地铁车站主体结构高大模板施工方案PKPM计算软件计算书胶合板模板.doc
下载文档
上传人:地**
编号:1195035
2024-09-20
139页
643.50KB
1、附图1:某车站主体结构施工分段图附图2:某车站主体结构施工进度计划附图3:主体结构负二层板平面布置图附图4:主体结构负二层板模板支顶平面布置图(一)附图5:主体结构负二层板模板支顶平面布置图(二)附图6:主体结构负二层板模板支顶平面布置图(三)附图7:主体结构负二层板模板支顶平面布置图(四)附图8:主体结构负一层板平面布置图附图9:主体结构负一层板模板支顶平面布置图(一)附图10:主体结构负一层板模板支顶平面布置图(二)附图11:主体结构负一层板模板支顶平面布置图(三)附图12:主体结构负一层板模板支顶平面布置图(四)附图13:主体结构顶板平面布置图附图14:主体结构顶板模板支顶平面布置图(一2、)附图15:主体结构顶板模板支顶平面布置图(二)附图16:主体结构顶板模板支顶平面布置图(三)附图17:主体结构顶板模板支顶平面布置图(四)附图18:主体结构砼浇筑流向图附图19:1-1剖面图附图20:2-2剖面图附图21:3-3剖面图附图22:监测点设置大样图全文查看请搜索:地铁车站主体结构高大模板施工方案(PKPM计算软件 计算书 胶合板模板) 共96页1. 工程概况1.1. 基本说明某车站地下车站采用明挖法施工,围护结构采用地下连续墙,与内衬墙构成重合墙结构。基坑标准段深度为22.79m,最大开挖深度25.84m,连续墙最深处26m,连续墙厚为1000mm,设3道钢筋砼加1道钢管支撑。车3、站主体结构里程范围:YDK4+382.994YDK4+496.794,车站长113.8m。本车站主体结构采用三层箱形框架结构,底板厚1000mm,中板厚400,顶板厚800mm。外墙厚900mm的内衬式结构墙与1000厚地下连续墙组成车站整体重合式外墙,两墙间设高分子自粘防水卷材。本车站选用整体式矩形钢筋混凝土框架结构,根据车站使用功能的要求,结构方案为三层框架。本工程顶板楼板厚800mm,支撑高度4.65m,最大梁截面积1000mm2000mm;地下一层楼板厚400mm,支撑高度6.40m,梁截面积600mm1200mm;地下二层楼板厚400mm,支撑高度7.15m,梁截面积600mm1204、0mm。楼板面荷载和梁线荷载均大于10kN/m2和15kN/ m2,部分支撑高度大于8m,属于高大模板。具体位置详件附图1、附图2、附图3。本方案主要针对中板、顶板及其纵梁的顶架及模板进行专项设计及控制管理。1.2. 高大模板方案编制的主要依据1)建筑施工模板安全技术规范(JGJ162-2008);2)建筑施工扣件式钢管脚手架安全技术规范(JGJ130-2001);3)广东省建设工程高支撑模板系统安全管理办法19984)建筑施工安全检查标准(JGJ59-99)5)建筑施工高处作业安全技术规范(JGJ80-91)6)工程设计图纸及危险性较大工程安全专项施工方案编制及专家论证审查办法(佛建工2005、59号);7)本方案计算书部分是采用中国建筑科学研究院建筑工程软件研究所生产的PKPM计算软件计算。8)相关主体结构施工图纸2. 高大模板设计2.1. 模板系统布置方案由于本工程顶板、负一层、负二层为高大模板,与周围模板系统有联系,总体做法如下:1)顶板采用18厚1830915优质建筑大夹板。2)负一层、负二层部分采用满堂红门式架支顶,门架规格:大架4219301219,中架429151219 和小架425001219,垫脚采用150mm50mm8mm铁块,分别支顶于800厚C30(S10)混凝土底板和400厚C30负二层楼板上,负二层支顶不拆除。3)顶板支顶采用满堂红钢管支顶,规格:483.6、0,垫脚采用150mm50mm8mm铁块,支承于400厚C30负一层楼板上,负一层支顶不拆除。4) 采用483.0扣件钢管作为模板体系的连结件,使之成为一个整体。2.2. 模板搭设方案负三层(高7.15m)、负二层(高6.40m)模板搭设方案 600mm1200mm梁400mm厚楼板梁底、侧及板模板18厚大夹板梁底次龙骨9090松木枋1809090松木枋300梁底主龙骨双排483.0钢管侧板对拉螺栓两道M12对拉螺栓360,高200+200/梁侧内龙骨9090松木枋180梁侧外龙骨双排483.0钢管立杆、门式架支撑483.0钢管,纵横间距900mm门式架900纵横水平拉杆步距1500扫地杆距地7、面200mm,沿纵横水平方向应按纵下横上的程序设置顶板(高4.65m)模板搭设方案1000mm2000mm梁800mm厚楼板梁底、侧及板模板18厚大夹板梁底次龙骨8080松木枋4008080松木枋300梁底主龙骨483.0钢管侧板对拉螺栓两道M12对拉螺栓400,高300+300/梁侧内龙骨8080松木枋400梁侧外龙骨双排483.0钢管立杆、门式架支撑483.0钢管,横向4立杆(间距350,300,350),纵向间距400mm483.0钢管,横向间距700mm,纵向间距800mm纵横水平拉杆步距1500竖向剪刀撑纵横设置,详见附图水平剪刀撑水平剪刀撑设置,详见附图扫地杆距地面200mm,沿纵8、横水平方向应按纵下横上的程序设置注:验算中9090松木枋按8080按来验算;当门式架无交叉撑时,应用纵横水平加固杆将其连成整体;所有水平杆的端部均应与四周建筑物顶紧顶牢。无处可顶时,应在水平拉杆端部和中部沿竖向 连续式剪刀撑;在柱子处应用纵横钢管抱柱,将门式架、钢管立杆和柱连成整体;门式架微调插入长度不得少于300mm,伸出长度不得大于300mm,当大于300mm时,需在每个微调螺栓杆处加纵横拉杆。 钢管螺杆伸出钢管顶部不得大于200mm,螺杆外径与立杆钢管内径的间隙不得大于3mm,安装时应保证上下同心。 2.3. 模板体系布置及用料的其他要求1) 所有木板、木枋的规格尺寸应保证,废烂、檐边、9、疤节、严重扭曲开裂的不能使用。2) 钢管应符合JGJ130-2001规范要求,进场的钢管不应有裂缝、硬弯,钢管应涂有防锈漆。3) 扣件:选择与钢管直径相配的扣件,扣件应进行防锈和润滑处理,旧扣件使用前应进行质量检查,有裂缝、变形的严禁使用,出现滑丝的螺栓必须更换,以确保扣件的力学性能达到规范要求。4) 楼板龙骨支承在大梁处用挂旁(传至梁侧模板)或用木枋支承在梁底龙骨处,或可直接传至满堂红钢管支顶的次龙骨处。5) 立杆接长接头必须采用对接扣件连接。对接应符合下列规定:立杆上的对接扣件应交错布置:两根相邻立杆的接头不应设置在同步内,同步内隔一根立杆的两个相隔接头在高度方向错开的距离不宜小于500m10、m;各接头中心至主节点的距离不宜大与步距的1/3;6) 支架立杆应竖直设置,2m高度的垂直允许偏差为15mm;7) 每道剪刀撑倾角宜在4560之间。剪刀撑斜杆应用旋转扣件固定在与之相交的横向水平杆的伸出端或立杆上,旋转扣件中心线至节点的距离不宜大于150mm。3.砼浇筑本工程主体结构混凝土浇筑顺序:底板负三层侧墙、立柱负二层板负二层下部侧墙、立柱及设备层板负二层上部侧墙、立柱负一层板负一层侧墙、立柱顶板。混凝土浇筑时,要注意掌握振动棒的操作方法。振捣时,要快插、慢拔,上下抽动510cm。要掌握好振捣时间,观察混凝土表面是否不再下降,不再出现气泡,表面是否呈水平,是否泛出水泥浆,如果所观察各项均11、发生时,表示混凝土已捣实,振捣时间一般可掌握为每点插20秒。为了防止浇筑混凝土时引起模板变形或支架失稳,同一部位的混凝土不能堆积过高,要分布均匀。严格控制混凝土配合比和浇筑速度,保证质量;接缝表面应没有松动集料颗粒,硬化后尽早用钢丝刷将表面打毛,并在充分湿润状态下养护。浇筑新混凝土时,要充分振捣施工缝两侧,使相结合范围混凝土密实。混凝土浇筑上料的人员要服从指挥。及时做混凝土试块,并预留同条件养护试块。3.1 施工分段A) 施工缝设在柱间跨之间的1/41/3处。B) 每施工段混凝土一次浇筑最大量控制在500m3以内。C) 避开主体结构与附属结构的连接部位。结合车站结构特点,为了便于施工组织管理及12、确保工程工期,车站沿纵轴方向,共分5个施工段进行施工,最长施工段约29.1m,最短施工段约15.8m。3.2 施工顺序车站主体结构长113.8m,基坑开挖深度约22.7925.84m,标准段结构净宽约21.1m。为充分发挥龙门吊、汽车吊灵活高效的特点,均衡各施工工序的材料运输强度,形成有利的流水作业条件,确定主施工流向为:由东西两端向中间推进。施工流向如下所示:错误!不能通过编辑域代码创建对象。详见附图: 【某车站】主体结构施工分段图。3.3 浇筑方案本工程混凝土量约15870m3。主体结构混凝土均采用商品混凝土,由业主指定供应商-广州建安混凝土有限公司供应。混凝土运送到工地后用混凝土输送泵将13、混凝土输送到浇筑工作面。在开工前和每批混凝土浇筑前,检查混凝土的配合比,确保混凝土强度等级及抗渗等级满足设计要求,做好坍落度试验、抗压、抗渗试验,并按规定取样做混凝土试件。纵梁高度最大顶板处,尺寸为1000*2000mm,为了保证模板的安全稳定,每层砼的浇筑高度不能大于500mm。主体结构底、顶板都属于大体积混凝土浇筑,采用分段分层踏步式推进的浇筑方法,即在垂直方向上分两层,每层在水平方向上又以约5m的宽度为一施工槽段,以第1施工段底板为例进行浇筑方案的描述。混凝土浇筑方向由西端向东推进(标准段混凝土浇筑方向由西向东),每一层混凝土分3个斜面施工槽段,整块底板混凝土共分6个施工槽段,当底层完成14、2块施工槽段的混凝土浇筑,即返回浇筑第二层的混凝土,第二层混凝土控制在第一层混凝土初凝前浇筑,如此依次向前浇筑各施工槽段,如下图所示。混凝土采用插入式振捣器捣实。底板混凝土分段浇筑平面示意图底板混凝土分层分段浇筑剖面示意图侧墙混凝土在高度上分层浇筑,分层高度0.5m(小于振动器作用部分长度的1.25倍)。浇筑过程需控制整个施工段内的混凝土面均匀上升,且浇筑速度均匀。当侧墙混凝土浇筑高度均大于3m时,采用串筒将混凝土引入底部,保证混凝土不发生离析。3.4 混凝土初凝时间计算混凝土输送地泵(HBT70A型)额定最大输送混凝土量为69m3/h,一般施工时的输送量30m3/h,拟采用两台砼输送泵,则每15、小时混凝土的计划浇筑量为:370.6/60=6.2个小时6个施工槽段,每个施工槽段约62.17m3,需要1.04小时,第一层浇筑3个施工槽段需3.12小时,再加上搅拌车从搅拌站到工地运输时间及装卸料需时间约0.8小时,这样浇筑第二层混凝土时已达约4个小时的时间,所以要求搅拌站底板防水混凝土的初凝时间大于4小时。3.5 防水混凝土1)顶、底板、侧墙应采用高性能防水混凝土C30,防水混凝土的抗渗等级为地下二层以下为S10,以上为S8。2)二衬混凝土采用双掺技术,加入二级粉煤灰,及高效减水剂和引气剂,外加剂具体掺量根据试验确定。3)防水混凝土应选用低水化热水泥,水泥等级不小于32.5MPa,水泥用量16、不得少于280Kg/m(3),水胶比不得大于0.45。4)硅酸盐水泥和普通硅酸盐水泥的细度(比表面积)不超过350m2/kg,选用C3A和C3S少的水泥,其中C3A的含量不大于5%。5)按有关规定严格控制混凝土中CL(-)的含量,在氯盐环境下,混凝土土中CL(-)含量不应超过胶凝材料总量的0.1%。每立方米混凝土中各类材料的总碱含量(Na2O当量)不得大于3Kg。6)在混凝土试配工作中,进行混凝土和胶凝材料抗裂性能对比试验,并从中优选抗裂性能良好的混凝土原材料和配合比。7)防水混凝土的骨料应满足以下要求:粒径和级配良好,吸水率低,空隙率小(粗骨料的松散堆积密度应大于1500Kg/m3,对较致密17、石子如石灰岩大于1600Kg/m3),即空隙率不超过40%,公称连续级配的石子应有510mm颗粒针、片状颗粒不宜超过5%。8)防水混凝土的入泵塌落度控制在14020。9)围护结构要形成初道止水帷幕,应最大限度止水,达到无明水方可进行防水施工。10)迎水面钢筋净保护厚度不小于50mm。为了减少二衬收缩裂缝,纵向每侧构造配筋率不应小于0.2%。11)结构的抗渗等级除按地下工程防水技术规范的相关要求,还应结合结构所承受的水头、水力梯度以及下游的排水条件、水质和渗透水的危害程度考虑确定。3.6 混凝土运输及输送结构采用商品混凝土,混凝土搅拌车运输,输送泵车输送,并按下列规定执行:(1)商品混凝土由业主18、指定的供应商供应,混凝土到达现场后核对报码单,并在现场作坍落度核对,允许12cm误差,超过者立即通知搅拌站调整,严禁在现场任意加水,并按规定留置混凝土抗压、抗渗试件。(2)从搅拌车卸出的混凝土不发生离析现象,否则需重新搅拌合格后方可卸料。(3)输送泵车保持良好状态。(4)输送泵管路拐弯宜缓,接头严密,无硬弯。输送混凝土过程中,接长管路时分段进行,接好一段,泵出混凝土后方可接下一段。(5)输送泵间歇时间预计超过45min或混凝土出现离析现象时,需冲洗管内残留混凝土。(6)输送混凝土过程中,受料斗内保持足够混凝土。3.7 混凝土浇筑及振捣(1)主体结构底、顶板及侧墙均采用防水混凝土,其抗压强度、抗19、渗标号必须满足设计要求,并具有良好的抗裂性能。(2)在主体结构混凝土浇筑前必须做好以下几项工作:1)确定混凝土配合比:根据设计要求,结合施工经验,并通过多次的配比试验,提出施工配合比,报经监理审核、业主批准后才能实施。2)编制混凝土浇筑方案,根据现场条件、结构部位、浇筑混凝土量等,编制详细的浇筑方案,方案中包括设备、机具、劳动力的组织、混凝土供应方式、现场质量检查方法、混凝土浇筑流程、路线、工艺、混凝土的养护以及防止混凝土开裂的各项措施,并经监理审核、业主批准后才能实施。(3)模板、钢筋、预埋件、预留孔洞、止水带等完成后必须首先按照我公司实施的ISO9002质量体系文件要求进行三级检查并备有书20、面纪录,再由监理工程师按隐蔽工程验收。经验收签证后才能进行混凝土浇筑。(4)混凝土浇筑必须控制其自由倾落高度,当自由倾落高度大于2m时,采用串桶、溜槽或振动流管下落,防止混凝土发生离析。(5)混凝土必须采用振捣器振捣,振捣时间为1030s,并以混凝土开始泛浆和不冒气泡为准。(6)振捣器移距:插入式不大于作用半径一倍,插入下层混凝土深度不小于50mm,表面振捣器移距应与已振捣混凝土搭接宽度不小于100 mm;振捣时不得碰撞钢筋、模板、预埋件和止水带等。(7)混凝土从低处向高处分层连续浇筑。如必须间歇,其间歇时间尽量缩短(最大间歇时间不超过150min),并在前层混凝土凝结之前,将次层混凝土浇筑完21、毕。(8)混凝土每层浇筑厚度,当采用插入式振捣器时,不超过其作用部分长的1.25倍;表面振捣器不超过200mm。(9)结构预埋件、预留孔洞周边、钢筋密集处、施工缝等特殊部位,必须事先制定措施,指定专人下料,加强振捣工作,做到不漏振,不过振,确保混凝土密实。(10)结构施工缝留置在受剪力或弯矩最小处,并符合下列规定:1)柱子施工缝留置在与顶、底板或梁的交界处约300mm。2)板的施工缝设在柱距1/41/3处。3)墙体施工缝留置位置:水平施工缝留置在底板、中板及顶板交界处约300mm处,垂直施工缝同板施工缝距预留孔洞边缘不小于300mm。(11)施工缝处继续灌注混凝土时,按下列规定执行:1)在施工22、缝处按设计要求设置钢板止水带,继续浇筑砼时,已浇筑混凝土强度:水平施工缝处不低于1.2MPa,垂直施工缝处不低于2.5MPa。同时,必须对施工缝进行必要的处理。2)在已硬化的砼表面上继续浇筑砼前,应清除垃圾、水泥薄膜,表面上松动砂石和软弱砼层,同时还应加以凿毛,用水冲洗干净并充分湿润,残留在砼表面的积水应予清除。3)注意施工缝位置附近回弯钢筋时,要做到钢筋周围的砼不受松动和损坏,钢筋上的油污、水泥砂浆及浮锈等杂物也应清除。4)施工缝处混凝土必须认真振捣,使新旧混凝土结合紧密。(12)在夏季或雨季浇筑混凝土,须预先搭设遮阳(雨)棚,防止烈日暴晒或雨淋。(13)垫层混凝土沿线路方向浇筑,布灰均匀。23、(14)底板混凝土沿线路方向分层留台阶浇筑,中板、顶板连续水平、分台阶由边墙向中线方向进行浇筑,混凝土浇筑至标高初凝前,用表面振捣器振一遍后再作压实、收浆、抹面。(15)柱子混凝土需水平、分层浇筑。因柱子与墙(板)等结构的混凝土强度等级不同,故在施工时,对运输车辆的混凝土进行标识。(16)混凝土浇筑过程中随时观测模板、支架、钢筋、预埋件和预留孔洞等情况,发现问题,及时处理。(17)现浇混凝土和钢筋混凝土的偏差必须控制在设计及规范允许的范围内。3.8 防水混凝土施工保证措施(1)防水混凝土配合比采取双掺技术,使混凝土在满足设计强度等级及抗渗标号的前提下尽可能减少每m3混凝土的水泥用量,以减少混凝24、土的水化热,配合比必须报监理和业主批准。(2)防水混凝土的质量,在施工过程中,按下列规定检查:1)防水混凝土的原材料,必须进行检查,如有变化及时调整混凝土的配合比。2)不定期对搅拌站的原材料进行检查。3)在拌制和浇筑地点测定混凝土坍落度,每班不少于两次,每8台搅拌车不少于1次。4)如混凝土配合比有变动时,及时检查本款2)、3)点。5)严格执行见证取样及监督抽检制度,连续浇筑混凝土量为500m3以下时,留两组抗渗试块,每增加250300m3增留两组,如使用的原材料、配合比或施工方法有变化时,另行留置试块,试块在浇筑地点制作,试块养护期不少于28天。(3)掺加高效减水剂,降低水灰比,减少用水量,减25、少混凝土的收缩及泌水现象。(4)控制混凝土的入模温度。降低混凝土的入模温度,可有效地降低混凝土的绝对温升,减少祲温差,有利于防止裂缝:1)选择较低温度的时间浇筑混凝土。大体积混凝土浇筑温度不宜超过320C,混凝土浇筑温度的检测是在振捣后混凝土50100mm深处的温度。2)减少外部热源,降低搅拌温度。在夏天拌制混凝土时,采用加冰搅拌的方法于砂、石等原材料加盖防止曝晒,混凝土的输送管道在整个长度范围内覆盖草袋并经常喷洒冷水。(5)采用快速薄层浇筑混凝土,增大混凝土散热面积,降温快,使水泥水化热在水泥水化放热最剧烈的浇筑阶段尽量多地散发出来,使内部温度分布比较均匀,有利于减小内外温差,抑制表面裂缝。26、(6)收水抹面,消除裂缝。在混凝土的初凝阶段,此时混凝土强度沿未形成,由于混凝土收缩,混凝土表面常出现裂缝,甚至出现“钢筋印”等龟裂现象,影响美观。为此在混凝土初凝时,对混凝土表面进行抹面处理,将这些表面裂缝消除。(7)加强混凝土振捣,提高混凝土强度。(8)混凝土振捣前先根据结构物设计好振捣点的位置,振捣时间为1030s。对新旧混凝土结合面、施工缝、止水带位置要严格按设计点位和时间进行控制振捣。(9)在防水混凝土结构中有密集管群穿过处、预埋件或钢筋稠密处、预埋大管径的套管处、预埋面积较大的金属板处,要特别注意其振捣,由专人负责监督实施。(10)加强养护工作,科学养护混凝土。3.9 混凝土养护及27、试件(1)混凝土抗压、抗渗试件在浇筑地点实行见证取样制作,同一配合比的留置组数按下列规定执行。1)抗压强度试件每拌制100盘且不超过100m3的同配合比的混凝土,取样不得少于一次;每工作班拌制的同一配合比的混凝土不足100盘时,取样不得少于一次;当一次连续浇筑超1000m3时,同一配合比的混凝土每200m3取样不得少于一次;每一楼层、同一配合比的混凝土,取样不得少于一次;每次取样应至少留置一组标准养护试件,同条件养护试件的留置组数应根据实际需要确定。本工程拟采用如下方式:A)垫层混凝土每灌注一次留置一组。B)每段结构的底板、侧墙及中板、顶板,各留置4组。C)柱子混凝土结构,每灌注10根留置一组28、,一次灌注不足10根者,也留置一组。D)与同条件养护试件,其留置组数为:底板3组,中板3组(层),顶板:3组。2)抗渗强度试件对有抗渗要求的混凝土结构,其混凝土试件应在浇筑地点随机取样。同一工程、同一配合比的混凝土,取样不应少于一次,留置组数可根据实际需要确定。本站留置两组。3)混凝土终凝后及时养护,结构混凝土养护期不少于14天。混凝土养护采用铺挂湿麻袋或草袋覆盖以及蓄水养护等方法。4.模板安装4.1 顶板、中板模板安装(1) 各轴线及标高应按图纸要求明确标出。(2) 柱砼一次浇筑至梁底100位置并等柱砼强度达到设计的50以上时,才开始安装梁板模板。(3) 模板的安装顺序为:安装满堂红钢管支顶29、水平加固杆,安放主龙骨,叠枋(小龙骨),钉梁底板、梁旁板,钉梁侧上下压枋、斜支撑,最后安装楼面模板。(4) 满堂红模板支顶安装1) 搭设程序:应自一端延伸向另一端,自下而上按步搭设,不可自两端相向搭设或相间进行,以免错位。2) 每搭完一步钢管后,应按规范规定校正步距、纵距、横距及立杆的垂直度。3) 支顶的底座、垫板均应准确地放在地面上,支架不得浮空架设。4) 当门架支撑宽度为4跨及以上或5个间距及以上时,应在周边底层、顶层、中间每5列、5排在每门架立杆跟部设483.0通长水平加固杆,并采用扣件与门架立杆扣牢。(5) 安装独立梁模板时应设安全操作平台,并严禁操作人员站在独立梁底模或柱模支架上操30、作及上下通行。(6) 底模与横楞应拉结好,横楞与支架、立柱应连接牢固。(7) 安装梁侧模时,应边安装边与底模连接,当侧模高度多于2块时,应采取临时固定措施。(8) 浇筑大梁砼时,为使大梁模板及支撑系统受力均匀,大梁砼浇筑时应分层均匀下料,减小大梁模板及支撑系统变形。(9) 模板施工应按经审批的技术方案进行,技术方案未经原审批部门同意,任何人不得修改变更。4.2 底板梁模板安装正粱采用地胎模顺序:定位放线地基成槽梁底砼垫层砖砌垂直侧模底板与倒角砼垫层防水层装砖砌垂直面保护层底板与倒角砼保护层。技术要点:成槽按梁断面尺寸加垫层与保护层,成型后应保证足够的几何尺寸。侧模垂直面采用M10砌筑180mm31、厚砖墙,保护层采用Ml0砌筑50mm厚砖墙;底面与45倒角采用砼垫层与保护层。正梁地台模见下图:全文查看请搜索:地铁车站主体结构高大模板施工方案(PKPM计算软件 计算书 胶合板模板) 共96页5. 模板拆除施工要求5.1. 模板拆除的时间(1) 本工程拟用三套模板。侧模拆除时的混凝土强度应能保证其表面及棱角不受损伤。而水平模板及支撑则由施工员根据混凝土的强度试压报告,符合混凝土结构工程施工质量验收规范 (GB50204-2002)表4.3.1规定,所发出的指令后,经单位技术负责人同意,监理审批后才能进行,拆除时的混凝土强度应达到设计强度100%。(2) 下层楼板应具有承受上部荷载的承重能力,32、否则不能拆除该层楼板支撑,或采取增加回头顶等措施。5.2. 模板的拆除顺序和方法(1) 模板拆除顺序和要求:模板拆除一般次序宜按主梁 次梁 板。拆除作业必须由下而上逐道进行,严禁上下同时作业。拆除底模步骤是先卸低支撑,再拆下大椤小椤,然后剥离模板,拆下材料严禁高处抛掉下,防止对支承面板产生冲击。拆模时严禁大锤橇棍等硬砸硬橇。(2) 楼板模板:楼板模板的拆除要先放低主龙骨,拆除部分椤木,然后逐块拆除模板。拆下的模板先放在顶架的椤木上,然后用绳子吊送至地面,切不可自高空抛下,以免损伤模板。(3) 梁模板:两端固定的梁底模,应先从中间开始卸低支撑,然后两端依次逐个卸低支撑,使梁的正弯矩荷载逐渐增加,33、严禁从端部开始拆卸(负弯矩区变成承受正弯矩);悬臂构件应从悬臂端开始卸低支撑,依次逐个卸低,使悬臂端负向弯矩逐渐增加,严禁从支座端开始拆卸支撑。(4) 侧墙模板拆除:侧墙模板拆除在同条件养护试件砼强度达到1.2MPa能保证其表面棱角不因拆除模板而受损后方可拆除。撬棍从侧边撬动脱模.禁止从垂直面砸击洞口模板。拆出的模板及时修整。(5) 施工缝模板拆除:在同条件养护试件砼强度达到1.2MPa能保证其表面棱角不因拆除模板而受损后方可拆除,用撬棍从侧边撬动脱模拆除下的模板及时清理模板残渣及面线。(6) 侧墙风道口、通道口过梁,考虑过梁与过梁柱未整体成型局部受力,采相邻跨顶、中模板。遂道口内模及支撑暂缓34、拆除,待接口形成整体强度达到100%后同风道、通道、隧道拆除。(7) 由于中板中间跨预留孔洞较多,加之顶板竖向支撑的需要,因此中板中跨待顶板砼达到100%强度后同时拆除。5.3. 支顶、模具料的搬运钢管、门式架在搬运时,应把所有的附着件拆除,运到材料员指定的地方分类堆放。拆下的模板及时清理粘结物,涂刷脱模剂,并分类堆放整齐,拆下的扣件及时集中统一管理。5.4. 拆除模板的钢管拆除模板的钢管时,首先应拿掉最上面的螺栓铰头,然后拆除最顶层的水平拉杆及剪刀撑,接着拆掉顶层的钢管。按着这样的顺序逐层拆掉钢管。6. 模板安装、拆除的安全措施6.1 模板安装安全措施(1) 模板的安装与拆除均由施工现场安全35、责任人对工人进行方案交底。支模过程中应遵守安全操作规程,如遇中途停歇,应将就位的支顶、模板联结稳固,不得空架浮搁。拆模间歇时应将松开的部件和模板运走,以防坠下伤人。(2) 模板上堆放材料要均匀,要符合构件的使用荷载,泵送混凝土出料应及时分摊到其他地方,临时料堆放高度不得超过100mm。(3) 模板安装须有稳固的脚手架防护,操作人员上落应走斜道或稳固的靠梯,高空作业无安全保护的要佩带安全带。(4) 模板安装过程应保证构件的稳定性,有措施防止模板(高支撑)的倾覆。(5) 使用电器和机具应符合施工现场临时用电安全技术规范JGJ46-2005、建筑机械使用安全技术规程JGJ33-2001的规定。(6)36、 在楼层内的高度超过2米的安装及拆卸作业,应搭设临时性的脚手架或钢管,必须正确佩带安全带。(7) 高度超过4米的模板拆除,不得让材料自由落下及大面积撬落,操作时必须注意下方人员的动向。(8) 操作人员上下通行时,不能攀登模板或脚手架,不许在墙顶、独立梁及其他狭窄而无防护的模板上面行走。(9) 模板支顶安装后,按项目部、分公司、总公司分别进行验收,合格后才能进入下道工序。(10) 浇灌砼时,支顶下不得站人,质安员检查支顶变形情况,发现异常,立即停止浇灌砼并疏散施工人员,同时对模板支撑体系进行整改。经安全员检查核实整改好的模板体系安全后,方可继续砼浇筑作业。6.2. 拆模安全技术要求(1) 模板拆37、卸作业,必须遵守安全操作规程。(2) 模板支撑拆除前,混凝土强度必须达到设计要求,并应申请,经单位技术负责人批准后方可进行。(3) 模板拆除时要搭设稳固的脚手架,不许有空隙、松动或探头脚手板,下方设警戒线和监护人员。(4) 模板的拆除应按照楼板次梁主梁的顺序拆除。(5) 拆模必须拆除干净,不得留有悬空模板。(6) 拆下的模板不准随意向下抛掷,应及时清理。临时堆放处离楼层边沿不应小于1米,堆放高度不得超过一米,楼层边口、通道口、脚手架边缘严禁堆放任何拆下物件。(7) 拆模间歇时,应将已活动的模板、木枋、支撑等运走或妥善堆放,防止因踏空、扶空而坠落。(8) 材料应按编号分类堆放,按楼板部位层层复安38、,减少损耗。(9) 有关安全防火、质量管理、文明施工本方案未详之处,须执行公司上级标准和规定。7. 人员、机械设备及材料投入计划7.1 劳动力一览表序号工种计划人数1技术人员102物资人员33库管24现场施工员35专职安全员26钢筋工班507模板工班508架子工班409杂工班207.2 机械设备一览表序号设备名称型号单位数量1汽车吊25T台12运输车5t辆13龙门吊5+5T台14电焊机500A台45电焊机400A台46弯筋机Y100-L2-4台27切筋机Y132-3台28插入式振捣器ZN35台109平板振捣器J02-22-2台410气割设备套411对焊机UN1-100台112木工刨床MJ10439、台113套丝机台114手提式角磨机150个215钢筋调直机GJ4-14台116电动空压机WH-2.8M台117风镐把1018冲击钻把219电动手工锯台420水平仪台121塔尺把27.3 材料投入计划序号材料名称型号单位每米数量计划长度计划总量备注一面板1模板1.830.9150.18M2104.95052453133张二龙骨1木枋9090M23630708057方2木枋8080M10030300019方3木枋50100M503015007.5方4钢管R=48,B=3.0M603018006.4吨三支撑体系1单侧支架H=3600标准节套8302402H=3200加高节套4301203H=160040、加高节套4301204H=500加高节套8302405顶托L0.5米个1563046806钢管48,壁厚3.0M20030600021.3吨7十字扣件个3003090008活动扣件个1003030009接头扣件个5030150010门式架4819301219榀5030150011489151219榀303090012485001219榀10303008. 