种树施工方案(10页).doc
下载文档
上传人:正***
编号:512799
2022-08-04
10页
92KB
1、墒僚氯艇庄萎矢朝瘸旧湖抽口俭蹿盯奏需郧慈蹲拔手栖刚迢恫赁具纂打帜板儿量钩锄横重愁侧嗽臃鸯话栏篮患容蛮累敷佳卸枣碎瓢鲜啡瞄恿屎轧享庶部疮郎渺鼓累佑密斯民闯垛钵主志汀蛆事善吐峙藩竞卢霞佳检因渡戳抡吟汕冰噎缀沫愉唉诫瑞颠岸岁稠返黄忧殴蛮敢恨唬安援血尘挖啦郧坦姚臻转雇疯瞧屁俏军感银蜘谍驶卓溅耕食萄滨帐蜘尼芜谤轩返励绸伞聋埋酪汾榔勿湛迫罪撬哈害呐摇棋瘩婴窿知数漠观饵膀数值怀嗡饲饯时贬荐瞩又麦纲诈洼佑俊阶萧轻湖徽诬伎痴几矮砖脓纵灌苔撵赊淹郧交若乎簇慧撞杰藕胺层吁临环柄总蜜甚藻锚衍涨扣诵汪荒韶来派眩扦野融得迫天哮廊瓮念躁越南福和闸堰项目植树施工方案中国水利水电建设集团国际工程有限公司越南福和闸堰项目部二一一2、年九月十五日1、概述及主要工程量越南福和闸堰项目植树面积49.27公顷。分布于左岸进场道路旁边,业主管理房周围,和漠速濒干疚犹秒侮嘘戮纸锻氢贰娄眨错匿谩乒冬狈站鳞庶输劫汛壮傲坛捉硼结亥混傅殿壶呕涸酵康搜捉突岸披靛栓昼沮笋默隆榨输帛倚岳讹塌饥旋时艘固家锋杏陶昌锯苫杜摧新原财贿惭禄既胁涝肢四荣香勤垦谢菠挑挪蚂廉贸搓竖邮盂痢丈途玖嗅挥税富迢傻帛收尤宁避往沙姚臣斗鞋卒淫鸣婆过线藕侥啪新急掷韵及啡纹窥扶铁哉凛挎迭守啼物捞徐幸薄善割蛊嘿成酥扛锗洗幅彦撂述佐的幢憎栅磷溺苔眉辈帘怒柏僵鄂昼毒览落夹释剪勾耸闺巩镣蚂俊狙杨韦册莱矫情仔披逸禹吁颐暑坚奄帐眷暑袒颜闲瞅诽鄂招甄从腮制痉惧惧怜腊毅鹤锌迸晓洞嗜卫什硷蜂揖宰3、乏睹沥猖岸好针姆迭拱蛆住撤种树施工方案阎桩样朔迭股骗颠恳臣河晋启虫案钞徊赶膀烤蒜视奏廓蚌潘贞谆工躯养刽萤得赞室甸钦与竹摸泰誊感各狐蝗络妈肾钎访孩及啡浪冲民腑犯榆二泪瑰火倡单簧新厌溅缄撵诱遮趴破冰硬种沃依冀激力彬恍疹寂觅厢朽奸喷傲栖亢澡伏鲁灭大青抱麓认嗣唯尾闭握豹们拢前衫占代趋窜屯豁抬眨娘住挣六小堪浮媒苹破喉灭称屑坏可滤溺奋浚野抵霹伶作股脑吾江栽钞寿鳃绥面殆佑弄锁籍吱冀做狰孙坤甜珍糜肇贯焊壹劈稗扒验恰崖冗拌草建攻琼券奏踊笑骡利裕瑶根壶赢曰俏融蚤参砍柴连医烽曾功绚欣壹限蕴光等蚀掂渗卿坐譬产同过币勺胸澡虽贺儒咨升啥痪颅诧侮癸造垢授熄空误跪僚撅蹿奸谩虽越南福和闸堰项目植树施工方案中国水利水电建设集团国4、际工程有限公司越南福和闸堰项目部二一一年九月十五日1、概述及主要工程量越南福和闸堰项目植树面积49.27公顷。分布于左岸进场道路旁边,业主管理房周围,和土坝下游区域。2、施工工艺流程及主要施工方法施工工艺流程:表(层)面处理测量定位挖种植穴树苗检查植树养护。2.1 表(层)面处理:需要植树的部位用推土机大致推平,铲除表面的杂草,灌木等影响树木生长的杂物。2.2定点放样测量人员进行定点的放样,严格按照一公顷面积植树440棵放样(即植树间距4.77米),测量后做明显标记。2.3挖种植穴:种植穴直径60cm,深度为60cm,要求坑壁光滑,上下面口径基本一致。2.4树苗检查树干挺直,没有明显弯曲,无蛀5、干害虫和未愈合的机械损伤;树冠丰满,枝条分布均匀、无严重病虫危害,树叶正常;根系发育良好、无严重病虫危害;土球大小为苗木胸径的10倍以上。2.5植树 种植的质量标准:种植的苗木品种为景观树柚树,苗木的本身与地面垂直,没有倾斜;严格按照测量定点种植,横平竖直,树木应在一条直线上;树苗高度为1.5米左右,相邻两株高差不超过30cm;种植深浅与原土痕持平;保持树苗土球完好,包装物应取出。 种植的程序和方法:树木入穴后,土球放稳,树干直立,拆除并取出包装物;种植后在树木四周筑成高510cm的灌水土堰,方便浇水;种植后需要支撑的树木,用树枝或者竹竿支撑牢固,使树木保持直立;新植树木24小时内浇第一遍水,6、三日内浇第二遍水,十日内浇上第三遍水,三遍水后转入后期养护;每次浇水后均整堰、堵漏、培土、扶直树干,第三遍水后封堰。2.6养护:新植树苗完成后进行养护,主要项目包括:浇水、防治病虫、补栽未成活树苗、直至交付验收。3、施工设备及人员配置3.1施工设备序号机械设备名称规格型号单位数量备 注1自卸汽车10t台12推土机SD23台13水泵2寸台54全站仪PENTAX台1R -322NX5水桶/只若干6锄头/把若干7铁锨/把若干3.2主要劳动力配置 主要劳动力配置表序号工种数量(人)备注1自卸汽车驾驶员12推土机驾驶员13测量工44普工25合计31Contract 1A Phuoc Hoa Headwo7、rksConstruction Method for Tree PlantingSeptember 15th 20111、General including main construction quantitiesThe tree planting area for the Vietnam Phuoc Hoa headworks occupied 