二次建设的现象。3、要把河坝砌筑,河道清淤,河坝外侧填方一并进行,修建一段,清理一段。在河坝外侧填方时,要把耕地的耕作土层用推土机推到适当地方堆放,填方下部填砂砾石,中部填土方,厚度不小于 0.5m,上部铺原耕作层土方。这是指耕地恢复和绿化带区域。4、尽可能做到新增耕地大于或等于被河道新占用耕地面积,新造和恢复耕地一定要保证耕作层土厚不少于 0.7m,并应进行平整,恢复原耕地现有的水利工程设施等。5、河道综合整治是一件利国利民的公益事业,应该以社会效益和环境效益为重要考虑因素,工程建成后能否充分发挥工程效益,管理是关键,建立一套科学合理的管理体制势在必行,管理所需要大量资金必须有国家和当地政府的政策及财政支持。