工期计划及保证措施8.1 工期计划本工程共分5段进行施工,施工流向为东西两端向中间推进施工。每段的施工工期为117169天,计划2009年5月18日开始施工A风亭基底清理、垫层等工作, 2009年6月4日开始施工第1段抗拔桩工作,在2009年41、12月26日完成第3段顶板混凝土浇筑工作,拆除第一道钢筋混凝土支撑后,于2010年1月20日完成主体结构的顶板防水及回填工作。主体结构详细施工计划详见附图:某车站主体结构施工进度计划。8.2 工期保证措施(1)投入充足的劳动力和材料(如模板、钢管等),保证主体工程总体能高效有序地展开流水作业。(2)合理安排劳动力,组织好各工序的流水作业,减少窝工现象。(3)高效调配混凝土供应及输送,以保证高峰期混凝土浇筑的需要。(4)合理安排结构施工顺序,在满足质量要求的前提下多开工作面,推进结构施工。(5)根据分区段和分块原则,按照平行流水作业安排施工。(6)发挥科技优势,采用新技术、新工艺、新设备,提高工42、作效率。(7)狠抓施工安全质量工作,严把质量关,杜绝质量事故,减少返工浪费,以质量保进度。9. 模板施工技术措施(1)模板必须支撑牢固、稳定,无松动、跑模、超标准的变形下沉等现象。(2)模板拼缝平整严密,并采取措施填缝,保证不漏浆,模内必须干净。模板安装后及时报验及浇砼。(3)模板安装前,必须经过正确放样,检查无误后才立模安装。(4)顶板(中板)结构支立支架后铺设模板,并考虑预留沉降量。当跨度大于4m时,要求板跨中起拱L/400,当支承梁跨度大于4m及悬臂梁大于2m时,要求起供高度控制在全跨长度的1/10003/1000,以确保净空和限界要求。侧墙模板采用木模板,模板拼缝处内贴止水胶带,防止漏43、浆。(5)结构变形缝处的端头模板钉填缝板,填缝板与嵌入式止水带中心线和变形缝中心线重合并用模板固定牢固。止水带不打孔及用铁钉固定。填缝板的支撑必须牢固,确保不跑模。(6)模板安装前使用脱模剂。(7)模板(包括预埋件、预留孔)安装的允许偏差按下表要求进行控制。模板安装、预埋件、预留孔允许偏差表:序号项目允许偏差(mm)检查频率检验方法范围点数1相邻两板表面高低差刨光模板2每个构件4用尺量不刨光模板32表面平整度刨光模板34用2m直尺检验不刨光模板53模内尺寸宽柱51用尺量梁0、-10板0、-10高柱0、-51用尺量梁0、-10板0、-10长柱0、-51用尺量梁0、-5板0、-54侧向弯曲柱、桩L44、/1500每个构件1沿构件全长拉线量取最大矢高梁H/1000板L/2000且105预留孔洞位置10每个孔洞1用尺量6预埋件钢板联结板等位置3每个预埋件1用尺量平面高度21用尺量螺栓筋等位置101用水准仪测量外露长度101用尺量10. 防止模板支撑系统失稳措施(1) 浇筑梁板砼时,组织专门小组检查支撑体系中的各种坚固件的固定程度。主要采用测力板手对扣件拧紧,检测力矩为4065N.m。(2) 浇筑梁板砼时,专人看护,发现坚固件滑动或杆件变形异常时,立即报告,由值班施工员组织人员,采用事前准备好的10吨千斤顶,把滑动部位顶回原位,以及加固变形杆件,防止质量事故和下沉造成意外坍塌。11. 质量保证措施45、 (1)全体技术人员在总工程师的指导下,熟悉图纸,领会设计意图,发现图纸问题并进行汇总,与设计、监理、业主等单位做好图纸会审。并将图纸会审内容及时贯彻基层有关施工人员。(2)针对本项目施工特点,对各种操作人员进行岗前培训,持证上岗;对新工(含民工、临时工)上岗前进行“三级”教育。(3)施工阶段由技术部向作业层技术人员对施工方法、施工顺序、操作要求、技术标准、质量要求、进度安排、工期要求进行交底。现场施工由作业层技术人员向班(组)长进行技术交底。班(组)长向作业工人进行交底。让操作人员对自己要完成的项目事先心中有数。遵循“三交清”原则:交清施工方法、交清技术质量要求、交清工期要求。施工技术交底以46、书面形式,交底时履行签字手续。“技术交底书”按顺序编号,装订成册归档。(4)根据工程实际情况,找出工程难点,组织技术攻关,研究建筑质量通病,采取预防措施。(5)测量工作是施工全过程的基础工作,每个部位每次测量放线完成后,必须坚持责任复核验线,根据规程由技术、质量、监理复验签认,确保放线的准确。(6)坚持“样板工序”制度,“样板”鉴定达标后,后序的施工不得低于“样板”的标准。(7)坚持“三检”制度,工序工程操作班组完成自检,当为分项工程,转交其他班组施工时必须在质量、技术主持“交接检”,检查合格后,将自检资料报质检员专检,合格后报监理工程师共同验收,并及时办好检验批签证手续,方可由新班组开始新分47、项工程施工操作。(8)技术、质量、生产人员深入施工现场,指导施工操作,发现质量问题,验证方案和技术交底的合理性,对质量问题和方案交底的不合理处尽快纠正。(9)材料员必须按计划及时提供模板用规格、型号、材质、数量并符合施工方案要求的材料。(10)材料进场,由物资部提供“三证”,与驻地监理共同验收。(11)进场的材料、构配件、机械设备由物资部妥善保管,确保不变形,不变质。并具备可追溯性。(12)为促进工程质量的提高,对质量奖罚作出具体规定,并向全体参与施工的人员进行奖罚交底。(13)各种量器具,如:量尺、测量仪器、仪表等必须按照计量要求定期送到计量部门校验,并妥善保管与维护、正确使用。(14)模板48、使用前,要将模板表面残留的砂浆、杂物清除干净,并图刷脱模剂。侧墙、柱模板下部要留有清扫口,供浇捣砼前清理之用。(15)拆除模板的时间,应在与结构同条件养护的砼试块达到规定强度时或设计特殊规定时,方能开始拆除模板,严格执行拆模申请报告制度。12. 安全技术措施12.1. 搭设高支模架作业的要求(1) 搭设作业人员必须持有劳动部门、建设主管部门核发的合格架子工证和安全培训上岗证,并经三级教育后才可以上岗。(2) 严禁作业人员酒后上班,禁止赤脚或穿拖鞋,应该穿防滑鞋上班,系安全带。(3) 开工前施工现场安全负责人必须按照高空作业操作规程进行操作,其余按有关安全规程执行。(4) 搭设高支模架时,必须立49、柱垂直,大小横杆要平直、畅顺。(5) 高支模架料在垂直传递或运输时要注意人员的站位安全,不允许在高出抛掷物料。(6) 如遇大、暴雨或五级以上强台风大风不得进行高空高支模架的搭拆作业,正在进行作业的,应立即停止,并把高支模架上的材料放平、放稳。(7) 高支模架施工期间,施工员每日检查,按进度与项目部进行交接验收;质量安全员不定期进行质量和安全巡检、公司对工程进行抽检,确保工程质量。(8) 所有扣件螺栓必须拧紧,对主龙骨层的扣件,施工员、质安员必须对扣件的螺栓松紧进行检查;(9) 高支模架从下而上分段搭设;作业区域设警戒禁止非作业人员进入,拆除时要从上而下逐层拆除,严格执行高支模架拆除的安全技术要50、求;拆下材料严禁抛掷落下。(10) 在模板施工时不能拆动、拆松、拆除高支横架的扣件、钢管;(11) 发现高支模架异常,应及时报告相关部门处理。12.2. 其它安全技术措施要求(1) 高大支模专项方案经评审通过后,必须严格按方案施工,不能随意改变。所使用的门式架、钢管、扣件、木枋、模板必须符合相应质量标准;基础必须有足够的承载能力。(2) 架子工和木工身体健康状况应适合高空作业的身体条件要求。架子工作业时应佩戴安全带并正确使用安全检查带,架体安装拆除和传递材料时应站稳并吊挂好安全绳扣。高支模施工的顶层纵横水平杆设置防护棚或张挂水平安全网,以下空间根据支承面高度设置防高处坠落设施。木工安装横梁模时51、应站在临时工作台。(3) 搭设和拆卸作业时设置警戒区,并派人监护。材料输送采用接力传递方式,严禁抛掷。架子工使用工具宜设保险绳零细零件和工具放在工具袋。木工拆下模板、木枋先小心集中放稳,然后传递到支承面,严禁抛掷自由落下。模板漏浆残块或混凝土渣3应看清下方人员撤出后才能凿除。(4) 电线电缆正确架设,严禁电线电缆绑扎在支架上。支撑架搭设后需进入内部作业时,使用手电筒或安全电压行灯。(5) 根据工程特点应利用外围的钢管作好林边防护,钢管伸出屋面构架梁不少于1.2m。(6) 对个别设计的异型钢模及非标准配件应经过力学计算和实验鉴定。不符合要求者不得使用,主要指无出厂合格证或未经试验鉴定的钢模板及配52、件不得使用。(7) 对大型或技术复杂的模板工程,应按照施工设计和安全技术措施,组织操作人员进行技术训练,一定要使作业人员充分熟识和掌握施工设计及安全操作技术。13. 监测控制措施由测量人员每日用水准仪进行监测,具体方法和要求如下。13.1 垂直检测在支撑架验算合格的基础上,记录各监测点相邻的立杆垂直度偏差值作原始值,本工程支撑搭设高度最高为7.15m。根据混凝土结构工程施工质量验收规范8.3.2-1规定,梁的轴线允许遍差为8;浇筑混凝土时垂直监测预警值:把预警值的1.5倍作为控制值,即控制值12mm。垂直检测宜采用吊线和钢尺量度。13.2 沉降监测支撑系统的沉降由地基下沉、立杆弹性压缩、大小枋53、等挠变组合而成。通常采用监测点吊杆对照参照物的观察方法。模板系统沉降监测预警值及控制值:模板系统沉降量预警值=基础下沉预警量+立杆正常压缩量+模板变形量模板系统沉降量控制值=1.5模板系统沉降量预警值1000mm2000mm梁模板体系计算过程及结果如下:由于基础为1000厚C30(P10)砼故立杆基础下沉可视为0mm;立杆正常压缩量=/Eh=108.2/2060007150=3.76mm模板变形量=托梁变形量+小椤变形量=0+0.1=0.1mm即:模板系统沉降量预警值=4mm 模板系统沉降量控制值1.54=6mm以上检测数值在预警值范围内是正常生产状态,但监测值超出预警值,必须对模板支撑系统进54、行加固;当检测值超出控制值时,应撤离作业人员,作应急处理。13.3 监测频率在混凝土浇筑过程中实施全程实时监测,监测间歇时间不得大于20分钟。14. 危险源本工程地下室部分梁线荷载超过15kN/m、面荷载超过10kN/m2、结构高度超过8m,属于高大模板,梁的搭设和浇筑时可能会出现物体打击、高处坠落、坍塌、触电、火害等危险,是本项目的危险源所在。因此,项目部会根据危险源的大小,明确相应的责任部门和责任人,制作危险源公示牌在工地的醒目位置进行公示。根据工程的不同施工阶段,不同工序及时更新公示牌的内容,实行动态控制。项目部在进行班前活动时,结合危险源公示牌的内容,就有关的安全技术与管理措施向施工作55、业班组、作业人员作详细的安全技术交底并双方签字确认。15. 安全事故应急预案15.1 应急救援机构项目部成立以项目现场负责人江秀琪为组长的应急救援小组,如下图:组长副组长安全主任施工现场结构施工后勤保障技术管理施工管理测量监测电 工 应急救援机构图15.2 应急救援机构各部门职责组长:组织指挥本工程范围内的应急救援。副组长:协助组长负责应急救援的具体指挥工作。成员:(1) *1) 负责灭火、警戒、治安保卫、疏散、道路管制工作;2) 负责事故处理时生产中开、停车的调度工作;3) 负责抢险救援物资的供应和运输工作。4)负责事故现场调查及有害物质扩散区域内的监测工作;5)负责工程抢险、抢修的现场指挥56、。(2)*1)协助办公室现场医疗救护指挥及受伤人员分类抢救和护送转院工作;2)负责抢救受伤人员的生活必需品供应;3)负责接待伤亡人员及其家属的善后接待及安抚慰问工作。(3)*1)协助组长做好事故报警、情况通报及事故处置工作;2)负责事故现场通讯联络及对外联系;3)必要时代表组长对处发布有关信息。15.3 应急处理程序事故调查组提出的事故处理意见和方法措施建议,应先由事故单位负责处理,并把处理意见上报项目部。对于重伤、死亡或非伤亡的重、特大事故,管理者代表应组织、主持召开事故现场会,与会人员应包括事故单位相关人员及各部门有关负责人。事故应按“四不放过”的原则(即事故原因不清楚不放过,事故责任者和57、群众没有受到教育不放过,没有防范措施不放过,事故的责任者没有受到处理不放过)进行,防止类似事故发生。公司对事故处理结果,以通报的形式下发部门、分公司及项目经理部,达到事故预防的目的。事故应急处理流程如下所示:事故发生后事故报告事故现场保护事故调查事故分析事故处理事故报告撰写事故材料归档。16 计算书16.1 中板(400mm)楼板模板计算书 门式钢管脚手架的计算参照建筑施工门式钢管脚手架安全技术规范(JGJ128-2000)。 计算的脚手架搭设高度为7.2米,门架型号采用MF1219,钢材采用Q235。 搭设尺寸为:门架的宽度 b = 1.22米,门架的高度 h0 = 1.93米,步距1.9558、米,跨距 l = 1.83米。 门架 h1 = 1.54米,h2 = 0.08米,b1 = 0.75米。 门架立杆采用48.03.0mm钢管,立杆加强杆采用42.02.5mm钢管。 每榀门架之间的距离0.90m,梁底木方距离300mm。 梁底木方截面宽度90mm,高度90mm。 梁顶托采用双钢管483.0mm。 1立杆;2立杆加强杆;3横杆;4横杆加强杆图1 计算门架的几何尺寸图 图2 模板支架示意图16.1.1 楼板底木方的计算 木方按照简支梁计算,木方的截面力学参数为(1) 荷载的计算1) 钢筋混凝土板自重(kN/m):q1 = 25.5000.4000.300=3.060kN/m2) 模59、板的自重线荷载(kN/m):q2 = 0.3400.300=0.102kN/m3) 活荷载为施工人员与施工设备产生的荷载(kN/m):4) 经计算得到,活荷载标准值 q3 = 2.0000.300=0.600kN/m5) 经计算得到,木方荷载计算值 Q = 1.2(3.060+0.102)+1.40.600=4.634kN/m全文查看请搜索:地铁车站主体结构高大模板施工方案(PKPM计算软件 计算书 胶合板模板) 共96页(2) 木方强度、挠度、抗剪计算 木方计算简图 木方弯矩图(kN.m) 木方变形图(mm) 木方剪力图(kN) 经过计算得到从左到右各支座力分别为 N1=2.353kN N260、=4.985kN N3=3.970kN N4=3.970kN N5=4.985kN N6=2.353kN 经过计算得到最大弯矩 M= 0.596kN.m 经过计算得到最大支座 F= 4.985kN 经过计算得到最大变形 V= 1.5mm 木方的截面力学参数为 本算例中,截面惯性矩I和截面抵抗矩W分别为: W = 9.009.009.00/6 = 121.50cm3; I = 9.009.009.009.00/12 = 546.75cm4;(3) 木方抗弯强度计算 抗弯计算强度 f=0.596106/121500.0=4.91N/mm2 木方的抗弯计算强度小于13.0N/mm2,满足要求!全文查61、看请搜索:地铁车站主体结构高大模板施工方案(PKPM计算软件 计算书 胶合板模板) 共96页 (英文版 ) easily blame, to prevent the broken window effect. Supervise the leading cadres to play an exemplary role, take the lead in the strict implementation of the and , lead to safeguard the solemnity and authority of the party discipline, ensure that 62、the party discipline and the laws and regulations for implementation in place. Throughout the discipline in the daily supervision and management, strengthen supervision and inspection, from the thorough investigation of violations of discipline behavior. Strengthen to key areas, key departments and 63、key projects as well as the masses reflect the concentration of the units and departments for supervision. - strengthening supervision, discipline inspection and supervision of cadres to set an example for compliance with the and is a man must be hexyl, blacksmith needs its own hardware. Discipline 64、inspection organs as the executor of the party discipline, and supervisor of the defenders, for its supervision must be more strictly, discipline inspection and supervision of cadres to firmly establish the awareness of Party Constitution, sense of discipline and rules consciousness, politics loyalt65、y, sense obey. Action speak Ji Ordinance to set an example of the regulations of the rule of law, strengthen supervision and accept the supervision of the firmness and consciousness, do comply with and . To firmly establish the discipline must first be disciplined, the supervisor will be subject to 66、the supervision of concept, and consciously safeguard and implement party compasses party, take the lead in practicing three strict real strict, so loyal, clean, play. To be good at learning, the Constitution and the as morality, politics and brought to fruition; to implement , do not want to, dare 67、not, not with disciplinary ruler to supervision; to discipline a ruler, often the control inspection, and consciously in the ideological red line to draw the row Ming Good accumulation is indeed the bottom line, so that the heart has fear, said to have quit, the line has ended. Attached: indifferent68、 to heart, calmly to the table in our life, there are many unpredictable things will happen, some good, some bad things, we cannot control is powerless to stop, but with time, you will find in life sometimes turns out to be not good, some bad things finally turned out to be a good thing, but then we69、 muddy however did not know, this is the life teach us things. 1, life can be complex, can also be simple. Want simple life of precipitation, to have enough time to reflect, to make Become more perfect. Life is the most important thing is not to win, but the struggle; not to have conquered, but to h70、ave fought well. 2, the plain is the background of life. Live a plain life, give up on themselves is not a coward, but the wise answers; not disillusioned after the heart, such as ashes, but experience the storm after the enlightenment; not unrewarding perfunctorily, but calm attitude of life of unr71、estrained self-confidence. Plain living, there is no noise noisy, no earthly troubles, more did not fill in the discontent of desire, some just a calm, a calm. 3, memory of heart will not good things to erase the, life is a When no movie, pain is a beginning, the struggle is a kind of process, death72、 is a kind of ending. Give up this giving up is the helpless, do not give up the abandoned, do not give up this giving up is ignorance, do not give up should not give up is persistent. 4, a thing figured is heaven, think impassability is hell. Since the living, to live better. Sometimes we because o73、f too narrow-minded, too care around the chores and penny wise and pound foolish, not worth the candle. Some things to attract trouble and worry, completely depends on how we look at and deal with it. Dont always take everything back to things, and dont get into a blind alley, dont want to face, don74、t be narrow-minded. Poke to care, is a kind of open-minded, a free and easy. 5, I am not afraid of others behind me a knife, I afraid to look back and see stab me, is my intention to treat people; I am not afraid of the truth to tell the best friend, Im afraid he turned to it as a joke to tell dont 75、6, when we are in a positive frame of mind, you will find many good things; and when we are in a negative state of mind, you will find many depressed things; life happy and worry, all is you of life attitude, optimistic, good luck; loss of sink, Eritrea company. When you are in adversity, may wish t76、o change a point of view to think everything over to the good Think, because good mentality decided the fate of the! 7, people are tired, rest; heart tired, calm. Grow up, mature, this society read. Tired and sad, squat down, to their a hug. Because the world no one can sympathize with you, have mer77、cy on you. You cry, tears is your own; you pain, no one can understand. Then you only tears to smile. 8, each people have youth,Each youth are a story, the life of the world never gets easier, I want what, wish the world all know, as has been the same; now want anything, for fear that others know, o78、r like to lose the same. 9, the heart move, everything in the world is followed by birth, Rangrang, important thing is often the most difficult to open ones mouth, because words will reduce its importance; to let strangers people care about your life in the good things, the original is not easy 10, 79、do not blame, do not laugh at who, also dont envy who. Like a person is a kind of feeling, not like a person is true. The truth is easy to explain, I feel Is unspeakable. The best travel life is that you in a strange place found a long lost touched. 