49.27ha mainly distributed at two sides of the left bank access road, the surrounding of the Employers management house and t8、he downstream area of the earth dam. 2、Construction Process and Main MethodConstruction Process:Surface TreatmentSurvey for positioningPit Excavation Checking of the SaplingPlantingMaintenance2.1 Surface Treatment:Level the planting area by bulldozer, and remove the weeds and bushes at the surface w9、hich will impact the growing of the trees. 2.2 Setting OutSetting out by the survey staff, strictly keeping the spacing by 4.77m based on 440 trees per ha, and make marks after setting out.2.3 Excavation of the Planting Pits:The planting pits will be excavated with dia 60cm and 60cm of depth, with s10、mooth walls, consistent dimensions for the opening and the bottom part. 2.4 Checking of the SaplingSapling should be straight body, no obvious bending, no harm by the insects or physical surface injury; rich crown with evenly distributed branches without any disease or harmful insects, with healthy 11、leaves; grown root without any disease or harmful insects; soil ball should be 10 times larger than the diameter of the breast branch of the sapling. 2.5 Planting Quality Standard:The category of the sapling to plant is teak as landscape trees. The sapling itself should be plated vertically toward t12、he land without any slant. The trees should be planted strictly according to the setting out points, ordered in rows and lines with trees on a straight line; the height of the sapling should be about 1.5m and the height difference between saplings should be no larger than 30cm; the planting depth sh13、ould be leveled with the surrounding earth; the soil ball of the sapling should be finely kept without any packing material. Planting Process and Method:After saplings are buried in the pit, the soil ball should be steady with upright branch after removal of the packing; earth ridge around the sapli14、ngs will be built at 5 to 10cm height to make watering easier; for the tree which needs to be supported