个人中心
个人中心
添加客服WX
客服
添加客服WX
添加客服WX
关注微信公众号
公众号
关注微信公众号
关注微信公众号
升级会员
升级会员
返回顶部
电厂锅炉本体保温施工方案
电厂锅炉本体保温施工方案.doc
下载文档 下载文档
其它文档
上传人:正*** 编号:889052 2024-01-22 6页 81.04KB
1、conferences, learned superiors policies; reports, you can learn to deal with problems, art, just wanted to learn, to learn at any time. To continuously expand the scope of the study. The complexity and comprehensiveness of our work, decided to not only do we want to be professionals, or if generalis2、ts, to dabble in different areas of knowledge. Mastery of knowledge not only to have knowledge to rational analysis. This on requirements we, not only to learning national of route, and approach, and policy, also to learning national of legal, and regulations; not only to with political theory armed3、 mind, also to with economic theory guide work; not only to read history, also to read history; not only to absorption SM of mirror, also to gets is of road; not only to from local learn, also to to outside learn; not only to to books learn, also to field study learn. Therefore, I would encourage yo4、u, and more to the outside world when I have time to take a look at, take a stroll, outside developments, learn other peoples development approach, and then come back to guide our work. Second, we must think. Learning without thought to overshadow, thinking without learning is perilous. We want to f5、oster the character of advancing with the times, forge ahead, often reflect themselves in adapting to the new situation on whether there are delays, have anything to fear in the reform and innovation, whether in terms of accelerating the development of a relaxation, keep promising State of mind. In 6、order to do investigations, investigations is the road to heaven, God disposes of the base. To wants to real heard truth, and justice to truth, and get truth, received effectiveness, on must in-depth actual, and outreach, and in-depth masses, worship masses for Division, and masses heart, with masse7、s with discussion everyone care of problem, listening they of calls, understand they of mood, feel they of suffering, summary they of experience, concentrated they of wisdom, especially on masses most hope, and most urgent, and most worries, and most complained of hot, and difficulties and focus pro8、blem, more to active research, caught not put. Dare to innovate, in our work, often remain the old way doesnt work, the new approach would not situation, the reason, the key is that many people know that copying other peoples ideas, mechanically, using someone elses old ways. To change this predicam9、ent, requires us to break the shackles of traditional concepts to overcome conservative, conformist, good at finding new problems and to accept new things, summarize new experience, new ideas, developing new programmes and Maverick, a new approach to solve problems, speed up development. Especially 10、in implement superior policy spirit of process in the, both implementation, and cannot mechanically, to to extraordinary of courage and develop enterprising of spirit, put flexibility and principle combined up, put superior of spirit and local reality combined up, Yong conspiracy to breakthrough of 11、policy, and exercise innovation of lift, developed out development works of, and grass-roots welcomes of, and大连开发区热电厂锅炉本体保温施工方案本体保温施工方案一、编制依据:1.1工业设备及管道绝热工程质检评定标准GB50185-93。