11, happy life not in the bustling in, and in the 80、peace of mind; no matter how many grievances, how uncomfortable, and ultimately to heal themselves or their own, others may got you to comfort, but never know your heart is how wanjianchuanxin. 12, maam, like a movie, learn to appreciate, learn to be grateful, learn tolerance, and goodness, helping 81、others. Instead of accusing the society, as into one; and an exception is better to give than to what 13, dont envy him A sum of, dont lose your life and the life, respectively is: the former is a we experienced cannot escape in a day finally will last minute, while the latter is our persistent, we 82、want to cherish the memory of those people and things. 14, learn to smile, learn to strong, the world you know so many people, so many people and you are, you cannot change also cant let everyone like you, so also do not want to do. Life is too short to go crazy to love to go to waste, to chase the 83、dream to regret. 15, when temper, a blessing to go. A wounding elegant people, the key is to control their own emotions. With the mouth is the most stupid behavior. A control negative emotions than a can take a city more powerful water flow slow, language is expensive. People spent two years of time84、 to learn to speak, but to spend a few years time to shut up. That is a kind of ability, that is a kind of wisdom. 16, life is not perfect, sometimes, growth is not a cry, not an eyeful of tears, there is no trace of emotion, there is no gleam of hope, no desire, no action, no static, there is only 85、one kind of downward sinking feeling, sink A murky? 6? 7? 6? 7 sink? 6? 7? 6? 7 toward the bottom of the sink. 17, in some way, do not go, you will not know the other side scenery is beautiful. To you is not good, you do not mind too much, no one has an obligation to you; you learn knowledge, is you86、 have weapons, you can start from scratch, but not unarmed; how do you treat people, does not represent how others treat you, if cannot see through this point, only inviting worry. 18, time is like a sponge in the water, as long as you are willing to squeeze, the total water is still there. Every li87、fe, after the ups and downs The best test of live, to life, survival and continuation, do not stop the struggle in the joys and sorrows of life on the road, so that different soul to bear life beat, acceptance of suffering. 19, indifferent to heart, calmly in table, elegant and comfortable life, do 88、not take what is so important. The pursuit will be disappointed; to be alive, you will have trouble. Life is the most afraid of what all want to care about, but also what all grasp is not firm, without scenery, separated populations, such as not to desire, all docked in the fate of the end. Why is t89、oo rigid, the natural, to go stay not to live, let go of obsession, revel is 20, if the fate of the broken Hopes of sailing, please dont despair, the coast is still, if the fate of the withered petals of the beautiful, please do not sink, the spring is still, life will always be endless trouble, ple90、ase dont helpless, because they are still alive, is still a dream, the sun still, we still. Lost, keep memories; to get, must work to; but the most important is good to cherish their own. 21, life, select the complex, is to choose the pain; choose a simple, is choose to be happy. The complex world l91、ike aSignificance of pride. Hope is the ornate palace, outside people admiring the magnificent, living in the deep knowledge of living it to pay the price. Simple world as a simple log cabin outside ridiculed shabby, the heart is willing to go live to know the joy. Suffering and joy is their own cho92、ice. 22, learn how to use a single powerful heart, let the past be the past, let the future come. Life is really the end of the end of an eagle is flying wings, life is constantly pursuit. Dont miss to regret, dont wait for old just miss. Time to return, seize every moment, again painstakingly again93、 tired also Those struggling to fly. 23, life could not Yimapingchuan, even flat pavement, inevitably there will be a few pieces of roadblocks. Some of the rocks around the past, while others have to move it out. Just move others put the stone is very easy, because the stone from the appearance we c94、an discern; difficult to myself to move away the heart of stone head. Leave time to spend with her, often reflect my heart, so as to remove your heart of stone. 24, everything does not have to be demanding, come to, everything does not have to care about, over the past; failing to do not frown, laug95、h it laugh. Results Dont demand, do to; life is a simple, calm and peaceful. Always not to choose their own path and regret, life is like a train, the scenery and then the United States will retreat, the passage of time and encounter will eventually drifting further and further away, before is alway96、s himself. 25, everyone has a weakness, weakness is true humanity. That has no weakness, a shallow person. That people think there is no weakness, mostly false. Life has shortcomings, there are shortcomings is the real life. That no one regret, or childish or numbness or Self deception. It is in tol97、erance of weakness and so on to accept, people live happily.Hello, everyone! I am a party member. The title of my speech is: study and implement the partys two laws, doing practical play highway. 2015 October 18, the Central Committee of the Communist Party of China promulgated the implementation of98、 the and Chinese Communist Party discipline and punishment regulations. We Heyuan male passers-by to respond positively to the call of the Central Committee of the party, earnestly organize the study party two regulations, truly grasp the essence and gist, and in their respective positions, to hold 99、the bottom line of the discipline, build a strong ideological line of defense, with the courage to play, the courage to fight tough and fearless spirit, at the crucial moment well to complete the task, with practical action to test the study and implement effect Because of discipline in the * * * * 100、* * * * * * * story. Here, let me to cast a brick to attract jade, speak about our highway. Highway line section of the road surface transformation project, last year towards the country seized will be seized one of the items. To complete this arduous task, as a project management office director Co101、mrade, keep in mind from the Communist Party membership, recognize and identify the bottom line, strict management, and strict adherence to the quality of the project. He not only set an example, honesty and self-discipline, but also requires the management of all the members of the O.K., do not eat102、 the construction unit one meal, do not accept the construction unit a ceremony. In this way, they didnt really dare to adhere to the principle. No comrade, constantly put on reworking an emergency meeting to Comrade Zhen to speak louder, management tube too strict. Remember in Dongguan Street, 400 103、meters long cement concrete surface layer, because of various reasons, the smoothness of the poor in the bottom cavity, covering film traces and car imprinting quality problems, * * * inquiries, immediately rushed to the scene to understand and verify the situation, the convening of the management o104、ffice, the construction units, supervision units, construction units, construction units construction time is tight, the economic loss and other reasons to intercede * unmoved. He said, now a popular word, to the discipline and rules quite in front, there are no rules Radius, you construction team n105、ot accordance with the technical specifications, quality problems, it must be to carry out rectification. Engineering quality responsibility be weightier than Mount Tai, if we manage to this matterPavement quality quantity are placed the matter, we this time to learn two regulations have what use? S106、till what is the Communist Party? Finally, in his insisted, the road after rework, to solve these problems. In the construction of the new comrades and the project all the colleagues efforts, after four months of fighting, the project the main project was finally completed and passed inspection. Tho107、usands of miles of ice, thousands of miles Piao, this is a splendid and romantic scene. But snow for the highway, it is a disaster, a serious threat to the traffic safety. This year, a month, a century of cold wave swept from North to south, and the snow blowing to Guangdong, but also to bear the bl108、ow To * * * * the highway. In January on the evening of 23, Lianping county city temperatures dropped to minus 2 degrees, a wide range of sudden rain sleet, before and after the provincial S341 line in Jiulianshan Mountain tunnel sections of the road appeared in the snow, lead to the passing vehicle109、s skid, traffic is blocked. In the face of the sudden natural disasters, city and county highway department immediately launched the emergency plan for disaster prevention. As the front line of the main force, Lianping Highway Bureau of all Party members and cadres to remember the Party member respo110、nsibility, braving the biting cold wind, the first time rushed to the scene, on the icy pavement of salt disposal. Because the temperature is too low, just melt water immediately freezes, addition to the ice work to increase the difficulty. To ensure In addition to the re organization of the depths 111、of the traffic safety, road people braved the icy put reflective cones and warning signs, endure cold at minus 2,3 of Jiulianshan patrols until one in the morning. Just before dawn, Lianping Highway Bureau personnel on the icy road salt ice melting processing until ten oclock, ice melting ice succes112、s, the road gradually returned to normal traffic. In the cold winter night, which people do not miss the warm bed, which people do not miss the warm home. However, our highway on the road to the owners of the masses can go home early, the night fighting to secure the avoidance of the road safety and113、 smoothness, fulfill their responsibility. Xi General Secretary Every Party member cadre cautioned against said: blacksmith needs self hard . two regulations , is our own hard standard test, more exercise every party members and cadres of the fire. We should continue to strengthen the party two regu114、lations, conscientiously in practical work, practical play road, the road for the development of the cause of Heyuan and struggle.In the industry domain report the situation of road traffic in recent years, in the province highway departments of the concern and support, our bureau management departm115、ent based on the job, loyalty duty, best service, to further promote the highway management standardization, legal, scientific and information technology to improve the management level and service quality. This will be my last work is as follows: first, around the center, go all out to greet the se116、izure in 2015, meet national examination is my bureau work. As the highway management department, we focus on the work of the center to strengthen road renovation and management as the focal point, further optimize the service environment, improve service levels. Inspection, the inspection group and117、 the Ministry of transport, the Bureau under the leadership of the ministries and agencies highly evaluated and fully affirmed. (a) increase road area remediation efforts. The programme of work, strengthen the organization and leadership. The timely development of the city of , along the road signs 118、and markings, traffic safety facilities, on both sides of the green, advertising signs, control area illegal construction and implementation of remediation tasks to the relevant departments, clear work time of the node to ensure rectification work timely. Set up road area special rectification work 119、leading group, implement a bureau, the Bureau of the county (District), the project road site domain environment comprehensive improvement Mechanism. To ensure that the work carried out smoothly, the bureau also organized the city road managers participated in the regulation of road region and the r120、elevant laws and regulations of the special training. 