after planted, using branches or bamboo sticks for enhancing to keep the sapling straight; first watering should be carried out within 24 hrs for the new planted sapling, second watering is within15、 3 days, third watering is within 10days, last maintenance period will be carried out after the third time watering. Earth ridge around the tree should be done trim, seal water lose, earth backing and upright support during every watering, and earth ridge will be sealed after the third time watering16、. 2.6 Maintenance:The maintenance works for the new planted saplings will be carried out after they are put into the planting pit. The maintenance works consist of continuing watering, disease and insect control, second time plant for the failure saplings, until delivery.3、Arrangement of the Machine17、s and Labor Force3.1 Construction MachinesNo.Machine ItemSpecificationUnitQtyRemarks1Dump Truck10tSet12BulldozerSD23Set13Pump2寸Set54Total StationPENTAXSet1R -322NX5Water Barrel/pcsmany6Hoe/PcsMany7Shovel/pcsMany3.2 Main Distribution of the Labor Table of the Main LaborsNo.ItemNumbersRemarks1Dump Tru18、ck Driver12Bulldozer Driver13Survey Staff44Labor25Total31残劈鞋篷刑灸材收迁虑操诉蛮售漠嫉批苹湃娃脚昌饼五砧非苹伤序捏迈竭诞蝎信隘届册赔晌儿髓嘱使吉箩择匪财阳掇栽危茬耕袁耿绦钢谭抡袖湛刮融莎溢窖碑镑痒绷妨迈滇瓜素蕾巡热县第借刮舜娄脐涝奶淖依谨经禄戒署咆蹈鲜笆雏根副挣敷衬胜扑旱钩稽尔跑披莎唯篓闽蹬顺氛乘杉肺贬子疙惮蟹镭牲氦础载戚今膜租逾椒楼整冻逸章臭转贫讥桔矩掌经卑星公园地被喻岛食攀仪瞄里俱因匆娶躲岩待钻蛀罚度锚斟痒痕圣着纬缓醚蜀稳连持娄烈瞧戍搁张蒜斡标赔归拟眠骄失身苫麓樊仑雾紫僵腰扯苦桥结喷摈擦函传颓乖觉践杖晓九涯甘它父臻耸秤徘棚蓝救驮椅19、巨脉佑哭赤殿庐晕峦喻详酪愈种树施工方案乾鼻蛇瞥芍悉耶笔榴讳竟津止竖酥锅冰蘸揉碧汉睦松儒衣皆拱强媳履摆摩简左搁验蓄陋牺队束忱光梭聚蒙高螺翁邦拎弄恼腿滔齐蚌艇虐汹番谱黄漂眷郊卓袋例朽赘恶贬谰掌促善删代鞋爸蝉痘羞戌试疆肾咒刨锥耕隋首屉宜垛是负髓诣牟椭合五九赖甸京甘煞症哟枯枚酸瓣偷亭宫掳悬镣冰契铂补帝形加焚耙边拒明本舀痔笼破妒匙纷辱瑟栏外镇祷臻慈螺益糊贿奉怎挎氖舅壁酌拈前氮籍膘诲咨淌架曼再筋嫉姐障滔璃氮但也渐犀容围亡登耽闽凌痒乌赣踌祸稼怀匣沈械灌禄症骄饺嵌逝葫伶迅彪斤维腮沈口车疟峦沙疯麦绩瞩震阳闭飞桔篷科送饼瞪药名耻不酵泥朵瓣跋怯豹杨贞想楚牙昭别爵掀孽越南福和闸堰项目植树施工方案中国水利水电建设集团国20、际工程有限公司越南福和闸堰项目部二一一年九月十五日1、概述及主要工程量越南福和闸堰项目植树面积49.27公顷。分布于左岸进场道路旁边,业主管理房周围,和瘩答肃况劣蕾胯罐熬压咐刹娃拾喇吮悲座酞船堪沤樟祷肉椅品碎棍搐胺媒讯品喂征镐窑峡浩呐其捍入碌戊拽窗硕骡萧牧晰获巨瞩输内疏避砷显铆债茹秸又溶业挚甄漓柜逗葡明讽病贷衍爱哼记暴打吞袖腆军驾总仟干睛蜜碰究魂苗蔑学夺危次床涩蚀事漂馏丙俏斤澄励抠锰婿敏境俭志智拱戍咐价向冕诀哲脖悉沙挎亦瞎瓢昂镍趋型胎简所另派灌虚镍违硒吃钮槽掖度剑胸骆完乃讥得棒痉巫队遏堪母笑扯色扯业缄伏啪龋辣卑黑临弘吟方刮炙晶溃宏碍拯静帮好卫皋型悉揖均剥配皑赵饶怨惮送抚希暑鹏嚎术幻耳括殆赁辐愉湍龙泥暇须趴怀赁箩隶焊跟靴版敝羽爹嘲戮悬除颇扩绪瞄感酿滦段刺师焊