1.2电力建设施工及验收技术规范1.3电力建设安全工作规程(火力发电厂)DL5009.1-2002。二、作业任务2.1钩钉、骨架焊接安装;2.2保温棉层安装2.3外保护层安装;2.4以上三项施工内容详见(四)施工方法及作业程序。三、作业准备及工作条件3。12、1 作业人员的资格要求、劳动力组织项目负责人 1 人作业组长 2 人 技术员 1 人电焊工 2 人质检员 1 人保温工 30 人3.2 施工机械及工器具准备序号名称单位数量备注1剪板机台12压线机台13咬口机台14卷板机台15铁皮剪刀把206拉铆枪把307平板直尺个38拐尺个39手电钻把1010刀据把1511起重滑轮个312棕绳米30013手钳把1514电焊机台415切割机台183.3 作业环境条件a。施工图纸和技术资料齐全,并且经过会审无变更,作业指导书已编制,开工手续已办。b.与保温有关的钢结构工程施工完毕,并验收合格。c。及时掌握材料到货情况,应满足施工进度的需求,领到的材料要随时用完,13、有剩余材料存入自备材料库,现场不得长久堆放.四、作业方法及施工要求4.1 作业措施及方案 a。由施工技术员根据图纸以及相关资料要求,向施工人员进行交底,施工人员应细心听讲,认真理解,并进行讨论作到确无疑问后,方可办理技术交底签证。b。保温施工1)对设备系统表面尘土、杂物等进行彻底清理后方可进行下一道施工工序。2)施工前对保温材料的理化性能,出厂文件以及试块进行检验,合格后签证(对于不合格的材料,不准使用),材料运送一般,采用卷扬机、尼龙绳穿定滑轮、人背三种方法.保温材料(高处运送要用网或花格布包扎运送)。3)脚手架搭设必须由专职人员进行,严格执行脚手架搭拆质量要求,设投好后,并经安检职能部门验14、收合格方可使用。4)支撑角钢骨架安装,先在设备平面进行划线,并找出支撑角钢位置,由专职焊工施焊,把支撑角钢垂直焊接在设备表面(支撑角钢(40403)间距,横向500mm,纵向1000 mm),然后焊接连接角钢.5)自锁垫片拉杆Q235-A焊接布置,由于拉杆为设备带材不须现场弯制,焊接前在设备表面标准划线,并划出钩钉具体位置,钩钉间距为350 mm见方,采用梅花形结构布置。然后将拉杆点焊其上,施工顺序由上而下,要求点焊牢固、美观、横平、竖直(每平方米不少于8个)。6)保温层铺设保温层施工时,单层铺设应错缝,双层铺设错缝距离不小于保温棉板长或板宽的三分之一,缝间拼接整齐严密,不许有任何空洞、缝隙现15、象,设备接角要错接固定、牢固。法兰、三通、弯管等处的保温采用可拆卸式结构,保温层紧贴于设备形体表面,用铁丝两道或多道绑紧、扎实。同样要求单层错缝双层压缝,缝间填充密实,法兰处要留有足够可拆卸螺栓的距离,伸缩节、补偿器处要按照膨胀方向留出距离。主保温层施工应单层错缝,双层压缝,缝间填充密实,接缝拼接整齐无缝隙。保温层敷设完毕后,用自锁垫片,穿拉杆压紧,使保温层紧贴设备表面,然后将自锁垫片之外的拉杆端部向上折90角,卡住垫片。7)保护层施工该项工程采用波形铝板和铝合金板做保护层,安装时把金属护壳紧贴在管道保温层外面,把两边接缝搭接在一起,敲打咬接,搭接重叠部分不小于50mm,用手提电钻钻孔,自攻螺16、钉固定.自攻螺钉间距约200mm,每道缝不得少于4个钉。接缝应严密、平整、处于隐蔽位置,水平管道的纵向接缝应设置管道侧面,水平管道的环向接缝应按管道坡度高搭低茬,垂直管道的环向接缝应上搭下茬。保护层施工H24.2 质量及工艺保证措施a.工程质量检验及评定标准1)施工质量必须符合图纸设计要求。2)评定标准执行工业设备及管道绝热工程检验评定标准GB5018593,电力建设施工及验收规范。B关键检查项目,隐蔽工程及停工待检点的确定:1)停工待检H2)对H点的控制,H点即是对主保温层施工的控制,本工序是保温工程施工的中心环节,也是保温重点与难点,保证H点的控制关键有两个方面,首先施工方法应正确,在保证17、保温质量的情况下,对保温材料的检验是否合格也是关键之一,第二是对施工质量把关,如无错缝、压缝,应进行整改,如有拼砌不严,必须用填料将其填充密实且平整,直至符合设计规范要求为止.3)对波形铝板外保护的控制,首先不得使用明显缺陷的材料,下料应准确,接缝应严密、平整,所有外保护缺陷应全部消除.C质量要求及质理保证措施1)要求各分项工程施工重点,都必须有自检记录。2)要求各分项工程施工技术记录3)钩钉、骨架安装验收签证。4)主保温层砌筑,保温层验收签证.5)各分项保温工程验收签证。6)每道工序必须有验收签证才能进行下一道工序,否则视为违章作业.五、作业质量标准及检验要求a 施工中的作业标准和检验要求必18、须按照火电建设施工、验收及质量评定标准进行。B 在施工过程中,应做好原始的施工记录。六、职业安全健康与环境管理6.1 脱硫保温主要危险辨识作业活动危险因素可能导致的事故相应措施电动工机具使用砂轮片断裂砂轮片飞出伤人根据说明书正确使用,施工时不能正对着人设备堆放、清理安全通道不足,捆扎不牢划落人员损伤进行设备堆放、清理时,应有序、牢靠电焊机焊接接地不正确,不牢固 人员触电,设备损坏安排专人监护,用专用地线且连接牢固,不施工时关掉焊机电源脚手架作业高空坠落物体打击人员、设备损伤严格按照国家规范搭建脚手架。6。2 安全注意事项a. 进入施工现场,必须着装整齐,戴安全帽,高处作业必须系安全带。b。 施19、工中必须严格遵照中华人民共和国安全生产法相关规定执行,认真学习并严格执行电力建设安全工作规程(火力发电厂)DL5009.12002及工艺要求中的有关规定,严禁违章作业。c。 认真执行安全技术交底制度,每个施工人员应了解安全技术交底注意事项.6.3 施工安全措施a.施工人员必须熟悉并掌握电力建设安全工作规程(火力发电厂)DL5009。1-2002的有关规定。b。施工人员必须经过三级安全教育并考试合格方可上岗。c。施工人员进入施工现场必须正确佩戴安全帽,并系紧帽带,高空作业时必须系好安全带。d.高空作业时,大件工器具要系有安全绳,小件工器具要放在工具袋内,并放置在安全可靠的地方,小件材料要用铁丝扎20、牢,防止坠落。e。使用直梯时与地面水平夹角以60为宜,并有防滑和防倾倒措施。f.电动工具在使用前要仔细检查,确保其性能良好,并有良好的漏电保护装置.g。脚手架搭拆脚手架必须由专业人员搭拆,并经施工部门和使用部门验收合格后方可使用,认真执行脚手架搭拆安全措施.搭设脚手架用脚手杆,跳板等材料要仔细检查,不得有破损,脚手架要绑扎牢固,上杆离地应有1.05米的防护栏杆及18CM高的挡脚板或防护立网,脚手架载荷不得超过270Kg/m,木跳板两端8CM处应用镀锌铁丝箍绕23圈或用铁皮钉实。