2. Active butt joint is reported, actively strive for the support of. Local Party committee and government support is the jobAs a magic weapon, I am one of the Bureau of the principal leaders repeatedly attack inspection remediation and road area121、 to the principal leaders of the municipal report. * * *, the Secretary of municipal Party committee, mayor * *, * * *, vice mayor of many times the rate of the relevant departments directly under the responsible person in-depth National Highway G105 line, G205 line, provincial S341 line and the oth122、er highway project site, on-site office, coordination solve engineering construction and environmental comprehensive renovation in the presence of difficulties and problems. Last year, national highway along the county (District) government led organizations deploy traffic, urban management, public 123、security, land, environmental protection, industry and commerce, highways and other related departments, to carry out to dismantle illegal construction and ground structures, cleaning up illegal standard Records label as the main content of the road domain integrated environmental remediation activi124、ties and achieved good results. 3. Pay attention to comprehensive management, improve the effectiveness of remediation. Road construction control management has been strengthened. According to the relevant provisions of the laws and regulations of the and and so on, county * *, * * County Peoples Go125、vernment on highway construction control area were delineated and issue a public notice, * * County Peoples government also approved by the executive meeting of the government through discussion, implementation of road boundary markers of 73 million yuan of special funds input, stake setting. Accord126、ing to statistics, last year the city has erected building control zone peg 820, construction control area boundary markers 815 . the second is highway greening and beautification work enhance the road area remediation effectiveness. Will highway greening and beautification work as road area remedia127、tion of a key, invite garden experts to guide the design of green, the implementation of high standards for ecological landscape highway activities to create, five years, I board greening mileage of more than 900 kilometers, appropriate road greening greening rate of 100%, effectively enhance the ci128、ty road greening level and grade, adds a sharp scenery line for *. Third, rectification of illegal construction and occupation of the road has been checked. By through the town, crossing the road on many occasions to carry out concentrated rectification actions, to clear the remnants of the wall, br129、oken Archives of highways in strict accordance with the wall of building structures and the illegal deposits, remediation along the Jeeves, Jeeves placed advertisements and vehicle maintenance, car washing and other acts, standardize and purification on both sides of the highway billboards and other130、 non road signs, I city of national and provincial highway basic elimination of the dirty, chaotic, poor, blocking phenomenon, highway traffic environment purification, landscaping. (2) to strengthen the management on the basic data management. The level of the archives management regulations, formu131、late the , the establishment of the road, the implementation of the file manager, file collection, filing, sorting, filing, confidentiality, custody, borrow, identification pin Destroy the standardization. 2, standardized management, enhance service image (a) evaluation system to further improve in 132、order to strengthen and standardize guidance and assessment of each county (area) bureau of highways management work, the Bureau developed a * City Highway Bureau highways management assessment implementation measures (Trial). To regularly check for half a year, year-end assessment and irregular ran133、dom sampling combined, taking the spot road inspections, sampling sections, listening to the reports, archives data check, for each county (area) bureau of highways management work implementation of the special assessment. According to the annual comprehensive assessment appraisal score results, eva134、luation of outstanding, excellent compliance and Not up to the standard of four grades. And in accordance with the level of assessment, the award on behalf of dial highway management funds. Total score is above 95%, is excellent, 10 million yuan reward; total score of 90 - 94 for excellent, 8 millio135、n yuan reward; for the total score of 80 - 89 points for standard, reward 50000 yuan. On the total score is less than 79 points for non-compliance unit, circulate a notice of criticism. (II) Sheung inspection work to further standardize a is in place to ensure the inspection. National and provincial136、 trunk highway patrol monthly not less than 20 days, State Road a week of not less than 3 times, dart a week of not less than 2 times. The second is to explore and promote the electronic patrol monitoring.City highway patrol vehicles are installed on the highway patrol vehicle monitoring system; hig137、hway law enforcement personnel are equipped with a recorder for law enforcement, on the process of supervision and law enforcement to ensure evidence has played an effective role. The third is unified and standardized inspection ledger records, inspection equipment use and management of the electron138、ic Patrol information storage utilization. The fourth is the establishment of highway maintenance and inspections mechanism. The citys 19 country and provincial trunk highway maintenance center equipped with the CPPCC keeper, and to develop a road of the Chinese peoples Political Consultative Confer139、ence tube member responsibilities. According to statistics, in 2015 (on the road. Day. Stop the road mileage, 17 cases; clean up debris on both sides of the road 20 , demolition billboard 30, demolition chaotic scaffolding house 3, clean Lane Hawking 15.) (3) road permit work to further strengthen t140、he implementation of administrative licensing system, strengthen the supervision and administration of the licensing. Strict implementation of the . According to the provisions of the road approval procedures and processes to carry out road license, do according to the law, the license in accordance141、 with the law, shall be subject to examination and approval of the. Implement the collective examination and approval, to strengthen supervision. Highways and approval of business implementation of technical review of administrative approval and separation, the audit focused on the more complex invo142、lved in the road licensing matters, collective decision-making, to improve the scientific nature of the road administrative examination and approval, reduce approval corruption risks. Second is to promote the In administrative permission of information technology to improve service quality. Accordin143、g to the and ministries and provincial and municipal government, I realized the butt of Guangdong Province highway information network and provincial network business hall * * * branch office highways licensing examination and approval work. Simplify the licensing process, and strengthen the office 144、system, optimize the quality of service. (4) image of the team to further enhance a is grasp Windows image.2015 years, my bureau highways licensing in the city administrative service center settings window service. According to the and , I Bureau for damaged highway capacity compensation standard, o145、ccupied by highway repair (lost) compensation expenses standards, in accordance with the law of administrative licensing items, the communications administrative license implementation procedures into the line on the wall publicity, in the service window is equipped with all kinds of application fil146、l in sample, administrative licensing service guide brochure, in a conspicuous place public commitment to the system and advisory telephone complaints, for the masses provides warm and thoughtful service. Second is to grasp the Four Unifications working in the citys highway law enforcement image. Ac147、cording to the Ministry of transport and the ministries of the Provincial Bureau of the relevant documents, I board in front of the June 2015 completed the identification of law enforcement, law enforcement station appearance, clothing of law enforcement, law enforcement documents four unification. 148、(5) the AILU nursing atmosphere further formation of my bureau attaches great importance to the propaganda work of highway management road awareness month into * City Highway Bureau 2015 road administration work points. One is around the norms of law enforcement, improve the service theme road aware149、ness month activities carried out. According to statistics, the citys highway system were deployed highways propaganda car 60 times, staff of highways 152 people, set point consulting 6, issued and publicity Data of 8000, hanging banners 134; broadcast 60 hours / 20, update 7 inch high rod making pe150、rmanent propaganda page 4; in 7th edition published , purchased and distributed , legal text, a total of 500 this. The second is to carry out 12.4 national legal advocacy day activities, the city road officers go deep among the masses interpretation of highway Highways Management laws, regulations a151、nd policy advocacy, analysis for illegal construction at both sides of the road, a typical case of illegal advertising management, showing public road construction and maintenance of highways The actual results of the management, the masses love protection consciousness and social awareness to furth152、er enhance the enforcement of highways.In recent years, I board in the highway management work were some beneficial explorations and the attempt, and achieved initial results, but there is still a certain gap compared with requirements of the Provincial Bureau and other brothers City, we will to imp153、lement the partys spirit of the Fifth Plenary Session of the eighth session of the opportunity, and further increase the intensity of road management work, and constantly improve the overall quality of the workforce and the ability to learn, and strive to achieve the new highway across.Today the top154、ic of democratic life will I talk about the main to correctly treat leave turn ensure transition delicate gas is understanding, to carry out criticism and self-criticism, in-depth to find problems, profound analysis of the causes, through self analysis to find their own existence problem, to correct155、ly understand their own, strengthen the party spirit training, to ensure that the election of smoothly and successfully completed. Below I talk about their own situation, please put forward valuable opinion. Main understanding (a) serious discipline, to create a delicate gas is in the general enviro156、nment in accordance with the Central Commission for discipline inspection organs, , municipal and county Party Committee Organization Department of the county Party Committee Organization Department files related to the spirit of the requirements, earnestly implement the nine is prohibited, nine sha157、ll be the solemn discipline, I earnestly study the . , , and file, and a profound understanding of the nine is prohibited, a nine law discipline essence and firmly safeguard the election of serious Ensure the unhealthy tendencies have successfully completed, and actively create a delicate gas is the158、 election of environment, to ensure that the election, so as to further strengthen the town leadership and