碎石基层施工方案翻译-4月6日修改(10页)
碎石基层施工方案翻译-4月6日修改(10页).doc
下载文档 下载文档
其它文档
上传人:正*** 编号:700729 2023-07-10 10页 60.50KB
1、Crushed Stone Base Construction Programme1. Purpose and Basis of the Programme1。1 Purpose: To guide the base construction in accordance with the Specification。1。2 Basis of the Programme1.2。1 Design DrawingsDWG. No.: TS001/2 TS-002/2 CS001/2CS037/2 CRS-001/2CRS070/21。2.2 SpecificationsWoretaWoldiya R2、oad Upgrading Project CONTRACT 2: Gob Gob - Gashena Bidding Documents Volume Ib Section Vi - Technical Specification:Part 1:General Specification 1205 Workmanship and Quality Control 1219 Remedial Work 3200 Placing and CompactionPart 2:Particular Specification 3407 Classification of Fill 3408 The Ca3、pping Layer 3700 Crushed Stone Base1。2.3 Other StandardsBS812: PART 1BS812: PART 3AASHTO T96AASHTO T104AASHTO T180 DAASHTO T1912。 GeneralThe WoretaWoldiya Road Upgrading Project Contract 2: Gob Gob Gashena with the initial station of 98+878。63 and terminal station of 184+800 has a total length of 854、.92137Km. The base course will be crushed stone base with a quantity of 187600m3。According to the general programme, the construction of base course will be divided into two sections to cover the part from Sta.134+300 to Sta。184+800 and Sta.134+300 to Sta.98+684 respectively。 The road-mixing method 5、and plantmixing method will be adopted for the construction.3. MaterialsThe crushed aggregate will be employed as the material for base layer and the grading will conform to the grading given in Table 3702/1。 The Aggregate Crushing Value will be no more than 25, the Loss by abrasion will not exceed 6、35%, the Loss of Sodium Sulphate Soundness will not exceed 12 and the Loss of Magnesium Sulphate Soundness will not exceed 15%.Flakiness Index: 35 Max.Liquid Limit: 20% Max.Plasticity Index: 6 Max。CBR: 80 Min。Sand equivalent: 25 Min。The material shall be plastic enough to be well compacted.Table-3707、2/1 Grading envelope crushed stoneSieve size (mm)Percentage Passing (by weight)Tolerance on target Grading (% passing by Mass)50.010037.5951002.019。060806.09。540608。04.7525402.3615-300。68226。00。0755-102。04。 Workmanship4。1 Roadmixing methodThe process for road-mixing method will be as follows:Prepara8、tion of underlying layer Setting out Transportation and placing of aggregate Watering Mixing Shaping Rolling Maintenance.Prior to the commencement of any base course construction, a trial section of not less than 1000m2 in area will be laid to demonstrate the suitable construction methodology includ9、ing suitable equipment, mixing, paving method, rolling speed and passes and inspection etc., loose thickness and suitable length for execution. 4。1。1 Preparation of underlying layer and setting outThe underlying layer (subbase) will be checked and approved complying with the quality requirement with10、 an even and sound surface and specified crown before the commencement of base construction. Then the centreline will be reinstated over the underlying layer and one peg will be installed at an interval of every 15 to 20m for straight line and every 10 to 20m for smooth curve to fix the contour line11、 of the base course. And the indicating stake will be stand on the edge of both base sides, clearly marking the position of design level and loose thickness for the base。4.1.2 Transportation and placing of aggregateThe mixing ratio of crushed stone and chips will be calculated in accordance with Tab12、le-3702/1 Grading envelope crushed stone。 The quantity of loose material will be calculated using the coefficient of loose laying (obtained from the test), compaction thickness, dry compacted density, width of base and intended placing length。 The paving area and stockpiling distance of the loading 13、material will be calculated.The aggregate will be delivered before placing by dump truck with uniform loading capacity and the unloading distance will be strict controlled over the underlying layer。