树脂工程冷热水系统、溶剂灌区项目施工图自控设备表.xls
下载文档
上传人:偷****
编号:622419
2023-03-09
15页
288.54KB
1、XXXXXXXX工工程程设设计计有有限限公公司司工工程程名名称称二二期期树树脂脂工工程程自自控控设设备备表表编编制制图图 号号04099-1000-50-02ENG.NAMEDesign设设计计项项目目CED校校核核Drawing NO.SUBJUCTINSTRUMENT SCHEDULECheck设设计计阶阶段段施施工工设设计计审审核核PERIODWorking DesignApproval仪仪表表位位号号检检测测点点名名称称仪仪表表名名称称及及规规格格型型号号数数量量安安装装地地点点安安装装图图号号操操作作条条件件 operation conditions备备注注介介质质及及重重度度粘粘度2、度温温度度表表压压流流量量或或液液位位TAG.NOITEMSNAME AND SPECIFICATIONTYPEQUA.INS.LOC.INS.D.NO.midium/densityviscosityTemp.pressureflow/levelREMARKSkg/m3cPoCMPa 一一、批批量量控控制制FT-1批量控制H-101的树脂椭圆齿轮流量计oval gear flowmeterLUS56C11-A4061L-SGP-50A-1100504.8m3/HOVALMeasuring and charging dCT4,SCS14/SUS316,with temperature DN50(3、ST)-H1-003resin resin into H-101compensation,24VDC,equiped with filterBC-1批量控制仪,输入;脉冲 输出:接点EL18571101IP电源 220VAC,50HZAV-1气动切断球阀shutoff ball valve,with air DPS.filterDN5010.7Valve actionwith dCT4 solenoid valve and limited switchfail to close(close),SCS13 antistatic type,24VDCFT-2批量控制H-101的树脂椭圆齿轮流量计o4、val gear flowmeterLUS56C11-A4061L-SGP-50A-1100504.8m3/HOVALMeasuring and charging dCT4,SCS14/SUS316,with temperature DN50(ST)-H1-007resin resin into H-101compensation,24VDC,equiped with filterBC-2批量控制仪,输入;脉冲 输出:接点EL18571101IP电源 220VAC,50HZAV-2气动切断球阀shutoff ball valve,with air DPS.filterDN5010.7Valve5、 actionwith dCT4 solenoid valve and limited switchfail to close(close),SCS13 antistatic type,24VDCFT-3批量控制R-101/R201的树脂椭圆齿轮流量计oval gear flowmeterLUS56C11-A4061L-SGP-50A-0160.80.1507.2m3/HOVALMeasuring and charging dCT4,SCS14/SUS316,with temperature DN50solevent resin into R-101/R201compensation,24VD6、C,equiped with filterBC-3批量控制仪,输入;脉冲 输出:接点EL18571101IP电源 220VAC,50HZAV-3气动切断球阀shutoff ball valve,with air DPS.filterDN5010.3Valve actionwith dCT4 solenoid valve and limited switchfail to close(close),SCS13 antistatic type,24VDCFT-4批量控制T-101/T102的树脂椭圆齿轮流量计oval gear flowmeterLUS56C11-A4061L-S304-40A-07、2010.12512m3/HOVALMeasuring and charging dCT4,SCS14/SUS316,with temperature DN50distilled water resin into T-101/T102compensation,24VDC,equiped with filterBC-4批量控制仪,输入;脉冲 输出:接点EL18571101IP电源 220VAC,50HZ第 1 页,共 15 页AV-4气动切断球阀shutoff ball valve,with air DPS.filterDN5010.3Valve actionwith dCT4 solenoid8、 valve and limited switchfail to close(close),SCS13 antistatic type,24VDCFT-5批量控制T-101的树脂椭圆齿轮流量计oval gear flowmeterLUS56C11-A4061L-SGP-50A-0521.1102512m3/HOVALMeasuring and charging dCT4,SCS14/SUS316,with temperature DN50sub emulsion resin into T-101compensation,24VDC,equiped with filterBC-5批量控制仪,输入9、;脉冲 输出:接点EL18571101IP电源 220VAC,50HZAV-5气动切断球阀shutoff ball valve,with air DPS.filterDN5010.5Valve actionwith dCT4 solenoid valve and limited switchfail to close(close),SCS13 antistatic type,24VDCFT-6批量控制BT201的树脂椭圆齿轮流量计oval gear flowmeterLUS56C11-A4061L-SGP-50A-0891.1102512m3/HOVALMeasuring and chargi10、ng dCT4,SCS14/SUS316,with temperature DN50main emulsion resin into BT201compensation,24VDC,equiped with filterBC-6on local panel批量控制仪,输入;脉冲 输出:接点EL18571local panel电源 220VAC,50HZAV-6气动切断球阀shutoff ball valve,with air DPS.filterDN5010.5Valve actionwith dCT4 solenoid valve and limited switchfail to clos11、e(close),SCS13 antistatic type,24VDCFT-001批量控制T101/T102/T103/BT201的树脂椭圆齿轮流量计oval gear flowmeterLUS56C11-A4061DW-S304-10.12512m3/HOVALMeasuring