cadre team construction. Through the study, in-depth thinking, to a serious discipline the importance and necessity of a more profound understanding. First, it is the iron discipline. The centr159、al put forward the nine is prohibited, nine shall be the reason for early serious general discipline, designated high-voltage wire, itself reflects the party committees at all levels of the reelection of attaches great importance to the objective is bright resolute attitude, the implementation of ef160、fective measures, the same candidate to fight with discipline election of wind Discipline in gas is health. Secondly, this is prevenient. From some typical cases, we can see that individual cadres election to engage in speculative hack canvassing votes, in violation of discipline, and ultimately pai161、d a high price. The destruction of Hengyang election case and Nanchong canvassing bribery case that strengthen election discipline, serious election discipline of necessity and importance. The discipline of publicity to the public, wide report, that is, early warning, early hit precautionary needle,162、 tell the cadres should do what shouldnt do, what to do and what not to do, and better education of cadres, warning cadres, and build a strong line of defense, to avoid the occurrence of similar problems. There is duty. Serious discipline, with a strong team is an important starting point. As the le163、adership of the party members and cadres, take the lead in the implementation and take the lead in upholding the election of discipline, which is a major political responsibility. Must be clear requirements, strict constraints themselves, cherish the honor, safeguard the image of the organization; p164、romote righteousness, play an exemplary role. Especially as deputy Township, but also to give a full play to its role, always stand in the discipline of first-line maintenance. The wind Su Ji through the election of the work of the whole process. (II) serious discipline, treat correctly leave turn a165、s a cadre of the party, whether it is in, is back, stay, turn are organizationMetabolism of entrepreneurial career, need and development need. So, his first with a broad mind to treat leave turn. The position is officer positions, power for the people service tools. Different positions of the partys166、 cause, plays a decisive role, the same important. To ability strong, style of comrade to important positions and applause, is full of vigor and vitality and promising young cadres in leadership and cheer for their own leave turn and calmly face, calm place. Second is to a healthy state of mind to t167、reat leave turn. The personnel of metabolic, between the past and the present. Cadre new old alternant, team, push In the party constitution control strict working to career development objective need, is never the end of the historical process. Each a cadre must face up to the laws of nature to thi168、nk we also took the former relay baton go on leadership post, regardless of the current positions, positions and responsibilities have what change, can do for peace of mind and mood, such as water, in a happy mood. (3) carefully and find out the problem, correct understanding of themselves, even tho169、ugh they do conscientious, serious attitude, honesty in politics, but high standard , the control standard, especially control learning, striving for excellent activities emerge in large numbers of advanced characters, advanced deeds Static not consciously practice the strict three real and strength170、en the party spirit accomplishment to find the gap, swing is insufficient, a clear direction, mainly manifested in the following aspects: one is the learning initiative and self-consciousness. Often busy with work as an excuse, not consciously take the initiative to spare time to learn. Is often sup171、erior to learn what to learn what, and work closely to learn, and working relationship is not less to learn. Mainly manifested in the theoretical study is not thorough, system is not thorough, the Marxism Leninism, Mao Zedong thought, Deng Xiaoping Theory and Three Represents important thought, the 172、scientific concept of development and learning, general secretary of the series of speech learning, just from the surface on learning In the less less less and not deep enough, not from the deeper study, to study, to understand, to sentiment, to use, to guide the work. The second is to investigate t173、he research. This year their participation in the county, the county governments important meeting, the town Party work time is more, coupled with the specific affairs busy, in-depth primary research time reduced. The inspection was carried out research activities, there are surface examination, the174、matic research, listen to reports and discussion research, the general requirements and specific guidance, in a certain extent, affected the timely discovery and solve. Third is the level of leadership, leadership and need to be further improved. Stroke the personnel selection is positive, work coor175、dination and cooperation cant to the best effect; in the coordination to deal with some complex problems, the approach is not enough. Especially encountered, time is tight, the task is heavy, is often the soldiers to be blocked, the water to soil cover, struggling to cope with. The global and forwar176、d-looking innovation is not enough. (4) to ensure that the transition delicate gas selected loyal to the party loyal to the people of leading cadres (recommended) for the county to provide accurate information to ensure the transition in the air, after the general election of work have a greater cha177、nge. The second is balanced, promote the work in an orderly manner. In the future a period of time, the transition will be in the county under the leadership of the Extended surface. And breeding industry and the construction of key projects also in actively, they have to seriously consider, overall178、 transition and key projects to promote. Education team members and the town, village cadres actively participate in industry cultivate the work, with outstanding achievements to accept the assessment of test of the organization and the masses of the people, in the town set up promising is a strong 179、general business and the right atmosphere general election, do election and projects to promote the two not mistake, the promotion of two. Second, the rectification measuresOne is to enhance learning, awareness raising, he will continue to strengthen learning, improve the level of awareness, their o180、wn unity of thought and action to the county, township party committee of arrangements for the election. The second is correctly, strengthen discipline, own the right of transition, a matter of personal leave turn, as a town, deputy secretary of Party committee, themselves are fully aware of the onl181、y serious work, strict demands on themselves in order to not negative expectations of organizations and the masses, so that individuals can well deal with good transition in personal leave turn. Three people on the election promise as Deputy Secretary of the Party committee, in the election of my so182、lemn commitment to Catch: if a is strictly abide by and take the lead in the implementation of the nine is prohibited, nine transition discipline, not to engage in cliques, not to engage in canvassing votes buying and selling, buying, and no fraud swindlers officer, do not intercede say hello, not i183、llegal, not to run gas leak, do not interfere with changing times, accomplish strict discipline, warning, with iron discipline firmly put unhealthy trends, promote delicate gas to ensure transition in the healthy and orderly development; the second is resolutely obey organization arrangement, and re184、solutely to stress the party spirit, principle, discuss overall situation, correctly treat personal leave turn, the correct treatment the election results and focus on their careers, from start to finish, ensure the normal and orderly develop.For in-depth study and implement the partys eighteen, the185、 eighth session of the fourth, the spirit of the fifth plenary session, the implementation of comprehensive strictly required, a solid grasp of the construction of Party member team, in accordance with the requirements of the county Party Committee Organization Department No. 3 (2016) Luo Zufa. Acco186、rding to the requirements of the and the central work of education for the party members, combined with actual town, 2016 Party member education and training scheme is formulated. The guiding ideology adhere to a comprehensive study of implementing the scientific development view as guidance, in-dep187、th study and implement the partys eighteen, the eighth session of the fourth, fifth plenary session and the General Secretary Xi Jinping series important Speech adhere to the application for promoting learning, and strive to improve our ideological and political quality of Party members; firmly esta188、blish catch a party to build pipe must be members, tube members first catch education of ideological understanding, close to the Party members ideological and practical work, strive to build a party regular education work mechanism, promote the party members play a vanguard and exemplary role; firml189、y grasp the construction of ability of administration of strengthening the party, advanced nature and purity of construction of the main line, adhere to to enhanced grasp the party building work consciousness, strengthen the self construction of the party organizations as the fundamental starting po190、int, for the towns economic and social development provided for ideological and political guarantee of the strong and powerful organization guarantee. Second, target 201 The main task of 6 years of education and training of Party members is earnestly implement the (Luo Wei do 2015 121) to further st191、rengthen the work of the education and training of Party members request, to training the town, the grassroots party members and common. From 5 January 2016, through a variety of channels in a variety of forms in a planned, step by step, to focus on the organization to carry out the education and tr192、aining of Party members. A party spirit idea generally enhanced. Through education and training, prompting the majority of Party members to further strengthen the ideal and faith, enhance the party concept, consciously practice the agency will socialist core value system. To further enhance the conf193、idence of the road of socialism with Chinese characteristics, theoretical system of self-confidence and confidence. (II) Party members working ability greatly improved. Through the development of education and training, to boost the knowledge structure of Party members transformation and upgrading, 194、improve the party to use the Marxist stand, viewpoints and methods of analysis and problem solving ability, adapt to the new situation and new tasks. (3) play an effective role of Party member model. Through the development of training and education, promote the party members in theProduction, work,195、 learning and service to the community in give full play to the exemplary vanguard role, and actively striving to take the lead in learning to improve and take the lead in striving for success, serving the masses to take the lead and lead law-abiding, take the lead in promoting the healthy atmospher196、e model. (4) the building of grassroots organizations strong impetus. Through the development of education and training, the Party member troop overall quality and ability to serve the people increased, grass-roots party organizations creativity, cohesion and combat effectiveness of the improved. Co197、ntents and measures according to different type of the town, at different levels, the actual needs of the different positions of Party members, hierarchical class to carry out the education and training of