收费岛施工方案Constructionschemefortollisland(9页)
收费岛施工方案Constructionschemefortollisland(9页).doc
下载文档 下载文档
通用施工
上传人:正*** 编号:477774 2022-07-22 9页 33.50KB
1、收费岛施工方案(Construction scheme for toll island)The construction organization design scheme (2007-01-24 17:03:06) has been reproduced in the highway toll collection stationHighway plan recharging renovation worksConstruction organization design1. Quality control before constructionIs mainly refers to th2、e construction preparation stage before construction, we mainly grasp the following several aspects: open clarificaiton will design units, supervision units, construction units, mechanical and electrical contractor, weighing equipment suppliers to attend the meeting, interpretation of the meter weig3、ht principle, make construction personnel understand weight charge equipment on the island of lane toll plaza, charge, charge.The construction unit to evaluate compound Examining construction units of recent performance, engineering command system, engineering quality level, the number of the worker4、s and technicians, check whether the key type of work has the mount guard qualification certificate, instrument and meter is national metrology inspection certificate of quality supervision department, understand the state of machinery, vehicles, equipment equipped with can meet the construction req5、uirements, etc.To review and inspect the quality assurance system, quality site management measures, project schedule and safety protection measures for the construction organization.Audit equipment and order the construction unit of the specifications of the equipment procurement contract, model, t6、echnical indicators should be carefully checked whether conform to the requirements of the provisions of the contract, the main material before entering the construction site for information about the test and certificate of quality inspection.The construction site investigation of communication pip7、elines have been completed, power line, people (hand) hole based, transformer room, computer room, and so on carries on the detailed investigation, review construction design drawings is complete and correct.2. Quality control of construction process2-1 in the construction supervision project, the s8、upervision office will start from the organizational leadership, scientific management, update supervision philosophy and bold innovation, so that the quality, safety and environmental protection of the project will be strictly controlled.The inspection and inspection of strict procedures shall be c9、arried out in accordance with the design standards and process requirements, and the quality acceptance standards of the construction procedure shall be prepared for the critical process. This time we process the acceptance variable construction units according to the project construction process to10、 apply for inspection to active inspection, in accordance with the construction process quality inspection earnestly, to meet the requirements of the quality of the scene to sign to recognize, is not in conformity with the quality requirements in a timely manner, construction units rectification req11、uired. Failure to enter the next procedure is not acceptable. Great extent eliminates the active supervision engineering quality hidden danger and accident, and also a one-time qualified for completed process inspection and sign recognition in time, make the project smoothly under the process of con12、struction, control the quality and speed up the construction schedule.Build system of model project key disciplines engineering or process, to select a heavy toll lane, a toll station as a model project for demonstration, through summarizing, construction unit put forward the construction technology13、 standard of specification, with the approval of the owner, supervision after all. Each process of this project was first conducted in ninglian high-speed huaian mainline toll booth, and summarized the experience. It was a good result to organize the visit and study.Adhere to the supervision enginee14、r of the sidelines, according to the work order of the construction unit, the general procedure will not leak the prison,Key position key supervision. If the weight equipment foundation pit size is strictly according to the manufacturers drawings, the concrete marking and curing time of the water sh15、all be satisfied.2-2-2 this project should improve the precision of weighing equipment and the stability of the charging system, and form the following points in the process of quality supervision.2-2-1 control the speedSpeed is directly related to the precision of weighing equipment. By measuring i16、nstrument for testing, to test the vehicle static weighing equipment accuracy is above 99%, and the speed of 5 km/h when weighing equipment precision reaches 95%, and when the speed is greater than 5 km/h when weighing equipment precision would be badly affected. Measures are as follows: in the high17、way exit, before weighing about 500 meters, set up the logo vehicle deceleration within 5 km/h, not to accelerate, decelerate and slamming on the brakes, to ensure the accuracy of weighing system measurement, reducing the possibility of dispute; Set the deceleration line and decelerate block, and wh18、en installing the deceleration block, it should be noted that when the vehicle passes the deceleration block, it will also hit the brake symmetric platform to impact the precision (variable speed) when passing the weighing platform. Normally not less than 18 meters in front of the weighing equipment19、.It is recommended to display the speed on the lane control display (according to the current interface provided by the weighing device). In this way, the toll collector can report the speed of the vehicle on the basis of the actual situation, and it is very convincing to some drivers who want to ta20、ke advantage of it.2 2-2-2 civil engineering requirementsTo ensure that the test is completed before the vehicles arrive at the toll booths, the length of the charging island should be extended appropriately, and the speed control of the driver through the platform shall be considered for the conven21、ience of the pilot. Rebuilt charging island: demolition reconstruction island head tail (island), within the scope of cutting excavation toll plaza concrete pavement, the construction of the island itself lengthening period and the new island head tail (island), and adjust the affected by the altera22、tion of equipment is designed according to the new arrangement and set up new equipment foundation; New entrance unidirectional charge island: the entrance unidirectional charge island has fog lamps, manual railings, lane cameras, traffic lights, automatic railings; New export one-way charge island:23、 export fog lamps on the island of one-way charge hand hole, hand railings, heavy equipment, control box, raster vehicle lane separator, weighing display, traffic signal, camera, the traffic signal lamp, automatic rail; The toll island and toll booth foundation: the charging island and the toll boot24、h foundation are horizontal in the cross-section direction, and the longitudinal section is the same as the longitudinal slope of the road, the lowest side of the top surface is 25cm from the surface of the road. Charge island protection: ahead of the toll booths set up 2 root 219 * 10.0 mm steel pi25、pe anticollision column, on both sides of toll booths set up cold bending square steel crash barriers, to ensure that the toll collector, charge craft and equipment safety; The paving of the toll island: the paving of the toll island shall be made of colored cement squares, and the colors, specifica26、tions and old islands shall be unified or determined by the construction unit; Charge island facade sign: island facade tag should be used by GB5768-1999 ordinary paint yellow black or red and white alternate with, line 15 cm intervals, charging island head aluminum reflective film, monochromatic 1527、 cm width, to increase the reflective effect of the night.The location of the platform will not span the cement plate, so as to prevent the cooling of the heat, the platform will be safe. The platform is installed in the middle of the driveway.The horizontal, vertical and vertical slope of the table28、 should be consistent, but the slope should not be greater than 2%. If said before and after the road slope is greater than 2% should be broken cement road surface, large heavy pouring cement pavement, leveling, control according to the slope, and the road smooth transition and weighing table, fight29、 said passing vehicles of vehicle, the turbulence.An additional control box, a weighing screen foundation and a hand hole are added on all the export side charging island, with a horizontal drainage pipe in the hand hole leading to the side slope. Special attention should be paid to the horizontal d30、rainage pipe center along the road and slope direction must have Angle, Angle to 15 to facilitate drainage. The bottom elevation of the hand hole is based on the base of the platform (if the water tank is set at the bottom of the hand hole, it can also be reached into the water tank). If the water i31、n the table can affect the precision of weighing equipment.From the base of toll booth to the front hand hole of the island, the steel tube was installed in the front hand hole of the island, and the base of the weighing screen was added before the end of the island, and connected with the steel pip32、e on the basis of the toll booth. If the distance between the traffic signal and the toll booth is not long enough, the weighing screen and the traffic signal will be fitted to the same post.2-2-3 installation of equipmentFreight vehicle standard in our country is not greater than the total length o33、f 18 meters, so weighing equipment installed in 18 meters distance charge window location, short distance will lead to some super long car arrived in charge the window to the rear of the vehicle is not all by weighing mesa, long distance, in general the speed will be relatively faster, or vehicles i34、n the variable state probability is bigger, affect the weighing precision. Because of the irregularity of individual vehicles, so weighing installation mesa is apart from the toll booths window than 18 meters, 18 to 23 metres or so commonly, so also facilitate vehicle queue, ensure that say a car, t35、o pay the cost of a car. The glass surface of the infrared vehicle separator is easy to frost in winter. It is recommended that the windshield of the car should be used to heat the windshield to remove the frost. The weighing display shall include at least the model, the excess capacity, the amount 36、and the standby two lines. The screen should work all the time, with dust, rain and sun protection. The brightness should be guaranteed to be clearly visible to the division crew within a range of 20 metres under various lighting and natural environment conditions; Now displays are generally LED, so37、 best can turn 15 , when installation is this display of the passenger, is easy to see.3. Equipment installation3-1 person (hand) hole and square cameraTo increase the charge fee of lane toll plaza, the corresponding increase toll booths under the manhole, set new shoulder outside the shoulder in th38、e expansion of the manhole, affected the expansion of the early to dismantle the toll plaza of hand hole and based on the new toll plaza cameras3-2 equipment foundation and pipeline3-3 toll booths4. Quality control after completion of the projectTo conduct the delivery, completion inspection and acc39、eptance according to the contract. Verify that the completed data and the completed drawings are in conformity with the actual construction and complete and accurate. Check the work load and defects, supervise the construction unit to complete the period until the issuance of the certificate of resp40、onsibility for the defect.The measurement accuracy of the rechargeable equipment needs to be improved.Domestic optional manufacturer is not many, and the price of foreign equipment is higher, maintenance is not very convenient. To fully embody the thought of people-oriented, let the driver has the right to appeal, it is recommended to increase export square side outline a set of low speed/static portable review equipment, set up the simple overloading enforcement pavilion, pavilion with management computer, printer and other equipment.
