个人中心
个人中心
添加客服WX
客服
添加客服WX
添加客服WX
关注微信公众号
公众号
关注微信公众号
关注微信公众号
升级会员
升级会员
返回顶部
桩基、天然地基承载力、沉降变形计算表
桩基、天然地基承载力、沉降变形计算表.xlsx
下载文档 下载文档
工程表格
上传人:十二 编号:904035 2026-03-02 147页 4.14MB
1、大直径压密注浆、桩底扩孔、桩底嵌岩 灌注桩承载力计算保护密码:qwe桩号北楼桩【设设计计标标高高均均为为绝绝对对标标高高】嵌岩桩参数按按建建筑筑桩桩基基技技术术规规范范JGJ94-2008,第第 5.3.9 条条地质孔号B3孔顶标高3.50(m)地下水位-3(m)桩端是否嵌岩嵌岩岩层性质极软岩、软岩沉桩工艺桩端注浆设设计计:单桩抗压荷载标准组合2900(kN)设设计计:单桩抗拔荷载标准组合1600(kN)嵌岩端深径比 hr/d11.90011.900【MAX】hr/d8荷荷载载综综合合分分项项系系数数1.35嵌岩段侧阻和端阻综合系数r2.040极软岩、软岩指frk 15MPa:较硬岩、坚硬岩指2、frk30MPa。二者之间时自自行行计计算算r内插值灌注桩基本资料桩 长(m)70.00桩径 d(m)1桩顶标高(m)0.60桩顶入土深度(m)2.90扩底灌注桩参数大大直直径径扩扩底底灌灌注注桩桩技技术术规规程程JGJ/225JGJ/225 20102010 第第6.2.36.2.3 条条,抗抗拔拔计计算算同同建建筑筑桩桩基基技技术术规规范范JGJ94-2008JGJ94-2008,第第5.4.65.4.6 条条桩身截面(m2)0.786周长 U(m)3.142桩端标高(m)-69.4桩端入土深度(m)72.90扩孔直径 D(m)斜坡高度 H(m)1.8承压桩不计侧阻高度(m):灌注桩计算资3、料14抗拔时扩底桩土体破坏面高度4d10d(m)9桩端阻面积Ap(m2)0.786端阻周长U(m)3.142桩身自重(KN)71629 注:1.当桩径大于0.8m时,按建筑桩基技术规范JGJ94-2008,第 5.3.6 条对大直径灌注桩考虑si、p大直径桩侧阻、端阻尺寸效应系数3.按大直径扩底灌注桩技术规程JGJ/225 2010,第 6.3.2 条,扩底桩扩大头斜面及变截面以上 2d 长度范围内不应计入桩侧阻力(d 为桩身直径)2.对大直径嵌岩桩(直径800mm),侧阻力和端阻力不需要考虑尺寸效应系数;计算嵌岩段以上土层侧阻力时,应考虑大直径桩侧阻力的尺寸效应系数。4.按桩基规范JGJ944、-2008,第 5.4.6 条,计算基桩的抗拔极限承载力。对于扩底桩按表 5.4.6-1 定扩底桩破坏表面周长ui及其计算高度。土层基本信息(si、p取值详:建筑桩基技术规范JGJ94-2008,第 5.3.10 条)桩承承压压(侧阻+端阻)计算桩抗抗拔拔(侧阻)计算抗拔桩分段侧阻计算土层名称土层顶顶面面深度入土厚度li(m)桩侧摩阻力q qsk侧阻修正si抗压强度标准值端阻修正p侧注浆si【桩侧注浆】端注浆p【桩端嵌岩】u*siqsksilipqpkpAp扩孔面高度扩孔侧阻si计算周长 u ui抗拔系数iu*siqsksili*i分段截面一分段截面二3-10.000.100.956 0.005、3.140.03-13.02.30150.956103.653.140.7577.73-15.35.70150.956256.883.140.75192.7碎石 3-211.05.00450.928656.193.140.75492.116.09.00250.956676.013.140.75507.0118.3125.05.00350.956525.783.140.75394.3394.3330.02.00450.956800270.403.140.70189.3189.3砂土 132.04.00700.9282500816.593.140.75612.4612.42-136.02.00756、0.9566000450.673.140.75338.0338.02-238.05.00750.9561126.683.140.65732.3732.314.643.012.00750.9562704.023.140.651757.61757.61757.655.06.000.9560.003.140.00.00.061.02.001.0001.000桩端嵌岩桩入岩1.0003.140.00.00.063.09.901.0001.000桩端嵌岩0.001.0003.140.00.00.0侧阻总长 70.007586.880.000.00抗拔【分段】极限侧阻:=5293.64142.31772.7、3注注:1.1.桩桩注注浆浆段段的的桩桩侧侧摩摩阻阻力力及及桩桩端端端端阻阻力力取取值值为为上上海海市市地地基基基基础础设设计计标标准准DGJDGJ 08-11-201808-11-2018表表7.2.4-27.2.4-2中中灌灌注注桩桩极极限限摩摩阻阻力力和和端端阻阻力力的的上上限限值值,综综合合调调整整系系数数取取1.21.2。桩上端分节长度(m):整整桩桩2040下节桩长(m):705030全全国国规规范范全国规范单桩竖向极限承载力安全系数:2.00单桩抗拔荷载标准组合(KN)1600.0799.70.0上海规范桩端阻比 p:0.00分项系数:桩侧摩阻力的分项系数s(表):2.000桩端8、阻力的分项系数p(表):2.00036 主筋配筋量(根):单桩抗抗压压承承载载力力极限值(kN):7586.88单桩抗压承载力特征值(kN):3793.442900合合格格主筋应力 s(N/mm2)单桩抗抗拔拔侧侧阻阻极限值(kN):5293.57单桩抗抗拔拔承载力特征值(kN):3362.371600合合格格裂缝宽度 max (mm)A:A:【钢钢筋筋混混凝凝土土轴轴心心受受压压桩桩正正截截面面受受压压承承载载力力应应符符合合建建筑筑桩桩基基技技术术规规范范JGJ94-2008JGJ94-2008第第 5.8.25.8.2条条的的规规定定】C:C:抗抗拔拔工工程程桩桩验验算算工工程程桩桩验算9、【钢筋混凝土桩正截面抗拉承载力应符合建筑桩基技术规范JGJ94-2008第 5.8.7条、3.5.3的规定】钻孔灌注桩裂缝控制等级为三级,最大裂缝限值0.2mm砼抗压强度设计值fc-N/mm2cAps抗压承载力设计值 Rd=fc*c*Aps+0.9fy*As荷载基本组合合格钢筋抗拉强度设计值fy-N/mm2桩抗拔主筋主筋根数(n)抗拔主筋总面积主筋配筋率te螺旋箍筋箍筋间距(mm)箍筋面积体积配箍率C3014.30.80.7869749.53915HRB4003603622223932.85%122001130.25%工工程程试试桩桩验算验算荷载单桩抗拔荷载标准组合(KN)抗拔承载力设计值 N10、(kN)桩身抗拉强度承载力复核(kN)合格砼抗压强度标准值fck-N/mm2cAps抗压承载力标准值 R=fck*c*Aps+0.9fy*As荷载标准组合合格N =fy*As+fpy*Apy =8061.582160.00C4026.80.80.78617604.55800砼抗拉强度标准值ftk-N/mm2受力特征系数acr保护层厚度Cs钢筋应力 s不均匀系数裂缝宽度max(mm)合格B B:【钻钻孔孔灌灌注注桩桩的的配配筋筋构构造造应应满满足足建建筑筑桩桩基基技技术术规规范范JGJ94-2008JGJ94-2008第第4.1.14.1.1 灌灌注注桩桩配配筋筋规规定定。】C302.012.711、50710.460.087608c0.70c0.80c0.703按混凝土结构设计规范GB50010-2010 第 7.1.2 条 计算抗拔桩身混凝土裂缝C504908.8C4513257.5C803037.5【7】建筑桩基技术规范JGJ 94-2008 第 5.7.2-7 条砼抗拉强度标准值 ftk特征系数保护层厚度钢筋应力不均匀系数裂裂缝缝宽宽度度max(mm)(mm)合合格格桩桩身身砼砼标标准准抗抗压压强强度度桩桩身身砼砼标标准准抗抗压压强强度度桩桩身身砼砼标标准准抗抗压压强强度度 验算永久荷载控制的桩基的水平承载力时,应将单桩水平承载力特征值乘以调整系数 0.800.80;验算地震作用桩12、基的水平承载力时,宜将单桩水平承载力特征值乘以调整系数 1.251.25。C502.642.75046.60.200.0200.20C506885.0C4518598.2C804247.5桩基础承台承载力、沉降变形计算 建筑桩基技术规范JGJ94-2008【5.5.7】保护密码:qwe一建筑场地土层、承台、桩基参数三/(2)桩基沉降计算参数 a)场地信息:场地天然地面 (绝对标高 m):4.00 室内 0.000相对 (绝对标高m):5.15 场地地下水位面 (绝对标高 m):2.501承台底压力 Pk :703.6(kPa)承台底土自重应力 Pc:0.0(kPa)b)荷载信息:上部结构准永久13、组合轴力 Fk (kN):5800.0(kN)C0=0.049=2.00群桩长径比 l/d=55C1=1.688=0.136第 i 层桩周土负摩阻力标准值 qnsi:(计算值大于正摩阻力标准值时,表格取正摩阻力标准值.)基础长宽比 Lc/Bc=1.36C2=9.7784考虑群桩效应的基桩下拉荷载标标准准值值-Qng负摩阻力群桩效应系数 n:=1.003桩基沉降计算经验系数-:沉降计算深度范围内压缩模量的当量值 :经验系数修整值:1.00【建筑桩基技术规范JGJ94-2008 第 5.5.11】=31.239(MPa):=其中:qns=12.36(kPa)m=8.15(kN/m3)0.538群桩14、效应的单桩下拉荷载标准值 Qng:=398.38(kN)e)桩端以下沉降计算深度(m):26.00(m)即时调整桩端以桩基沉降计算深度,直至满足规范【5.5.8】桩基沉降计算深度 Zn 按应力比法确定,计算深度处的附加应力z 与土的自重应力c 应小于 0.2(计算表格各层附加应力栏中查看此值)。求得桩基最终沉降量。5矩形桩基中点最终沉降量=5.45.4(mm)三/(1)土层参数表格G26 孔土土层层参参数数极限侧阻、端阻土层设计参数桩桩位位桩承载力计算负摩阻力计算参数桩基沉降计算建筑桩基技术规范JGJ94-2008第【5.5.7】条土层编号土层编号、属性混凝土钻孔灌注桩土重度压缩模量土层顶面深15、度厚度厚厚度度土层侧阻土层端阻负摩阻力系数中心点位置平均竖向有效应力负摩阻力标准值土层自重应力桩端至压缩层距离深宽比平均附加应力系数各层附加应力用布辛奈斯克解的桩基沉降量qsikqpikEsihohiliQsikQpkniliiqnsicZi2*Zi/Bcaizz/cZi*aiZi*ai-Zi-1*ai-1sisi(kPa)(kPa)(kN/m3)(MPa)(m)(m)(m)(kN)(m)(m)(kPa)(kPa)(kPa)(m)/(kPa)/(mm)(mm)1-3杂填土10.0016.004.300.001.403.7364.40.151.40100.105.008.400.000.001粉16、质粘土夹粘质粉土15.0018.804.431.401.101.1028.50.201.10100.747.5018.080.000.003-1粘质粉土15.0018.602.882.503.603.6093.30.253.60121.067.5049.040.000.003-2砂质粉土30.00220018.8014.006.108.608.60445.80.358.60174.3815.00124.720.000.00淤泥质粘土30.0016.904.0014.704.304.30222.90.203.95225.8615.00154.390.000.00粉质粘土35.0018.106.017、019.004.904.90296.30.35194.080.000.00粘质粉土65.00200019.8010.0023.903.103.10348.20.30224.460.000.001砂质粉土85.00500018.8028.0027.005.000.6798.41187.9268.464.333.460.1365393.091.460.5910.59160.7960.792粉砂100.00100019.1045.0032.0013.41390.4917.7414.190.0426122.510.310.7550.16410.4771.2619.0052.0045.418.2646418、.8326.0020.800.030888.670.190.8010.0462.5473.80天然地基基础承承载载力力、沉沉降降变变形形计算 建筑地基基础设计规范 GB 50007-2011 第【5.2.4、5.3.5】条保护密码:qwe一建筑场地土层、基础参数,地基承载力验算二基础沉降计算1:场地信息:场地天然地面 (绝对标高 m):4.50 室内 0.000相对 (绝对标高m):5.15 场地地下水位面 (绝对标高 m):2.501:沉降计算点位:基础形心中点沉降2:荷载信息:上部结构准永久组合轴力 (kN):280000.0(kN)=计算大型筏基沉降时,轴力应扣除地下室的土层补偿重量。调19、整时控制 P0 值。应先计算基础 中中心心点点 沉降,确确定定沉降变形 计计算算深深度度,再查看其它点位沉降变形。3:基础信息:基础承台长 Lc (m ):130.00 基础承台宽 Bc (m):50.00基础埋深 (m ):1.20-相对 0.000基础埋深2:基底压力值 Pk :67.1(kPa)基底土自重应力 Pc:8.8(kPa)底位于第 1 层 1-3 号土层。