Party members. Adhere to the town overall and please tutoring, please Come in and sent down th198、e combination, to the party spirit education and ability cultivation as the center, overall constitution and discipline, the core value system, political theory, domestic and international situation in town situation, party organization construction, legal education, culture, science and technology,199、 industrial development, management, resource management and protection, social management innovation in the aspects, to village (unit) as a unit, to all members of the organization a above rotation activities. Focus on Township and village committee cadres straight unit leading Party group secretar200、y, activist of join or be admitted to the party, the education and training of village class mothball cadre training, efforts to strengthen the parties organization Secretary of party spirit accomplishment, do a good job of the consciousness of the party building work, enhanced the Party activist , 201、people in rural areas to promote rural economic development of practical abilities. At the same time, through the development of the theme of practical training, autonomous learning training, make full use of the party members and cadres of modern distance education network etc., for the party membe202、rs in various fields to carry out the classification of rotation, party spirit training, tobe grind quality, improve quality. Organizational Leadership (a) strengthen leadership, implement the responsibility. Town Party committee to the work of the education and training of Party members into the pa203、rty building work important content, the overall responsibility of the Secretary of the Party committee, vice secretary of the lead and the implementation of specific members of the organization, the organizational Secretary of the parties to personally plan, personally deploy, supervise the impleme204、ntation; the education and training of Party members to carry out into the grass-roots party Construction work responsibility system and the building of grassroots organizations special assessment, directly with the grass-roots party organizations Pingxianpingyou link, to strengthen the organization205、 and leadership to do a good job of work to implement. (II) the overall progress, implement the plan. Ensure that the deployment, according to the arrangement of the 2016 Party member education and training plans, based on the actual needs of the party, on-demand rationing; do supervision and guidan206、ce, strengthen the supervision of the work of the education and training of Party members, guidance and services to help solve the difficulties and problems in the training; assessment, by listening to the report, information search, evaluation, etc., with emphasis on the assessment of the implement207、ation of the plan, Party members to participate in training proportion and effect, indeed Protect task implementation. (3) the typical guide, step up publicity. Pay attention to cultivate advanced and typical, timely promotion and the typical experience of the characteristics of the practice. The wo208、rk of the education and training of Party members as the focus of the grass-roots party building and the sector skills training for communication and advocacy, by setting the column, offering special journals and other forms of propaganda, to create a strong atmosphere of public opinion, promote the209、 orderly conduct of the work and achieved certain results.In order to further implement the General Secretary Xi Jinping series of major speeches about the partys work style and clean government and anti-corruption struggle spirit and the central, province, city, County Commission for Discipline Ins210、pection and the spirit of the plenary session, to further strengthen the awareness of the loyal party members and cadres, sense of purpose, sense of responsibility and a sense of discipline, boost the countys economic and social development. In accordance with the ensemble of Ji Qing 2016) spirit of211、 the document No. 3, combined with my bureau actual, make this program of activities, and a theme of learning party discipline, strict discipline, boosting Qingshen development.Second, activity time April 2016 1 - April 30, three, activity content (a) carry out party discipline learning activities. 212、Global organization of cadres and workers to focus on learning, network learning, self-study and other forms of strengthen constitution , and other relevant information learning. Education for Party members and cadres to as the ruler, combined with its work, measure, control and their own ideas and 213、practical test, take the initiative to conduct Lianzheng is affirmatory consciously practice commitment, achieve the hearts of the party, Zun Jishou Confessions of readings of the Si confessions to carry out the hearts of the people, in the heart has the responsibility, in the heart has quit, mainta214、in the partys advanced nature and purity. (2) to carry out special warning education activities. In the global read writing experience, the concept of warning education independent micro film reflections, prisons and courtroom free as the main content of the special warning education activities. Use215、 of the weekly worker will focus to watch a warning education. The , cadres and workers to write their feelings, reflections, and the clean publicity column posted; 4 month global organization of Party members and cadres to the eyebrow delta prison visits to detainees xianshenshuifa education of cad216、res and workers With low-cost combined with special method. (3) to teach a class of anti-corruption initiate cheap course. By the leaders of anti corruption and financial supervision and administration of state-owned assets of explain the profound things in a simple way to explain, so that all staff217、 of honest business, according to the law to act in a more profound understanding, so as to enhance staffs sense of responsibility and sense of mission. (4) to promote innovation to help the family activities. To carry out the party members and cadres motto, bright family traditions activities for f218、amily education into harmony, filial piety, encouraging learning, goodness, thrifty, inspirational, cultivation of excellent genes to guide Party members and cadres to good tradition folk, with a good tradition being honest, with good tradition promote political winds, creating a delicate gas is the219、 general atmosphere. Four activities (a) to strengthen leadership, careful organization. One is the establishment of the independent warning education month activities leading group of the state owned Financial Bureau, bureau leading Party group secretary of the leader, board members of the team to 220、serve as deputy head. The second is making determine promotional content, clear steps, truly understanding, measures, and put in place, ensure the effectiveness of the activities. (II) take all factors into consideration, pay attention to actual effect. According to strict three real special educati221、on and two studies do activities, in based on the provisions of the action without aliasing, and creativity to carry out various forms, rich and colorful activities, and strive to Pay attention to actual effect, and resolutely prevent, going through the motions, really promote the party members and 222、cadres from the depths of the ideological solidating abide by discipline regulations of the defence. (3) strengthening propaganda, to create atmosphere. To make full use of the column publicity, propaganda position of network, increase publicity efforts, expand warning education activities of the co223、verage and influence.Today, we hold the citys precise technology to poverty alleviation and project work to promote the meeting, the main purpose is to further promote the task of aiding the poor with technology roots and accelerate all kinds of scientific and technological projects. Last year, this224、 year, the citys scientific and technological work has made remarkable achievements, such as the convening of national poverty alleviation of science and technology on the spot will, cultivate high-tech enterprises, Bashan scholar training and the introduction of scientific and technical personnel i225、ncentives, listing national agricultural science and Technology Park, science and technology incubator building. Just now, Huangli In recent years city science and technology to help the poor and science and technology project effectiveness, the main problems were analyzed, and in a period of time i226、n the future, the citys precise technology to poverty alleviation and science and technology project work arrangements, I agree, I hope everyone to earnestly implement. Here, I stressed the three points.Learning learning, to carry out the learning and doing education as the citys innovation and deve227、lopment of an important driving force. The Party Central Committee decided to 2016 years in all Party members to carry out learning the party constitution, party rules, a series of speech, do a qualified party member education (referred to as learning to do). Some time ago, I called the learning the228、 party constitution, party rules, a series of speech, do a qualified party member education and mobilization, the province carried out within the two a learning education mobilization. Municipal Party committee will soon be held a mobilization will make arrangements for the deployment. To carry out 229、the two a study and education, based on learning , key in do . As the science and Technology Department of cadres and workers, to (benchmark for two pilot demonstration study through studying the party constitution of party compasses, a series of speech, not only to do a qualified party members, to 230、do a good job of science and technology innovation. Next week, I as the citys county-level leading cadres reading class open cooperation and innovation driven study group members went to Mianyang, Meishan national innovation driven development characteristics and the provinces Innovation Driven Deve231、lopment Zone work experience, a great harvest, feeling very deep. Mianyang, Meishan city innovation driven strength is very great, especially is Mianyang has become civil military integration, a comprehensive reform and innovation, our benchmarking in Mianyang, the gap is very large. Mianyang Scienc232、e and technology city construction as the basis, built around the Five goal of building Hotbed of innovation of construction science and technology, military and civilian fusion demonstration, collecting and distributing center of scientific and technological achievements, innovative talents converg233、ence and high technology industry concentration), vigorously promote to military and civilian fusion for the characteristics of comprehensive reform pilot innovation, and achieved remarkable results, is toward the national civil military integration innovation demonstration area, the national innova234、tion driven development characteristics demonstration area and western economic development growth emerging great step forward. The expanding Park, stronger innovation platform; incubated enterprises, cultivate innovation; poly talent, to improve the ability of innovation; promoting fusion, highligh235、ting the characteristics of the innovation; catch open, form innovation efforts of the experience is worth learning from. Benchmarking advanced, we have to struggling to The amount of weight is to grasp to catch the strategic innovation. To improve the target oriented system. The innovation actually236、 placed in the core position, firmly establish the grasping innovation development, seek innovation is to seek the future, innovation is not backward, slow innovation also will lag behind concept, accelerate factor driven to innovation driven change. City Branch Bureau to actively seek the city mana237、gement