油罐砂石基础施工方案(8页)
油罐砂石基础施工方案(8页).doc
下载文档 下载文档
其它文档
上传人:正*** 编号:475515 2022-07-22 8页 114.50KB
1、CSPC NANHAI PETROCHEMICALS PROJECTCSPC 南海石化项目 BACKFILLING OF OIL TANK FOUNDATION油 罐 砂 石 基 础 施 工WORK INSTRUCTION: WI-8710-8100-0005 SEPCO Electric Power Construction Corporation山东电力基本建设总公司REV版次DATE日期REASON FOR ISSUE修订原因BY编制CHKD审核REVIEW审查APPR批准A20.Aug.2003Issued for ApprovalZhao.KCao.ALLin.HDing.PS0022、8.Aug.2003Issued for UseZhao.KCao.ALLin.HDing.PS0113.Sep.2003Issued for ApprovalZhao.KCao.ALLiu.QYDing.PS目 录content1.目的 purpose2.范围 scope3.职责 responsibilities4.参考文件 references5.计量器具、工具、机械 tools and equipment6.劳动力组织 labors7.施工工序和施工方法 procedure and method8.附件 attachment1.0范围 scope本程序适用于CSPC 南海石化项目Stea3、m & Power生产区油罐砂石基础施工。It applies to backfilling of oil tank foundation for CSPC Nanhai Petrochemical Project Steam and Power Generation Plant.2.0目的 Purpose规定SEPC01在CSPC南海石化项目中油罐基础砂石回填的执行标准,以有效的控制回填过程及质量。To specify the standard applicable for the backfilling for the project so as to effectively contro4、l the quality of backfilling.3.0职责 responsibilities技术负责人 Engineering supervisor 宋辉施工负责人 Construction superintendent 许德利测量安全 Survey safety 张胜利质检员 Quality inspector 高见技术员 Technician 赵克施工员 Construction supervisor 卜现刚3.1 SEPC1建筑队负责对砂石回填的全过程进行管理。 Sepco1 civil team is responsible for the management and co5、ntrol of backfilling.3.2砂石回填班组负责制安全施工措施,并予以执行。 Backfilling group is responsible for working out the safety measure and the implementation.3.3 SEPC1施工部对砂石回填的施工措施进行审核,并在作业过程中进行监督指导。 Sepco1 Construction Dept is responsible for the review of the construction measures and the surveillance of implementing6、.3.4 SEPC1 HSE部对砂石回填的安全措施进行审核,并检查现场安全防护措施。 SEPC1 HSE for the review of the safety measure and the inspection of safety prevention actions.3.5砂石回填班组技术负责人员如有需要,负责办理受限空间施工许可证。The technician of the backfill group for requesting work permit if required.3.6 SEPC1管理人员及施工单位的负责人应坚守岗位,发现异常问题,立即报告或采取救援措施。Sepco7、1 management and subcontractors supervisor shall keep watch the site for handling any problems potentially arisen. 3.7检测中心负责压实遍数、含水率的确定及压实系数的检测。The test center for the inspection of compacting times, water content and compaction factor.4.0参考文件 references4.1相关设计图纸;related design drawings4.2与施工图纸相关的设计8、变更文件;design change notes4.3 GB50202-20024.4 SP-8310-0000-0010 EARTHWORK SPECIFICATION4.5 PR-8710-8100-0013 SITE EXCAVATION AND BACKFILL5.0计量器具、工具及机械 tools and equipment计量器具:水准仪、钢卷尺Measuring instrument: level and tape工具:小推车。 Tool: wheelbarrow 机械:YZ-18振碾式压路机一台、装载机一台、振动式打夯机一台、抽水机5台(所有机械进厂前应进行认真检查,并报有关部9、门审查通过后方能进入现场施工)machines: 1 roller, 1 loader, 1 rammer,5 water pumps.6.0劳动力组织 labors技术员1人,施工员1人,测量员1名、安全员1名,质检员1名,壮工20名,熟练操作工3名。1 technician, 1 supervisor, 1 surveyor, 1 HSE member, 1 inspector, 20 labors and 3 operators.7.0施工工序和施工方法 procedure and method7.1施工工序 procedure砂石回填施工工序为:材料入场(带试验合格证/拌合报告) 验槽10、检查材料含水率(5.3%),并提供报告砂石回填(每30cm一层) 砂石碾压(68次) 每层检查并取样试验,并提交压实率试验报告 压实率合格(压实率96%)后进行上一层砂石回填重复上述步骤,直至回填至设计标高。Ingress of the material to the job site (with the material test certificate/blend report) conformity inspection for base groundinspection of water content(5.3%) of material and check report issued11、 backfilling (30cm each layer) compaction(68 times) final inspection and check report issued for compact rate of each layer proceed to backfilling if the compact rate meet requirements (Compact Rate96%).Repeat above steps till the design elevation.7.2施工方法 method7.2.1回填材料要求 requirement of backfilling12、 materials回填材料为购买搅拌好的砂石(碎石、卵石最大粒径20mm,砂:中粗砂且细度模数2.33.7,混合料中碎石、卵石含量40%)。