承台深度(m):=0.55地下水深度(m):2.00沉降计算深度(m):27.00基础底部平均附加压力 P0 =58.28(kPa)4:地基承载力:基础承载力 fa:建筑地基基础设计规范 GB 50007-2011 第【5.220、.4】条基础长宽比:2.60 承载力宽度修正 b :0.00 承载力深度修正 d:1.20基底下土重度:16.00基底上土重度 m m:16.00计算深度以上有限范围变形 Z=1.00(m)=71.0(kPa)3:沉降计算经验系数 s:=0.981建筑地基基础设计规范 GB 50007-2011 第 5.3.5基底压力值 Pk :建筑地基基础设计规范 GB 50007-2011 第【5.2.1、5.2.2】条其中:沉降计算深度范围内压缩模量的当量值 :Pk=(Fk+Gk)/A=67.1(kPa)=合合格格=5.18(MPa)5:软弱下卧层-地基承载力:软弱下卧层验算:建筑地基基础设计规范 GB21、 50007-2011 第【5.2.7】条指指定定下下卧卧层层:3-2土层深度(m):6.10(m)承载力宽度修正 b :0.00 承载力深度修正 d:1.00下卧层土重度:8.80下卧层上土重度 m m:11.324:沉降变形计算深度:建筑地基基础设计规范 GB 50007-2011 第 5.3.7下卧层承载力 faz:=183.4(kPa)承台底以下沉降计算深度(m):27.00(m)=0.0200.0200.0250.025下卧层附加压力Pz :=22.4(kPa)Pcz=69.0(kPa)5:【基础形心中点沉降】最终沉降量:【建筑地基基础设计规范 GB 50007-2011 第 5.322、.5】其中:Es1/Es2=0.71z/b=0.11则:=0=276.6(mm)【注】下卧层地基压力:Pz +Pcz =91.5(kPa)=合合格格三土层参数表格23G26土土层层参参数数土层设计参数基基础础基础沉降计算计算深度校核建筑地基基础设计规范GB 50007-2011 第【5.3.5】条土层编号土层属性土重度压缩模量承载力特征值深度厚度埋埋深深土层自重应力承台底至压缩层距离土层深宽比平均附加应力系数用分层总和法计算基础沉降计算深度之上 z 高度土层变形ESifakhohiHicZiZi/(0.5*Bc)aiZi*aiZi*ai-Zi-1*ai-1sisiZn-zi(Zn-zi)/(023、.5*Bc)az(Zn-zi)*azsn(kN/m3)(MPa)(kPa)(m)(m)(m)(kPa)(m)(mm)(mm)(m)(mm)1-3杂填土16.004.0070.00.001.400.5522.400.850.030.25000.2120.21212.3812.381粉质粘土夹粘质粉土18.805.8385.01.401.1038.081.950.080.24990.4870.27510.9923.373-1粘质粉土18.608.2790.02.503.6069.045.550.220.24971.3860.89825.3248.693-2砂质粉土18.809.67120.06.124、08.60144.7214.150.570.24603.4802.09550.5099.19淤泥质粘土16.902.4560.014.704.30174.3918.450.740.24224.4690.98894.03193.22粉质粘土18.103.8365.019.004.90214.0823.350.930.23675.5281.05964.45257.6726.001.040.23346.068粘质粉土19.806.7723.903.10244.4626.451.060.23286.1570.63021.68279.3526.451.060.23286.1573.061砂质粉土18.825、09.6427.000.55249.3027.001.080.23216.2650.1082.61281.9627.001.080.23216.2655.672粉砂19.1013.4432.0013.4445.41建筑桩基技术规范JGJ94-2008 附录 A 桩型与成桩工艺选择A.0.1 桩型与成桩工艺选择根据建筑结构类型、荷载性质、桩的使用功能、穿越土层、桩端持力层、地下水位、施工设备、施工环境、施工经验、制桩材料供应条件等,可按表 A.0.1 进行。表表 A.0.1 桩型与成桩工艺选择 【注:表中符号表示比较合适;表示有可能采用;表示不宜采用。】桩 类桩桩径径最 大 桩 长穿穿越越土土层26、层桩身扩大头一般黏性土及其填土淤泥和淤泥质土粉 土(mm)(mm)(m)非挤土成桩干干作作业业法法长螺旋钻孔灌注桩300800/28短螺旋钻孔灌注桩300800/20钻孔扩底灌注桩300600800120030机动洛阳铲成孔灌注桩300500/20人工挖孔扩底灌注桩80020001600300030泥泥浆浆护护壁壁法法潜水钻成孔灌注桩500800/50反循环钻成孔灌注桩6001200/80正循环钻成孔灌注桩6001200/80旋挖成孔灌注桩6001200/60钻孔扩底灌注桩60012001000160030套套管管护护壁壁贝诺托灌注桩8001600/50短螺旋钻孔灌注桩300800/20部分挤27、土成桩灌灌注注桩桩冲击成孔灌注桩6001200/50长螺旋钻孔压灌桩300800/25钻孔挤扩多支盘桩7009001200160040预预 制制 桩桩预钻孔打入式预制桩500/50静压混凝土(预应力砼)敞口管桩800/60H 型钢桩规格/80敞口钢管桩600900/80挤土成桩灌灌注注桩桩内夯沉管灌注桩325,37746070025预预制制桩桩打入式混凝土预制桩500500/60闭口钢管桩、混凝土管桩1000静压桩1000/60部分挤土成桩预预 制制 桩桩桩桩端端进进入入持持力力层层地地下下水水位位砂 土碎 石 土季节性冻土膨胀土黄土中间有硬夹层中间有砂夹层中间有砾石夹层硬黏性土密实砂土碎 石28、 土软质岩石和风化岩石以 上以 下非自重湿陷性 黄土自重湿陷性 黄土建筑桩基技术规范JGJ94-2008 附录 A 桩型与成桩工艺选择A.0.1 桩型与成桩工艺选择根据建筑结构类型、荷载性质、桩的使用功能、穿越土层、桩端持力层、地下水位、施工设备、施工环境、施工经验、制桩材料供应条件等,可按表 A.0.1 进行。表表 A.0.1 桩型与成桩工艺选择 【注:表中符号表示比较合适;表示有可能采用;表示不宜采用。】穿穿越越土土层层对对环环境境影影响响孔底有无挤密振动和噪音排 浆无无无无无无无无无无无无无无无无有有无无有有无无有有无无有有无无有有无无无无无无无有有有有无无无无无有有无有有无有有无无有有29、有有无无有有无有有有有无有有有有无有有无无有有钢管桩承载力计算保护密码:qwe桩号Z1【设设计计标标高高均均为为绝绝对对标标高高】地质孔号2孔顶标高(m)3.91地下水位(m)3.55单桩承载力特征值700kNkN钢管桩基本资料桩 长(m)33.00钢管直径d(m)0.325桩顶标高(m)3.55桩顶入土深度(m)0.36钢管壁厚 t(mm):12桩身截面(m2)0.083周长 U(m)1.021桩端标高(m)-29.45桩端入土深度(m)33.36压屈稳定的允许厚径比 t/d:1/45厚径比 t/d:1/27钢管桩计算资料桩端阻面积Ap(m2)0.083端阻周长U(m)1.021空心钢管桩端30、封口形式:开口钢管桩桩身自重(KN)26*钢材牌号Q345抗拉、抗压、抗弯强度设计值:f295抗剪强度 fv170屈服强度 fy3351.1.按按建建筑筑桩桩基基技技术术规规范范JGJ94-2008JGJ94-2008,第第 5.3.75.3.7 条条,确确定定钢钢管管桩桩单单桩桩竖竖向向极极限限承承载载力力标标准准值值。桩承压计算桩承压计算土层名称土层深度入土厚度li(m)桩侧摩阻力q qsk桩端端阻力q qpk桩端土塞系pu*qsk*lipqpkAp抗拔系数iu*qsk*li*i1填土0.03.141548.090.003 淤泥质粉质粘土夹砂质粉土3.54.101562.790.7043.31、954 淤泥质粘土7.68.9022199.920.60119.955-1-1 粘土16.54.0035700142.940.6085.775-1-2 粉质粘土20.511.5042850493.150.60295.895-3 粉质粘土32.01.366016000.6783.3288.870.7058.325-4 粉质粘土42.300.657-1 砂质粉土44.500.70331030.2188.87603.88单桩承载力抗抗压压极限值(kN):1119.08单桩承载力抗压特征值(kN):559.54700不不合合格格建建筑筑桩桩基基技技术术规规范范JGJ94-2008,第第 5.3.10532、.3.10 条条计计算算基基桩桩抗抗压压承承载载力力单桩承载力抗抗拔拔侧侧阻阻极限值(kN):603.88单桩承载力抗抗拔拔特特征征值值(kN)(kN):328.42建建筑筑桩桩基基技技术术规规范范JGJ94-2008,第第 5.4.5 条条计计算算基基桩桩抗抗拔拔承承载载力力A:【打(压压)入式钢管桩,按建建筑筑桩桩基基技技术术规规范范JGJ94-2008JGJ94-2008第第 5.8.65.8.6条条的规定,验算桩身强度及桩身局部压屈】钢管的横截面积:Aa11800mm2极限压应力(N/mm2)95295钢材抗压强度设计值(N/mm2)合合格格极限压应力比0.321/45合合格格B:钢桩33、的防腐处理应符合建建筑筑桩桩基基技技术术规规范范JGJ94-2008JGJ94-2008第第 4.1.184.1.18条条规定。当采用“增加腐蚀余量”法时,钢桩的腐蚀速率当无实测资料时可按表 4.1.18 确定;地基基础设计规范地基承载力修正系数表(4.2.3-1,2)混凝土材料属性表 qwe地基承载力系数表地基承载力修正系数表jd(0)NgNqNcgd002.55.141.210.012.55.381.2C1520.012.55.631.2C2030.022.55.91.2C2540.052.56.191.2C3050.072.56.491.2C3560.112.56.811.2C4070.34、162.57.161.2C4580.222.57.531.2C5090.32.57.921.17C55100.392.58.351.14C60110.52.718.81.11C65120.632.979.281.07C70130.783.269.811.02C75140.973.5910.370.97C80151.183.9410.980.92161.434.3411.630.85171.734.7712.340.83普普通通热热轧轧钢钢筋筋材材料料属属性性表表 qweqwe182.085.2613.10.8192.485.813.930.8钢筋材料202.956.414.830.8213.535、7.0715.820.8钢筋牌号224.137.8216.880.8HPB235234.888.6618.050.8HPB300245.749.619.320.8HRB335256.7610.6620.720.8HRB400HRB500地基基础设计规范桩基端、侧阻力分项系数表(6.2.4-2)分项系数rpgpgsSymbol0011.6Symbol10.051.021.64宋体20.11.051.730.151.081.7540.21.121.79上海市地基基础设计标准DGJ 08-11-2018,表7.2.4-250.251.181.82p60.31.241.83s70.351.31.8p836、0.41.411.7690.451.51.69表 D.0.1-2 矩形面积上均布荷载作用下角点平均附加应力系数()建筑桩基技术规范JGJ94-2008【5.5.7】/建筑地基基础设计规范GB50007-2011【5.3.5】z/ba/b1.01.21.41.61.82.00.00.25000.25000.25000.25000.25000.25000.20.24960.24970.24970.24980.24980.24980.40.24740.24790.24810.24830.24830.24840.60.24230.24370.24440.24480.24510.24520.80.23437、60.23720.23870.23950.24000.24031.00.22520.22910.23130.23260.23350.23401.20.21490.21990.22290.22480.22600.22681.40.20430.21020.21400.21460.21800.21911.60.19390.20060.20490.20790.20990.21131.80.18400.19120.19600.19940.20180.20342.00.17460.18220.18750.19120.19800.19582.20.16590.17370.17930.18330.18620.38、18832.40.15780.16570.17150.17570.17890.18122.60.15030.15830.16420.16860.17190.17452.80.14330.15140.15740.16190.16540.16803.00.13690.14490.15100.15560.15920.16193.20.13100.13900.14500.14970.15330.15623.40.12560.13340.13940.14410.14780.15083.60.12050.12820.13420.13890.14270.14563.80.11580.12340.12930.39、13400.13780.14084.00.11140.11890.12480.12940.13320.13624.20.10730.11470.12050.12510.12890.13194.40.10350.11070.11640.12100.12480.12794.60.10000.10700.11270.11720.12090.12404.80.09670.10360.10910.11360.11730.12045.00.09350.10030.10570.11020.11390.11695.20.09060.09720.10260.10700.11060.11365.40.08780.40、09430.09960.10390.10750.11055.60.08520.09160.09680.10100.10460.10765.80.08280.08900.09410.09830.10180.10476.00.08050.08660.09160.09570.09910.10216.20.07830.08420.08910.09320.09660.09956.40.07620.08200.08690.09090.09420.09716.60.07420.07990.08470.08860.09190.09486.80.07230.07790.08260.08650.08980.09241、67.00.07050.07610.08060.08440.08770.09047.20.06880.07420.07870.08250.08570.08847.40.06720.07250.07690.08060.08380.08657.60.06560.07090.07520.07890.08200.08467.80.06420.06930.07360.07710.08020.08288.00.06270.06780.07200.07550.07850.08118.20.06140.06630.07050.07390.07690.07958.40.06010.06490.06900.07242、40.07540.07798.60.05880.06360.06760.07100.07390.07648.80.05760.06230.06630.06960.07240.07499.20.05540.05990.06370.06700.06970.07219.60.05330.05770.06140.06450.06720.069610.00.05140.05560.05920.06220.06490.067210.40.04960.05370.05720.06010.06270.064910.80.04790.05190.05530.05810.06060.062811.20.0463043、.05020.05350.05630.05870.060911.60.04480.04860.05180.05450.05690.059012.00.04350.04710.05020.05290.05520.057312.80.04090.04440.04740.04990.05210.054113.60.03870.04200.04480.04720.04930.051214.40.03670.03980.04250.04880.04680.048615.20.03490.03790.04040.04260.04460.046316.00.03320.03610.03850.04070.044、4250.044218.00.02970.03230.03450.03640.03810.039620.00.02690.02920.03120.03300.03450.0359附录 E 桩基等效沉降系数e 计算参数建筑桩基技术规范JGJ94-2008【5.5.7】E.0.1 桩基等效沉降系数应按表 E.0.1-1E.0.1-5 中列出的参数,采用本规范式 5.5.9-1 或 5.5.9-2 计算。