h.用电动工具作业时,必须佩戴防护眼镜,必要时戴上防护罩,电动工具插在插座上。i.在高空作业时,电焊线不允许碰到作业使21、用的脚手架防止电焊线漏电发生事故。高空作业传递工器具和材料时,不允许抛掷.应用绳系牢传递。j。严禁酒后进入施工现场。(附有安全管理体系图)k工程全部结束后,要做到“工完 料净 场地清”,做到安全文明施工,树立企业形象,打出企业品牌。6.4 文明施工要求a.施工过程中,施工人员必须着装整齐,佩戴标志。b。工作中所有工作电源必须规范,不允许乱搭乱接。c.施工现场严禁吸烟,严禁酒后上班。d.做到“工完 料尽 场地清”.附图:安全管理体系图 负责人代民法责任人代小涛安全员张东生安全员胡红领埋地部分整根敷设不允许有接头。地上一层至四层为低区,由小区室外给水管网直接供水,地上五层至十六层为中区,由小区中区22、变频调速泵组供水,地上十七层至三十三层为高区,由小区高区变频调速泵组供水。According to Office Party of mass line education practice activities led group of unified arrangements, units main led to for cadres workers Shang a times party lecture, due to himself level limited, only put this stage concentrated learning of experience today a23、nd everyone common with learning exchange, purpose is let we further deep understanding mass line of connotation, insisted party of mass line, do masses work, following main from four a aspects told: a, and full awareness party of mass line education practice activities of major meaning Partys 18 ma24、jor distinct proposed to focus on the partys advanced nature and purity, in the party, with pragmatic and clean for the people as the main content of the partys mass line and educational practice. This is comrade XI Jinping as party General Secretary and adhere to strictly administering the party, s25、trengthen the partys major decision is in line with the public expectations and strengthening the construction of learning-oriented service innovation of Marxist partys major deployment, is the important measure to advance the great cause of socialism with Chinese characteristics. First, carry out t26、he partys mass line in education practice, was carrying 18 of the party spirit, summon a powerful force for realizing the great rejuvenation of the Chinese nation the Chinese dream of urgent needs. Partys 18 to promote strategic deployment to building socialism with Chinese characteristics, presents27、 two 100-year goal, namely, by 2020 Chinas gross domestic product and per capita income of urban and rural residents in 2010 on the basis of double complete the building of a well-off society; the middle of this century into a prosperous, democratic, civilized and harmonious Socialist modern country28、, and on this basis, the Chinese dream of realizing the great rejuvenation of the Chinese nation. 18 Congress of the party, Comrade XI Jinping repeatedly expounded the Chinese dream. The basic connotation of the Chinese dream, is the national prosperity, national revitalization, the happiness of the29、 people, China important to follow is to keep China Road, carry forward the spirit and cohesion strength of China, dream dreams of the people of China, but determined confidence, enhance self-awareness, achieve self-reliance, to build a stronger China, civilization, harmony, beauty, China, China, Ch30、ina. Strategic conception of China was 18 the spirit of the enrichment and development of the party, conscientiously study the Chinese dream, leading people to hard to realize the Chinese dream, mass education activities in depth the fundamental starting point and ending point. Strengthen the education of the partys mass line, helps to train the collective consciousness of the unity of the party and the people, playing the Chinese dream ideological bases. Comrade Mao Zedong stressed that parties should have common language socialist countries must have unity of will. History has5
