2018博地影秀城互动装置艺术展主题活动策划方案(56页).pptx
下载文档
上传人:十二
编号:900522
2024-03-13
56页
8.35MB
1、Vivid lifeInshow,12/1 Nov-Jan,主题活动概念案,VIVID INSHOW 互动装置艺术展,灵动影秀,At the beginning of heaven and earth,The appearance of light,The form,color and life that endow all things.Everything has light.In the nothingness of the reach,To re-think history,memory and soul,Looking for the real world behind the li2、ght source.,万物伊始,世本无界,到处是 混沌/无形/无序,于是 黑白明暗交界,生成“日与夜”,At the beginning of heaven and earth,The appearance of light,The form,color and life that endow all things.Everything has light.In the nothingness of the reach,To re-think history,memory and soul,Looking for the real world behind the light source.3、,万物 被赋予具象的形态和色彩,“样式与形态”,At the beginning of heaven and earth,The appearance of light,The form,color and life that endow all things.Everything has light.In the nothingness of the reach,To re-think history,memory and soul,Looking for the real world behind the light source.,生成 一切生灵所需养分和能力,“生命之光”,At the4、 beginning of heaven and earth,The appearance of light,The form,color and life that endow all things.Everything has light.In the nothingness of the reach,To re-think history,memory and soul,Looking for the real world behind the light source.,生命之光,于是 万物生长,生灵复苏,“孕育自然”,At the beginning of heaven and ea5、rth,The appearance of light,The form,color and life that endow all things.Everything has light.In the nothingness of the reach,To re-think history,memory and soul,Looking for the real world behind the light source.,At the beginning of heaven and earth,The appearance of light,The form,color and life 6、that endow all things.Everything has light.In the nothingness of the reach,To re-think history,memory and soul,Looking for the real world behind the light source.,光,孕育生命,生命之美,源于自然,VIVID Inshow Interactive Installation Art,Vivid lifeInshow,视觉方向,Visival Identification,造景营造,Project Design,光,承载生命,生命,创造光7、,互动Interactive,展示Show,场景一 外广场中庭,场景二 内广场小中庭,场景三 内广场中庭,场景革命,主景观装置艺术Interactive Installation,生命之光/场景一“Lights of Life”,灵动影秀,示意图,节日Countdown,动态视频效果,圣诞表白墙/促销信息播放,夜晚灯光秀,中庭艺术装置流程拟Vivid Christmas Tree Rundown,10:00 动态素材10:30 商场促销信息11:00 来宾互动12:00 商场促销信息(餐饮类)13:00 动态素材13:30 来宾互动14:30 商场促销信息(服装/母婴/培训机构等)15:30 来宾互动16:30 商场促销信息(餐饮类)18:00 来宾互动19:00 商场促销信息(服装/母婴/培训机构等)19:30 灯光秀(5首曲子)20:00 表白墙/心愿墙20:30 灯光秀(5首曲子)21:00 动态素材,灵动影秀,互动类场景体验社交/互动/科技,生命之光/场景二“Lights of Life”,灵动影秀,设 计理 念,实景图示,感谢聆听,Thanks,2018/12-2019/1,