表表 E.0.1-1 (sa /d=2 )l/dLc/Bc123455C00.2030.2820.3290.3630.389C11.5431.6871.7971.8451.915C25.5635.345、565.0865.0204.87810C00.1250.1880.2280.2580.282C11.4871.5731.6531.6761.731C27.0006.2605.7375.5355.29215C00.0930.1460.1800.2070.228C11.5081.5681.6371.6471.696C28.4137.2526.5206.2085.87820C00.0750.1200.1510.1750.194C11.5481.5921.6541.6561.701C29.7838.2367.3106.8976.48625C00.0630.1030.1310.1520.170C11.546、961.6281.6861.6791.722C211.1189.2058.0947.5837.09530C00.0550.0900.1160.1350.152C11.6461.6691.7241.7111.753C212.42610.1598.8688.2647.70040C00.0440.0730.0950.1120.126C11.7541.7611.8121.7871.827C214.98412.03610.3969.6108.90050C00.0360.0620.0810.0960.108C11.8651.8601.9091.8731.911C217.49213.88511.90510.47、94510.09060C00.0310.0540.0700.0840.095C11.9791.9622.0101.9621.999C219.96715.71913.40612.27411.27870C00.0280.0480.0630.0750.085C12.0952.0672.1142.0552.091C222.42317.54614.90113.60212.46580C00.0250.0430.0560.0670.077C12.2132.1742.2202.1502.185C224.86819.37016.39814.93313.65590C00.0220.0390.0510.0610.048、70C12.3332.2832.3282.2452.280C227.30721.19517.89716.26714.849100C00.0210.0360.0470.0570.065C12.4532.3922.4362.3412.375C229.74423.02419.40017.60816.049注:Lc 群桩基础承台长度;Bc 群桩基础承台宽度;l 桩长;d 桩径。表表 E.0.1-2 (sa /d=3 )l/dLc/Bc123455C00.2030.3180.3770.4160.445C11.4831.7231.8751.9552.045C23.6794.0364.0064.0533.949、9510C00.1250.2130.2630.2980.324C11.4191.5591.6621.7051.770C24.8614.7234.4604.3844.23715C00.0930.1660.2090.2400.265C11.4301.5331.6191.6461.703C25.9005.4355.0104.8554.64120C00.0750.1380.1760.2050.227C11.4611.5421.6191.6351.687C26.8796.1375.5705.3465.07325C00.0630.1180.1530.1790.200C11.5001.5651.6371.650、441.693C27.8226.8266.1275.8395.51130C00.0550.1040.1360.1600.180C11.5421.5951.6631.6621.709C28.7417.5066.6806.3315.94940C00.0440.0850.1120.1330.150C11.6321.6671.7291.7151.759C210.5358.8457.7747.3096.82250C00.0360.0720.0960.1140.130C11.7261.7461.8051.7781.819C212.29210.1688.8608.2847.69460C00.0310.06351、0.0840.1010.115C11.8221.8281.8851.8451.885C214.02911.4869.9449.2598.56870C00.0280.0560.0750.0900.103C11.9201.9131.9681.9161.954C215.75612.80111.02910.2379.44480C00.0250.0500.0680.0810.093C12.0192.0002.0531.9882.025C217.47814.12012.11711.22010.32590C00.0220.0450.0620.0740.085C12.1182.0872.1392.0602.052、96C219.20015.44213.21012.20811.211100C00.0210.0420.0570.0690.097C12.2182.1742.2252.1332.168C220.92516.77014.30713.20112.101注:Lc 群桩基础承台长度;Bc 群桩基础承台宽度;l 桩长;d 桩径。表表 E.0.1-3 (sa /d=4 )l/dLc/Bc123455C00.2030.3540.4220.4640.495C11.4451.7861.9862.1012.213C22.6333.2433.3403.4443.43110C00.1250.2370.2940.332053、.361C11.3781.5701.6951.7561.830C23.7073.8733.7433.7293.63015C00.0930.1850.2340.2690.296C11.3841.5241.6261.6661.729C24.5714.4584.1884.1073.95120C00.0750.1530.1980.2300.254C11.4081.5211.6111.6381.695C25.3615.0244.6364.5024.29725C00.0630.1320.1730.2020.225C11.4411.5341.6161.6331.68680C26.1145.5785.081454、.9004.65030C00.0550.1170.1540.1810.203C11.4771.5551.6331.6401.691C26.8436.1225.5245.2985.00440C00.0440.0950.1270.1510.170C11.5551.6111.6811.6731.720C28.2617.1956.4026.0935.71350C00.0360.0810.1090.1300.148C11.6361.6741.7401.7181.762C29.6488.2587.2776.8876.42460C00.0310.0710.0960.1150.131C11.7191.742155、.8051.7681.810C211.0219.3198.1527.6847.13870C00.0280.0630.0860.1030.117C11.8031.8111.8721.8211.861C212.38710.3819.0298.4857.85680C00.0250.0570.0770.0930.107C11.8871.8821.9401.8761.914C213.75311.4479.9119.2918.57890C00.0220.0510.0710.0850.098C11.9721.9532.0091.9311.967C215.11912.51810.79910.1029.305156、00C00.0210.0470.0650.0790.090C12.0572.0252.0791.9862.021C216.49013.59511.69110.91810.036注:Lc 群桩基础承台长度;Bc 群桩基础承台宽度;l 桩长;d 桩径。表表 E.0.1-4 (sa /d=5 )l/dLc/Bc123455C00.2030.3890.4640.5100.543C11.4161.8642.1202.2772.416C21.9412.6522.8242.9572.97310C00.1250.2600.3230.3640.394C11.3491.5931.7401.8181.902C22.57、9593.3013.2553.2783.20815C00.0930.2020.2570.2950.323C11.3511.5281.6451.6971.766C23.7243.8253.6493.6143.49220C00.0750.1680.2180.2520.278C11.3721.5131.6151.6511.712C24.4074.3164.0363.9573.79225C00.0630.1450.1900.2220.246C11.3991.5171.6091.6331.690C25.0494.7924.4184.3014.09630C00.0550.1280.1700.1990.2258、2C11.4311.5311.6171.6301.684C25.6685.2584.7964.6444.40140C00.0440.1050.1410.1670.188C11.4981.5731.6501.6461.695C26.8656.1765.5475.3315.01350C00.0360.0890.1210.1440.163C11.5691.6231.6951.6751.720C28.0347.0856.2966.0185.62860C00.0310.0780.1060.1280.145C11.6421.6781.7451.7101.753C29.1927.9947.0466.709659、.24670C00.0280.0690.0950.1140.130C11.7151.7351.7991.7481.789C210.3458.9057.8007.4036.86880C00.0250.0630.0860.1040.118C11.7881.7931.8541.7881.827C211.4989.8208.5588.1027.49390C00.0220.0570.0790.0950.109C11.8611.8511.9091.8301.866C212.65310.7419.3218.8058.123100C00.0210.0520.0720.0880.100C11.9341.909160、.9661.8711.905C213.81211.66710.0899.5128.755注:Lc 群桩基础承台长度;Bc 群桩基础承台宽度;l 桩长;d 桩径。表表 E.0.1-5 (sa /d=6)l/dLc/Bc123455C00.2030.4230.5060.5550.588C11.3931.9562.2772.4852.658C21.4382.1522.3652.5032.53810C00.1250.2810.3500.3930.424C11.3281.6231.7931.8891.983C22.4212.8702.8812.9272.87915C00.0930.2190.2790.361、180.348C11.3271.5401.6711.7331.80960C23.1263.3663.2563.2503.15320C00.0750.1820.2360.2720.300C11.3441.5131.6251.6691.735C23.7403.8153.6073.5653.42825C00.0630.1570.2070.0240.266C11.3681.5091.6101.6401.700C24.3114.2423.9503.8773.70330C00.0550.1390.1840.2160.240C11.3951.5161.6081.6271.683C24.8584.6594.262、884.1873.97740C00.0440.1140.1530.1810.203C11.4551.5451.6271.6261.676C25.9125.4774.9574.8044.52850C00.0360.0970.1320.1570.177C11.5171.5841.6591.6401.687C26.9396.2875.6245.4235.08060C00.0310.0850.1160.1390.157C11.5811.6271.6981.6621.706C27.9567.0976.2926.0435.63470C00.0280.0760.1040.1250.141C11.6451.663、731.7401.6881.728C28.9687.9086.9646.6676.19180C00.0250.0680.0940.1130.129C11.7081.7201.7831.7161.754C29.9818.7247.6407.2936.75190C00.0220.0620.0860.1040.118C11.7721.7681.8271.7451.780C210.9979.5448.3197.9247.314100C00.0210.0570.0790.0960.110C11.8351.8151.8721.7751.808C212.01610.3709.0048.5577.879注:L64、c 群桩基础承台长度;Bc 群桩基础承台宽度;l 桩长;d 桩径。