高速公路工程6m跨径箱涵钢筋构造图计算表格.xls
下载文档
上传人:Le****97
编号:821113
2023-11-23
368页
529KB
该文档所属资源包:
高速公路工程标准化桥涵计算数量通用表格EXCEL全套资料
1、低填土构造净高顶底板厚1净跨侧墙厚1倒角300606005025高填土构造顶底板厚2侧墙厚27060主筋边距组合间距斜布区组合间距6.51012.5低填土1#重合段1R13#弯钩1272025高填土1#重合段2R23#弯钩2302027.5正涵身材料数量表(适用于填土0.53.5)(每10m)钢筋编号直径(mm)每根长度(cm)根数共长(m)1&221103.82022229.686653.4463442&1211681962289.284472.6011853&227422021498.841823.8719854&18452202913.04353.29673655&121972023972、.94298.77784936&1283.3404336.532214.9345577&1278.931622494.82528.19788678&1268.7866594.942032.4550269&22561.8101567.421693.19902钢筋合计(kg)&12:5427.7&16:0.020070.820070.78059&18:1823.9&22:12819.2C35混凝土合计(m3)115.25斜布钢筋尺寸计算表(cm),适用于填土0.53.540456.8钢筋尺寸aiLi钢筋编号1xi (i=1,2,3.)Bi-40ai+456.82xi(平均)1/2(L1+L2)ai3、+843xi (i=1,2,3.)Bi+4ai+506876.2522)25.6(687i截面面积1(cm2)115250斜涵端部长度及一端斜布筋组合片数,填土厚度:0.53.5截面面积2(cm2)斜交角度()5101520138050L2=700tan(cm)61.2123.4187.6254.8L1=2700tan(cm)122.5246.9375.1509.6组合片数n8182839填土高度0.53.5miBiai(1x)Li(1x)ai(3x)1687.0647.01103.8691.02687.1647.11103.9691.13687.3647.31104.1691.34687.54、647.51104.3691.55687.7647.71104.5691.76688.0648.01104.8692.07688.4648.41105.2692.48688.8648.81105.6692.89689.3649.31106.1693.310689.8649.81106.6693.811690.4650.41107.2694.412691.1651.11107.9695.113691.8651.81108.6695.814692.5652.51109.3696.515693.4653.41110.2697.416694.2654.21111.0698.217695.2655.215、112.0699.218696.2656.21113.0700.219697.2657.21114.0701.220698.3658.31115.1702.321699.4659.41116.2703.422700.6660.61117.4704.623701.9661.91118.7705.924703.2663.21120.0707.225704.5664.51121.3708.526706.0666.01122.8710.027707.4667.41124.2711.428708.9668.91125.7712.95029710.5670.51127.3714.530712.1672.16、1128.9716.131713.8673.81130.6717.832715.5675.51132.3719.533717.3677.31134.1721.334719.1679.11135.9723.135721.0681.01137.8725.036722.9682.91139.7726.937724.9684.91141.7728.938726.9686.91143.7730.939729.0689.01145.8733.040731.1691.11147.9735.141733.2693.21150.0737.242735.4695.41152.2739.443737.7697.717、154.5741.744740.0700.01156.8744.045742.3702.31159.1746.346744.7704.71161.5748.747747.2707.21164.0751.248749.6709.61166.4753.649752.2712.21169.0756.250754.7714.71171.5758.751757.3717.31174.1761.352760.0720.01176.8764.053762.7722.71179.5766.754765.4725.41182.2769.455768.2728.21185.0772.256771.0731.0118、87.8775.057773.9733.91190.7777.958776.8736.81193.6780.859779.7739.71196.5783.760782.7742.71199.5786.761785.7745.71202.5789.762788.7748.71205.5792.763791.8751.81208.6795.864795.0755.01211.8799.065798.1758.11214.9802.166801.3761.31218.1805.367804.6764.61221.4808.668807.8767.81224.6811.869811.1771.11229、7.9815.170814.5774.51231.3818.571817.9777.91234.7821.972821.3781.31238.1825.373824.7784.71241.5828.774828.2788.21245.0832.275831.7791.71248.5835.776835.2795.21252.0839.277838.8798.81255.6842.878842.4802.41259.2846.479846.0806.01262.8850.080849.7809.71266.5853.781853.4813.41270.2857.482857.1817.1127310、.9861.183860.9820.91277.7864.984864.6824.61281.4868.685868.4828.41285.2872.486872.3832.31289.1876.387876.1836.11292.9880.188880.0840.01296.8884.089884.0844.01300.8888.090887.9847.91304.7891.991891.9851.91308.7895.992895.9855.91312.7899.993899.9859.91316.7903.994903.9863.91320.7907.995908.0868.01324.11、8912.096912.1872.11328.9916.197916.2876.21333.0920.298920.4880.41337.2924.499924.6884.61341.4928.6100928.8888.81345.6932.8101933.0893.01349.8937.0102937.2897.21354.0941.2103941.5901.51358.3945.5104945.8905.81362.6949.8105950.1910.11366.9954.1106954.4914.41371.2958.4107958.7918.71375.5962.7108963.19212、3.11379.9967.1109967.5927.51384.3971.5110971.9931.91388.7975.9111976.3936.31393.1980.3112980.8940.81397.6984.8113985.3945.31402.1989.3114989.8949.81406.6993.8115994.3954.31411.1998.3116998.8958.81415.61002.81171003.3963.31420.11007.31181007.9967.91424.71011.91191012.5972.51429.31016.51201017.1977.1113、433.91021.11211021.7981.71438.51025.71221026.3986.31443.11030.31231031.0991.01447.81035.01241035.7995.71452.51039.71251040.31000.31457.11044.31261045.01005.01461.81049.01271049.81009.81466.61053.81281054.51014.51471.31058.51291059.21019.21476.01063.21301064.01024.01480.81068.01311068.81028.81485.61014、72.81321073.61033.61490.41077.61331078.41038.41495.21082.41341083.21043.21500.01087.21351088.11048.11504.91092.11361092.91052.91509.71096.91371097.81057.81514.61101.81381102.71062.71519.51106.71391107.61067.61524.41111.61401112.51072.51529.31116.51411117.41077.41534.21121.41421122.31082.31539.11126.15、31431127.31087.31544.11131.31441132.21092.21549.01136.21451137.21097.21554.01141.21461142.21102.21559.01146.21471147.21107.21564.01151.21481152.21112.21569.01156.21491157.21117.21574.01161.21501162.31122.31579.11166.32530354045326.4404.1490.1587.4700.0652.8808.3980.31174.71400.051637792110Li(3x)741.16、0741.1741.3741.5741.7涵洞斜度742.0钢筋编号直径(mm)742.4742.81x&22743.32x&12743.83x&22744.44&18745.15&12745.86&12746.57&12747.48&12748.29&22749.2钢筋合计(kg)&12750.2&16751.2&18752.3&22753.4合计斜涵端部长度及一端斜布筋组合片数,填土厚度:0.53.5754.6C35混凝土合计(m3)755.9757.2758.5760.0761.4762.9764.5766.1767.8769.5771.3773.1775.0776.9778.9780.17、9783.0785.1787.2789.4791.7794.0796.3798.7801.2803.6806.2808.7811.3814.0816.7819.4822.2825.0827.9830.8833.7836.7839.7842.7845.8849.0852.1855.3858.6861.8865.1868.5871.9875.3878.7882.2885.7889.2892.8896.4900.0903.7907.4911.1914.9918.6922.4926.3930.1934.0938.0941.9945.9949.9953.9957.9962.0966.1970.2974.18、4978.6982.8987.0991.2995.5999.81004.11008.41012.71017.11021.51025.91030.31034.81039.31043.81048.31052.81057.31061.91066.51071.11075.71080.31085.01089.71094.31099.01103.81108.51113.21118.01122.81127.61132.41137.21142.11146.91151.81156.71161.61166.51171.41176.31181.31186.21191.21196.21201.21206.21211.19、21216.3510每根长度(cm)根数共长(m)每根长度(cm)根数共长(m)1104.5(平均)16176.721107.1(平均)36398.56175.9(平均)196344.69269.1(平均)196527.52741.7(平均)16118.68744.3(平均)36267.954521672.3245236162.721971631.521973670.9283.33226.6683.37259.9878.9310244.5978.9620489.1868.77048.0968.7154105.80561.8844.94561.818101.12617.51112.80.00.020、144.5325.01015.62290.71777.63728.510.5921.341979.04137.7FF1520每根长度(cm)根数共长(m)每根长度(cm)根数共长(m)1111.6(平均)56622.471118.5(平均)78872.43365.3(平均)196716.08466.2(平均)196913.69748.8(平均)56419.30755.7(平均)78589.4445256253.1245278352.5619756110.3219778153.6683.311293.3083.3156129.9578.9930733.7778.91240978.3668.72421、0164.8868.7324222.59561.828157.30561.839219.101614.42129.20.00.0505.6704.33578.15016.15698.17849.632.4344.046316.08675.1FF25涵洞斜度30每根长度(cm)根数共长(m)钢筋编号直径(mm)每根长度(cm)1128.4(平均)1021150.971x&221140.6(平均)573.6(平均)1961124.302x&12690.2(平均)765.6(平均)102780.913x&22777.8(平均)452102461.044&18452197102200.945&121922、783.3204169.936&1283.378.916121271.877&1278.968.7426292.668&1268.7561.851286.529&22561.82716.4钢筋合计(kg)&123319.60.0&160.0921.0&181137.76619.8&228269.010257.2合计12726.356.43C35混凝土合计(m3)69.8711332.6F3540根数共长(m)每根长度(cm)根数共长(m)每根长度(cm)1261437.141157.4(平均)1541782.441178.3(平均)1961352.83819.2(平均)1961605.679623、5.1(平均)126980.01794.6(平均)1541223.73815.5(平均)126569.52452154696.08452126248.22197154303.38197252209.9283.3308256.5683.319841565.3878.924181907.8078.9528362.7468.7648445.1868.763353.93561.877432.59561.84011.74792.70.00.01390.51661.310261.412489.715663.518943.7303319.60.01137.78269.012726.384.73101.54124、4051.417280.4FF69.8745根数共长(m)每根长度(cm)根数共长(m)1842168.091206.8(平均)2202654.881961891.511134.0(平均)1962222.641841500.54844.0(平均)2201856.72184831.68452220994.40184362.48197220433.40368306.5483.3440366.5229142299.1578.934722739.41784538.6168.7936643.0392516.86561.8110617.985686.40.01986.415306.922979.8404725、92.70.01661.312489.718943.7121.0120893.525303.3FF101.54正涵身材料数量表(适用于填土3.56)(每10m)钢筋编号直径(mm)每根长度(cm)根数共长(m)1&251146.82022316.542&1612081962367.683&257682021551.364&18472202953.445&12225.2202454.906&1292.7404374.517&12197.615813124.068&1278.8866682.419&25589.6101595.50钢筋合计(kg)&12:4115.8&16:3737.026956.26、5&18:1904.6&25:17199.1C35混凝土合计(m3)138.05斜布钢筋尺寸计算表(cm),适用于填土3.56.040钢筋尺寸ai钢筋编号1xi (i=1,2,3.)Bi-402xi(平均)1/2(L1+L2)3xi (i=1,2,3.)Bi+47076.2522)25.6(707i斜涵端部长度及一端斜布筋组合片数,填土厚度:3.56.0斜交角度()51015L2=720tan(cm)63.0127.0192.9L1=2720tan(cm)126.0253.9385.8组合片数n91929填土高度3.56.0miBiai(1x)Li(1x)1707.0667.01146.82727、07.1667.11146.93707.2667.21147.04707.4667.41147.25707.7667.71147.56708.0668.01147.87708.4668.41148.28708.8668.81148.69709.2669.21149.08926.44655710709.8669.81149.65977.94816511710.3670.31150.11904.57428512711.0671.01150.8403.87017813711.7671.71151.5332.493476914712.4672.41152.22773.58091615713.2673.28、21153.0605.851433416714.0674.01153.83736.99493417714.9674.91154.72294.66031118715.9675.91155.726956.4202619716.9676.91156.720718.0678.01157.821719.1679.11158.922720.2680.21160.023721.5681.51161.324722.7682.71162.5479.825724.1684.11163.9Li26725.4685.41165.227726.9686.91166.7ai+479.828728.3688.31168.129、ai+1045529729.9689.91169.7ai+5530731.4691.41171.231733.1693.11172.932734.7694.71174.533736.5696.51176.334738.2698.21178.035740.1700.11179.936741.9701.91181.737743.9703.91183.738745.8705.81185.639747.8707.81187.640749.9709.91189.741752.0712.01191.842754.2714.21194.043756.4716.41196.244758.6718.61198.30、445760.9720.91200.746763.2723.21203.047765.6725.61205.448768.0728.01207.849770.5730.51210.350773.0733.01212.851775.5735.51215.352778.1738.11217.9斜布钢筋尺寸计算表(cm),适用于填土3.56.053780.8740.81220.654783.4743.41223.255786.1746.11225.956788.9748.91228.757791.7751.71231.558794.5754.51234.359797.4757.41237.2608031、0.3760.31240.161803.2763.21243.062806.2766.21246.063809.3769.31249.164812.3772.31252.165815.4775.41255.266818.5778.51258.367821.7781.71261.568824.9784.91264.769828.1788.11267.970831.4791.41271.271834.7794.71274.572838.1798.11277.973841.4801.41281.274844.8804.81284.675848.3808.31288.176851.7811.7129132、.577855.2815.21295.078858.8818.81298.679862.3822.31302.180865.9825.91305.781869.6829.61309.482873.2833.21313.083876.9836.91316.784880.6840.61320.485884.4844.41324.286888.1848.11327.987891.9851.91331.788895.7855.71335.589899.6859.61339.490903.5863.51343.391907.4867.41347.292911.3871.31351.193915.387533、.31355.194919.2879.21359.095923.2883.21363.096927.3887.31367.197931.3891.31371.198935.4895.41375.299939.5899.51379.3100943.6903.61383.4101947.8907.81387.6102952.0912.01391.8103956.2916.21396.0104960.4920.41400.2105964.6924.61404.4106968.9928.91408.7107973.2933.21413.0108977.5937.51417.3109981.8941.834、1421.6110986.2946.21426.0111990.5950.51430.3112994.9954.91434.7113999.3959.31439.11141003.7963.71443.51151008.2968.21448.01161012.7972.71452.51171017.1977.11456.91181021.6981.61461.41191026.2986.21466.01201030.7990.71470.51211035.3995.31475.11221039.8999.81479.61231044.41004.41484.21241049.01009.01435、88.81251053.71013.71493.51261058.31018.31498.11271063.01023.01502.81281067.61027.61507.41291072.31032.31512.11301077.01037.01516.81311081.81041.81521.61321086.51046.51526.31331091.21051.21531.01341096.01056.01535.81351100.81060.81540.61361105.61065.61545.41371110.41070.41550.21381115.21075.21555.01336、91120.11080.11559.91401124.91084.91564.71411129.81089.81569.61421134.71094.71574.51431139.61099.61579.41441144.51104.51584.31451149.41109.41589.21461154.31114.31594.11471159.31119.31599.11481164.21124.21604.01491169.21129.21609.01501174.21134.21614.0202530354045262.1335.7415.7504.1604.2720.0524.167137、.5831.41008.31208.31440.04052657995114ai(3x)Li(3x)711.0766.0711.1766.1711.2766.2711.4766.4711.7766.7涵洞斜度712.0767.0钢筋编号712.4767.4712.8767.81x713.2768.22x713.8768.83x714.3769.34715.0770.05715.7770.76716.4771.47x717.2772.28718.0773.09718.9773.9钢筋合计(kg)719.9774.9720.9775.9722.0777.0723.1778.1斜涵端部长度及一端斜布38、筋组合片数,填土厚度:3.56.0填土高度3.56.0m724.2779.2C35混凝土合计(m3)725.5780.5726.7781.7728.1783.1729.4784.4730.9785.9732.3787.3733.9788.9735.4790.4737.1792.1738.7793.7740.5795.5742.2797.2744.1799.1745.9800.9747.9802.9749.8804.8751.8806.8753.9808.9756.0811.0758.2813.2760.4815.4762.6817.6764.9819.9767.2822.2769.6824.639、772.0827.0774.5829.5777.0832.0779.5834.5782.1837.1784.8839.8787.4842.4790.1845.1792.9847.9795.7850.7798.5853.5801.4856.4804.3859.3807.2862.2810.2865.2813.3868.3816.3871.3819.4874.4822.5877.5825.7880.7828.9883.9832.1887.1835.4890.4838.7893.7842.1897.1845.4900.4848.8903.8852.3907.3855.7910.7859.2914.240、862.8917.8866.3921.3869.9924.9873.6928.6877.2932.2880.9935.9884.6939.6888.4943.4892.1947.1895.9950.9899.7954.7903.6958.6907.5962.5911.4966.4915.3970.3919.3974.3923.2978.2927.2982.2931.3986.3935.3990.3939.4994.4943.5998.5947.61002.6951.81006.8956.01011.0960.21015.2964.41019.4968.61023.6972.91027.997741、.21032.2981.51036.5985.81040.8990.21045.2994.51049.5998.91053.91003.31058.31007.71062.71012.21067.21016.71071.71021.11076.11025.61080.61030.21085.21034.71089.71039.31094.31043.81098.81048.41103.41053.01108.01057.71112.71062.31117.31067.01122.01071.61126.61076.31131.31081.01136.01085.81140.81090.511442、5.51095.21150.21100.01155.01104.81159.81109.61164.61114.41169.41119.21174.21124.11179.11128.91183.91133.81188.81138.71193.71143.61198.61148.51203.51153.41208.41158.31213.31163.31218.31168.21223.21173.21228.21178.21233.2510直径(mm)每根长度(cm)根数共长(m)每根长度(cm)根数&251147.7(平均)18206.581150.4(平均)38&16198.5(平均)1943、6389.04294.4(平均)196&25766.9(平均)18138.04769.6(平均)38&184721884.9647238&12225.21840.54225.238&1292.73633.3792.776&12195.2(平均)155302.56195.2(平均)310&1278.88466.1978.8170&25589.6953.06589.619&12393.0794.7&16614.0910.8&18169.7358.3&251532.43243.0合计2709.25306.8涵洞斜度13.0426.292963.9FC35混凝土合计(m3)1520共长(m)每根长度(44、cm)根数共长(m)每根长度(cm)根数437.141154.9(平均)58669.821161.8(平均)80577.09393.4(平均)196771.03497.1(平均)196292.44774.1(平均)58448.96781.0(平均)80179.3647258273.764728085.58225.258130.62225.28070.4592.7116107.5392.7160605.12195.2(平均)465907.68195.2(平均)651133.9678.8254200.1578.8356112.02589.629170.98589.6401195.01668.91245、17.01537.8546.9754.34969.96897.97928.710858.839.9554.275817.08693.2FF25涵洞斜度共长(m)每根长度(cm)根数共长(m)钢筋编号直径(mm)929.451171.7(平均)1041218.521x&25974.29607.6(平均)1961190.922x&16624.81790.9(平均)104822.493x&25377.60472104490.884&18180.16225.2104234.215&12148.3292.7208192.826&121270.75195.2(平均)8371633.827x&12280.546、378.8458360.908&12235.84589.652306.599&252150.1钢筋合计(kg)&121879.7&16980.6&189046.1&2514056.4合计69.52C35混凝土合计(m3)11929.215432.5FF3035每根长度(cm)根数共长(m)每根长度(cm)根数共长(m)1184.8(平均)1301540.261201.6(平均)1581898.61727.5(平均)1961425.98860.2(平均)1961686.04804.0(平均)1301045.22820.8(平均)1581296.94472130613.60472158745.7647、225.2130292.76225.2158355.8292.7260241.0292.7316292.93195.2(平均)10231996.90195.2(平均)12402420.4878.8560441.2878.8680535.84589.665383.24589.679465.782638.53200.62250.72661.11225.71489.711439.514108.417554.521459.986.08104.4019236.123498.7FF4045每根长度(cm)根数共长(m)每根长度(cm)根数共长(m)1223.9(平均)1902325.461254.1(平均48、)2282859.271010.2(平均)1961980.051184.0(平均)1962320.64843.1(平均)1901601.94873.3(平均)2281991.04472190896.804722281076.16225.2190427.88225.2228513.4692.7380352.2692.7456422.71195.2(平均)14882904.58195.2(平均)17983509.7078.8816643.0178.8986776.97589.695560.12589.6114672.143842.24636.93125.23662.81791.42149.717249、92.021280.026050.831729.4125.10149.0928497.034684.6FF低填土构造净高顶底板厚1净跨侧墙厚1倒角400606005025高填土构造顶底板厚2侧墙厚27060主筋边距组合间距斜布区组合间距6.51012.5低填土1#重合段1R13#弯钩1272025高填土1#重合段2R23#弯钩2302027.5正涵身材料数量表(适用于填土0.53.5)(每10m)钢筋编号直径(mm)每根长度(cm)根数共长(m)1&221203.82022431.687256.2227842&1211682162522.884472.6011853&227422021498.50、842227.3834864&185522021115.04353.29673655&12197202397.94298.77784936&1283.3404336.532214.9345577&1278.931622494.82652.62325498&1268.71070735.092239.8483969&22561.8101567.421693.19902钢筋合计(kg)&12:5759.5&16:0.021408.921408.88727&18:2227.4&22:13422.0C35混凝土合计(m3)125.25斜布钢筋尺寸计算表(cm),适用于填土0.53.540556.8钢筋尺51、寸aiLi钢筋编号1xi (i=1,2,3.)Bi-40ai+556.82xi(平均)1/2(L1+L2)ai+843xi (i=1,2,3.)Bi+4ai+506876.2522)25.6(687i截面面积1(cm2)125250斜涵端部长度及一端斜布筋组合片数,填土厚度:0.53.5截面面积2(cm2)斜交角度()5101520150050L2=700tan(cm)61.2123.4187.6254.8L1=2700tan(cm)122.5246.9375.1509.6组合片数n8182839填土高度0.53.5miBiai(1x)Li(1x)ai(3x)1687.0647.01203.852、691.02687.1647.11203.9691.13687.3647.31204.1691.34687.5647.51204.3691.55687.7647.71204.5691.76688.0648.01204.8692.07688.4648.41205.2692.48688.8648.81205.6692.89689.3649.31206.1693.310689.8649.81206.6693.811690.4650.41207.2694.412691.1651.11207.9695.113691.8651.81208.6695.814692.5652.51209.3696.5156953、3.4653.41210.2697.416694.2654.21211.0698.217695.2655.21212.0699.218696.2656.21213.0700.219697.2657.21214.0701.220698.3658.31215.1702.321699.4659.41216.2703.422700.6660.61217.4704.623701.9661.91218.7705.924703.2663.21220.0707.225704.5664.51221.3708.526706.0666.01222.8710.027707.4667.41224.2711.42870854、.9668.91225.7712.95029710.5670.51227.3714.530712.1672.11228.9716.131713.8673.81230.6717.832715.5675.51232.3719.533717.3677.31234.1721.334719.1679.11235.9723.135721.0681.01237.8725.036722.9682.91239.7726.937724.9684.91241.7728.938726.9686.91243.7730.939729.0689.01245.8733.040731.1691.11247.9735.1417355、3.2693.21250.0737.242735.4695.41252.2739.443737.7697.71254.5741.744740.0700.01256.8744.045742.3702.31259.1746.346744.7704.71261.5748.747747.2707.21264.0751.248749.6709.61266.4753.649752.2712.21269.0756.250754.7714.71271.5758.751757.3717.31274.1761.352760.0720.01276.8764.053762.7722.71279.5766.75476556、.4725.41282.2769.455768.2728.21285.0772.256771.0731.01287.8775.057773.9733.91290.7777.958776.8736.81293.6780.859779.7739.71296.5783.760782.7742.71299.5786.761785.7745.71302.5789.762788.7748.71305.5792.763791.8751.81308.6795.864795.0755.01311.8799.065798.1758.11314.9802.166801.3761.31318.1805.367804.57、6764.61321.4808.668807.8767.81324.6811.869811.1771.11327.9815.170814.5774.51331.3818.571817.9777.91334.7821.972821.3781.31338.1825.373824.7784.71341.5828.774828.2788.21345.0832.275831.7791.71348.5835.776835.2795.21352.0839.277838.8798.81355.6842.878842.4802.41359.2846.479846.0806.01362.8850.080849.758、809.71366.5853.781853.4813.41370.2857.482857.1817.11373.9861.183860.9820.91377.7864.984864.6824.61381.4868.685868.4828.41385.2872.486872.3832.31389.1876.387876.1836.11392.9880.188880.0840.01396.8884.089884.0844.01400.8888.090887.9847.91404.7891.991891.9851.91408.7895.992895.9855.91412.7899.993899.9859、59.91416.7903.994903.9863.91420.7907.995908.0868.01424.8912.096912.1872.11428.9916.197916.2876.21433.0920.298920.4880.41437.2924.499924.6884.61441.4928.6100928.8888.81445.6932.8101933.0893.01449.8937.0102937.2897.21454.0941.2103941.5901.51458.3945.5104945.8905.81462.6949.8105950.1910.11466.9954.110660、954.4914.41471.2958.4107958.7918.71475.5962.7108963.1923.11479.9967.1109967.5927.51484.3971.5110971.9931.91488.7975.9111976.3936.31493.1980.3112980.8940.81497.6984.8113985.3945.31502.1989.3114989.8949.81506.6993.8115994.3954.31511.1998.3116998.8958.81515.61002.81171003.3963.31520.11007.31181007.996761、.91524.71011.91191012.5972.51529.31016.51201017.1977.11533.91021.11211021.7981.71538.51025.71221026.3986.31543.11030.31231031.0991.01547.81035.01241035.7995.71552.51039.71251040.31000.31557.11044.31261045.01005.01561.81049.01271049.81009.81566.61053.81281054.51014.51571.31058.51291059.21019.21576.0162、063.21301064.01024.01580.81068.01311068.81028.81585.61072.81321073.61033.61590.41077.61331078.41038.41595.21082.41341083.21043.21600.01087.21351088.11048.11604.91092.11361092.91052.91609.71096.91371097.81057.81614.61101.81381102.71062.71619.51106.71391107.61067.61624.41111.61401112.51072.51629.3111663、.51411117.41077.41634.21121.41421122.31082.31639.11126.31431127.31087.31644.11131.31441132.21092.21649.01136.21451137.21097.21654.01141.21461142.21102.21659.01146.21471147.21107.21664.01151.21481152.21112.21669.01156.21491157.21117.21674.01161.21501162.31122.31679.11166.32530354045326.4404.1490.158764、.4700.0652.8808.3980.31174.71400.051637792110Li(3x)741.0741.1741.3741.5741.7涵洞斜度742.0钢筋编号直径(mm)742.4742.81x&22743.32x&12743.83x&22744.44&18745.15&12745.86&12746.57&12747.48&12748.29&22749.2钢筋合计(kg)&12750.2&16751.2&18752.3&22753.4合计斜涵端部长度及一端斜布筋组合片数,填土厚度:0.53.5754.6C35混凝土合计(m3)755.9757.2758.5760.0761.65、4762.9764.5766.1767.8769.5771.3773.1775.0776.9778.9780.9783.0785.1787.2789.4791.7794.0796.3798.7801.2803.6806.2808.7811.3814.0816.7819.4822.2825.0827.9830.8833.7836.7839.7842.7845.8849.0852.1855.3858.6861.8865.1868.5871.9875.3878.7882.2885.7889.2892.8896.4900.0903.7907.4911.1914.9918.6922.4926.3930.66、1934.0938.0941.9945.9949.9953.9957.9962.0966.1970.2974.4978.6982.8987.0991.2995.5999.81004.11008.41012.71017.11021.51025.91030.31034.81039.31043.81048.31052.81057.31061.91066.51071.11075.71080.31085.01089.71094.31099.01103.81108.51113.21118.01122.81127.61132.41137.21142.11146.91151.81156.71161.6116667、.51171.41176.31181.31186.21191.21196.21201.21206.21211.21216.3510每根长度(cm)根数共长(m)每根长度(cm)根数共长(m)1204.5(平均)16192.721207.1(平均)36434.56175.9(平均)216379.86269.1(平均)216581.35741.7(平均)16118.68744.3(平均)36267.955521688.3255236198.721971631.521973670.9283.33226.6683.37259.9878.9310244.5978.9620489.1868.78659.068、868.7190130.53561.8844.94561.818101.12658.51182.50.00.0176.4397.01063.32398.11898.33977.611.5123.192107.34403.9FF1520每根长度(cm)根数共长(m)每根长度(cm)根数共长(m)1211.6(平均)56678.471218.5(平均)78950.43365.3(平均)216789.15466.2(平均)2161006.92748.8(平均)56419.30755.7(平均)78589.4455256309.1255278430.5619756110.3219778153.668369、.311293.3083.3156129.9578.9930733.7778.91240978.3668.7296203.3568.7400274.80561.828157.30561.839219.101713.42258.30.00.0617.5860.13745.25248.86076.18367.235.2447.876720.69228.8FF25涵洞斜度30每根长度(cm)根数共长(m)钢筋编号直径(mm)每根长度(cm)1228.4(平均)1021252.971x&221240.6(平均)573.6(平均)2161239.032x&12690.2(平均)765.6(平均)102770、80.913x&22777.8(平均)552102563.044&18552197102200.945&1219783.3204169.936&1283.378.916121271.877&1278.968.7526361.368&1268.7561.851286.529&22561.82879.3钢筋合计(kg)&123517.80.0&160.01124.7&181389.46924.2&228645.010928.2合计13552.161.33C35混凝土合计(m3)75.9312051.0F3540根数共长(m)每根长度(cm)根数共长(m)每根长度(cm)1261563.14125771、.4(平均)1541936.441278.3(平均)2161490.87819.2(平均)2161769.51965.1(平均)126980.01794.6(平均)1541223.73815.5(平均)126695.52552154850.08552126248.22197154303.38197252209.9283.3308256.5683.319841565.3878.924181907.8078.9652447.9268.7800549.6068.763353.93561.877432.59561.84249.85076.30.00.01698.12028.910720.913038.72、716668.920143.9303517.80.01389.48645.013552.192.09110.3514936.118357.8FF75.9345根数共长(m)每根长度(cm)根数共长(m)1842352.091306.8(平均)2202874.882162084.521134.0(平均)2162449.441841500.54844.0(平均)2201856.721841015.685522201214.40184362.48197220433.40368306.5483.3440366.5229142299.1578.934722739.41968665.0268.71156773、94.1792516.86561.8110617.986022.00.02425.915963.424411.3405076.30.02028.913038.720143.9131.5122181.026839.1FF110.35正涵身材料数量表(适用于填土3.56)(每10m)钢筋编号直径(mm)每根长度(cm)根数共长(m)1&251246.82022518.542&1612082162609.283&257682021551.364&185722021155.445&12225.2202454.906&1292.7404374.517&12197.615813124.068&1278.874、1070843.169&25589.6101595.50钢筋合计(kg)&12:4258.5&16:4118.328662.3&18:2308.1&25:17977.4C35混凝土合计(m3)150.05斜布钢筋尺寸计算表(cm),适用于填土3.56.040钢筋尺寸ai钢筋编号1xi (i=1,2,3.)Bi-402xi(平均)1/2(L1+L2)3xi (i=1,2,3.)Bi+47076.2522)25.6(707i斜涵端部长度及一端斜布筋组合片数,填土厚度:3.56.0斜交角度()51015L2=720tan(cm)63.0127.0192.9L1=2720tan(cm)126.025375、.9385.8组合片数n91929填土高度3.56.0miBiai(1x)Li(1x)1707.0667.01246.82707.1667.11246.93707.2667.21247.04707.4667.41247.25707.7667.71247.56708.0668.01247.87708.4668.41248.28708.8668.81248.69709.2669.21249.09704.82522410709.8669.81249.65977.94816511710.3670.31250.12308.08578612711.0671.01250.8403.87017813711.776、671.71251.5332.493476914712.4672.41252.22773.58091615713.2673.21253.0748.56932316714.0674.01253.84118.32094717714.9674.91254.72294.66031118715.9675.91255.728662.3543319716.9676.91256.720718.0678.01257.821719.1679.11258.922720.2680.21260.023721.5681.51261.324722.7682.71262.5579.825724.1684.11263.9Li277、6725.4685.41265.227726.9686.91266.7ai+579.828728.3688.31268.1ai+1045529729.9689.91269.7ai+5530731.4691.41271.231733.1693.11272.932734.7694.71274.533736.5696.51276.334738.2698.21278.035740.1700.11279.936741.9701.91281.737743.9703.91283.738745.8705.81285.639747.8707.81287.640749.9709.91289.741752.071278、.01291.842754.2714.21294.043756.4716.41296.244758.6718.61298.445760.9720.91300.746763.2723.21303.047765.6725.61305.448768.0728.01307.849770.5730.51310.350773.0733.01312.851775.5735.51315.352778.1738.11317.9斜布钢筋尺寸计算表(cm),适用于填土3.56.053780.8740.81320.654783.4743.41323.255786.1746.11325.956788.9748.913279、8.757791.7751.71331.558794.5754.51334.359797.4757.41337.260800.3760.31340.161803.2763.21343.062806.2766.21346.063809.3769.31349.164812.3772.31352.165815.4775.41355.266818.5778.51358.367821.7781.71361.568824.9784.91364.769828.1788.11367.970831.4791.41371.271834.7794.71374.572838.1798.11377.973841.48080、1.41381.274844.8804.81384.675848.3808.31388.176851.7811.71391.577855.2815.21395.078858.8818.81398.679862.3822.31402.180865.9825.91405.781869.6829.61409.482873.2833.21413.083876.9836.91416.784880.6840.61420.485884.4844.41424.286888.1848.11427.987891.9851.91431.788895.7855.71435.589899.6859.61439.490981、03.5863.51443.391907.4867.41447.292911.3871.31451.193915.3875.31455.194919.2879.21459.095923.2883.21463.096927.3887.31467.197931.3891.31471.198935.4895.41475.299939.5899.51479.3100943.6903.61483.4101947.8907.81487.6102952.0912.01491.8103956.2916.21496.0104960.4920.41500.2105964.6924.61504.4106968.9982、28.91508.7107973.2933.21513.0108977.5937.51517.3109981.8941.81521.6110986.2946.21526.0111990.5950.51530.3112994.9954.91534.7113999.3959.31539.11141003.7963.71543.51151008.2968.21548.01161012.7972.71552.51171017.1977.11556.91181021.6981.61561.41191026.2986.21566.01201030.7990.71570.51211035.3995.315783、5.11221039.8999.81579.61231044.41004.41584.21241049.01009.01588.81251053.71013.71593.51261058.31018.31598.11271063.01023.01602.81281067.61027.61607.41291072.31032.31612.11301077.01037.01616.81311081.81041.81621.61321086.51046.51626.31331091.21051.21631.01341096.01056.01635.81351100.81060.81640.6136184、105.61065.61645.41371110.41070.41650.21381115.21075.21655.01391120.11080.11659.91401124.91084.91664.71411129.81089.81669.61421134.71094.71674.51431139.61099.61679.41441144.51104.51684.31451149.41109.41689.21461154.31114.31694.11471159.31119.31699.11481164.21124.21704.01491169.21129.21709.01501174.2185、134.21714.0202530354045262.1335.7415.7504.1604.2720.0524.1671.5831.41008.31208.31440.04052657995114ai(3x)Li(3x)711.0766.0711.1766.1711.2766.2711.4766.4711.7766.7涵洞斜度712.0767.0钢筋编号712.4767.4712.8767.81x713.2768.22x713.8768.83x714.3769.34715.0770.05715.7770.76716.4771.47x717.2772.28718.0773.09718.977386、.9钢筋合计(kg)719.9774.9720.9775.9722.0777.0723.1778.1斜涵端部长度及一端斜布筋组合片数,填土厚度:3.56.0填土高度3.56.0m724.2779.2C35混凝土合计(m3)725.5780.5726.7781.7728.1783.1729.4784.4730.9785.9732.3787.3733.9788.9735.4790.4737.1792.1738.7793.7740.5795.5742.2797.2744.1799.1745.9800.9747.9802.9749.8804.8751.8806.8753.9808.9756.0811.87、0758.2813.2760.4815.4762.6817.6764.9819.9767.2822.2769.6824.6772.0827.0774.5829.5777.0832.0779.5834.5782.1837.1784.8839.8787.4842.4790.1845.1792.9847.9795.7850.7798.5853.5801.4856.4804.3859.3807.2862.2810.2865.2813.3868.3816.3871.3819.4874.4822.5877.5825.7880.7828.9883.9832.1887.1835.4890.4838.7893.88、7842.1897.1845.4900.4848.8903.8852.3907.3855.7910.7859.2914.2862.8917.8866.3921.3869.9924.9873.6928.6877.2932.2880.9935.9884.6939.6888.4943.4892.1947.1895.9950.9899.7954.7903.6958.6907.5962.5911.4966.4915.3970.3919.3974.3923.2978.2927.2982.2931.3986.3935.3990.3939.4994.4943.5998.5947.61002.6951.810089、6.8956.01011.0960.21015.2964.41019.4968.61023.6972.91027.9977.21032.2981.51036.5985.81040.8990.21045.2994.51049.5998.91053.91003.31058.31007.71062.71012.21067.21016.71071.71021.11076.11025.61080.61030.21085.21034.71089.71039.31094.31043.81098.81048.41103.41053.01108.01057.71112.71062.31117.31067.01190、22.01071.61126.61076.31131.31081.01136.01085.81140.81090.51145.51095.21150.21100.01155.01104.81159.81109.61164.61114.41169.41119.21174.21124.11179.11128.91183.91133.81188.81138.71193.71143.61198.61148.51203.51153.41208.41158.31213.31163.31218.31168.21223.21173.21228.21178.21233.2510直径(mm)每根长度(cm)根数共91、长(m)每根长度(cm)根数&251247.7(平均)18224.581250.4(平均)38&16198.5(平均)216428.73294.4(平均)216&25766.9(平均)18138.04769.6(平均)38&1857218102.9657238&12225.21840.54225.238&1292.73633.3792.776&12195.2(平均)155302.56195.2(平均)310&1278.810481.9578.8210&25589.6953.06589.619&12407.0822.7&16676.71003.8&18205.7434.2&251601.833892、9.4合计2891.15650.1涵洞斜度14.1828.573156.9FC35混凝土合计(m3)1520共长(m)每根长度(cm)根数共长(m)每根长度(cm)根数475.141254.9(平均)58727.821261.8(平均)80635.98393.4(平均)216849.71497.1(平均)216292.44774.1(平均)58448.96781.0(平均)80217.3657258331.765728085.58225.258130.62225.28070.4592.7116107.5392.7160605.12195.2(平均)465907.68195.2(平均)6511693、5.4878.8314247.4378.8440112.02589.629170.98589.6401237.01727.61341.11694.7662.7914.15193.47206.18434.211542.643.4258.986182.19231.5FF25涵洞斜度共长(m)每根长度(cm)根数共长(m)钢筋编号直径(mm)1009.451271.7(平均)1041322.521x&251073.71607.6(平均)2161312.442x&16624.81790.9(平均)104822.493x&25457.60572104594.884&18180.16225.210423494、.215&12148.3292.7208192.826&121270.75195.2(平均)8371633.827x&12346.7278.8566446.018&12235.84589.652306.599&252225.6钢筋合计(kg)&122071.5&161188.3&189446.9&2514932.3合计75.57C35混凝土合计(m3)12658.816367.4FF3035每根长度(cm)根数共长(m)每根长度(cm)根数共长(m)1284.8(平均)1301670.261301.6(平均)1582056.61727.5(平均)2161571.48860.2(平均)2161895、58.08804.0(平均)1301045.22820.8(平均)1581296.94572130743.60572158903.76225.2130292.76225.2158355.8292.7260241.0292.7316292.93195.2(平均)10231996.90195.2(平均)12402420.4878.8692545.3078.8840661.92589.665383.24589.679465.782730.93312.62480.32932.71485.41805.311940.514717.318637.122767.893.56113.4720390.92489496、.0FF4045每根长度(cm)根数共长(m)每根长度(cm)根数共长(m)1323.9(平均)1902515.461354.1(平均)2283087.271010.2(平均)2162182.091184.0(平均)2162557.44843.1(平均)1901601.94873.3(平均)2281991.045721901086.805722281304.16225.2190427.88225.2228513.4692.7380352.2692.7456422.71195.2(平均)14882904.58195.2(平均)17983509.7078.81008794.3078.812189597、9.78589.695560.12589.6114672.143976.54799.23444.14036.52171.02605.218024.122158.627615.733599.4135.98162.0530166.736681.4FF低填土构造净高顶底板厚1净跨侧墙厚1倒角450606005025高填土构造顶底板厚2侧墙厚27060主筋边距组合间距斜布区组合间距6.51012.5低填土1#重合段1R13#弯钩1272025高填土1#重合段2R23#弯钩2302027.5正涵身材料数量表(适用于填土0.53.5)(每10m)钢筋编号直径(mm)每根长度(cm)根数共长(m)1&22198、253.82022532.687557.6110042&1211682282663.044472.6011853&227422021498.842429.1392374&186022021216.04353.29673655&12197202397.94298.77784936&1283.3404336.532214.9345577&1278.931622494.82777.04862328&1268.71274875.242364.2844189&22561.8101567.421693.19902钢筋合计(kg)&12:6008.3&16:0.022160.822160.89263&18:99、2429.1&22:13723.4C35混凝土合计(m3)130.25斜布钢筋尺寸计算表(cm),适用于填土0.53.540606.8钢筋尺寸aiLi钢筋编号1xi (i=1,2,3.)Bi-40ai+606.82xi(平均)1/2(L1+L2)ai+843xi (i=1,2,3.)Bi+4ai+506876.2522)25.6(687i截面面积1(cm2)130250斜涵端部长度及一端斜布筋组合片数,填土厚度:0.53.5截面面积2(cm2)斜交角度()5101520156050L2=700tan(cm)61.2123.4187.6254.8L1=2700tan(cm)122.5246.93100、75.1509.6组合片数n8182839填土高度0.53.5miBiai(1x)Li(1x)ai(3x)1687.0647.01253.8691.02687.1647.11253.9691.13687.3647.31254.1691.34687.5647.51254.3691.55687.7647.71254.5691.76688.0648.01254.8692.07688.4648.41255.2692.48688.8648.81255.6692.89689.3649.31256.1693.310689.8649.81256.6693.811690.4650.41257.2694.4126101、91.1651.11257.9695.113691.8651.81258.6695.814692.5652.51259.3696.515693.4653.41260.2697.416694.2654.21261.0698.217695.2655.21262.0699.218696.2656.21263.0700.219697.2657.21264.0701.220698.3658.31265.1702.321699.4659.41266.2703.422700.6660.61267.4704.623701.9661.91268.7705.924703.2663.21270.0707.22570102、4.5664.51271.3708.526706.0666.01272.8710.027707.4667.41274.2711.428708.9668.91275.7712.95029710.5670.51277.3714.530712.1672.11278.9716.131713.8673.81280.6717.832715.5675.51282.3719.533717.3677.31284.1721.334719.1679.11285.9723.135721.0681.01287.8725.036722.9682.91289.7726.937724.9684.91291.7728.9387103、26.9686.91293.7730.939729.0689.01295.8733.040731.1691.11297.9735.141733.2693.21300.0737.242735.4695.41302.2739.443737.7697.71304.5741.744740.0700.01306.8744.045742.3702.31309.1746.346744.7704.71311.5748.747747.2707.21314.0751.248749.6709.61316.4753.649752.2712.21319.0756.250754.7714.71321.5758.75175104、7.3717.31324.1761.352760.0720.01326.8764.053762.7722.71329.5766.754765.4725.41332.2769.455768.2728.21335.0772.256771.0731.01337.8775.057773.9733.91340.7777.958776.8736.81343.6780.859779.7739.71346.5783.760782.7742.71349.5786.761785.7745.71352.5789.762788.7748.71355.5792.763791.8751.81358.6795.864795105、.0755.01361.8799.065798.1758.11364.9802.166801.3761.31368.1805.367804.6764.61371.4808.668807.8767.81374.6811.869811.1771.11377.9815.170814.5774.51381.3818.571817.9777.91384.7821.972821.3781.31388.1825.373824.7784.71391.5828.774828.2788.21395.0832.275831.7791.71398.5835.776835.2795.21402.0839.277838.106、8798.81405.6842.878842.4802.41409.2846.479846.0806.01412.8850.080849.7809.71416.5853.781853.4813.41420.2857.482857.1817.11423.9861.183860.9820.91427.7864.984864.6824.61431.4868.685868.4828.41435.2872.486872.3832.31439.1876.387876.1836.11442.9880.188880.0840.01446.8884.089884.0844.01450.8888.090887.9107、847.91454.7891.991891.9851.91458.7895.992895.9855.91462.7899.993899.9859.91466.7903.994903.9863.91470.7907.995908.0868.01474.8912.096912.1872.11478.9916.197916.2876.21483.0920.298920.4880.41487.2924.499924.6884.61491.4928.6100928.8888.81495.6932.8101933.0893.01499.8937.0102937.2897.21504.0941.210394108、1.5901.51508.3945.5104945.8905.81512.6949.8105950.1910.11516.9954.1106954.4914.41521.2958.4107958.7918.71525.5962.7108963.1923.11529.9967.1109967.5927.51534.3971.5110971.9931.91538.7975.9111976.3936.31543.1980.3112980.8940.81547.6984.8113985.3945.31552.1989.3114989.8949.81556.6993.8115994.3954.31561109、.1998.3116998.8958.81565.61002.81171003.3963.31570.11007.31181007.9967.91574.71011.91191012.5972.51579.31016.51201017.1977.11583.91021.11211021.7981.71588.51025.71221026.3986.31593.11030.31231031.0991.01597.81035.01241035.7995.71602.51039.71251040.31000.31607.11044.31261045.01005.01611.81049.0127104110、9.81009.81616.61053.81281054.51014.51621.31058.51291059.21019.21626.01063.21301064.01024.01630.81068.01311068.81028.81635.61072.81321073.61033.61640.41077.61331078.41038.41645.21082.41341083.21043.21650.01087.21351088.11048.11654.91092.11361092.91052.91659.71096.91371097.81057.81664.61101.81381102.7111、1062.71669.51106.71391107.61067.61674.41111.61401112.51072.51679.31116.51411117.41077.41684.21121.41421122.31082.31689.11126.31431127.31087.31694.11131.31441132.21092.21699.01136.21451137.21097.21704.01141.21461142.21102.21709.01146.21471147.21107.21714.01151.21481152.21112.21719.01156.21491157.2111112、7.21724.01161.21501162.31122.31729.11166.32530354045326.4404.1490.1587.4700.0652.8808.3980.31174.71400.051637792110Li(3x)741.0741.1741.3741.5741.7涵洞斜度742.0钢筋编号直径(mm)742.4742.81x&22743.32x&12743.83x&22744.44&18745.15&12745.86&12746.57&12747.48&12748.29&22749.2钢筋合计(kg)&12750.2&16751.2&18752.3&22753.4合113、计斜涵端部长度及一端斜布筋组合片数,填土厚度:0.53.5754.6C35混凝土合计(m3)755.9757.2758.5760.0761.4762.9764.5766.1767.8769.5771.3773.1775.0776.9778.9780.9783.0785.1787.2789.4791.7794.0796.3798.7801.2803.6806.2808.7811.3814.0816.7819.4822.2825.0827.9830.8833.7836.7839.7842.7845.8849.0852.1855.3858.6861.8865.1868.5871.9875.3878.114、7882.2885.7889.2892.8896.4900.0903.7907.4911.1914.9918.6922.4926.3930.1934.0938.0941.9945.9949.9953.9957.9962.0966.1970.2974.4978.6982.8987.0991.2995.5999.81004.11008.41012.71017.11021.51025.91030.31034.81039.31043.81048.31052.81057.31061.91066.51071.11075.71080.31085.01089.71094.31099.01103.81108.5115、1113.21118.01122.81127.61132.41137.21142.11146.91151.81156.71161.61166.51171.41176.31181.31186.21191.21196.21201.21206.21211.21216.3510每根长度(cm)根数共长(m)每根长度(cm)根数共长(m)1254.5(平均)16200.721257.1(平均)36452.56175.9(平均)228400.97269.1(平均)228613.65741.7(平均)16118.68744.3(平均)36267.956021696.3260236216.721971631.116、521973670.9283.33226.6683.37259.9878.9310244.5978.9620489.1868.710270.0768.7226155.26561.8844.94561.818101.12687.01233.20.00.0192.4432.91087.22451.81966.64117.911.9724.112183.34561.3FF1520每根长度(cm)根数共长(m)每根长度(cm)根数共长(m)1261.6(平均)56706.471268.5(平均)78989.43365.3(平均)228832.99466.2(平均)2281062.86748.8(平均)117、56419.30755.7(平均)78589.4460256337.1260278469.5619756110.3219778153.6683.311293.3083.3156129.9578.9930733.7778.91240978.3668.7352241.8268.7476327.01561.828157.30561.839219.101786.52354.30.00.0673.4938.03828.85365.26288.68657.636.6549.786959.89555.2FF25涵洞斜度30每根长度(cm)根数共长(m)钢筋编号直径(mm)每根长度(cm)1278.4(平均)118、1021303.971x&221290.6(平均)573.6(平均)2281307.862x&12690.2(平均)765.6(平均)102780.913x&22777.8(平均)602102614.044&18602197102200.945&1219783.3204169.936&1283.378.916121271.877&1278.968.7626430.068&1268.7561.851286.529&22561.83001.4钢筋合计(kg)&123667.00.0&160.01226.6&181515.27076.4&228833.011304.4合计14015.263.77C3119、5混凝土合计(m3)78.9612474.6F3540根数共长(m)每根长度(cm)根数共长(m)每根长度(cm)1261626.141307.4(平均)1542013.441328.3(平均)2281573.70819.2(平均)2281867.82965.1(平均)126980.01794.6(平均)1541223.73815.5(平均)126758.52602154927.08602126248.22197154303.38197252209.9283.3308256.5683.319841565.3878.924181907.8078.9776533.1168.7952654.0268120、.763353.93561.877432.59561.84429.85291.30.00.01851.92212.710950.713313.317232.520817.3303667.00.01515.28833.014015.295.76114.7615457.918993.6FF78.9645根数共长(m)每根长度(cm)根数共长(m)1842444.091356.8(平均)2202984.882282200.321134.0(平均)2282585.521841500.54844.0(平均)2201856.721841107.686022201324.40184362.481972204121、33.40368306.5483.3440366.5229142299.1578.934722739.411152791.4268.71376945.3192516.86561.8110617.986277.00.02645.616291.625214.2405291.30.02212.713313.320817.3136.7622941.727746.5FF114.76正涵身材料数量表(适用于填土3.56)(每10m)钢筋编号直径(mm)每根长度(cm)根数共长(m)1&251296.82022619.542&1612082282754.243&257682021551.364&186222122、021256.445&12225.2202454.906&1292.7404374.517&12197.615813124.068&1278.812741003.919&25589.6101595.50钢筋合计(kg)&12:4401.2&16:4347.129624.7&18:2509.8&25:18366.6C35混凝土合计(m3)156.05斜布钢筋尺寸计算表(cm),适用于填土3.56.040钢筋尺寸ai钢筋编号1xi (i=1,2,3.)Bi-402xi(平均)1/2(L1+L2)3xi (i=1,2,3.)Bi+47076.2522)25.6(707i斜涵端部长度及一端斜布筋组合片123、数,填土厚度:3.56.0斜交角度()51015L2=720tan(cm)63.0127.0192.9L1=2720tan(cm)126.0253.9385.8组合片数n91929填土高度3.56.0miBiai(1x)Li(1x)1707.0667.01296.82707.1667.11296.93707.2667.21297.04707.4667.41297.25707.7667.71297.56708.0668.01297.87708.4668.41298.28708.8668.81298.69709.2669.21299.010094.0145610709.8669.81299.659124、77.94816511710.3670.31300.12509.84153712711.0671.01300.8403.87017813711.7671.71301.5332.493476914712.4672.41302.22773.58091615713.2673.21303.0891.287212616714.0674.01303.84347.11655517714.9674.91304.72294.66031118715.9675.91305.729624.8129119716.9676.91306.720718.0678.01307.821719.1679.11308.922720.125、2680.21310.023721.5681.51311.324722.7682.71312.5629.825724.1684.11313.9Li26725.4685.41315.227726.9686.91316.7ai+629.828728.3688.31318.1ai+1045529729.9689.91319.7ai+5530731.4691.41321.231733.1693.11322.932734.7694.71324.533736.5696.51326.334738.2698.21328.035740.1700.11329.936741.9701.91331.737743.97126、03.91333.738745.8705.81335.639747.8707.81337.640749.9709.91339.741752.0712.01341.842754.2714.21344.043756.4716.41346.244758.6718.61348.445760.9720.91350.746763.2723.21353.047765.6725.61355.448768.0728.01357.849770.5730.51360.350773.0733.01362.851775.5735.51365.352778.1738.11367.9斜布钢筋尺寸计算表(cm),适用于填土3127、.56.053780.8740.81370.654783.4743.41373.255786.1746.11375.956788.9748.91378.757791.7751.71381.558794.5754.51384.359797.4757.41387.260800.3760.31390.161803.2763.21393.062806.2766.21396.063809.3769.31399.164812.3772.31402.165815.4775.41405.266818.5778.51408.367821.7781.71411.568824.9784.91414.769828.1128、788.11417.970831.4791.41421.271834.7794.71424.572838.1798.11427.973841.4801.41431.274844.8804.81434.675848.3808.31438.176851.7811.71441.577855.2815.21445.078858.8818.81448.679862.3822.31452.180865.9825.91455.781869.6829.61459.482873.2833.21463.083876.9836.91466.784880.6840.61470.485884.4844.41474.28129、6888.1848.11477.987891.9851.91481.788895.7855.71485.589899.6859.61489.490903.5863.51493.391907.4867.41497.292911.3871.31501.193915.3875.31505.194919.2879.21509.095923.2883.21513.096927.3887.31517.197931.3891.31521.198935.4895.41525.299939.5899.51529.3100943.6903.61533.4101947.8907.81537.6102952.0912130、.01541.8103956.2916.21546.0104960.4920.41550.2105964.6924.61554.4106968.9928.91558.7107973.2933.21563.0108977.5937.51567.3109981.8941.81571.6110986.2946.21576.0111990.5950.51580.3112994.9954.91584.7113999.3959.31589.11141003.7963.71593.51151008.2968.21598.01161012.7972.71602.51171017.1977.11606.9118131、1021.6981.61611.41191026.2986.21616.01201030.7990.71620.51211035.3995.31625.11221039.8999.81629.61231044.41004.41634.21241049.01009.01638.81251053.71013.71643.51261058.31018.31648.11271063.01023.01652.81281067.61027.61657.41291072.31032.31662.11301077.01037.01666.81311081.81041.81671.61321086.51046.132、51676.31331091.21051.21681.01341096.01056.01685.81351100.81060.81690.61361105.61065.61695.41371110.41070.41700.21381115.21075.21705.01391120.11080.11709.91401124.91084.91714.71411129.81089.81719.61421134.71094.71724.51431139.61099.61729.41441144.51104.51734.31451149.41109.41739.21461154.31114.31744.133、11471159.31119.31749.11481164.21124.21754.01491169.21129.21759.01501174.21134.21764.0202530354045262.1335.7415.7504.1604.2720.0524.1671.5831.41008.31208.31440.04052657995114ai(3x)Li(3x)711.0766.0711.1766.1711.2766.2711.4766.4711.7766.7涵洞斜度712.0767.0钢筋编号712.4767.4712.8767.81x713.2768.22x713.8768.83x7134、14.3769.34715.0770.05715.7770.76716.4771.47x717.2772.28718.0773.09718.9773.9钢筋合计(kg)719.9774.9720.9775.9722.0777.0723.1778.1斜涵端部长度及一端斜布筋组合片数,填土厚度:3.56.0填土高度3.56.0m724.2779.2C35混凝土合计(m3)725.5780.5726.7781.7728.1783.1729.4784.4730.9785.9732.3787.3733.9788.9735.4790.4737.1792.1738.7793.7740.5795.5742.2135、797.2744.1799.1745.9800.9747.9802.9749.8804.8751.8806.8753.9808.9756.0811.0758.2813.2760.4815.4762.6817.6764.9819.9767.2822.2769.6824.6772.0827.0774.5829.5777.0832.0779.5834.5782.1837.1784.8839.8787.4842.4790.1845.1792.9847.9795.7850.7798.5853.5801.4856.4804.3859.3807.2862.2810.2865.2813.3868.3816.3136、871.3819.4874.4822.5877.5825.7880.7828.9883.9832.1887.1835.4890.4838.7893.7842.1897.1845.4900.4848.8903.8852.3907.3855.7910.7859.2914.2862.8917.8866.3921.3869.9924.9873.6928.6877.2932.2880.9935.9884.6939.6888.4943.4892.1947.1895.9950.9899.7954.7903.6958.6907.5962.5911.4966.4915.3970.3919.3974.3923.2137、978.2927.2982.2931.3986.3935.3990.3939.4994.4943.5998.5947.61002.6951.81006.8956.01011.0960.21015.2964.41019.4968.61023.6972.91027.9977.21032.2981.51036.5985.81040.8990.21045.2994.51049.5998.91053.91003.31058.31007.71062.71012.21067.21016.71071.71021.11076.11025.61080.61030.21085.21034.71089.71039.3138、1094.31043.81098.81048.41103.41053.01108.01057.71112.71062.31117.31067.01122.01071.61126.61076.31131.31081.01136.01085.81140.81090.51145.51095.21150.21100.01155.01104.81159.81109.61164.61114.41169.41119.21174.21124.11179.11128.91183.91133.81188.81138.71193.71143.61198.61148.51203.51153.41208.41158.3139、1213.31163.31218.31168.21223.21173.21228.21178.21233.2510直径(mm)每根长度(cm)根数共长(m)每根长度(cm)根数&251297.7(平均)18233.581300.4(平均)38&16198.5(平均)228452.55294.4(平均)228&25766.9(平均)18138.04769.6(平均)38&1862218111.9662238&12225.21840.54225.238&1292.73633.3792.776&12195.2(平均)155302.56195.2(平均)310&1278.812497.7178.825140、0&25589.6953.06589.619&12421.0850.7&16714.31059.5&18223.6472.1&251636.53462.6合计2995.45845.0涵洞斜度14.7429.723272.0FC35混凝土合计(m3)1520共长(m)每根长度(cm)根数共长(m)每根长度(cm)根数494.141304.9(平均)58756.821311.8(平均)80671.31393.4(平均)228896.92497.1(平均)228292.44774.1(平均)58448.96781.0(平均)80236.3662258360.766228085.58225.25813141、0.62225.28070.4592.7116107.5392.7160605.12195.2(平均)465907.68195.2(平均)651197.0078.8374294.7178.8524112.02589.629170.98589.6401278.91786.41415.61788.8720.6994.05305.27360.38720.411929.545.1661.346398.99550.5FF25涵洞斜度共长(m)每根长度(cm)根数共长(m)钢筋编号直径(mm)1049.451321.7(平均)1041374.521x&251133.36607.6(平均)2281385.3142、62x&16624.81790.9(平均)104822.493x&25497.60622104646.884&18180.16225.2104234.215&12148.3292.7208192.826&121270.75195.2(平均)8371633.827x&12412.9178.8674531.118&12235.84589.652306.599&252301.2钢筋合计(kg)&122186.6&161292.2&189647.3&2515427.2合计78.59C35混凝土合计(m3)13091.716921.3FF3035每根长度(cm)根数共长(m)每根长度(cm)根数共长(m143、)1334.8(平均)1301735.261351.6(平均)1582135.61727.5(平均)2281658.79860.2(平均)2281961.31804.0(平均)1301045.22820.8(平均)1581296.94622130808.60622158982.76225.2130292.76225.2158355.8292.7260241.0292.7316292.93195.2(平均)10231996.90195.2(平均)12402420.4878.8824649.3178.81000788.00589.665383.24589.679465.782823.23424.5144、2618.13095.61615.21963.112190.915021.719247.523504.997.30118.0121073.425718.4FF4045每根长度(cm)根数共长(m)每根长度(cm)根数共长(m)1373.9(平均)1902610.461404.1(平均)2283201.271010.2(平均)2282303.321184.0(平均)2282699.52843.1(平均)1901601.94873.3(平均)2281991.046221901181.806222281418.16225.2190427.88225.2228513.4692.7380352.2692145、.7456422.71195.2(平均)14882904.58195.2(平均)17983509.7078.81200945.6078.814501142.60589.695560.12589.6114672.144110.94961.53635.44260.82360.72832.918390.222597.828497.234653.0141.42168.5331153.137861.6FF低填土构造净高顶底板厚1净跨侧墙厚1倒角500606005025高填土构造顶底板厚2侧墙厚27060主筋边距组合间距斜布区组合间距6.51012.5低填土1#重合段1R13#弯钩1272025高填土1#146、重合段2R23#弯钩2302027.5正涵身材料数量表(适用于填土0.53.5)(每10m)钢筋编号直径(mm)每根长度(cm)根数共长(m)1&221303.82022633.687858.9992242&1211682362756.484472.6011853&227422021498.842630.8949874&186522021317.04353.29673655&12197202397.94298.77784936&1283.3404336.532214.9345577&1278.931622494.82839.26130738&1268.71376945.312447.24176147、69&22561.8101567.421693.19902钢筋合计(kg)&12:6153.5&16:0.022809.222809.20663&18:2630.9&22:14024.8C35混凝土合计(m3)135.25斜布钢筋尺寸计算表(cm),适用于填土0.53.540656.8钢筋尺寸aiLi钢筋编号1xi (i=1,2,3.)Bi-40ai+656.82xi(平均)1/2(L1+L2)ai+843xi (i=1,2,3.)Bi+4ai+506876.2522)25.6(687i截面面积1(cm2)135250斜涵端部长度及一端斜布筋组合片数,填土厚度:0.53.5截面面积2(cm2)148、斜交角度()5101520162050L2=700tan(cm)61.2123.4187.6254.8L1=2700tan(cm)122.5246.9375.1509.6组合片数n8182839填土高度0.53.5miBiai(1x)Li(1x)ai(3x)1687.0647.01303.8691.02687.1647.11303.9691.13687.3647.31304.1691.34687.5647.51304.3691.55687.7647.71304.5691.76688.0648.01304.8692.07688.4648.41305.2692.48688.8648.81305.6149、692.89689.3649.31306.1693.310689.8649.81306.6693.811690.4650.41307.2694.412691.1651.11307.9695.113691.8651.81308.6695.814692.5652.51309.3696.515693.4653.41310.2697.416694.2654.21311.0698.217695.2655.21312.0699.218696.2656.21313.0700.219697.2657.21314.0701.220698.3658.31315.1702.321699.4659.41316.270150、3.422700.6660.61317.4704.623701.9661.91318.7705.924703.2663.21320.0707.225704.5664.51321.3708.526706.0666.01322.8710.027707.4667.41324.2711.428708.9668.91325.7712.95029710.5670.51327.3714.530712.1672.11328.9716.131713.8673.81330.6717.832715.5675.51332.3719.533717.3677.31334.1721.334719.1679.11335.97151、23.135721.0681.01337.8725.036722.9682.91339.7726.937724.9684.91341.7728.938726.9686.91343.7730.939729.0689.01345.8733.040731.1691.11347.9735.141733.2693.21350.0737.242735.4695.41352.2739.443737.7697.71354.5741.744740.0700.01356.8744.045742.3702.31359.1746.346744.7704.71361.5748.747747.2707.21364.075152、1.248749.6709.61366.4753.649752.2712.21369.0756.250754.7714.71371.5758.751757.3717.31374.1761.352760.0720.01376.8764.053762.7722.71379.5766.754765.4725.41382.2769.455768.2728.21385.0772.256771.0731.01387.8775.057773.9733.91390.7777.958776.8736.81393.6780.859779.7739.71396.5783.760782.7742.71399.5786153、.761785.7745.71402.5789.762788.7748.71405.5792.763791.8751.81408.6795.864795.0755.01411.8799.065798.1758.11414.9802.166801.3761.31418.1805.367804.6764.61421.4808.668807.8767.81424.6811.869811.1771.11427.9815.170814.5774.51431.3818.571817.9777.91434.7821.972821.3781.31438.1825.373824.7784.71441.5828.154、774828.2788.21445.0832.275831.7791.71448.5835.776835.2795.21452.0839.277838.8798.81455.6842.878842.4802.41459.2846.479846.0806.01462.8850.080849.7809.71466.5853.781853.4813.41470.2857.482857.1817.11473.9861.183860.9820.91477.7864.984864.6824.61481.4868.685868.4828.41485.2872.486872.3832.31489.1876.3155、87876.1836.11492.9880.188880.0840.01496.8884.089884.0844.01500.8888.090887.9847.91504.7891.991891.9851.91508.7895.992895.9855.91512.7899.993899.9859.91516.7903.994903.9863.91520.7907.995908.0868.01524.8912.096912.1872.11528.9916.197916.2876.21533.0920.298920.4880.41537.2924.499924.6884.61541.4928.61156、00928.8888.81545.6932.8101933.0893.01549.8937.0102937.2897.21554.0941.2103941.5901.51558.3945.5104945.8905.81562.6949.8105950.1910.11566.9954.1106954.4914.41571.2958.4107958.7918.71575.5962.7108963.1923.11579.9967.1109967.5927.51584.3971.5110971.9931.91588.7975.9111976.3936.31593.1980.3112980.8940.8157、1597.6984.8113985.3945.31602.1989.3114989.8949.81606.6993.8115994.3954.31611.1998.3116998.8958.81615.61002.81171003.3963.31620.11007.31181007.9967.91624.71011.91191012.5972.51629.31016.51201017.1977.11633.91021.11211021.7981.71638.51025.71221026.3986.31643.11030.31231031.0991.01647.81035.01241035.79158、95.71652.51039.71251040.31000.31657.11044.31261045.01005.01661.81049.01271049.81009.81666.61053.81281054.51014.51671.31058.51291059.21019.21676.01063.21301064.01024.01680.81068.01311068.81028.81685.61072.81321073.61033.61690.41077.61331078.41038.41695.21082.41341083.21043.21700.01087.21351088.11048.159、11704.91092.11361092.91052.91709.71096.91371097.81057.81714.61101.81381102.71062.71719.51106.71391107.61067.61724.41111.61401112.51072.51729.31116.51411117.41077.41734.21121.41421122.31082.31739.11126.31431127.31087.31744.11131.31441132.21092.21749.01136.21451137.21097.21754.01141.21461142.21102.217160、59.01146.21471147.21107.21764.01151.21481152.21112.21769.01156.21491157.21117.21774.01161.21501162.31122.31779.11166.32530354045326.4404.1490.1587.4700.0652.8808.3980.31174.71400.051637792110Li(3x)741.0741.1741.3741.5741.7涵洞斜度742.0钢筋编号直径(mm)742.4742.81x&22743.32x&12743.83x&22744.44&18745.15&12745.86161、&12746.57&12747.48&12748.29&22749.2钢筋合计(kg)&12750.2&16751.2&18752.3&22753.4合计斜涵端部长度及一端斜布筋组合片数,填土厚度:0.53.5754.6C35混凝土合计(m3)755.9757.2758.5760.0761.4762.9764.5766.1767.8769.5771.3773.1775.0776.9778.9780.9783.0785.1787.2789.4791.7794.0796.3798.7801.2803.6806.2808.7811.3814.0816.7819.4822.2825.0827.9830162、.8833.7836.7839.7842.7845.8849.0852.1855.3858.6861.8865.1868.5871.9875.3878.7882.2885.7889.2892.8896.4900.0903.7907.4911.1914.9918.6922.4926.3930.1934.0938.0941.9945.9949.9953.9957.9962.0966.1970.2974.4978.6982.8987.0991.2995.5999.81004.11008.41012.71017.11021.51025.91030.31034.81039.31043.81048.310163、52.81057.31061.91066.51071.11075.71080.31085.01089.71094.31099.01103.81108.51113.21118.01122.81127.61132.41137.21142.11146.91151.81156.71161.61166.51171.41176.31181.31186.21191.21196.21201.21206.21211.21216.3510每根长度(cm)根数共长(m)每根长度(cm)根数共长(m)1304.5(平均)16208.721307.1(平均)36470.56175.9(平均)236415.04269.1164、(平均)236635.18741.7(平均)16118.68744.3(平均)36267.9565216104.3265236234.721971631.521973670.9283.33226.6683.37259.9878.9310244.5978.9620489.1868.711075.5768.7244167.63561.8844.94561.818101.12704.41263.30.00.0208.4468.91111.12505.52023.84237.612.4225.042244.34689.6FF1520每根长度(cm)根数共长(m)每根长度(cm)根数共长(m)1311.165、6(平均)56734.471318.5(平均)781028.43365.3(平均)236862.22466.2(平均)2361100.16748.8(平均)56419.30755.7(平均)78589.4465256365.1265278508.5619756110.3219778153.6683.311293.3083.3156129.9578.9930733.7778.91240978.3668.7380261.0668.7514353.12561.828157.30561.839219.101829.52410.60.00.0729.41015.93912.35481.66471.289166、08.138.0551.697155.59823.8FF25涵洞斜度30每根长度(cm)根数共长(m)钢筋编号直径(mm)每根长度(cm)1328.4(平均)1021354.971x&221340.6(平均)573.6(平均)2361353.752x&12690.2(平均)765.6(平均)102780.913x&22777.8(平均)652102665.044&18652197102200.945&1219783.3204169.936&1283.378.916121271.877&1278.968.7676464.418&1268.7561.851286.529&22561.83072.6167、钢筋合计(kg)&123753.80.0&160.01328.5&181641.17228.5&229021.011629.7合计14415.866.22C35混凝土合计(m3)81.9912823.6F3540根数共长(m)每根长度(cm)根数共长(m)每根长度(cm)1261689.141357.4(平均)1542090.441378.3(平均)2361628.91819.2(平均)2361933.35965.1(平均)126980.01794.6(平均)1541223.73815.5(平均)126821.526521541004.08652126248.22197154303.38197168、252209.9283.3308256.5683.319841565.3878.924181907.8078.9838575.7168.71028706.2468.763353.93561.877432.59561.84534.45416.00.00.02005.72396.511180.513587.817720.621400.2303753.80.01641.19021.014415.899.44119.1615888.019517.7FF81.9945根数共长(m)每根长度(cm)根数共长(m)1842536.091406.8(平均)2203094.882362277.531134.0(169、平均)2362676.241841500.54844.0(平均)2201856.721841199.686522201434.40184362.48197220433.40368306.5483.3440366.5229142299.1578.934722739.411244854.6368.714861020.8892516.86561.8110617.986424.60.02865.316619.925909.8405416.00.02396.513587.821400.2142.0123568.328494.3FF119.16正涵身材料数量表(适用于填土3.56)(每10m)钢筋编号直径170、(mm)每根长度(cm)根数共长(m)1&251346.82022720.542&1612082362850.883&257682021551.364&186722021357.445&12225.2202454.906&1292.7404374.517&12197.615813124.068&1278.813761084.299&25589.6101595.50钢筋合计(kg)&12:4472.6&16:4499.630439.6&18:2711.6&25:18755.8C35混凝土合计(m3)162.05斜布钢筋尺寸计算表(cm),适用于填土3.56.040钢筋尺寸ai钢筋编号1xi (i171、=1,2,3.)Bi-402xi(平均)1/2(L1+L2)3xi (i=1,2,3.)Bi+47076.2522)25.6(707i斜涵端部长度及一端斜布筋组合片数,填土厚度:3.56.0斜交角度()51015L2=720tan(cm)63.0127.0192.9L1=2720tan(cm)126.0253.9385.8组合片数n91929填土高度3.56.0miBiai(1x)Li(1x)1707.0667.01346.82707.1667.11346.93707.2667.21347.04707.4667.41347.25707.7667.71347.56708.0668.01347.8172、7708.4668.41348.28708.8668.81348.69709.2669.21349.010483.2038910709.8669.81349.65977.94816511710.3670.31350.12711.59728812711.0671.01350.8403.87017813711.7671.71351.5332.493476914712.4672.41352.22773.58091615713.2673.21353.0962.646157416714.0674.01353.84499.64696117714.9674.91354.72294.66031118715.9173、675.91355.730439.6473419716.9676.91356.720718.0678.01357.821719.1679.11358.922720.2680.21360.023721.5681.51361.324722.7682.71362.5679.825724.1684.11363.9Li26725.4685.41365.227726.9686.91366.7ai+679.828728.3688.31368.1ai+1045529729.9689.91369.7ai+5530731.4691.41371.231733.1693.11372.932734.7694.71374174、.533736.5696.51376.334738.2698.21378.035740.1700.11379.936741.9701.91381.737743.9703.91383.738745.8705.81385.639747.8707.81387.640749.9709.91389.741752.0712.01391.842754.2714.21394.043756.4716.41396.244758.6718.61398.445760.9720.91400.746763.2723.21403.047765.6725.61405.448768.0728.01407.849770.5730175、.51410.350773.0733.01412.851775.5735.51415.352778.1738.11417.9斜布钢筋尺寸计算表(cm),适用于填土3.56.053780.8740.81420.654783.4743.41423.255786.1746.11425.956788.9748.91428.757791.7751.71431.558794.5754.51434.359797.4757.41437.260800.3760.31440.161803.2763.21443.062806.2766.21446.063809.3769.31449.164812.3772.3145176、2.165815.4775.41455.266818.5778.51458.367821.7781.71461.568824.9784.91464.769828.1788.11467.970831.4791.41471.271834.7794.71474.572838.1798.11477.973841.4801.41481.274844.8804.81484.675848.3808.31488.176851.7811.71491.577855.2815.21495.078858.8818.81498.679862.3822.31502.180865.9825.91505.781869.682177、9.61509.482873.2833.21513.083876.9836.91516.784880.6840.61520.485884.4844.41524.286888.1848.11527.987891.9851.91531.788895.7855.71535.589899.6859.61539.490903.5863.51543.391907.4867.41547.292911.3871.31551.193915.3875.31555.194919.2879.21559.095923.2883.21563.096927.3887.31567.197931.3891.31571.1989178、35.4895.41575.299939.5899.51579.3100943.6903.61583.4101947.8907.81587.6102952.0912.01591.8103956.2916.21596.0104960.4920.41600.2105964.6924.61604.4106968.9928.91608.7107973.2933.21613.0108977.5937.51617.3109981.8941.81621.6110986.2946.21626.0111990.5950.51630.3112994.9954.91634.7113999.3959.31639.11179、141003.7963.71643.51151008.2968.21648.01161012.7972.71652.51171017.1977.11656.91181021.6981.61661.41191026.2986.21666.01201030.7990.71670.51211035.3995.31675.11221039.8999.81679.61231044.41004.41684.21241049.01009.01688.81251053.71013.71693.51261058.31018.31698.11271063.01023.01702.81281067.61027.61180、707.41291072.31032.31712.11301077.01037.01716.81311081.81041.81721.61321086.51046.51726.31331091.21051.21731.01341096.01056.01735.81351100.81060.81740.61361105.61065.61745.41371110.41070.41750.21381115.21075.21755.01391120.11080.11759.91401124.91084.91764.71411129.81089.81769.61421134.71094.71774.51181、431139.61099.61779.41441144.51104.51784.31451149.41109.41789.21461154.31114.31794.11471159.31119.31799.11481164.21124.21804.01491169.21129.21809.01501174.21134.21814.0202530354045262.1335.7415.7504.1604.2720.0524.1671.5831.41008.31208.31440.04052657995114ai(3x)Li(3x)711.0766.0711.1766.1711.2766.2711182、.4766.4711.7766.7涵洞斜度712.0767.0钢筋编号712.4767.4712.8767.81x713.2768.22x713.8768.83x714.3769.34715.0770.05715.7770.76716.4771.47x717.2772.28718.0773.09718.9773.9钢筋合计(kg)719.9774.9720.9775.9722.0777.0723.1778.1斜涵端部长度及一端斜布筋组合片数,填土厚度:3.56.0填土高度3.56.0m724.2779.2C35混凝土合计(m3)725.5780.5726.7781.7728.1783.1729183、.4784.4730.9785.9732.3787.3733.9788.9735.4790.4737.1792.1738.7793.7740.5795.5742.2797.2744.1799.1745.9800.9747.9802.9749.8804.8751.8806.8753.9808.9756.0811.0758.2813.2760.4815.4762.6817.6764.9819.9767.2822.2769.6824.6772.0827.0774.5829.5777.0832.0779.5834.5782.1837.1784.8839.8787.4842.4790.1845.1792184、.9847.9795.7850.7798.5853.5801.4856.4804.3859.3807.2862.2810.2865.2813.3868.3816.3871.3819.4874.4822.5877.5825.7880.7828.9883.9832.1887.1835.4890.4838.7893.7842.1897.1845.4900.4848.8903.8852.3907.3855.7910.7859.2914.2862.8917.8866.3921.3869.9924.9873.6928.6877.2932.2880.9935.9884.6939.6888.4943.4892185、.1947.1895.9950.9899.7954.7903.6958.6907.5962.5911.4966.4915.3970.3919.3974.3923.2978.2927.2982.2931.3986.3935.3990.3939.4994.4943.5998.5947.61002.6951.81006.8956.01011.0960.21015.2964.41019.4968.61023.6972.91027.9977.21032.2981.51036.5985.81040.8990.21045.2994.51049.5998.91053.91003.31058.31007.710186、62.71012.21067.21016.71071.71021.11076.11025.61080.61030.21085.21034.71089.71039.31094.31043.81098.81048.41103.41053.01108.01057.71112.71062.31117.31067.01122.01071.61126.61076.31131.31081.01136.01085.81140.81090.51145.51095.21150.21100.01155.01104.81159.81109.61164.61114.41169.41119.21174.21124.111187、79.11128.91183.91133.81188.81138.71193.71143.61198.61148.51203.51153.41208.41158.31213.31163.31218.31168.21223.21173.21228.21178.21233.2510直径(mm)每根长度(cm)根数共长(m)每根长度(cm)根数&251347.7(平均)18242.581350.4(平均)38&16198.5(平均)236468.43294.4(平均)236&25766.9(平均)18138.04769.6(平均)38&1867218120.9667238&12225.21840.5188、4225.238&1292.73633.3792.776&12195.2(平均)155302.56195.2(平均)310&1278.8134105.5978.8270&25589.6953.06589.619&12428.0864.6&16739.31096.7&18241.6510.1&251671.13535.9合计3080.16007.3涵洞斜度15.3130.863362.2FC35混凝土合计(m3)1520共长(m)每根长度(cm)根数共长(m)每根长度(cm)根数513.141354.9(平均)58785.821361.8(平均)80694.86393.4(平均)236928.3189、9497.1(平均)236292.44774.1(平均)58448.96781.0(平均)80255.3667258389.766728085.58225.258130.62225.28070.4592.7116107.5392.7160605.12195.2(平均)465907.68195.2(平均)651212.7678.8404318.3578.8566112.02589.629170.98589.6401299.91815.81465.31851.6778.61073.95416.97514.48960.712255.746.8963.706572.29807.2FF25涵洞斜度共长(190、m)每根长度(cm)根数共长(m)钢筋编号直径(mm)1089.451371.7(平均)1041426.521x&251173.13607.6(平均)2361433.962x&16624.81790.9(平均)104822.493x&25537.60672104698.884&18180.16225.2104234.215&12148.3292.7208192.826&121270.75195.2(平均)8371633.827x&12446.0178.8728573.668&12235.84589.652306.599&252339.0钢筋合计(kg)&122263.3&161396.1&18191、9847.6&2515845.9合计81.61C35混凝土合计(m3)13440.817369.5FF3035每根长度(cm)根数共长(m)每根长度(cm)根数共长(m)1384.8(平均)1301800.261401.6(平均)1582214.61727.5(平均)2361716.99860.2(平均)2362030.13804.0(平均)1301045.22820.8(平均)1581296.94672130873.606721581061.76225.2130292.76225.2158355.8292.7260241.0292.7316292.93195.2(平均)10231996.90192、195.2(平均)12402420.4878.8890701.3278.81080851.04589.665383.24589.679465.782869.43480.52710.03204.21745.12121.012441.415326.119765.924131.7101.04122.5521627.826388.9FF4045每根长度(cm)根数共长(m)每根长度(cm)根数共长(m)1423.9(平均)1902705.461454.1(平均)2283315.271010.2(平均)2362384.141184.0(平均)2362794.24843.1(平均)1901601.94873.3(平均)2281991.046721901276.806722281532.16225.2190427.88225.2228513.4692.7380352.2692.7456422.71195.2(平均)14882904.58195.2(平均)17983509.7078.812961021.2578.815661234.01589.695560.12589.6114672.144178.05042.73763.04410.32550.53060.618756.323037.129247.835550.7146.85175.0131956.038822.6FF
CAD图纸
上传时间:2023-12-21
14份
合同表格
上传时间:2021-01-21
420份