会员尊享权益 会员尊享权益 会员尊享权益
500万份文档
500万份文档 免费下载
10万资源包
10万资源包 一键下载
4万份资料
4万份资料 打包下载
24小时客服
24小时客服 会员专属
开通 VIP
升级会员
  • 周热门排行

  • 月热门排行

  • 季热门排行

  1. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  2. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  3. 陕西化学工业公司招聘管理与职业发展管理手册30页.doc
  4. 动火作业安全告知卡(1页).docx
  5. 高处作业安全告知卡(1页).docx
  6. 广场工程建设项目施工招标评标报告表格(24页).pdf
  7. 原油码头消防工程维保方案(39页).docx
  8. 建筑工程外脚手架专项施工方案(悬挑式脚手架、落地式脚手架)(25页).doc
  9. 2020柏向堂房地产公司材料标准化手册3.0(143页).pdf
  10. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  11. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  12. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  13. 房地产开发贷款实操指南(5页).pdf
  14. 学校宿舍楼建设工程施工方案【153页】.docx
  15. 住宅小区工程施工方案【234页】.docx
  16. 鄂尔多斯空港物流园区总体规划方案(2017-2030)环境影响评价报告书(23页).doc
  17. 规划兰园西路道路工程环境方案环境影响评价报告书(89页).pdf
  18. 屋面圆弧形穹顶结构高支模施工方案(40米)(47页).doc
  19. 埋石混凝土挡土墙施工方案(23页).doc
  20. 重庆市五小水利工程建设规划报告(64页).doc
  21. 厂区至矿区管网蒸汽管道系统扩容改造工程施工组织设计方案(105页).doc
  22. 超高纯氦气厂建设项目办公楼、变电站、水泵房及消防水池、门卫、厂房、仓库、配套工程施工组织设计方案(140页).doc
  1. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  2. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  3. 2024大楼室内精装修工程专业分包投标文件(393页).docx
  4. 苏州水秀天地商业项目购物中心100%室内设计方案(158页).pptx
  5. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  6. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  7. 室内移动式操作平台工程施工方案(19页).doc
  8. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  9. 矿山治理工程施工组织设计方案(240页).docx
  10. 老旧小区改造工程施工方案及技术措施(364页).doc
  11. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  12. 川主寺城镇风貌整治景观规划设计方案(60页).pdf
  13. 建筑工程三级安全教育内容(24页).doc
  14. 新疆风电十三间房二期工程49.5mw风电项目可行性研究报告(附表)(239页).pdf
  15. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  16. 四川凉山攀西灵山国际度假区小镇活力中心商业业态规划方案建议书(33页).pdf
  17. 埋石混凝土挡土墙施工方案(23页).doc
  18. 地下停车场环氧地坪漆施工方案(45页).doc
  19. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  20. 住宅定价策略及价格表制定培训课件.ppt
  21. 西安名京九合院商业项目招商手册(28页).pdf
  22. 2010-2030年湖北咸宁市城市总体规划(32页).doc
  1. 建筑工程夜间施工专项施工方案(18页).doc
  2. 赣州无动力亲子乐园景观设计方案(111页).pdf
  3. 2016泰安乡村旅游规划建设示范案例(165页).pdf
  4. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  5. 龙山县里耶文化生态景区里耶古城片区旅游修建性详细规划2015奇创.pdf
  6. 连云港市土地利用总体规划2006-2020年调整方案文本图集(78页).pdf
  7. 850亩项目塑钢门窗工程施工组织设计方案(34页).doc
  8. 老旧小区改造工程施工方案及技术措施(364页).doc
  9. 城市更新项目地价公式测算表.xlsx
  10. 房地产项目规划前期投资收益测算模板带公式.xls
  11. 存储器基地项目及配套设施建筑工程临时用水施工方案(40页).docx
  12. 铁路客运枢纽项目站前框构中桥工程路基注浆加固专项施工方案(19页).doc
  13. 室内移动式操作平台工程施工方案(19页).doc
  14. 装配式结构工业厂房基础、主体结构、门窗及装饰工程施工方案(83页).doc
  15. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  16. 施工工程安全教育培训技术交底(13页).doc
  17. 老旧小区改造施工方案及技术措施(365页).doc
  18. 新建贵广铁路线下工程沉降变形观测及评估监理实施细则(126页).doc
  19. 消防火灾应急疏散演练预案(12页).doc
  20. 矿山治理工程施工组织设计方案(240页).docx
  21. 崖城站悬臂式挡墙施工方案(92页).doc
  22. 北京科技园公寓建设项目整体报告方案.ppt