混凝土强度等级(N/mm2)混凝土弹性模量(N/mm2)强度标准值强度设计值拉压模量疲劳模量fckftkfcftEcEfc101.277.20.912.20E+0413.41.549.61.12.55E+041.10E+0416.71.7811.91.272.80E+041.20E+0420.12.0114.31.433.00E+041.30E+0423.42.216.71.573.15E+041.40E+0426.82.3919.11.713.25E+041.50E+0429.62.5121.11.83.35E+041.55E65、+0432.42.6423.11.893.45E+041.60E+0435.52.7425.31.963.55E+041.65E+0438.52.8527.52.043.60E+041.70E+0441.52.9329.72.093.65E+041.75E+0444.52.9931.82.143.70E+041.80E+0447.43.0533.82.183.75E+041.85E+0450.23.1135.92.223.80E+041.90E+04强度标准值(N/mm2)强度设计值(N/mm2)弹性模量屈服强度极限强度抗拉强度抗压强度(N/mm2)d (mm)fykfstkfyfyEs62066、2353152102102.10E+05混凝土材料属性表 qwe普普通通热热轧轧钢钢筋筋材材料料属属性性表表 qweqwe钢筋材料6223004202702702.10E+056503354553003002.00E+056504005403603602.00E+056504006304354102.00E+05工作表密码:qweA B C D E F G H I J K L M N O P Q R S T U V W X Y Za b c d e f g h I j k l m n o p q r s t u v w x y z 0.050.10.150.20.250.30.352.092.67、162.182.132.031.881.731.081.21.371.611.932.342.832.42.83.23.64.05.010.00.25000.25000.25000.25000.25000.25000.25000.24980.24980.24980.24980.24980.24980.24980.24850.24850.24850.24850.24850.24850.24850.24540.24550.24550.24550.24550.24550.2456上海市地基基础设计标准DGJ 08-11-2018,表7.2.4-2表 D.0.1-2 矩形面积上均布荷载作用下角点平均附68、加应力系数()建筑桩基技术规范JGJ94-2008【5.5.7】/建筑地基基础设计规范GB50007-2011【5.3.5】a/b0.24070.24080.24090.24090.24100.24100.24100.23460.23490.23510.23520.23520.23530.23530.22780.22820.22850.22860.22870.22880.22890.22040.22110.22150.22170.22180.22200.22210.21300.21380.21430.21460.21480.21500.21520.20550.20660.20730.2077069、.20790.20820.20840.19820.19960.20040.20090.20120.20150.20180.19110.19270.19370.19430.19470.19520.19550.18430.18620.18730.18800.18850.18900.18950.17790.17990.18120.18200.18250.18320.18380.17170.17390.17530.17630.17690.17770.17840.16580.16820.16980.17080.17150.17250.17330.16020.16280.16450.16570.1664070、.16750.16850.15500.15770.15950.16070.16160.16280.16390.15000.15280.15480.15610.15700.15830.15950.14520.14820.15020.15160.15260.15410.15540.14080.14380.14590.14740.14850.15000.15160.13650.13960.14180.14340.14450.14620.14790.13250.13570.13790.13960.14070.14250.14440.12870.13190.13420.13590.13710.1390071、.14100.12500.12830.13070.13240.13370.13570.13790.12160.12490.12730.12910.13040.13250.13480.11830.12170.12410.12590.12730.12950.13200.11520.11860.12100.12290.12430.12650.12920.11220.11560.11810.12000.12150.12380.12660.10940.11280.11530.11720.11870.12110.12400.10670.11010.11260.11460.11610.11850.1216072、.10410.10750.11010.11200.11360.11610.11930.10160.10500.10760.10960.11110.11370.11710.09930.10270.10530.10730.10880.11140.11490.09700.10040.10300.10500.10660.10920.11290.09490.09820.10080.10280.10440.10710.11090.09280.09620.09870.10080.10230.10510.10900.09080.09420.09670.09880.10040.10310.10710.0889073、.09220.09480.09680.09840.10120.10540.08710.09040.09290.09500.09660.09940.10360.08530.08860.09120.09320.09480.09760.10200.08370.08690.08940.09140.09310.09590.10040.08200.08520.08780.08930.09140.09430.09380.08050.08360.08620.08820.08980.09270.09730.07900.08210.08460.08660.08820.09120.09590.07610.0792074、.08170.08370.08530.08820.09310.07340.07650.07890.08090.08250.08550.09050.07100.07390.07630.07830.07990.08290.08800.06860.07160.07390.07590.07750.08040.08570.06640.06930.07170.07360.07510.07810.08340.06640.06720.06950.07140.07300.07590.08130.06250.06520.06750.06940.07090.07380.07930.06060.06340.0656075、.06740.06900.07190.07740.05730.05990.06210.06390.06540.06820.07390.05430.05680.05890.06070.06210.06490.07070.05160.05400.05610.05770.05920.06190.06770.04920.05150.05350.05510.05650.05920.06500.04690.04920.05110.05270.05400.05670.06250.04220.04420.04600.04750.04870.05120.05700.03830.04020.04180.0432076、.04440.04680.05241267891030.4100.4280.4430.4560.46841.9491.9812.0472.0732.09854.8434.8174.7044.6904.68160.3010.3180.3330.3460.35771.7501.7681.8281.8441.86085.1915.1144.9494.9034.86590.2460.2620.2750.2870.298101.7071.7181.7761.7871.798115.7225.6045.3935.3205.259120.2110.2250.2380.2490.260131.7061.71277、1.7701.7771.783146.2806.1235.8705.7715.689150.1860.1990.2110.2210.231161.7221.7241.7831.7861.789176.8416.6476.3536.2306.128180.1660.1790.1900.2000.209191.7481.7451.8061.8061.806207.4007.1706.8366.6896.568210.1390.1500.1600.1690.177221.8141.8031.8671.8611.85523附录 E 桩基等效沉降系数e 计算参数建筑桩基技术规范JGJ94-2008【5.78、5.7】E.0.1 桩基等效沉降系数应按表 E.0.1-1E.0.1-5 中列出的参数,采用本规范式 5.5.9-1 或 5.5.9-2 计算。Lc/Bc8.5098.2117.7977.6057.446240.1200.1290.1380.1470.154251.8891.8721.9391.9271.916269.6139.2478.7558.5198.323270.1050.1140.1220.1300.137281.9701.9452.0161.9981.9812910.71510.2849.7139.4339.200300.0940.1020.1100.1170.123312.05479、2.0212.0972.0722.0493211.81811.32210.67210.34910.080330.0850.0930.1000.1060.112342.1392.0992.1782.1472.1193512.92512.36411.63511.27010.964360.0780.0850.0910.0970.103372.2252.1772.2612.2232.1893814.03613.41112.60312.19411.853390.0720.0780.0840.0900.095402.3112.2562.3442.2992.2594115.15314.46413.5751380、.12312.745424344451267891030.4680.4860.5020.5160.52842.0982.1442.2182.2562.29054.0074.0143.9383.9443.9486注:Lc 群桩基础承台长度;Bc 群桩基础承台宽度;l 桩长;d 桩径。Lc/Bc0.3460.3640.3800.3940.40671.8011.8281.8911.9131.93584.1934.1584.0384.0174.00090.2850.3020.3170.3300.342101.7231.7411.8011.8171.832114.5594.4964.3404.3004.81、267120.2460.2620.2760.2880.299131.7001.7121.7721.7831.793144.9584.8694.6794.6234.577150.2180.2330.2460.2580.268161.6991.7061.7671.7741.780175.3645.2525.0304.9584.899180.1960.2100.2230.2340.244191.7111.7121.7751.7771.780205.7725.6385.3835.2975.226210.1650.1780.1890.1990.208221.7501.7431.8081.8041.79982、236.5886.4106.0935.9785.883240.1430.1550.1650.1740.182251.8011.7861.8551.8431.832267.4057.1856.8056.6626.543270.1270.1370.1460.1550.163281.8581.8341.9071.8881.870298.2247.9627.5207.3487.206300.1140.1230.1320.1400.147311.9181.8851.9621.9361.911329.0478.7428.2388.0387.871330.1030.1120.1200.1270.13434183、.9791.9382.0191.9851.954359.8749.5278.9598.7318.540360.0950.1030.1100.1170.123372.0411.9912.0762.0361.9983810.70510.3169.6849.4279.211390.0870.0950.1020.1080.114402.1032.0442.1332.0862.0424111.54111.11010.41310.1279.886424344451267891030.5190.5380.5550.5680.58042.2862.3492.4342.4842.53053.4663.4883.84、4333.4473.45760.3840.4030.4190.4330.44571.8701.9061.9722.0002.02783.6123.5973.5003.4903.48290.3170.3350.3510.3640.376101.7571.7811.8431.8631.881113.9043.8663.7363.7123.693120.2750.2910.3060.3190.331131.7131.7301.7911.8051.818144.2254.1694.0093.9733.944150.2440.2600.2740.2860.297161.6981.7081.7701.7785、91.78617注:Lc 群桩基础承台长度;Bc 群桩基础承台宽度;l 桩长;d 桩径。