拌合料进场前,应提供碎石、砂的试验报告,并对配合后的混合料进行检测。取样进行击实试验,并采用筛析法进行级配试验。Material is mixed sand and gravel at a portion of 40% of gravel and scree (Diameter of gravel and scree20mm, sand defined as medium and coarse sand with fineness modulus ran13、ge 2.33.7). Before ingress of the material to the job site, the test report of the sand and gravel should be furnished. And the material after blend should be tested. Compaction test and grading test shall be carried out as well.7.2.2基底处理 base treatment 回填前先清理基底,清除基坑内积水、淤泥和杂物,并防止地表滞水流入回填区域。清理完毕,进行基坑14、验收,符合要求方可进行砂石回填。The base shall be cleared, without any water, sullage and debris. The surface water shall be prevented into the backfilled area. The groundwork of the footing groove check before acceptance, and it should be acceptable before backfilling.7.2.3碎石回填 gravel backfilling7.2.3.1正式回填前,现场进行试15、碾,确定压实遍数及含水率,以达到最好的碾压效果。试碾后,根据确定的压实遍数及含水率进行大面积施工。To carry out trial compaction before backfilling to determine the compaction times and water content to get a optimum effect.7.2.3.2碎石料场布置见附件(碎石堆放布置及入口设置)。Gravel storage arrangement see attachment.7.2.3.3基坑修设机械通道见附件(碎石堆放布置及入口设置)。The access for machine16、s see attachment.7.2.3.4本项施工采用机械回填,在振碾式压路机碾压之前先用装载机将碎石推平,使表面平实,后使用振碾式压路机先静压,后振压。This work is to be implemented by machines. First to level the gravel, then compact without vibration by road roller, finally vibrantly compact the soil.7.2.3.5碾压机械压实填方时,控制行驶速度,并控制压实遍数。The compaction speed and times shal17、l be controlled.7.2.3.6采用“薄填、慢驶、多次”的方法,砂石回填厚度为300mm,碾压方向从两边逐渐压向中间,碾轮每次重叠宽度约为1525cm,避免漏压。运行中碾轮边距填方边缘大于500mm,防止溜坡倾倒。边角、边坡边缘压实不到之处,辅以振动式打夯机夯实。每碾压一层完后,用装载机将表面拉毛以利结合。The method of “ thin layer, slow speed and many times” is to be used. The layer thickness is to be 30mm, and compaction from two sides to t18、he center with overlapped width of 15-25cm of each time. The wheel side shall be 500 mm away from the edge to prevent any upsetting. The rammer is to be used for the places where the roller couldnt reach. The surface of last layer shall be made coarse by loader shovel for sound incorporation with ne19、xt layer.7.2.3.7根据确定的碾压遍数进行施工,保证遍数足够,控制砂石料的含水率(在试碾后采用灌砂法测定最优含水率为5.3%),保证砂石回填达到要求。Compaction should be according to the determinate times and guarantee the compaction times. The water content of the material should be controlled (the optimum water content of 5.3% is to be determined test) , and the b20、ackfilling should be up to standard.7.2.3.8砂石回填区保持中间稍高,两边稍低,当天回填砂石当天压实。The center of the backfilled area shall be a little bit higher than the sides, and the backfilled gravel and sand shall be compacted in the same day.7.2.3.9每层材料压实后,按要求进行取样检测,发布检测报告,压实率必须96%,方可进行下层施工。振碾机碾压区域密度及含水率试验每层5组,振动打夯机夯实区域密21、度及含水率试验每层1组。Quality inspection shall be taken, including Inspect Report Form which indicating the Compact Rate for each layer, and the standard (Compact Rate96%) must be attained, before backfilling the next layer. Sampling for unit weight and water content test in the area compacted be vibrating ro22、ller shall be 5 groups each layer, while sampling in the area by rammer is to be 1 group each layer.7.2.4施工排水和雨季施工措施Construction drain, and measures during rainy season7.2.4.1基坑周围设挡水坝(高度至少50cm),防止地表水流入回填区域内。Claybank(the height50cm) should be used to prevent the surface water from flowing into the ba23、ckfilling area.7.2.4.2在回填区域东西两端设集水坑,加设潜水泵进行排水,潜水泵的设置应能保证在基坑回填过程中,不得有水浸泡回填材料。