The underlying layer will be watered to suitable moisture content and where the area of which is too w14、et will be dried out to required moisture then spread by grader. Where oversize materials and layer exceeding the required thickness exist, it will be removed by hand and area without aggregate will be made good with qualified materials. The deleterious material will be removed and the loose thickne15、ss will be checked to reach designed requirement. The traffic will be forbidden over loose crushed stone layer except the water truck.4.1.3 WateringThe water content will be tested on loose crushed stone layer and suitable content will be 1% more than optimum water content。 The water will be equally16、 added into the material to avoid excess moisture if the water content is not satisfactory。4。1。4 MixingOn the completion of placing, the mixing frequency will be fixed by the test and the mixing will be carried out with grader。 The aggregate will be mixed uniformly without segregation of coarse and 17、fine materials and the water content will be 1 more than optimum water content. 4。1.5 ShapingThe shaping of the work will be initially carried out by grader after mixing the aggregate uniformly。 It will be bladed more than one time, if necessary, from both sides to the center of the road for straigh18、t line section and from inside to outside of the road for smooth curve。 The surface after shaping will be rolled quickly by grader to expose the existing unflatness。 The defects and discrepancies will be scarified, remixed and leveled. Then the materials exceeding the road level will be bladed out o19、f the road by grader. The shaping work must have required slope and crown. The special care must be taken to make the joints clean and neat. In the process of shaping, the traffic and segregation of coarse and fine materials will be forbidden。 4。1。6 RollingWhere the water content of mixture after Sh20、aping arrives at the optimum water content or 1 more than optimum water content, the vibratory roller of 20T will be employed to roll full width of the surface. The rolling will be started from both shoulders to road center for straight line and smooth curve without superelevation and from inside sh21、oulder to outside shoulder for curve with superelevation. The overlap width will be one half width of the wheel when rolling. The rear wheel of the roller must exceed the joint of two adjacent sections. The suitable rolling speed will be 1。5 -1。7Km/h in the first two passes and then changed into 2。022、 2。5Km/h。 The rolling passes will be as specified in the trial section. The stabilized crushed stone surface will be maintained moisture during rolling and watered to avoid rapid evaporation。 The surface which appears as springing, loosening or scaling will be scarified, remixed or replaced with sui23、table materials to required quality. Prior to the completion of rolling, the grader will be adopted in leveling work for the purpose of required crown and superelevation。 Care must be taken to blade the material exceeding the surface level out of the road。 The defects and discrepancies in local area24、 will be left to remedy when placing the base layer。 The turning or emergent braking of roller on the completed section or rolling section will be forbidden to ensure undamaged surface。4.1.7 Areas inaccessible to mechanical equipmentThe materials on the area that cannot be reached by the equipment w25、ill be placed by hand with loose thickness of each layer not more than 100mm. The density will be tamped with the vibrating tamper to the required density.4。1.8 MaintenanceThe completed base will be watered, bladed or cleaned by water truck, broom drag and sweeper, keeping maintenance until such tim26、e as the prime coat is applied. The unprimed base course will not be open to traffic unless otherwise approved or designated by the Engineer.4。1。9 Joint treatment(a) Transverse joint treatmentThe overlapping of two sections will be mixed, shaped and compacted together. A length of 5-8m in the first 27、section left uncompacted after mixing will be mixed, shaped and rolled with the second section to design requirement。(b) Longitudinal joint treatmentThe base course will be divided into two parts from the centerline of the road for construction when the temporary road cannot be got. Therefore, the l28、ongitudinal joint will be overlapped to mix。 The side of first part with a width of 300mm will be overlapped with the second part for mixing, shaping and rolling to design requirement。 