建筑类外文文献及中文翻译(4页).doc
下载文档
上传人:正***
编号:445614
2022-07-11
4页
22.93KB
1、forced concrete structure reinforced with an overviewReinSince the reform and opening up, with the national economys rapid and sustained development of a reinforced concrete structure built, reinforced with the development of technology has been great. Therefore, to promote the use of advanced techn2、ology reinforced connecting to improve project quality and speed up the pace of construction, improve labor productivity, reduce costs, and is of great significance. Reinforced steel bars connecting technologies can be divided into two broad categories linking welding machinery and steel. There are 3、six types of welding steel welding methods, and some apply to the prefabricated plant, and some apply to the construction site, some of both apply. There are three types of machinery commonly used reinforcement linking method primarily applicable to the construction site. Ways has its own characteri4、stics and different application, and in the continuous development and improvement. In actual production, should be based on specific conditions of work, working environment and technical requirements, the choice of suitable methods to achieve the best overall efficiency.1、 steel mechanical link 1.15、 radial squeeze linkWill be a steel sleeve in two sets to the highly-reinforced Department with superhigh pressure hydraulic equipment (squeeze tongs) along steel sleeve radial squeeze steel casing, in squeezing out tongs squeeze pressure role of a steel sleeve plasticity deformation closely integra6、ted with reinforced through reinforced steel sleeve and Wang Liangs Position will be two solid steel bars linkedCharacteristic: Connect intensity to be high, performance reliable, can bear high stress draw and pigeonhole the load and tired load repeatedly.Easy and simple to handle, construction fast7、, save energy and material, comprehensive economy profitable, this method has been already a large amount of application in the project.Applicable scope : Suitable for , , grade reinforcing bar (including welding bad reinforcing bar ) with ribbing of 18- 50mm, connection between the same diameter or8、 different diameters reinforcing bar .1.2 must squeeze linkExtruders used in the covers, reinforced axis along the cold metal sleeve squeeze dedicated to insert sleeve Lane two hot rolling steel drums into a highly integrated mechanical linking methods.Characteristic: Easy to operate and joining fas9、t and not having flame homework , can construct for 24 hours , save a large number of reinforcing bars and energy.Applicable scope : Suitable for , set up according to first and second class antidetonation requirement -proof armored concrete structure , grade reinforcing bar with ribbing of hot roll10、ing of 20- 32mm join and construct live.1.3 cone thread connectingUsing cone thread to bear pulled, pressed both effort and self-locking nature, undergo good principles will be reinforced by linking into cone-processing thread at the moment the value of integration into the joints connecting steel b11、ars.Characteristic: Simple , all right preparatory cut of the craft , connecting fast, concentricity is good, have pattern person who restrain from advantage reinforcing bar carbon content.Applicable scope : Suitable for the concrete structure of the industry , civil building and general structures,12、 reinforcing bar diameter is for for the the 16- 40mm one , grade verticality, it is the oblique to or reinforcing bars horizontal join construct live. conclusionsThese are now commonly used to connect steel synthesis methods, which links technology in the United States, Britain, Japan and other cou13、ntries are widely used. There are different ways to connect their different characteristics and scope of the actual construction of production depending on the specific project choose a suitable method of connecting to achieve both energy conservation and saving time limit for a project ends.钢筋混凝土结构14、中钢筋连接综述改革开放以来,随着国民经济的快速、持久发展,各种钢筋混凝土建筑结构大量建造,钢筋连接技术得到很大的发展。因此,推广应用先进的钢筋连接技术,对于提高工程质量、加快施工速度、提高劳动生产率、降低成本,具有十分重要的意义。钢筋连接技术可分为钢筋焊接和钢筋机械连接两大类。钢筋焊接有6种焊接方法,有的适用于预制厂,有的适用于现场施工,有的两者都适用。钢筋机械连接常用有3种方法,主要适用于现场施工。各种方法有其自身特点和不同的适用范围,并在不断发展和改进。在实际生产中,应根据具体的工作条件、工作环境和技术要求,选用合适的方法以期达到最佳的综合效益。1、钢筋机械连接1.1径向挤压连接将一个钢套15、筒套在两根带肋钢筋的端部,用超高压液压设备(挤压钳)沿钢套筒径向挤压钢套管,在挤压钳挤压力作用下,钢套筒产生塑性变形与钢筋紧密结合,通过钢套筒与钢筋横肋的咬合,将两根钢筋牢固连接在一起。特点:接头强度高,性能可靠,能够承受高应力反复拉压载荷及疲劳载荷。操作简便、施工速度快、节约能源和材料、综合经济效益好,该方法已在工程中大量应用。适用范围:适用于1850mm的、级带肋钢筋(包括焊接性差的钢筋),相同直径或不同直径钢筋之间的连接。1.2轴向挤压连接将两钢筋安放成对接形式,利用焊接电流通过两钢筋接触点产生塑性区及均匀的液体金属层,迅速施加顶锻力完成的一种压焊方法。特点:操作简单、速度快、无明火作业16、可全天候施工,节约大量钢筋和能源。适用范围:适用于按一、二级抗震设防要求的钢筋混凝土结构中2032mm的、级热轧带肋钢筋现场连接施工。1.3锥螺纹连接利用锥螺纹能承受拉、压两种作用力及自锁性、密封性好的原理,将钢筋的连接端加工成锥螺纹,按规定的力矩值把钢筋连接成一体的接头。利用锥螺纹能承受拉、压两种作用力及自锁性、密封性好的原理,将钢筋的连接端加工成锥螺纹,按规定的力矩值把钢筋连接成一体的接头。特点:工艺简单可以预加工连接速度快同心度好,不受钢筋含碳量和有无花纹限制等优点。适用范围:适用于工业与民用建筑及一般构筑物的混凝土结构中,钢筋直径为1640mm的、级竖向、斜向或水平钢筋的现场连接施工。以上是对现今常用的钢筋连接方法的综述,这些连接技术在美国、英国、日本等国家均得到广泛应用。不同的连接方法有其不同的特点和适用范围,在实际施工生产中需视具体工程情况选择合适的连接方法,以达到既节约能源又节省工期的目的。
CAD图纸
上传时间:2024-10-31
12份