Lc/Bc4.5554.4824.2934.2464.208180.2210.2360.2490.2610.271191.6961.7011.7641.7681.771204.8874.7994.5814.5244.477210.1860.2000.2120.2230.233221.7141.7081.7741.7701.765235.5565.4365.1635.0855.021240.1620.1750.1860.1960.205251.7451.7301.8001.7871.775266.2276.086、775.7495.6505.569270.1440.1560.1660.1750.183281.7831.7581.8321.8111.791296.9026.7216.3386.2196.120300.1300.1400.1500.1580.166311.8241.7891.8671.8391.812327.5807.3696.9296.7896.672330.1180.1280.1370.1450.152341.8661.8221.9041.8681.834358.2628.0207.5247.3627.226360.1080.1170.1260.1330.140371.9091.857187、.9431.8991.858388.9498.6748.1227.9387.782390.1000.1090.1170.1230.130401.9531.8911.9811.9311.883419.6399.3318.7228.5158.33942434445注:Lc 群桩基础承台长度;Bc 群桩基础承台宽度;l 桩长;d 桩径。1267891030.5670.5870.6030.6170.62842.5142.5992.6952.7612.82153.0183.0453.0083.0233.03360.4170.4370.4530.4670.48071.9521.9962.0652.099288、.13183.2063.2013.1203.1163.11290.3450.3640.3790.3930.405101.8001.8291.8931.9161.938113.4653.4423.3293.3143.301120.2990.3170.3320.3450.357131.7351.7551.8181.8341.849143.7453.7083.5663.5423.522150.2670.2830.2980.3100.322161.7051.7171.7811.7911.800174.0313.9823.8123.7803.754180.2410.2570.2710.2830.294189、91.6921.6971.7621.7671.770204.3204.2594.0634.0223.990210.2050.2190.2320.2430.253221.6891.6831.7511.7461.741234.9024.8174.5684.5124.467240.1790.1920.2040.2140.224251.7031.8681.7581.7431.730265.4865.3795.0785.0064.948270.1590.1710.1820.1920.20128Lc/Bc1.7241.6971.7721.7491.727296.0745.9435.5905.5025.4290、9300.1430.1550.1650.1740.182311.7491.7121.7911.7601.730326.6646.5096.1045.9995.911330.1310.1410.1510.1590.167341.7761.7301.8121.7731.737357.2587.0776.6206.4976.393360.1200.1300.1390.1470.154371.8051.7491.8351.7891.745387.8547.6477.1386.9966.876390.1110.1200.1290.1360.143401.8341.7691.8591.8051.7554191、8.4538.2187.6577.4957.358424344451267891030.6130.6330.6490.6630.67442.7892.9023.0213.0993.17952.5812.6032.5862.5962.59960.4490.4680.4850.4990.51172.0442.0962.1692.2102.24782.8862.8872.8182.8172.81590.3710.3900.4060.4190.423101.8481.8821.9491.9751.99911注:Lc 群桩基础承台长度;Bc 群桩基础承台宽度;l 桩长;d 桩径。Lc/Bc3.1393.92、1263.0243.0153.007120.3220.3400.3550.3690.380131.7621.7851.8501.8681.884143.3983.3743.2433.2273.214150.2870.3040.3190.3320.343161.7171.7311.7961.8071.816173.6593.6253.4683.4453.427180.2600.2760.2910.3030.314191.6921.6991.7651.7691.773203.9213.8793.6943.6663.643210.2210.2360.2490.2610.271221.6711.66493、1.7331.7271.721234.4474.3864.1514.1114.078240.1930.2070.2190.2300.240251.6691.6501.7231.7071.691264.9744.8964.6104.5574.514270.1720.1850.1960.2070.216281.6751.6451.7221.6971.672295.5045.4065.0715.0044.948300.1560.1680.1780.1880.196311.6861.6461.7261.6921.660326.0355.9175.5325.4505.382330.1420.1530.194、630.1720.180341.7001.6501.7341.6921.652356.5696.4285.9945.8965.814360.1310.1410.1500.1590.167371.7161.6571.7441.6941.648387.1036.9396.4576.3426.244390.1210.1310.1400.1480.155401.7331.6651.7551.6981.646417.6397.4506.9196.7876.67342434445注:Lc 群桩基础承台长度;Bc 群桩基础承台宽度;l 桩长;d 桩径。钢钢材材和和钢钢铸铸件件的的物物理理性性能能指指标标弹性95、模量 E E(N/mm2)206000剪变模量 G G(N/mm2)79000线膨胀系数(以每 oC 计)12000000质量密度 (kg/m3)7850123456789101112131415161718192021222324252627282930313233343536373839404142434445464748495051525354555657585960123456789101112131415161718192021222324252627282930313233343536373839404142434445464748495051525354555657585960696、16263646566676869707172737475767778798081828384858687888990919293949596979899100951011021031210410510610710810911011111211311411511611711811912012112212312412512612712812913013113213313413513613713813914014114214314414514614714814915015115215315415515615715815916016116216316416516616716816917017117297、173174175176177178179180181182183184185186187188189190191192193194195196197198199200201202203204205206207208209210211212213214215216217218219220221222223地基基础设计规范地基承载力修正系数表(5.2.3-1,2)混凝土材料属性表 qwe地基承载力系数表地基承载力修正系数表jd(0)NgNqNcy0025.140.910.0125.380.9C1520.0125.630.9C2030.0225.90.9C2540.0526.190.9C3050.98、0726.490.9C3560.1126.810.9C4070.1627.160.9C4580.2227.530.9C5090.327.920.9C55100.3928.350.9C60110.52.078.80.9C65120.632.099.280.9C70130.782.129.810.9C75140.972.1510.370.6C80151.182.1810.980.9161.432.2211.630.9171.732.2612.340.965普通热轧钢筋材料属性表 qwe182.082.313.11.03192.482.3513.931.1钢筋材料202.952.414.831.1799、213.52.4615.821.235钢筋种类224.132.5216.881.3HPB235234.882.5818.051.37HRB335245.742.6519.321.44HRB400256.762.7220.721.5RRB400地基基础设计规范桩基端、侧阻力分项系数表(6.2.4-2)分项系数rpgpgs000010.051.082.0920.11.22.1630.151.372.1840.21.612.1350.251.932.0360.32.341.8870.352.831.7380.42.831.7390.452.831.73注:L一基础长度(m);b一基础宽度(m);z一100、计算点离基础底面竖向距离(m)。附录D天然地基沉降计算系数表表D-1 矩形基础中心应力系数 a12z/bL/b1.01.21.41.61.82.00.01.0001.0001.0001.0001.0001.0000.20.9940.9950.9960.9960.9960.9970.40.9600.9680.9720.9740.9750.9760.60.8920.9100.9200.9260.9300.9320.80.8000.8300.8480.8590.8660.8701.00.7010.7400.7660.7820.7930.8001.20.6060.6510.6820.7030.7170101、.7271.40.5220.5690.6030.6280.6450.6581.60.4490.4960.5320.5580.5780.5931.80.3880.4330.4690.4960.5170.5342.00.3360.3790.4140.4410.4630.4812.20.2930.3330.3660.3930.4160.4332.40.2570.2940.3250.3520.3740.3922.60.2260.2600.2900.3150.3370.3552.80.2010.2320.2600.2840.3040.3223.00.1790.2080.2330.2560.2760.29102、33.20.1600.1870.2100.2320.2510.2673.40.1440.1690.1910.2110.2290.2443.60.1310.1530.1730.1920.2090.2243.80.1190.1390.1580.1760.1920.2064.00.1080.1270.1450.1610.1760.1904.20.0990.1160.1330.1480.1630.1764.40.0910.1070.1230.1370.1500.1634.60.0840.0990.1130.1270.1390.1514.80.0770.0910.1050.1180.1300.1415.103、00.0720.0850.0970.1090.1210.1316.00.0510.0600.0700.0780.0870.0957.00.0380.0450.0520.0590.0650.0728.00.0290.0350.0400.0460.0510.0569.00.0230.0280.0320.0360.0410.04510.00.0190.0220.0260.0300.0330.03712.00.0130.0160.0180.0210.0230.02614.00.0100.0120.0130.0150.0170.01916.00.0070.0090.0100.0120.0130.0151104、8.00.0060.0070.0080.0090.0100.01220.00.0050.0060.0070.0080.0090.00925.00.0030.0040.0040.0050.0050.00630.00.0020.0030.0030.0030.0040.00435.00.0020.0020.0020.0020.0030.00340.00.0010.0010.0020.0020.0020.002注:L一基础长度(m);b一基础宽度(m);z一计算点离基础底面竖向距离(m)。