4.2 Plant-mixing methodThe process for plantmixing method will be as follows:Preparation of underlying layer Settin29、g out Transportation and placing of aggregate Rolling Maintenance。Prior to the commencement of any base course construction, a trial section of not less than 1000m2 in area will be laid to demonstrate the suitable construction methodology including suitable equipment, mixing, paving method, rolling 30、speed and passes and inspection etc。, loose thickness and suitable length for execution. 4.2。1 Preparation of underlying layer and setting outThe underlying layer (subbase) will be checked and approved complying with the quality requirement with an even and sound surface and specified crown before t31、he commencement of base construction. Then the centreline will be reinstated over the underlying layer and one peg will be installed at an interval of every 15 to 20m for straight line and every 10 to 20m for smooth curve to fix the contour line of the base course. And the indicating stake will be s32、tand on the edge of both base sides, clearly marking the position of design level and loose thickness for the base。4。2.2 Transportation and placing of aggregateThe aggregate will be watered by sprinkling using water tank and mixed uniformly by loader in stock pile then delivered to construction site33、 by dump truck. The spreader will be employed to carry out spreading work as per specified crown, width and thickness。The segregation of fine and coarse materials will be eliminated by appointed persons。 The accumulation of coarse material will be treated with fine material to mix uniformly and even34、ly. On the contrary, the fine material will be treated using coarse material.4.2.3 RollingWhere the water content of mixture after paving with spreader arrives at the optimum water content or more than optimum water content, the vibratory roller of 20T will be employed to roll full width of the surf35、ace. The rolling will be started from both shoulders to road center for straight line and smooth curve without superelevation and from inside shoulder to outside shoulder for curve with superelevation。 The overlap width will be one half width of the wheel when rolling。 The rear wheel of the roller m36、ust exceed the joint of two adjacent sections。 The suitable rolling speed will be 1。5 1。7Km/h in the first two passes and then changed into 2.0 2.5Km/h. The number of rolling passes will be as specified in the trial section。 4.2。4 Areas inaccessible to mechanical equipmentThe materials on the area t37、hat cannot be reached by the equipment will be placed by hand with loose thickness of each layer not more than 100mm. The density will be tamped with the vibrating tamper to 95 of required AASHTO T180 density.4。2.5 MaintenanceThe completed base will be watered, bladed or cleaned, keeping maintenance38、 until such time as the prime coat is applied。 The damaged base part caused by the opening of the road to traffic will be scarified and restored. 4。2.6 Joint treatment4.2。6.1 Joint treatment in the same layer(a) Transverse joint treatmentThe mixture near the spreader left uncompacted will be rolled 39、and compacted with the mixture paved in the following day. Special attention will be paid to the water content of the mixture. The water if necessary will be added into the mixture to specified requirements。(b) Longitudinal joint treatmentThe half width construction method will be employed in this P40、roject when the detour road cannot be constructed。 Therefore, the longitudinal joint will be joined vertically。 When the construction of the first half width starts, the wooden form or steel form will be made as bracing for the side near the other half width. The height of the forms will be the same41、 as the compacted thickness of the mixture. And the forms will be removed prior to the construction of second half width。 Alternatively, a slope will be formed in the area of 30cm near the uncompacted boundary when the forms are not applied to the first half width construction。 