and charging dCT4,SCS14/SUS316,with temperature DN5050A-007deionized water resin into T101/T102/T103/T201compensation,24VDC,equiped with filterBC-001批量控制仪,输入12、;脉冲 输出:接点EL18571101IP电源 220VAC,50HZAV-001气动切断球阀shutoff ball valve,with air DPS.filterDN5010.20.3Valve actionwith dCT4 solenoid valve and limited switchfail to close(close),SCS13 antistatic type,24VDC二二、控控制制阀阀气动切断球阀shutoff ball valve,with air DPS.filterAV-R101-SOLCharge valve for R-101with dCT4 solen13、oid valve and limited switchDN501L-SGP-50A-022solevent250.37.2m3/HValve action:AV-R201-SOLCharge valve for R-201(close),SCS13 antistatic type,24VDCDN501L-SGP-50A-023250.3fail to close气动切断球阀shutoff ball valve,with air DPS.filterAV-T101-LCharge valve for T-101with dCT4 solenoid valve and limited switc14、hDN401L-S304-40A-046distilled water250.312m3/HValve action:AV-T102-LCharge valve for T-102(close),SCS13 antistatic type,24VDCDN401L-S304-40A-020250.5fail to close气动切断球阀shutoff ball valve,with air DPS.filter AV-ST001A1Charge valve from ST-001Awith dCT4 solenoid valve and limited switchDN501L-SGP-50A-15、052sub emulsion250.512m3/HValve action:AV-ST001B1Charge valve from ST-001B(close),SCS13 antistatic type,24VDCDN501L-SGP-50A-052250.5fail to close仪仪表表位位号号检检测测点点名名称称仪仪表表名名称称及及规规格格型型号号数数量量安安装装地地点点安安装装图图号号操操作作条条件件 operation conditions备备注注介介质质及及重重度度粘粘度度温温度度表表压压流流量量或或液液位位TAG.NOITEMSNAME AND SPECIFICATIONT16、YPEQUA.INS.LOC.INS.D.NO.midium/densityviscosityTemp.pressureflow/levelREMARKSkg/m3cPoCMPa第 2 页,共 15 页on local panel气动切断球阀shutoff ball valve,with air DPS.filterAV-ST001A2Charge valve from ST-001Awith dCT4 solenoid valve and limited switchDN501L-SGP-50A-110main emulsion250.512m3/HValve action:AV-ST00117、B2Charge valve from ST-001B(close),SCS13 antistatic type,24VDCDN501L-SGP-50A-117250.5fail to closeAV-ST002Charge valve from ST-002DN501L-SGP-50A-085250.5AV-ST003Charge valve from ST-003DN501L-SGP-50A-088250.5气动切断球阀shutoff ball valve,with air DPS.filterAV-T101-DWCharge valve for T-101with dCT4 soleno18、id valve and limited switchDN401DW-S304-40A-010deionized water250.20.312m3/HValve action:AV-T102-DWCharge valve for T-102(close),SCS13 antistatic type,24VDCDN401DW-S304-40A-011250.20.3fail to closeAV-T103-DWCharge valve for T-103DN401DW-S304-40A-012250.20.3AV-BT201-DW Charge valve for BT-201DN401DW-19、S304-40A-009250.20.3on local气动切断球阀shutoff ball valve,with air DPS.filterValve action:AV-H101Tank bottom valve for H-101single acting(spring back type)DN1501 L-SGP-150A-(ST)-H1-028resin500.025fail to closeAV-H102Tank bottom valve for H-102SCS13,with the seat mounted tank bottom DN651 L-SGP-65A-029raw20、 material 500.025fail to closeAV-H103Tank bottom valve for H-103DN501L-SGP-40A-103solvent 500.025fail to closeAV-H201Tank bottom valve for H-201DN251L-S304-25A-072solvent 500.025fail to close气动切断球阀shutoff ball valve,with air DPS.filterValve action:AV-R101-HO1outlet valve of lower jacketwith dCT4 sol21、enoid valve and limited switchDN1251heating 3000.360m3/Hfail to openAV-R101-HO2outlet valve of middle jacket(close),SCS13 antistatic type,24VDCDN1251medium oil3000.3fail to closeAV-R101-HO3outlet valve of upper jacketDN12513000.3fail to close气动切断球阀shutoff ball valve,with air DPS.filterValve action:A22、V-R101-CWcooling water inlet valve with dCT4 