表D-2矩形基础中心沉降系数 d12z/bL/b1.01.21.41.61.82.00.00.0000.0000.105、0000.0000.0000.0000.20.1000.1000.1000.1000.1000.1000.40.1970.1980.1980.1980.1980.1980.60.2900.2920.2930.2930.2940.2940.80.3750.3790.3810.3830.3830.3831.00.4500.4570.4620.4650.4660.4671.20.5150.5270.5340.5390.5420.5441.40.5710.5880.5990.6050.6100.6131.60.6200.6410.6550.6650.6710.6761.80.6620.6880.705106、0.7170.7260.7322.00.6980.7280.7490.7640.7750.7832.20.7290.7640.7880.8060.8190.8282.40.7570.7950.8230.8430.8580.8702.60.7810.8230.8540.8770.8940.9072.80.8020.8480.8810.9070.9260.9403.00.8200.8700.9060.9330.9550.9703.20.8380.8890.9230.9580.9810.9993.40.8540.9070.9480.9801.0051.0253.60.8670.9230.9661.0107、001.0271.0483.80.8800.9380.9831.0191.0471.0704.00.8910.9510.9981.0351.0651.0904.20.9020.9631.0121.0511.0821.1084.40.9110.9741.0251.0651.0981.1254.60.9200.9851.0361.0781.1131.1414.80.9280.9941.0471.0911.1261.1555.00.9351.0031.0571.1021.1381.1696.00.9661.0391.0991.1491.1901.2257.00.9881.0651.1301.1831108、.2281.2678.01.0051.0851.1531.2091.2581.2999.01.0181.1011.1711.2301.2801.32410.01.0281.1131.1851.2461.2991.34512.01.0441.1331.2071.2711.3271.37614.01.0551.1461.2231.2901.3471.40016.01.0641.1531.2351.3031.3631.41518.01.0711.1641.2441.3141.3751.42920.01.0761.1711.2521.3221.3841.43925.01.0861.1821.2651.109、3381.4021.45830.01.0921.1901.2741.3481.4131.47135.01.0971.1961.2811.3551.4211.48140.01.1001.2001.2861.3611.4281.487注:L一基础长度(m);b一基础宽度(m);z一计算点离基础底面竖向距离(m)。表D-3矩形基础角点应力系数 a2z/bL/b1.01.21.41.61.82.00.00.2500.2500.2500.2500.2500.2500.20.2490.2490.2490.2490.2490.2490.40.2400.2420.2430.2430.2440.2440.60.110、2230.2280.2300.2320.2320.2330.80.2000.2070.2120.2150.2160.2181.00.1750.1850.1910.1950.1980.2001.20.1520.1630.1710.1760.1790.1821.40.1310.1420.1510.1570.1610.1641.60.1120.1240.1330.1400.1450.1481.80.0970.1080.1170.1240.1290.1332.00.0840.0950.1030.1100.1160.1202.20.0730.0830.0920.0980.1040.1082.40.064111、0.0730.0810.0880.0930.0982.60.0570.0650.0720.0790.0840.0892.80.0500.0580.0650.0710.0760.0803.00.0450.0520.0580.0640.0690.0733.20.0400.0470.0530.0580.0630.0673.40.0360.0420.0480.0530.0570.0613.60.0330.0380.0430.0480.0520.0563.80.0300.0350.0400.0440.0480.0524.00.0270.0320.0360.0400.0440.0484.20.0250.0112、290.0330.0370.0410.0444.40.0230.0270.0310.0340.0380.0414.60.0210.0250.0280.0320.0350.0384.80.0190.0230.0260.0290.0320.0355.00.0180.0210.0240.0270.0300.0336.00.0130.0150.0170.0200.0220.0247.00.0090.0110.0130.0150.0160.0188.00.0070.0090.0100.0110.0130.0149.00.0060.0070.0080.0090.0100.01110.00.0050.006113、0.0070.0070.0080.00912.00.0030.0040.0050.0050.0060.00614.00.0020.0030.0030.0040.0040.00516.00.0020.0020.0030.0030.0030.00418.00.0010.0020.0020.0020.0030.00320.00.0010.0010.0020.0020.0020.00225.00.0010.0010.0010.0010.0010.00230.00.0010.0010.0010.0010.0010.00135.00.0000.0000.0010.0010.0010.00149.00.00114、00.0000.0000.0000.0010.001注:L一基础长度(m);b一基础宽度(m);z一计算点离基础底面竖向距离(m)。表D-4矩形基础角点沉降系数 d2Z/bL/b1.01.21.41.61.82.00.00.0000.0000.0000.0000.0000.0000.20.0500.0500.0500.0500.0500.0500.40.0990.0990.0990.0990.0990.0990.60.1450.1460.1460.1470.1470.1470.80.1870.1890.1910.1910.1920.1921.00.2250.2290.2310.2320.233115、0.2341.20.2580.2630.2670.2690.2710.2721.40.2860.2940.2990.3030.3050.3071.60.3100.3210.3280.3320.3360.3381.80.3310.3440.3530.3590.3630.3662.00.3500.3640.3750.3820.3870.3912.20.3650.3820.3940.4030.4090.4142.40.3780.3980.4110.4220.4290.4352.60.3910.4110.4270.4380.4470.4532.80.4010.4240.4410.4530.4630.4116、703.00.4110.4350.4530.4670.4770.4863.20.4190.4450.4640.4790.4910.5003.40.4270.4530.4740.4900.5030.5133.60.4340.4620.4830.5000.5130.5243.80.4400.4690.4910.5090.5240.5354.00.4460.4750.4990.5180.5330.5454.20.4510.4820.5060.5250.5410.5544.40.4560.4870.5120.5330.5490.5634.60.4660.4920.5180.5390.5560.5704117、.80.4640.4970.5240.5450.5630.578Z/b5.00.4680.5010.5290.5510.5690.5846.00.4830.5200.5500.5740.5950.6137.00.4940.5330.5650.5920.6140.6348.00.5020.5430.5760.6050.6290.6509.00.5090.5500.5850.6150.6400.66210.00.5140.5570.5930.6230.6500.67212.00.5220.5660.6040.6360.6640.68814.00.5280.5730.6120.6450.6740.6118、9916.00.5320.5780.6180.6520.6820.70818.00.5350.5830.6220.6570.6870.71420.00.5380.5860.6260.6610.6920.72025.00.5430.5920.6330.6690.7010.72930.00.5460.5960.6370.6740.7070.73635.00.5480.5990.6400.6780.7110.74040.00.5500.6010.6430.6800.7140.744表D-5圆形基础中心应力系数 a3 和沉降系数 d32Z/Da3d30.01.0000.0000.20.9920.100119、0.40.9490.1970.60.8640.2870.80.7560.3681.00.6460.4381.20.5470.4981.40.4610.5481.60.3900.5911.80.3320.6272.00.2840.6582.20.2460.6842.40.2130.7072.60.1870.7272.80.1650.7453.00.1460.7613.20.1300.7743.40.1170.7873.60.1060.7983.80.0960.8084.00.0870.8174.20.0790.8254.40.0730.8334.60.0670.8404.80.0620.8465120、.00.0570.8526.00.0400.8777.00.0300.8948.00.0230.9079.00.0180.91810.00.0150.92612.00.0100.93914.00.0080.94816.00.0060.95518.00.0050.96020.00.0040.964注:0一圆形基础直径(m);Z计算点离基础底面竖向距离(m)。表D-8无限长线荷载应力系数a6x/za60.050.3170.100.3120.150.3040.200.2940.250.2820.300.2680.350.2530.400.2370.450.2200.500.2040.550.1880121、.600.1720.650.1570.700.1430.750.1300.800.1180.850.1070.900.0970.950.0881.000.0801.050.0721.100.0651.150.0591.200.0531.250.0481.300.0441.350.0401.400.0361.450.0331.500.0301.550.0271.600.0251.650.0231.700.0211.750.0191.800.0181.850.0161.900.0151.950.0142.000.0132.050.0122.100.0112.150.0102.200.0092.25122、0.0092.300.0082.350.0072.400.0072.450.0062.500.0062.550.0062.600.0052.650.0052.700.0052.750.0042.800.0042.850.0042.900.0042.950.0033.000.0033.050.0033.100.0033.150.0033.200.0033.250.0023.300.0023.350.0023.400.0023.450.0023.500.0023.550.0023.600.0023.650.0023.700.0013.750.0013.800.0013.850.0013.900.0123、013.950.0014.000.001表D一7有限长线荷载应力系数a5x/zY /Z0.020.040.060.080.100.140.10.0090.0190.0280.0370.0460.0640.20.0090.0170.0260.0340.0430.060.30.0080.0150.0230.0310.0380.0530.40.0070.0130.020.0260.0330.0450.50.0050.0110.0160.0220.0270.0380.60.0040.0090.0130.0180.0220.0310.70.0040.0070.0110.0140.0180.0240.80124、.0030.0060.0080.0110.0140.0190.90.0020.0040.0060.0090.0110.0151.00.0020.0030.0050.0070.0080.0121.10.0010.0030.0040.0050.0070.0091.20.0010.0020.0030.0040.0050.0071.30.0010.0020.0020.0030.0040.0061.40.0010.0010.0020.0030.0030.0041.50.0010.0010.0020.0020.0030.0031.60.0010.0010.0020.0020.0031.70.0010.00125、10.0010.0020.0021.80.0010.0010.0010.0010.0021.90.0010.0010.0010.0012.00.0010.0010.0010.0012.10.0010.0010.0012.20.0010.0012.30.0012.40.0012.52.62.72.82.93.0混凝土强度等级(N/mm2)混凝土弹性模量(N/mm2)强度标准值强度设计值拉压模量疲劳模量fckftkfcftEcEfc101.277.20.912.20E+0413.41.549.61.12.55E+041.10E+0416.71.7811.91.272.80E+041.20E+042126、0.12.0114.31.433.00E+041.30E+0423.42.216.71.573.15E+041.40E+0426.82.3919.11.713.25E+041.50E+0429.62.5121.11.83.35E+041.55E+0432.42.6423.11.893.45E+041.60E+0435.52.7425.31.963.55E+041.65E+0438.52.8527.52.043.60E+041.70E+0441.52.9329.72.093.65E+041.75E+0444.52.9931.82.143.70E+041.80E+0447.43.0533.82.1127、83.75E+041.85E+0450.23.1135.92.223.80E+041.90E+04钢筋强度等级(N/mm2)钢筋弹性模量强度标准值 强度设计值d (mm)fykfyEs混凝土材料属性表 qwe普通热轧钢筋材料属性表 qwe钢筋材料钢筋种类Q2358202352102.10E+0520MnSi6503353002.00E+0520MnSiV6504003602.00E+05K20MnSi8404003602.00E+05工作表密码:qweA B C D E F G H I J K L M N O P Q R S T U V W X Y Za b c d e f g h I j k128、 l m n o p q r s t u v w x y z3.04.05.06.010.0 条形 1.0001.0001.0001.0001.0001.000z一计算点离基础底面竖向距离(m)。