Therefore, prior to t42、he construction of the other half width, the uncompacted area and the portion doesnt meet the crown requirements will be scarified and watered and then leveled and rolled with the placed mixture.4.2.6.2 Joint treatment in different layersThe overlap for the transverse joint and longitudinal joint of43、 the first layer and second layer will be stagger.4。3 Quality ControlThe field density, plasticity index, liquid limit and grading of materials, ACV, LAA, Soundness and Flakiness index will be checked complying with the testing frequency specified in Clause 3705(a) for the purpose of process control44、。 The construction tolerance of surface level, thickness, width and cross section for base course will be checked for approval。5. Manpower ArrangementThe construction management staff will be qualified engineers, safety staff, dispatcher and statistician etc。.The construction operation staff will be45、 as follows:NoType of WorkQuantityWork ScopeRequirement1Engineer2Construction technical guidance, supervision and quality controlProfessional technology and skill2Foreman4Construction organization and management on SiteAbility of management3Operator16Equipment operation like truck, excavator, spread46、er and grader etc.Skilled worker4Others10To assist foremanUnskilled worker5Interpreter1To overcome language problemFluent in Engineering English6. Construction Equipment ArrangementMain construction equipmentNo。DescriptionSpecification and TypeUnitQuantity1Water truck10t SGZ5141 GSSset22GraderMG530set23SpreaderWTS75set14Steel wheel roller20t SD-200DXset25Rammerset26Loader3m3 CAT 950Hset27Dump truck15t FV517JD1LB9Bset6
会员尊享权益 会员尊享权益 会员尊享权益
500万份文档
500万份文档 免费下载
10万资源包
10万资源包 一键下载
4万份资料
4万份资料 打包下载
24小时客服
24小时客服 会员专属
开通 VIP
升级会员
  • 周热门排行

  • 月热门排行

  • 季热门排行

  1. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  2. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  3. 陕西化学工业公司招聘管理与职业发展管理手册30页.doc
  4. 动火作业安全告知卡(1页).docx
  5. 高处作业安全告知卡(1页).docx
  6. 广场工程建设项目施工招标评标报告表格(24页).pdf
  7. 建筑工程外脚手架专项施工方案(悬挑式脚手架、落地式脚手架)(25页).doc
  8. 2020柏向堂房地产公司材料标准化手册3.0(143页).pdf
  9. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  10. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  11. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  12. 工程变形测量之基坑监测培训课件(155页).ppt
  13. 房地产开发企业拿地操作指引方案.pdf
  14. 新规下的户型增值秘籍.ppt(22页)
  15. 房地产开发贷款实操指南(5页).pdf
  16. 鄂尔多斯空港物流园区总体规划方案(2017-2030)环境影响评价报告书(23页).doc
  17. 规划兰园西路道路工程环境方案环境影响评价报告书(89页).pdf
  18. 屋面圆弧形穹顶结构高支模施工方案(40米)(47页).doc
  19. 埋石混凝土挡土墙施工方案(23页).doc
  20. 重庆市五小水利工程建设规划报告(64页).doc
  21. 厂区至矿区管网蒸汽管道系统扩容改造工程施工组织设计方案(105页).doc
  22. 超高纯氦气厂建设项目办公楼、变电站、水泵房及消防水池、门卫、厂房、仓库、配套工程施工组织设计方案(140页).doc
  1. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  2. 2024大楼室内精装修工程专业分包投标文件(393页).docx
  3. 苏州水秀天地商业项目购物中心100%室内设计方案(158页).pptx
  4. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  5. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  6. 室内移动式操作平台工程施工方案(19页).doc
  7. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  8. 矿山治理工程施工组织设计方案(240页).docx
  9. 老旧小区改造工程施工方案及技术措施(364页).doc
  10. 北京科技园公寓建设项目整体报告方案.ppt
  11. 川主寺城镇风貌整治景观规划设计方案(60页).pdf
  12. 建筑工程三级安全教育内容(24页).doc
  13. 新疆风电十三间房二期工程49.5mw风电项目可行性研究报告(附表)(239页).pdf
  14. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  15. 四川凉山攀西灵山国际度假区小镇活力中心商业业态规划方案建议书(33页).pdf
  16. 埋石混凝土挡土墙施工方案(23页).doc
  17. 地下停车场环氧地坪漆施工方案(45页).doc
  18. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  19. 地铁深基坑及钢筋笼吊装安全专项施工方案【98页】.doc
  20. 住宅定价策略及价格表制定培训课件.ppt
  21. 西安名京九合院商业项目招商手册(28页).pdf
  22. 2010-2030年湖北咸宁市城市总体规划(32页).doc
  1. 建筑工程夜间施工专项施工方案(18页).doc
  2. 赣州无动力亲子乐园景观设计方案(111页).pdf
  3. 2016泰安乡村旅游规划建设示范案例(165页).pdf
  4. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  5. 龙山县里耶文化生态景区里耶古城片区旅游修建性详细规划2015奇创.pdf
  6. 连云港市土地利用总体规划2006-2020年调整方案文本图集(78页).pdf
  7. 850亩项目塑钢门窗工程施工组织设计方案(34页).doc
  8. 老旧小区改造工程施工方案及技术措施(364页).doc
  9. 城市更新项目地价公式测算表.xlsx
  10. 房地产项目规划前期投资收益测算模板带公式.xls
  11. 存储器基地项目及配套设施建筑工程临时用水施工方案(40页).docx
  12. 铁路客运枢纽项目站前框构中桥工程路基注浆加固专项施工方案(19页).doc
  13. 室内移动式操作平台工程施工方案(19页).doc
  14. 装配式结构工业厂房基础、主体结构、门窗及装饰工程施工方案(83页).doc
  15. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  16. 施工工程安全教育培训技术交底(13页).doc
  17. 老旧小区改造施工方案及技术措施(365页).doc
  18. 新建贵广铁路线下工程沉降变形观测及评估监理实施细则(126页).doc
  19. 消防火灾应急疏散演练预案(12页).doc
  20. 矿山治理工程施工组织设计方案(240页).docx
  21. 崖城站悬臂式挡墙施工方案(92页).doc
  22. 北京科技园公寓建设项目整体报告方案.ppt