Catchment puddle should be used at the east and west of the backfilling area, and water pump should be used to drain. 7.2.4.3 在雨季回填时,排水沟和集水井分别加深至0.5m和0.7m深,并增加水泵(5台备用水泵)和人力,以保证基坑内雨水经排水沟、集水井和水泵立即排出基坑外。回填材料经受雨淋后,则停止下步回填,待回填材料经24、处理且试验确定其(含水率为5.3%)满足设计要求后,方可进行下步施工.During rainy season, the ditches and catchment puddles in foundation pits will be deepened respectively to 0.5m and 0.7m, in addition more pumps (5 spare pumps) and labor fore will be provided to guarantee that rainwater be drained away out of foundation pits on time. If material be poured by raining, work will not start until the material is disposed to meet requirements (water content 5.3%).8附件 attachment
会员尊享权益 会员尊享权益 会员尊享权益
500万份文档
500万份文档 免费下载
10万资源包
10万资源包 一键下载
4万份资料
4万份资料 打包下载
24小时客服
24小时客服 会员专属
开通 VIP
升级会员
  • 周热门排行

  • 月热门排行

  • 季热门排行

  1. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  2. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  3. 陕西化学工业公司招聘管理与职业发展管理手册30页.doc
  4. 动火作业安全告知卡(1页).docx
  5. 高处作业安全告知卡(1页).docx
  6. 广场工程建设项目施工招标评标报告表格(24页).pdf
  7. 原油码头消防工程维保方案(39页).docx
  8. 建筑工程外脚手架专项施工方案(悬挑式脚手架、落地式脚手架)(25页).doc
  9. 2020柏向堂房地产公司材料标准化手册3.0(143页).pdf
  10. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  11. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  12. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  13. 房地产开发贷款实操指南(5页).pdf
  14. 学校宿舍楼建设工程施工方案【153页】.docx
  15. 住宅小区工程施工方案【234页】.docx
  16. 鄂尔多斯空港物流园区总体规划方案(2017-2030)环境影响评价报告书(23页).doc
  17. 规划兰园西路道路工程环境方案环境影响评价报告书(89页).pdf
  18. 屋面圆弧形穹顶结构高支模施工方案(40米)(47页).doc
  19. 埋石混凝土挡土墙施工方案(23页).doc
  20. 重庆市五小水利工程建设规划报告(64页).doc
  21. 厂区至矿区管网蒸汽管道系统扩容改造工程施工组织设计方案(105页).doc
  22. 超高纯氦气厂建设项目办公楼、变电站、水泵房及消防水池、门卫、厂房、仓库、配套工程施工组织设计方案(140页).doc
  1. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  2. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  3. 2024大楼室内精装修工程专业分包投标文件(393页).docx
  4. 苏州水秀天地商业项目购物中心100%室内设计方案(158页).pptx
  5. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  6. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  7. 室内移动式操作平台工程施工方案(19页).doc
  8. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  9. 矿山治理工程施工组织设计方案(240页).docx
  10. 老旧小区改造工程施工方案及技术措施(364页).doc
  11. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  12. 川主寺城镇风貌整治景观规划设计方案(60页).pdf
  13. 建筑工程三级安全教育内容(24页).doc
  14. 新疆风电十三间房二期工程49.5mw风电项目可行性研究报告(附表)(239页).pdf
  15. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  16. 四川凉山攀西灵山国际度假区小镇活力中心商业业态规划方案建议书(33页).pdf
  17. 埋石混凝土挡土墙施工方案(23页).doc
  18. 地下停车场环氧地坪漆施工方案(45页).doc
  19. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  20. 住宅定价策略及价格表制定培训课件.ppt
  21. 西安名京九合院商业项目招商手册(28页).pdf
  22. 2010-2030年湖北咸宁市城市总体规划(32页).doc
  1. 建筑工程夜间施工专项施工方案(18页).doc
  2. 赣州无动力亲子乐园景观设计方案(111页).pdf
  3. 2016泰安乡村旅游规划建设示范案例(165页).pdf
  4. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  5. 龙山县里耶文化生态景区里耶古城片区旅游修建性详细规划2015奇创.pdf
  6. 连云港市土地利用总体规划2006-2020年调整方案文本图集(78页).pdf
  7. 850亩项目塑钢门窗工程施工组织设计方案(34页).doc
  8. 老旧小区改造工程施工方案及技术措施(364页).doc
  9. 城市更新项目地价公式测算表.xlsx
  10. 房地产项目规划前期投资收益测算模板带公式.xls
  11. 存储器基地项目及配套设施建筑工程临时用水施工方案(40页).docx
  12. 铁路客运枢纽项目站前框构中桥工程路基注浆加固专项施工方案(19页).doc
  13. 室内移动式操作平台工程施工方案(19页).doc
  14. 装配式结构工业厂房基础、主体结构、门窗及装饰工程施工方案(83页).doc
  15. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  16. 施工工程安全教育培训技术交底(13页).doc
  17. 老旧小区改造施工方案及技术措施(365页).doc
  18. 新建贵广铁路线下工程沉降变形观测及评估监理实施细则(126页).doc
  19. 消防火灾应急疏散演练预案(12页).doc
  20. 矿山治理工程施工组织设计方案(240页).docx
  21. 崖城站悬臂式挡墙施工方案(92页).doc
  22. 北京科技园公寓建设项目整体报告方案.ppt