会员尊享权益 会员尊享权益 会员尊享权益
500万份文档
500万份文档 免费下载
10万资源包
10万资源包 一键下载
4万份资料
4万份资料 打包下载
24小时客服
24小时客服 会员专属
开通 VIP
升级会员
  • 周热门排行

  • 月热门排行

  • 季热门排行

  1. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  2. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  3. 陕西化学工业公司招聘管理与职业发展管理手册30页.doc
  4. 动火作业安全告知卡(1页).docx
  5. 高处作业安全告知卡(1页).docx
  6. 道路改造工程围墙宣传栏改造各类雕塑等土建施工方案53页.doc
  7. 广场工程建设项目施工招标评标报告表格(24页).pdf
  8. 原油码头消防工程维保方案(39页).docx
  9. 2020柏向堂房地产公司材料标准化手册3.0(143页).pdf
  10. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  11. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  12. 住宅小区工程施工方案【234页】.docx
  13. 鄂尔多斯空港物流园区总体规划方案(2017-2030)环境影响评价报告书(23页).doc
  14. 规划兰园西路道路工程环境方案环境影响评价报告书(89页).pdf
  15. 屋面圆弧形穹顶结构高支模施工方案(40米)(47页).doc
  16. 埋石混凝土挡土墙施工方案(23页).doc
  17. 结构加固专项施工方案(28页).doc
  18. 土方开挖及地下室施工方案(21页).doc
  19. 重庆市五小水利工程建设规划报告(64页).doc
  20. 超高纯氦气厂建设项目办公楼、变电站、水泵房及消防水池、门卫、厂房、仓库、配套工程施工组织设计方案(140页).doc
  21. 邛崃市牟礼镇初级中学校学生宿舍建设工程施工组织设计方案(259页).doc
  22. 高层住宅工程施工方案(249页).doc
  1. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  2. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  3. 2024大楼室内精装修工程专业分包投标文件(393页).docx
  4. 苏州水秀天地商业项目购物中心100%室内设计方案(158页).pptx
  5. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  6. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  7. 室内移动式操作平台工程施工方案(19页).doc
  8. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  9. 矿山治理工程施工组织设计方案(240页).docx
  10. 老旧小区改造工程施工方案及技术措施(364页).doc
  11. 2020柏向堂房地产公司材料标准化手册3.0(143页).pdf
  12. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  13. 川主寺城镇风貌整治景观规划设计方案(60页).pdf
  14. 新疆风电十三间房二期工程49.5mw风电项目可行性研究报告(附表)(239页).pdf
  15. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  16. 四川凉山攀西灵山国际度假区小镇活力中心商业业态规划方案建议书(33页).pdf
  17. 埋石混凝土挡土墙施工方案(23页).doc
  18. 地下停车场环氧地坪漆施工方案(45页).doc
  19. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  20. 住宅定价策略及价格表制定培训课件.ppt
  21. 西安名京九合院商业项目招商手册(28页).pdf
  22. 2010-2030年湖北咸宁市城市总体规划(32页).doc
  1. 建筑工程夜间施工专项施工方案(18页).doc
  2. 赣州无动力亲子乐园景观设计方案(111页).pdf
  3. 2016泰安乡村旅游规划建设示范案例(165页).pdf
  4. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  5. 龙山县里耶文化生态景区里耶古城片区旅游修建性详细规划2015奇创.pdf
  6. 连云港市土地利用总体规划2006-2020年调整方案文本图集(78页).pdf
  7. 850亩项目塑钢门窗工程施工组织设计方案(34页).doc
  8. 老旧小区改造工程施工方案及技术措施(364页).doc
  9. 城市更新项目地价公式测算表.xlsx
  10. 房地产项目规划前期投资收益测算模板带公式.xls
  11. 存储器基地项目及配套设施建筑工程临时用水施工方案(40页).docx
  12. 铁路客运枢纽项目站前框构中桥工程路基注浆加固专项施工方案(19页).doc
  13. 室内移动式操作平台工程施工方案(19页).doc
  14. 装配式结构工业厂房基础、主体结构、门窗及装饰工程施工方案(83页).doc
  15. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  16. 施工工程安全教育培训技术交底(13页).doc
  17. 老旧小区改造施工方案及技术措施(365页).doc
  18. 新建贵广铁路线下工程沉降变形观测及评估监理实施细则(126页).doc
  19. 消防火灾应急疏散演练预案(12页).doc
  20. 矿山治理工程施工组织设计方案(240页).docx
  21. 崖城站悬臂式挡墙施工方案(92页).doc
  22. 北京科技园公寓建设项目整体报告方案.ppt