天然地基沉降计算系数表L/b0.9970.9970.9970.9970.9970.9970.9770.9770.9770.9770.9770.9770.9360.9360.9370.9370.9370.9370.8780.8800.8810.8810.8810.8810.8140.8170.8180.8180.8180.8180.7480.7530.7540.7550.7550.7560.6850.6129、920.6940.6950.6960.6960.6270.6360.6390.6400.6420.6420.5730.5850.5900.5910.5930.5930.5250.5400.5450.5470.5490.5500.4820.4990.5050.5080.5110.5110.4430.4620.4700.4730.4770.4770.4080.4290.4380.4420.4460.4470.3770.4000.4100.4140.4190.4200.3480.3730.3840.3890.3950.3960.3220.3480.3600.3660.3730.3740.2990.3130、260.3390.3450.3530.3540.2780.3050.3190.3270.3350.3370.2590.2870.3010.3090.3180.3200.2410.2690.2850.2930.3030.3050.2250.2540.2700.2780.2900.2920.2110.2390.2550.2650.2770.2800.1970.2260.2420.2520.2650.2680.1850.2130.2300.2400.2540.2580.1740.2020.2190.2290.2440.2480.1300.1550.1720.1840.2020.2080.1000.1131、220.1390.1500.1710.1790.0790.9800.1130.1250.1470.1580.0640.0810.0940.1050.1280.1400.0530.0670.0790.0890.1120.1260.0380.0480.0580.0660.0880.1060.0280.0360.0440.0510.0700.0910.0220.0280.0340.0400.0570.0790.0170.0230.0280.0320.0470.0710.0140.0180.0230.0270.0400.0640.0090.0120.0150.0170.0270.0510.0060.0132、080.0100.0120.0190.0420.0050.0060.0080.0090.0150.0370.0040.0050.0060.0070.0110.0323.04.05.06.010.0条形0.0000.0000.0000.0000.0000.0000.1000.1000.1000.1000.1000.1000.1990.1990.1990.1990.1990.1990.2940.2940.2940.2940.2940.2940.3840.3850.3850.3850.3850.3850.4690.4700.4700.4700.4700.4700.5480.5480.5490.549133、0.5490.5490.6190.6200.6210.6200.6210.6210.6850.6870.6880.6880.6880.688z一计算点离基础底面竖向距离(m)。L/b0.7450.7480.7490.7500.7500.7500.8000.8040.8060.8060.8070.8070.8500.8560.8580.8590.8600.8600.8960.9040.9070.9080.9090.9100.9390.9490.9530.9540.9560.9560.9780.9900.9950.9970.9990.9991.0141.0291.0351.0371.0401.04134、01.0481.0651.0721.0751.0781.0791.0791.0991.1071.1101.1141.1151.1081.1301.1401.1441.1491.1491.1351.1601.1711.1761.1811.1821.1601.1881.2001.2061.2121.2141.1831.2141.2281.2351.2421.2441.2051.2381.2541.2621.2701.2721.2251.2621.2791.2881.2971.3001.2441.2841.3021.3121.3231.3261.2621.3041.3251.3361.3481.35135、11.3381.3941.4231.4391.4601.4651.3961.4631.5011.5231.5531.5621.4411.5181.5641.5911.6331.6461.4771.5631.6151.6491.7011.7211.5061.6001.6591.6971.7611.7881.5511.6581.7271.7741.8611.9041.5841.7001.7781.8331.9402.0021.6091.7321.8171.8782.0032.0871.6281.7581.8481.9142.0552.1621.6441.7781.8731.9442.0992.22136、91.6731.8161.9201.9992.1832.3721.6921.8421.9522.0362.2412.4881.7061.8601.9742.0632.2832.5871.7161.8731.9912.0832.3162.6723.04.05.06.010.0条形0.2500.2500.2500.2500.2500.2500.2490.2490.2490.2490.2490.2490.2440.2440.2440.2440.2440.2440.2340.2340.2340.2340.2340.2340.2200.2200.2200.2200.2200.2200.2030.2040137、.2040.2040.2040.2040.1870.1880.1890.1890.1890.1890.1710.1730.1740.1740.1740.1740.1570.1590.1600.1600.1600.1600.1430.1460.1470.1480.1480.1480.1310.1350.1360.1370.1370.1370.1210.1250.1260.1270.1280.1280.1110.1160.1180.1180.1190.1190.1020.1070.1100.1110.1120.1120.0940.1000.1020.1040.1050.1050.0870.0930138、.0960.0970.0990.0990.0810.0870.0900.0920.0930.094z一计算点离基础底面竖向距离(m)。L/b0.0750.0810.0850.0860.0880.0890.0690.0760.0800.0820.0840.0840.0650.0720.0750.0770.0800.0800.0600.0670.0710.0730.0760.0760.0560.0630.0670.0700.0720.0730.0530.0600.0640.0660.0690.0700.0490.0560.0610.0630.0660.0670.0460.0530.0580.060139、0.0640.0640.0430.0500.0550.0570.0610.0620.0330.0390.0430.0460.0510.0520.0250.0310.0350.0380.0430.0450.0200.0250.0280.0310.0370.0390.0160.0200.0240.0260.0320.0350.0130.0170.0200.0220.0280.0320.0090.0120.0140.0170.0220.0260.0070.0090.0110.0130.0180.0230.0050.0070.0090.0100.0140.0200.0040.0060.0070.008140、0.0120.0180.0040.0050.0060.0070.0100.0160.0020.0030.0040.0040.0070.0130.0020.0020.0030.0030.0050.0110.0010.0020.0020.0020.0040.0090.0010.0010.0010.0020.0030.008z一计算点离基础底面竖向距离(m)。L/b3.04.05.06.010.0条形0.0000.0000.0000.0000.0000.0000.0500.0500.0500.0500.0500.0500.0990.0990.0990.0990.0990.0990.1470.1470141、.1470.1470.1470.1470.1920.1930.1930.1930.1930.1930.2350.2350.2350.2350.2350.2350.2740.2740.2740.2740.2740.2740.3100.3100.3110.3110.3110.3110.3420.3430.3440.3440.3440.3440.3720.3740.3750.3750.3750.3750.4000.4020.4030.4030.4040.4040.4250.4280.4290.4300.4300.4300.4480.4520.4540.4540.4550.4550.4690.4740142、.4760.4770.4780.4780.4890.4950.4970.4980.4990.5000.5080.5140.5170.5190.5200.5200.5240.5820.5360.5370.5390.5390.5390.5490.5530.5550.5570.5570.5540.5650.5700.5720.5740.5750.5670.5800.5850.5880.5910.5910.5800.5940.6000.6030.6060.6070.5910.6070.6140.6170.6210.6220.6020.6190.6270.6310.6350.6360.6130.6310143、.6390.6440.6490.6500.6220.6420.6510.6560.6620.6630.6310.6520.6620.6680.6740.6760.6690.6970.7110.7190.7300.7330.6980.7310.7500.7610.7770.7810.7200.7590.7820.7960.8160.8230.7380.7810.8080.8240.8510.8600.7530.8000.8290.8480.8810.8940.7760.8290.6000.8870.9300.9520.7920.8500.8890.9160.9701.0010.8040.8660144、.9090.9381.0021.0430.8140.8790.9240.9561.0281.0810.8220.8890.9370.9711.0501.1140.8360.9080.9600.9991.0911.1860.8460.9210.9761.0171.1201.2440.8530.9300.9871.0311.1421.2930.8580.9370.9961.0411.1581.336表D-6集中荷载应力系数 a4r/za40.000.4780.010.4770.020.4770.030.4760.040.4760.050.4750.060.4730.070.4720.080.470145、0.090.4680.100.4660.110.4630.120.4610.130.4580.140.4550.150.4520.160.4480.170.4450.180.4410.190.4370.200.4330.210.4290.220.4240.230.4200.240.4150.250.4100.260.4050.270.4000.280.3950.290.3900.300.3850.310.3800.320.3740.330.3690.340.3630.350.3580.360.3520.370.3470.380.3410.390.3350.400.3290.410.3240.4146、20.3180.430.3120.440.3070.450.3010.460.2960.470.2900.480.2840.490.2790.500.2730.510.2680.520.2630.530.2570.540.2520.550.2470.560.2410.570.2360.580.2310.590.2260.600.2210.610.2170.620.2120.630.2070.640.2020.650.1980.660.1930.670.1890.680.1850.690.1800.700.1760.710.1720.720.1680.730.1640.740.1600.750.147、1570.760.1530.770.1490.780.1460.790.1420.800.1390.810.1350.820.1320.830.1290.840.1260.850.1230.860.1200.870.1170.880.1140.890.1110.900.1080.910.1060.920.1030.930.1010.940.0980.950.0960.960.0930.970.0910.980.0890.990.0871.000.0841.010.0821.020.0801.030.0781.040.0761.050.0741.060.0731.070.0711.080.069148、1.090.0671.100.0661.110.0641.120.0631.130.0611.140.0601.150.0581.160.0571.170.0551.180.0541.190.0531.200.0511.210.0501.220.0491.230.0481.240.0471.250.0451.260.0441.270.0431.280.0421.290.0411.300.0401.310.0391.320.0381.330.0371.340.0371.350.0361.360.0351.370.0341.380.0331.390.0321.400.0321.410.0311.4149、20.0301.430.0301.440.0291.450.0281.460.0281.470.0271.480.0261.490.0261.500.0251.510.0251.520