个人中心
个人中心
添加客服WX
客服
添加客服WX
添加客服WX
关注微信公众号
公众号
关注微信公众号
关注微信公众号
升级会员
升级会员
返回顶部
深圳证券交易所营运中心建筑设计方案竞赛
深圳证券交易所营运中心建筑设计方案竞赛.doc
下载文档 下载文档
其它文档
上传人:正*** 编号:889359 2024-01-22 10页 383KB
1、一、 法定代表人授权委托书 Letter of Authorization二、 设计服务建议书 Proposal2.1项目设计单位或联合体组织机构关系框图Organizational Structure of the Design Firm or Consortium2.2项目设计单位或联合体设计人员配备表Architects Name List of This Project2.3拟参加本工程设计的主要人员资历表CVs of the Main Architects of This Project三、签字盖章Signature and Stamp四、设计联合体协议Consortium Agre2、ement一.法定代表人授权委托书Letter of Authorization本人作为 (参赛人名称) 的法定代表人,在此授权我公司的 _ ,其身份证(护照)号码:_ ,作为我公司的合法的授权代表,以我公司的名义并代表我公司全权处理 国信证券大厦建筑方案设计竞赛 以下事宜:Here I, as the legal representative of (name of the firm) , authorize to be our firms representative, who will legally and fully represent our company in the Inte3、rnational Competition of Guosen Securities Building and deal with the following issues:1、签署参赛文件 1. Sign the document of 2、递交参赛文件 2. Submit the competition document 本授权委托书期限自_年_月_日起至_年_月 日止。This letter is valid from _to_在上述授权范围和期限内,授权代表所实施的行为具有法律效力,本人及参赛人予以认可并承担相应法律后果。 授权代表无权转让委托权。特此委托。The behavior o4、f authorized representative is legally valid only within the scope and the duration of this Letter of Authorization. The legal consequence is recognized and assumed by me and my firm. My entrusted agent has no right of sub-entrustment.Hereby authorize. 授权代表: (签字或盖章)Authorized Representative: (signat5、urestamp)身份证或护照号码:ID No. or Passport No. 职务:Designation: 参赛人: (单位全称)(盖章)Name of the company: (full name)(stamp) 法定代表人: (签字或盖章)Legal Representative: (signaturestamp)授权委托日期:年月日Term of Validity: _(m)_(d)_(y)二、设计服务建议书Proposal2.1项目设计单位或联合体组织机构关系框图2.1 Organizational Structure of the Design Firm or Consort6、ium1.组织机构关系框图1.The organizational structure(注:用图表表示项目经理、项目设计负责人/总建筑师/总设计师、主要专业设计人员及现场设计总代表。)(note: please use a diagram, the structure should include the project manager, chief architect, main designers and on-site designing representative.)2.为本项目合同管理建议图2.The contract management proposal diagram(注:注7、明设计单位或联合体各成员间的关系及在合同中的责任划分)(note: please specify the relationships and responsibilities of the each member )参赛人:(设计联合体各成员分别盖章)Participant(firm): (stamp by each member of the consortium)设计单位或联合体各成员的法定代表人:(签字)或授权代表:(签字)Or the authorized representative: (signature)日期: 年 月 日Date: 2.2项目设计单位或联合体设计人员配备表2.28、 Designers of this project序号No.姓名Name性别Gender单位Firm从业年限Service Year执业资格Position Certification在本项目中拟任的职务或担当的工作Role and Responsibility of This Project参赛人:(设计联合体各成员分别盖章)Participant(firm): (stamp by each member of the consortium)设计单位或联合体各成员的法定代表人:(签字)或授权代表:(签字)Or the authorized representative: (signatur9、e)日期: 年 月 日Date: 2.3拟参加本工程设计的主要人员资历表2.3 CVs of the Main Designers in This Project 1一般情况1.Basic Information姓名Name年龄Age执业资格Position Certificate现任职务Designation本合同中拟任职务Position of this project为参赛人设计单位服务的时间Work Years for the current position教育背景Educational Background年毕业于 学校 专业Major School Year of Graduat10、ion 从事设计的年限Working Years as an Architect获奖情况(不含设计竞赛奖)Awards(excluded the designing competition award)2工程设计经验 2.Project Experience类似工程设计经验时间Date参加设计的工程 Projects 工程规模:总建筑面积、建筑高度Scale: total building area 该项目中的任职Position in this project注: 1需填报本表的主要人员包括表3.2中的项目经理、项目设计负责人总建筑师总设计师、主要专业设计人员及现场设计总代表等人员。