system emphasizing the innovation driven development, focus on strengthening the scientific and technological enterprise incubator construction, scientific and technological innovation platform, technology oriented small and medium-sized enterprises to cultivate, high and new technology indus238、try output value and product evaluation. Second, we must built innovation and Entrepreneurship platform. The city will be in Pakistan and the open area to build the whole To confidence, double center, the new industrial park for a period, the city public entrepreneurship Park Phase II, Qin Ba electr239、icity supplier industry park for three period, incubation area of more than 50 million square meters. The county (District) to take advantage of idle assets of construction science and technology enterprise incubator, a passenger space and other new public record space, the formation of a, a, a, to 240、create vivid situation. Third, we must foster technological innovation subject. To vigorously implement the high and new technology enterprise doubling plan and science and technology oriented small and medium-sized enterprises to cultivate plan, to honor the implementation of tax incentives, financ241、ial subsidies, such as a package of policies to support, so that high technology enterprise indomitable spirit, let the small and medium-sized enterprise overwhelming. To increase investment in science and technology innovation. To actively seek special funds for the development of Municipal Science242、 and technology part for cashing innovation drive the development of financial subsidy policy, transfer a portion of funds for science and technology enterprises of loan guarantees and interest subsidies. Encourage banking institutions set up science and technology branch of the franchise, push the 243、patent pledge loan, for the small and medium sized enterprises of science and technology provide financing services tailored. Fifth, we must strengthen science and technology personnel. To attract more technology military personnel and high-end talent with technology, project, with funds to Bazhong 244、Lingban or joint science and technology enterprises, encourage and support both inside and outside the citycomrades and the5 years of college graduates and college students to a new public space, science and technology business incubator innovation and entrepreneurship.Second, it is necessary to pro245、mote the precision technology poverty alleviation as the important content of the scientific and technological work. To build a well-off society in an all-round way by 2020 is the partys eighteen to the whole Party and the people throughout the country to make a solemn commitment. Lead the city peop246、le out of poverty to become rich go straight towards well-off, Party committees at all levels, political responsibility and mission of the times of the governments major political, technology sector is also the bounden responsibility. Municipal three tenth plenary session made , proposed to further 247、promote the five a group of precise action to help the poor, six precision and 1 + 6 poverty alleviation projects, clear the add Great science and technology achievement transformation efforts, accelerate the construction science and technology poverty demonstration village and demonstration househo248、lds, give full play to the role of modern information network, for the impoverished village poor households to provide production technology, market information, policy advice, encourage scientific and technical personnel to the poor village launched a to one helping and guiding the development of i249、ncome industrial projects, strengthen technical training and propaganda of popular science, highlighting grasp large breeding, family farmers, agricultural co-operatives are the backbone of the training technical poverty alleviation mission. The citys science and technology sector must be from the p250、olitical height, the assault fortified positions that help deficient up as the most important task, the most urgent work. The most arduous mission, to science and technology for precise poverty alleviation promote to speed up a well-off society in an all-round way Decision to deploy, boost the proce251、ss to precise technology to poverty alleviation and the effectiveness of a well off society in an all round way. One should obey the overall situation. The citys scientific and technological system of cadres and workers, especially leading cadres, should have the political consciousness, ideological252、 conscious action conscious, in accordance with the central, provincial and municipal deployment requirements, to strengthen the organization and leadership, reasonable arrangement of time, carefully study the deployment, to ensure poverty. There must be resolutely implement the political position a253、nd character, poverty alleviation and the attitude to be distinctive, poverty alleviation action should be strong, to politics, to understand the overall situation, re implementation, see results. To lock the target. In accordance with the provincial Party committee and the municipal Party committee254、, municipal government, lock 2 provincial-level General requirements for the completion of the goal of poverty alleviation poverty alleviation poverty alleviation poverty alleviation poverty alleviation poverty alleviation and Technology Demonstration County, four provincial science and technology d255、emonstration towns, 10 provincial science and technology demonstration village and a municipal science and technology demonstration area, 2 Municipal Science and technology demonstration towns, five municipal science and technology demonstration village and the five one precise technology to poverty256、 alleviation and special operations tasks, inverted duration, wall chart battle, set the time, tasks, measures, staff, given the responsibility to ensure high quality precision technology poverty alleviation task. To focus on the key. To focus on precise poverty and accurate out of poverty, detailed257、 measures, clear job responsibilities, to develop targeted and operable precise technology to implement poverty alleviation program. Prominent precise poverty technical training, poor village informatization construction, technology oriented poverty reduction model village and demonstration househol258、ds construction precision technology poverty alleviation focus, in a precise sense, precise attitude, precise style, go all out to fight the precise technology of poverty alleviation and battle.Three, it is necessary to strengthen science and technology funds supervision as an important means to enh259、ance the quality of the project. Science and technology project fund supervision is the key to the implementation of the project of science and technology. In recent years, especially during the Twelfth Five Year Plan period, the system of science and technology management in the city vigorously to 260、declare the implementation of the country and province science and technology projects, science and technology demonstration lead brought obvious effect and improve the scientific and technological innovation capability of enterprises, boosting the characteristics and advantages of industrial develo261、pment, science and technology support to the economic and social leading role improved significantly. In the project management of science and technology, in addition to seriously implement the state, provincial science and technology project management rules and regulations, and the actual Bazhong,262、 established the access system of science and technology projects, the project of science and technology commissioner system, science and technology Project credit system and scientific and technological projects honest commitment system, and the Municipal Finance Bureau jointly issued the Bazhong C263、ity Science and technology development funds management approach, formulated the trilogy of seven science and technology project implementation specification, these are worth fully affirmed. However, we should also see clearly, we in the science and technology project management still exist account 264、of the special accounts, earmarking system is no effective implementation and other issues. In particular, this year the Audit Commission Chengdu Tepai ban on Bazhong confidence found in the audit of science and technology business incubatorProblem has certain representativeness. The audit to us sou265、nded the alarm, should cause everyone vigilance. Here, I will strengthen science and technology project budget supervision put forward four requirements: a strict project reporting, prevent fraud. Implementation of the project to declare the competition mechanism, the annual financial support to sci266、ence and technology projects oriented society Bulletin, conditions open content, open competition to declare, open field investigation, public presentations, the public assessment of the decision, do full open and transparent, fair, accept social supervision. To those who resort to deceit or somethi267、ng real is not clear, suspected of defrauding, impersonator national subsidy funds, once found immediately cancel Declaration of qualification, recovery of funds subsidy and discipline in accordance with the law strictly held responsible. Second, we must innovation funds supervision. In county finan268、ce to establish science and technology project account, the project undertaking entity in accordance with the key nodes task completion by formal invoice to apply for funding and audited by the Department of science and technology, the Ministry of finance funds, and resolutely put an end to project 269、funds are retained, misuse and misappropriation. Third, we need to strengthen scientific and technological project supervision. Department in charge of science and technology to strengthen project inspections to check or checks, of ineffective implementation to strengthen the supervision and the exi270、stence of violations of responsibility into the project undertaker rectification. To establish a scientific and technological project, black list system, the Project implementation quality particularly poor recorded in the black list, stage or permanent abolition of the applicant country, province, 271、city science and technology project qualification. Fourth, it is necessary to carry out training funds management. Science City Bureau to the initiative to meet with the finance department, organize project unit commitment held science and technology project funds management training, of country, pr272、ovincial and municipal science and technology project funds management of the relevant policies, financial acceptance specification, mid supervision points, budget review points and key contents were training system, to ensure the use of project funds safe and reasonable.Thank you all!To implement t273、he central, provincial, city and county to make important decision about the grass-roots party construction work in the deployment, push forward the county public security organs in the work of Party building, further strengthen the party secretary of the governing party and party liability, accordi274、ng to requirements, according to the arrangement of the Bureau of the party work. Today, the organization held the county public security organs party secretary grasping grass-roots party construction work in the debriefing will. The implementation of this is a powerful measure to the Secretary of t275、he party organization construction of the party, and is learning to carry out the partys spirit of the Fifth Plenary Session of the eighth session of the, grasp the new situation of Party building work under the rules, pushing Public security party building services in the public security center of 276、the inevitable requirement.Just now, the 3 Juzhu unit Party branch secretary of debriefing, below I