.0241.530.0231.540.0231.550.0221.560.0221.570.0211.580.0211.590.0201.600.0201.610.0201.620.0191.630.0191.640.0181.650.0181.660.0181.670.0171.680.0171.690.0161.700.0161.710.0161.720.0151.730.0151.740.0151.750.150、0141.760.0141.770.0141.780.0141.790.0131.800.0131.810.0131.820.0121.830.0121.840.0121.850.0121.860.0111.870.0111.880.0111.890.0111.900.0111.910.0101.920.0101.930.0101.940.0101.950.0101.960.0091.970.0091.980.0091.990.0092.000.0092.010.0082.020.0082.030.0082.040.0082.050.0082.060.0082.070.0082.080.007151、2.090.0072.100.0072.110.0072.120.0072.130.0072.140.0072.150.0062.160.0062.170.0062.180.0062.190.0062.200.0062.210.0062.220.0062.230.0062.240.0052.250.0052.260.0052.270.0052.280.0052.290.0052.300.0052.310.0052.320.0052.330.0052.340.0052.350.0042.360.0042.370.0042.380.0042.390.0042.400.0042.500.0032.6152、00.0032.700.0022.800.0022.900.0023.000.0023.200.0013.400.0013.600.0013.800.0014.000.0000.180.220.260.300.400.50.600.0820.0990.1150.130.1650.1950.2190.0760.0920.1070.1210.1540.1820.2050.0680.0820.0950.1080.1380.1630.1840.0580.070.0820.0930.1190.1410.1590.0480.0580.0680.0770.0990.1180.1340.0390.0470.0153、550.0630.0810.0960.110.0310.0380.0440.050.0650.0780.0890.0250.030.0350.040.0510.0620.0710.0190.02.30.0270.0310.040.0490.0560.0150.0180.0210.0240.0320.0380.0440.0120.0140.0170.0190.0250.030.0350.0090.0110.0130.0150.0190.0240.0280.0070.0090.010.0120.0150.0190.0220.0060.0070.0080.0090.0120.0150.0170.00154、40.0050.0060.0070.010.0120.0140.0040.0040.0050.0060.0080.0090.0110.0030.0030.0040.0050.0060.0080.0090.0020.0030.0030.0040.0050.0060.0070.0020.0020.0030.0030.0040.0050.0060.0020.0020.0020.0030.0030.0040.0050.0010.0020.0020.0020.0030.0030.0040.0010.0010.0010.0020.0020.0030.0030.0010.0010.0010.0010.002155、0.0020.0030.0010.0010.0010.0010.0020.0020.0020.0010.0010.0010.0010.0010.0020.0020.0010.0010.0010.0010.0010.0010.0020.0010.0010.0010.0010.0010.0010.0010.0010.0010.0010.0010.0010.0010.0010.0010.0010.0010.001预应力混凝土管桩技术标准JGJ/T 406-2017第 5.2.1 条0.700.800.901.001.502.000.2380.2540.2660.2750.2990.3070.2230156、.2380.2490.2590.2820.2890.2010.2140.2250.2340.2560.2630.1740.1870.1960.2040.2250.2320.1470.1580.1670.1740.1930.1990.1210.130.1380.1440.1610.1680.0980.1060.1130.1180.1330.1390.0790.0850.0910.0950.1090.1140.0620.0680.0730.0770.0880.0930.0490.0540.0580.0610.0720.0760.0390.0430.0460.0490.0580.0620.0310.157、0340.0370.0390.0470.05Y /Z0.0250.0270.0290.0310.0380.0410.020.0220.0230.0250.0310.0330.0160.0170.0190.020.0250.0270.0130.0140.0150.0160.020.0230.010.0110.0120.0130.0170.0190.0080.0090.010.0110.0140.0160.0070.0080.0080.0090.0110.0130.0060.0060.0070.0070.010.0110.0050.0050.0060.0060.0080.0090.0040.004158、0.0050.0050.0070.0080.0030.0040.0040.0040.0060.0070.0030.0030.0030.0040.0050.0060.0020.0030.0030.0030.0040.0050.0020.0020.0020.0030.0030.0040.0020.0020.0020.0020.0030.0040.0010.0020.0020.0020.0030.0030.0010.0010.0010.0020.0020.0030.0010.0010.0010.0020.0020.0022.503.004.005.0010.000.310.3110.3120.312159、0.3120.2920.2930.2940.2940.2940.2660.2670.2670.2680.2680.2340.2350.2360.2360.2370.2010.2030.2030.2040.2040.170.1710.1720.1720.1720.1410.1420.1430.1430.1430.1160.1170.1180.1180.1180.0950.0960.0970.0970.0970.0780.0790.0790.0790.080.0630.0640.0650.0650.0650.0520.0520.0530.0530.0530.0420.0430.0440.0440.160、0440.0350.0350.0360.0360.0360.0290.0290.030.030.030.0240.0240.0250.0250.0250.020.020.0210.0210.0210.0160.0170.0170.0180.0180.0140.0140.0150.0150.0150.0120.0120.0120.0130.0130.010.010.0110.0110.0110.0080.0090.0090.0090.0090.0070.0070.0080.0080.0080.0060.0060.0070.0070.0070.0050.0060.0060.0060.0060.0050.0050.0050.0050.0050.0040.0040.0040.0050.0050.0030.0040.0040.0040.0040.0030.0030.0030.0030.0040.0030.0030.0030.0030.003
会员尊享权益 会员尊享权益 会员尊享权益
500万份文档
500万份文档 免费下载
10万资源包
10万资源包 一键下载
4万份资料
4万份资料 打包下载
24小时客服
24小时客服 会员专属
开通 VIP
升级会员
  • 周热门排行

  • 月热门排行

  • 季热门排行

  1. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  2. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  3. 陕西化学工业公司招聘管理与职业发展管理手册30页.doc
  4. 动火作业安全告知卡(1页).docx
  5. 高处作业安全告知卡(1页).docx
  6. 广场工程建设项目施工招标评标报告表格(24页).pdf
  7. 原油码头消防工程维保方案(39页).docx
  8. 建筑工程外脚手架专项施工方案(悬挑式脚手架、落地式脚手架)(25页).doc
  9. 2020柏向堂房地产公司材料标准化手册3.0(143页).pdf
  10. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  11. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  12. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  13. 房地产开发贷款实操指南(5页).pdf
  14. 学校宿舍楼建设工程施工方案【153页】.docx
  15. 住宅小区工程施工方案【234页】.docx
  16. 鄂尔多斯空港物流园区总体规划方案(2017-2030)环境影响评价报告书(23页).doc
  17. 规划兰园西路道路工程环境方案环境影响评价报告书(89页).pdf
  18. 屋面圆弧形穹顶结构高支模施工方案(40米)(47页).doc
  19. 埋石混凝土挡土墙施工方案(23页).doc
  20. 重庆市五小水利工程建设规划报告(64页).doc
  21. 厂区至矿区管网蒸汽管道系统扩容改造工程施工组织设计方案(105页).doc
  22. 超高纯氦气厂建设项目办公楼、变电站、水泵房及消防水池、门卫、厂房、仓库、配套工程施工组织设计方案(140页).doc
  1. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  2. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  3. 2024大楼室内精装修工程专业分包投标文件(393页).docx
  4. 苏州水秀天地商业项目购物中心100%室内设计方案(158页).pptx
  5. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  6. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  7. 室内移动式操作平台工程施工方案(19页).doc
  8. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  9. 矿山治理工程施工组织设计方案(240页).docx
  10. 老旧小区改造工程施工方案及技术措施(364页).doc
  11. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  12. 川主寺城镇风貌整治景观规划设计方案(60页).pdf
  13. 建筑工程三级安全教育内容(24页).doc
  14. 新疆风电十三间房二期工程49.5mw风电项目可行性研究报告(附表)(239页).pdf
  15. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  16. 四川凉山攀西灵山国际度假区小镇活力中心商业业态规划方案建议书(33页).pdf
  17. 埋石混凝土挡土墙施工方案(23页).doc
  18. 地下停车场环氧地坪漆施工方案(45页).doc
  19. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  20. 住宅定价策略及价格表制定培训课件.ppt
  21. 西安名京九合院商业项目招商手册(28页).pdf
  22. 2010-2030年湖北咸宁市城市总体规划(32页).doc
  1. 建筑工程夜间施工专项施工方案(18页).doc
  2. 赣州无动力亲子乐园景观设计方案(111页).pdf
  3. 2016泰安乡村旅游规划建设示范案例(165页).pdf
  4. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  5. 龙山县里耶文化生态景区里耶古城片区旅游修建性详细规划2015奇创.pdf
  6. 连云港市土地利用总体规划2006-2020年调整方案文本图集(78页).pdf
  7. 850亩项目塑钢门窗工程施工组织设计方案(34页).doc
  8. 老旧小区改造工程施工方案及技术措施(364页).doc
  9. 城市更新项目地价公式测算表.xlsx
  10. 房地产项目规划前期投资收益测算模板带公式.xls
  11. 存储器基地项目及配套设施建筑工程临时用水施工方案(40页).docx
  12. 铁路客运枢纽项目站前框构中桥工程路基注浆加固专项施工方案(19页).doc
  13. 室内移动式操作平台工程施工方案(19页).doc
  14. 装配式结构工业厂房基础、主体结构、门窗及装饰工程施工方案(83页).doc
  15. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  16. 施工工程安全教育培训技术交底(13页).doc
  17. 老旧小区改造施工方案及技术措施(365页).doc
  18. 新建贵广铁路线下工程沉降变形观测及评估监理实施细则(126页).doc
  19. 消防火灾应急疏散演练预案(12页).doc
  20. 矿山治理工程施工组织设计方案(240页).docx
  21. 崖城站悬臂式挡墙施工方案(92页).doc
  22. 北京科技园公寓建设项目整体报告方案.ppt