建筑英语名言建筑是一种社会艺术的形式(4页).docx
下载文档
上传人:正***
编号:444363
2022-07-11
4页
22.17KB
1、建筑英语名言建筑是一种社会艺术的形式1、建筑是凝固的音乐。architecture is frozen music.2、建筑始于工程完结之处。construction began in the end.3、建筑是地球引力的艺术。architecture is the art of earths gravity.4、绿树加建筑物就是风景。green building is the scenery.5、人造房子,房子也造人。artificial house, and also made man.6、人对他自己建筑起堤防来。man barricades to himself.7、城中十万户,此地两三2、家。two or three hundreds of households in the city, here.8、建筑是一种社会艺术的形式。architecture is a kind of social art form.9、每个人都是自己的命运建筑师。every man is his own destiny architect.10、建筑是研究如何浪费空间的艺术。the art of architecture is the study of how to waste space.11、中国的房子很多,但是建筑很少。chinas house a lot, but rarely buildi3、ngs.12、宅不树艺者为不毛,出三夫之市。house not for barren tree art, three of the city.13、人要塑造建筑,建筑也要塑造人!people to shape construction, the building is to shape man!14、有机建筑抽掉灵魂就成了现代建筑。organic architecture smoke soul became modern architecture.15、西窗过雨,怪瑶佩流空,玉筝调柱。west window after the rain, empty, blame yao yu zheng c4、olumn.16、我们不安居,因为我们已经在建筑。we are not living, because we have in the building.17、建筑是连接私密性和公共性的通道。the building is connected to the privacy and publicity channels.18、美在于自然景观与艺术表现的结合。beauty lies in the combination of natural landscape and artisticexpression.19、建筑本身应像土里面生出来的一样。the building itself should b5、e like soil born inside.20、xx楼纷照耀,壁房锦殿相玲珑。zige floor shine of dispute, dan jin temple wall room andexquisite.21、建筑是用结构表达观点的科学之艺术。building is expressed in structure point of view of the art ofscience.22、社会是建筑在英雄崇拜这个基础上的。society is built on the basis of hero worship the.23、建筑学是世界各民族共同劳动的成果。architectur6、e is the result of common labor in the world.24、建筑是凝固的音乐,音乐是流动的建筑。architecture is frozen music, music is flowing construction.25、建筑是是居住的机器,产生感情的机器!architecture is a living machine, to produce the feelings ofmachines!26、一件大义往往建筑在许多小的不义之上。ones sense of honor often building on many smallunrighteousness7、.27、建筑是人的想象力驾驭材料和技术的凯歌。architecture is the song of the imagination of the peoplecontrol the material and technology.28、建筑应该是自然的,要成为自然的一部分。construction should be natural, to be a part of nature.29、真正的建筑师之思想接近于哲学家与诗人。the idea of true architect close to the philosophers and poets.30、建筑在别人痛苦上的幸福不是真正的幸福。8、building on others pain of happiness is not real happiness.31、我们塑造了建筑,反过来建筑塑造了我们。we shaped buildings, which in turn the building shape us.32、建筑不是一种职业,而是一种心灵的习惯。architecture is not a profession, but a habit of mind.33、建筑设计师的激情可以从顽石中创造出奇迹。architects passion can create the miracle from the rocks.34、建筑,9、是用结构来表达思想的科学性的艺术。construction, structure is used to express the science of art.35、如果房间与自然界隔绝的话,就无异于坟墓。if room from nature, is a tomb.36、建筑师什么都没有发明,他只是改造了现实。the architect did not invent anything, he just transform thereality.37、建筑是在光线下对形式的恰当而宏伟的表现。in the form of building is in the light of appropriat10、e and themagnificent performance.38、建筑的实质是空间,空间的本质是为人服务。architecture is the essence of space, the space is the essenceof human services.39、土生土长是所有真正艺术和文化的必要的领域。a native of all true art and culture is necessary.40、我们解释一个奇迹的时候,不必害怕奇迹失踪。when we explain a miracle, dont have to be afraid of themiracle is missing. 4 / 4