Note11、:1. this form should include the information of the project manager, chief architect, main designers and on-site architect of charter 3.2. 2人员的身份证明文件、最高学历证明文件、资格证书等相关资料的清晰复印件(加盖公司公章)附后。 2Attach the Stamped copies of related materials including the ID card,the highest education diploma, qualification12、 certificate etc.3类似工程是指大型公共建筑,尤其是大型金融类建筑。3. Relevant projects here refer to large scale public building, especially mega financial buildings.参赛人:(设计联合体各成员分别盖章)Participant(firm): (stamped by each member of the consortium)设计单位或联合体各成员的法定代表人:(签字)Legal Representative of each member of the consortium: (s13、ignature)或授权代表:(签字)Or the Authorized Representative: (signature)年 月 日Date: 三签字盖章Signature and stamped我谨代表前述申请参加本次竞赛的设计公司(设计联合体)声明:本表各页,加盖公章为记,所填一切内容属实,并同时在此授权本次竞赛组织者在其认为适当的时间和场合公开、使用有关信息。On behalf of the participant, I do hereby declare that all pages are stamped and all the above contents are truly14、 filled in, and authorize the organizer the right to disclose and use the information. 填表人姓名 :Name of the compiler公司法人代表 :Legal Representative of the firm日 期 :Date四. 设计联合体协议Consortium Agreement4.1设计联合体协议4.1 Consortium Agreement设计联合体协议中应约定各成员在设计联合体中所占有的权益份额、拟承担的工作内容、工作分工、设计联合体的牵头单位以及设计联合体代表人(自然人)的名称和15、担负的责任。Members of the consortium should agree and decide the percentage of contract amount,work content,division of work and the responsibility of each firms (including the lead firm)representative(natural person)设计联合体协议中应明确中标后的设计合同须由设计联合体各成员单位加盖公章,并由各成员单位的法定代表人或合法授权代表签字。设计联合体全体成员对主办单位负有单独和连带的责任。If t16、he consortium wins the competition, the consortium should sign a design contract with the host. The contract should be stamped by all members and has signature of each member firms legal representative or legally authorized representative. All members of the consortium have both single and jointly l17、iabilities to the host. 4.2设计联合体成员单位一览表4.2 members of the consortium设计联合体牵头单位: Lead firm (盖章) (stamp)拟定的成员单位名称Member firm法定代表人Legal Representative资质情况Qualification Certificate在设计联合体中的权益份额(%)Percentage of the contract amount在设计联合体中拟承担的工作内容和工作量Job content and workload完成类似工程设计的经历Relevant Experience拟配备主18、要人员的情况Key Designer in this project其他Others请将营业执照、资质证书等相关资料的清晰复印件(加盖公章)附后。Please attach the Stamped Clear certified copies of business license, qualification certificate。设计联合体各成员单位应分别填写本表The form should be filled by each member of the consortium respectively设计联合体成员单位:(盖章) Member of the consortium: (stamp) 法定代表人或授权代表:(签字)legal representative or Authorized representative(signature)10