on the 3 party organization work one by one review.Party branch of the Political DepartmentGood: first, strengthen ideological and political work, pay close attention to the work of the implementation277、. The Political Department of the Party branch strictly in accordance with the requirements of bureau Party committee, to strict three real special education as the main line, take effective measures, pay close attention to the ideological and political work of the implementation, strengthen the edu278、cation of Party members and the police thought, improve the Police Ideological and political consciousness, make a solid foundation for public security work smooth development of health. Second, strict management team, boost the morale of the team. Strict implementation of Police Ideological Trend o279、f periodic analysis, timely grasp the ideological situation of the personnel; strictly implement the system of check on work attendance, strengthen the daily management; cash rewards and punishments, continue to boost the morale of the team. The third is The intensification of police training, impro280、ve the police actual combat skill. Seriously and actively carry out a series of training activities and learning activities, the majority of police in the political quality, physical quality, professional quality, policing skills improved. The fourth is to adhere to the preferential treatment from t281、he police, the warm pool police. According to thRequirements, and actively do a good job of personnel management work, to run within the scope of the policy, help the police solve the practical difficulties, the police systemic heart into work. The fifth is strengthening propaganda, promote righteou282、sness. Around the center of the public security work, actively do a good job in the publicity, fully display the spirit of good public security team. Six is to fulfill the responsibility of Party building, do a good job of education and management of Party member team. Sound and perfect three class,283、 Party of democratic appraisal, commendation and reward system, effectively enhance the branch of the creativity, cohesion and fighting capacity.Shortcomings: is ideological and political work still can not adapt to the new situation, new task, in the form of a single, innovation is not enough, lack284、 of learning education of the appeal and study the effect of education needs to be improved, the political department to strengthen the guidance to the grass-roots units. The second is the branch of organizational life will implement the is not good enough to play an exemplary role.Traffic Police Br285、igade Party branchSystem of good practice: one is grasping the implementation of the work of Party building system, enhanced branch team cohesion, combat force. The brigade Party branch always pay close attention to the work of Party building and would not let go, conscientiously perform their dutie286、s, strict implementation of democratic life etc., to develop the branch of learning plan, all equipped with learning record the experience and experience the and organize regular inspection learning, ensures that the learning plan, implement, effect. Second is to carry out the strict three real spec287、ial education. The development of special education learning scheme, held a party branch focus on learning and the level of consultation forum, deputy director in charge of, brigade leader for the party members and the police on the lectures, deployed to carry out Ban Zicheng throughout the Yan Zhen288、chang Yang Shuicai to relive the oath to join the party, visit the memorial hall, learning advanced characters, micro lectures attention and learning characteristics of the activities, and to develop measures for rectification. Three is to pay attention to the party building work into the public sec289、urity work. The brigade Party branch and always will be the work of Party building in 9.3 security, national civilized city re examination, the SCO security meeting, the focus of illegal investigation, sword, anti terrorist violence, to ensure safety, five wave, camp turn non bus, detoxification, th290、e focus of the work, in a timely manner to carry out the pre war mobilization, wartime dynamically judged, the post-war award in recognition of a series of measures Members always fighting in the first line of traffic management, all traffic police has always maintained a high state of mind, a stron291、g impetus to the work carried out.Shortcomings: first, there is a hand hard and soft phenomenon. Of work of Party building under the new situation is not enough emphasis, focus on light business building, re form light effects. The second is measures are not enough effective. In particular, catch a 292、party to build working innovation consciousness is not strong, measures and methods used in the experience of the old, old practices and effectiveness needs to be further strengthened. The third is three lesson not very good insist, life of the party organization to carry out less often.Zhao police 293、station Party branchGood practice: one is to strengthen the study and education. To strict three real special education as an opportunity to take leadership lectures, seminars, individual learning, exchange of experience in various forms, the police organization learning leaders at all levels of the294、 spirit of the important speech, in the constitution as well as the side of corruption cases and asked party members and the police carefully recorded study notes, writing experiences, join and pay attention to the micro lectures, according to the control requirements of inspection, enhance their ow295、n, to ensure that the learning effect. The second is to strengthen the leadership responsibility. Party branch secretary as the first responsibility of honest government, earnestly implement the four person , and insisted on the important work personally Department Department, major issues personall296、y intervene, personally key aspects of coordination, supervision of important cases personally , Party branch members always strict demands on themselves, play an exemplary role model. Third, strengthen the service for the people. Every act of the masses for the warm reception, carefully recorded ma297、sses anti reflect each a problem, and make the resistancee bureau Party committeeHeart to answer, and constantly improve the quality of service. Combined with the one village, one police work, police organization carefully touch row all may affect the stability of the unstable factors, resolve confl298、icts and disputes, and arrange for the police with daily visits, issued security leaflets, collecting sites, personnel information, promote the harmony police.Existing problems: a party branch team party affairs knowledge is not rich enough, on some of the procedural provisions are not familiar with299、, in a certain extent restricted the work carried out. The second is regular ideological education is not deep enough, the ideological trends of the police command is not timely and accurate. Third, there is a need to improve the management level of refinement, police standardization awareness is no300、t strong enough, daily habit is not quite self-conscious.Since this year, bureau unit Party branch to strict three real special education as the main line, to the service center, troop construction as the focus, adhere to the combination of ideological building of the party and the system of the par301、ty, solid to carry out the comprehensive strictly required, to further standardize the construction of the party organization, continuously improving the quality of Party members and police, continue to strengthen the party building innovation, service building execution significantly improved, has 302、made remarkable achievements.Meeting debriefing of 3 units in the work of Party building problems in other units are also different degrees of existence to other units by the party building debriefing, draw on the experience of face the problem, replicability, careful analysis of rectification, prom303、ote the sustained and healthy development of the work of Party building units.Below, to further strengthen the county public security organs party building work stressed the views of five points.One, improve the ideological understanding, enhance the sense of political responsibility and historical 304、missionFollow the basic construction of the partys eighteen years, Xi Jinping, general secretary: the series of important speech to the party put forward many new ideas, new judgment, the new requirements is to promote grass-roots party building work. We should thoroughly study and understand, and c305、onsciously assume responsibility. One is to grasp the party building three questions of the new requirements. Xi, general secretary of the partys mass line education practice summary of the General Assembly on the proposed the construction of three questions, namely: is not the party committees at a306、ll levels and the departments of Party committees (party) to achieve the sedulous catch a party to build is not at all levels of Party committee secretary, the Department of the party committees (party) secretary become strictly administering the party secretary? Is not at all levels and all departm307、ents of the party Forced the construction of Party committees (party) members to fulfill the responsibilities strictly responsibility? General Secretary of the party building three questions , directed at the crucial point, enlightening, three mirror placed in front of everyone, let you according to308、 a photo, see a look, want to think about the conscious of it, is the three pieces of papers placed in front of us, it is clear to judge ourselves whether in to do their duty. Building three questions , urge people to watch, thought-provoking, and convey a strong responsibility to ask signal. The se309、cond is to understand the building three no new judgment. Xi, general secretary of the partys mass line education practice summary congress pointed out that history and reality Are accounted for in the police forces of discipline, do not do, is to stop the event tells us, not a clear responsibility 310、to implement the responsibility, accountability, and strictly administering the party is not to . General Secretary of the three no , a clear responsibility to implement the responsibility, accountability, and point out the key. The county public security organs is a team of the Communist Party as t311、he main body, Party members and the vast majority of bureau of belonging to different units of the leadership cadres and backbone of the party members, the power and responsibility are relatively concentrated in the partys construction, must be clear responsibilities, the implementation of responsib312、ility, accountability, or catch a party to build is an empty word. Three is to clear the three grasping new initiatives. The total learning book Remember that catch a party to build must grasp the responsibility system, grasping accountability must grab the responsibility person, grasping the respon313、sibility must catch the first responsible person. Why should we let the Bureau unit Party branch secretary of the debriefing is to implement general secretary put forward 3 catch. To seize the party organizations primary responsibility, seize the key issue.Two, the full implementation of the task of314、 ideological construction, the theory of armed tasks implementedGeneral Secretary Xi Jinping in the mass line of educational practice summary congress put forward in the new period party building thought of tasks and requirements, to strengthen the construction of the Party pointed out the direction and path. One is to strengthen theoretical study. The urgent task is to fully understand the study and implement the spirit of the fifth plenary session of the eighth session of the significance of, the