2017长沙滨江正荣府社区项目景观概念方案设计迈丘(76页).pdf
下载文档
上传人:偷****
编号:394126
2022-05-24
76页
29.81MB
1、长沙滨江正荣府项目景观概念方案设计Binjiang Changsha projeCt LandsCape design ConCeptMETROSTUDIO2017.03壹backgROUnD analySIS 前期分析caSE STUDy案例分析DESIgn cOncEpT 设计概念ExhIbIT aREa DESIgn展示区景观DESIgn plannIng整体设计DETaIl DESIgn专项设计planTIng DESIgn植物设计贰叁肆伍陆柒03页15页23页27页45页60页67页3壹background analysis 前期分析4长沙滨江正荣府项目景观概念方案设计METROST2、UDIObInjIang changSha pROjEcT lanDScapE DESIgn cOncEpT2017.03lOcaTIOn analySIS | 区位分析 |滨江新城老城区谷山路 GUSHAN ROAD项目位于滨江新城,位于城市主干道交叉处,临近地铁站与公交车站,交通优势突出。与老城区联系方便,具有良好的发展前景。周边住宅较多,居住基础条件相对完善,居住氛围浓厚。临近湘江,具有较好的景观视野。商业相对缺乏,人气不够充足,不利于人流引入。project is located in the Riverside town, located in the intersection of3、 urban main road, close to Metro and bus stations, transportation prominence. contact with the old town, with good development prospects.Surrounding residential lot, living conditions are relatively complete, live atmosphere. near the xiangjiang, have better landscape view.Relative lack of business, popularity is not sufficient enough, is not conducive to flow into.福元路大桥 FUYUAN ROAD BRIDGE 湘江地铁四号线