会员尊享权益 会员尊享权益 会员尊享权益
500万份文档
500万份文档 免费下载
10万资源包
10万资源包 一键下载
4万份资料
4万份资料 打包下载
24小时客服
24小时客服 会员专属
开通 VIP
升级会员
  • 周热门排行

  • 月热门排行

  • 季热门排行

  1. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  2. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  3. 动火作业安全告知卡(1页).docx
  4. 高处作业安全告知卡(1页).docx
  5. 道路改造工程围墙宣传栏改造各类雕塑等土建施工方案53页.doc
  6. 广场工程建设项目施工招标评标报告表格(24页).pdf
  7. 原油码头消防工程维保方案(39页).docx
  8. 2020柏向堂房地产公司材料标准化手册3.0(143页).pdf
  9. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  10. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  11. 住宅小区工程施工方案【234页】.docx
  12. 屋面圆弧形穹顶结构高支模施工方案(40米)(47页).doc
  13. 埋石混凝土挡土墙施工方案(23页).doc
  14. 结构加固专项施工方案(28页).doc
  15. 土方开挖及地下室施工方案(21页).doc
  16. 家园工程项目雨季及防台防汛施工方案(29页).doc
  17. 重庆市五小水利工程建设规划报告(64页).doc
  18. 超高纯氦气厂建设项目办公楼、变电站、水泵房及消防水池、门卫、厂房、仓库、配套工程施工组织设计方案(140页).doc
  19. 邛崃市牟礼镇初级中学校学生宿舍建设工程施工组织设计方案(259页).doc
  20. 高层住宅工程施工方案(249页).doc
  21. 园林工程质量通病控制方案及防治措施(27页).doc
  22. 珠海市三灶镇二级生活污水处理厂工程技术标书方案说明书(135页).doc
  1. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  2. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  3. 2024大楼室内精装修工程专业分包投标文件(393页).docx
  4. 苏州水秀天地商业项目购物中心100%室内设计方案(158页).pptx
  5. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  6. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  7. 室内移动式操作平台工程施工方案(19页).doc
  8. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  9. 矿山治理工程施工组织设计方案(240页).docx
  10. 老旧小区改造工程施工方案及技术措施(364页).doc
  11. 化工公司20000吨/年甲醛工程安全评价预评价报告(97页).doc
  12. 建筑工程外脚手架专项施工方案(悬挑式脚手架、落地式脚手架)(25页).doc
  13. 2020柏向堂房地产公司材料标准化手册3.0(143页).pdf
  14. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  15. 川主寺城镇风貌整治景观规划设计方案(60页).pdf
  16. 新疆风电十三间房二期工程49.5mw风电项目可行性研究报告(附表)(239页).pdf
  17. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  18. 埋石混凝土挡土墙施工方案(23页).doc
  19. 地下停车场环氧地坪漆施工方案(45页).doc
  20. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  21. 住宅定价策略及价格表制定培训课件.ppt
  22. 2010-2030年湖北咸宁市城市总体规划(32页).doc
  1. 建筑工程夜间施工专项施工方案(18页).doc
  2. 赣州无动力亲子乐园景观设计方案(111页).pdf
  3. 2016泰安乡村旅游规划建设示范案例(165页).pdf
  4. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  5. 龙山县里耶文化生态景区里耶古城片区旅游修建性详细规划2015奇创.pdf
  6. 连云港市土地利用总体规划2006-2020年调整方案文本图集(78页).pdf
  7. 850亩项目塑钢门窗工程施工组织设计方案(34页).doc
  8. 老旧小区改造工程施工方案及技术措施(364页).doc
  9. 城市更新项目地价公式测算表.xlsx
  10. 房地产项目规划前期投资收益测算模板带公式.xls
  11. 存储器基地项目及配套设施建筑工程临时用水施工方案(40页).docx
  12. 铁路客运枢纽项目站前框构中桥工程路基注浆加固专项施工方案(19页).doc
  13. 室内移动式操作平台工程施工方案(19页).doc
  14. 装配式结构工业厂房基础、主体结构、门窗及装饰工程施工方案(83页).doc
  15. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  16. 施工工程安全教育培训技术交底(13页).doc
  17. 老旧小区改造施工方案及技术措施(365页).doc
  18. 新建贵广铁路线下工程沉降变形观测及评估监理实施细则(126页).doc
  19. 消防火灾应急疏散演练预案(12页).doc
  20. 矿山治理工程施工组织设计方案(240页).docx
  21. 崖城站悬臂式挡墙施工方案(92页).doc
  22. 北京科技园公寓建设项目整体报告方案.ppt