solenoid valve and limited switchDN801cooling water250.330m3/Hfail to closeAV-R101-RCW cooling water outlet valve(close),SCS13 antistatic type,24VDCDN801cooling water300.330m3/Hfail to closeAV-R101-Ddrain outlet valve DN401drain water250.330m3/Hfail to op23、enAV-R101-Aair inlet valve DN201air250.1fail to close顶底阀tank bottom ball valve,with air DPS.filteron localsingle acting(spring back type)Valve action:AV-R101-L1tank bottom valve-1 of R-101SCS13,with the seat mounted tank bottom DN2001R-101main resin260-0.10.01down to openAV-R101-L2tank bottom valve-24、2 of R-101DN2001R-101260-0.10.01down to open顶底阀tank bottom ball valve,with air DPS.filterAV-T103-Ltank bottom valve-1 of T-103single acting(spring back type)DN401T-103raw material 1000.03on localSCS13,with the seat mounted tank bottom dissolution气动切断球阀shutoff ball valve,with air DPS.filterValve acti25、on:AV-T101-1selecting the jacket section with dCT4 solenoid valve and limited switchDN501steam.cooling1500.15240Kg/Hfail to closeAV-T101-2aand changing(close),SCS13 antistatic type,24VDCDN501water1500.312m3/Hfail to closeAV-T101-2bvalves by 2-notch selector switchDN5011500.3fail to open气动切断球阀shutoff26、 ball valve,with air DPS.filterValve action:AV-T101-Sselecting the fluid in jacket with dCT4 solenoid valve and limited switchDN501steam1500.15240Kg/Hfail to closeAV-T101-SDand changing(close),SCS13 antistatic type,24VDCDN251steam1500.15240Kg/Hfail to closeAV-T101-Dvalves by 4-notch selector switch 27、DN401drain water1500.312m3/Hfail to openAV-T101-ADN201air250fail to closeAV-T101-CWDN501cooling water250.312m3/Hfail to closeAV-T101-RCWDN501cooling water300.312m3/Hfail to closeAV-T101-CCWDN501chilled water150.312m3/Hfail to closeAV-T101-RCCWDN501chilled water200.312m3/Hfail to close气动切断球阀shutoff b28、all valve,with air DPS.filterValve action:仪仪表表位位号号检检测测点点名名称称仪仪表表名名称称及及规规格格型型号号数数量量安安装装地地点点安安装装图图号号操操作作条条件件 operation conditions备备注注介介质质及及重重度度粘粘度度温温度度表表压压流流量量或或液液位位TAG.NOITEMSNAME AND SPECIFICATIONTYPEQUA.INS.LOC.INS.D.NO.midium/densityviscosityTemp.pressureflow/levelREMARKSkg/m3cPoCMPa第 3 页,共 15 页AV29、-T102-1selecting the jacket section with dCT4 solenoid valve and limited switchDN1251steam.cooling 2000.3100Kg/Hfail to closeAV-T102-2aand changing(close),SCS13 antistatic type,24VDCDN1251water1500.3100Kg/Hfail to openAV-T102-2bvalves by 2-notch selector switchDN12511500.3100Kg/Hfail to open气动切断球阀sh30、utoff ball valve,with air DPS.filterValve action:AV-T102-3Sselecting the fluid in jacket with dCT4 solenoid valve and limited switchDN401steam1700.3100Kg/Hfail to closeAV-T102-1.5Sand changing(close),SCS13 antistatic type,24VDCDN401steam1500.3100Kg/Hfail to closeAV-T102-SDvalves by 6-notch selector 31、switch DN251steam1500.3100Kg/Hfail to openAV-T102-DDN401drain water1500.330m3/Hfail to closeAV-T102-ADN201air250fail to close气动蝶阀butterfly valve,with air DPS.filterValve action:AV-T102-HWwith dCT4 solenoid valve and limited switchDN1251hot water1000.280m3/Hfail to closeAV-T102-RHW(close),tefron,24VD32、CDN1251hot water1000.280m3/Hfail to closeAV-T102-CWDN801cooling water250.330m3/Hfail to closeAV-T102-RCWDN801cooling water300.330m3/Hfail to closeAV-T102-CCWDN801chilled water150.330m3/Hfail to closeAV-T102-RCCWDN801chilled water200.330m3/Hfail to close三通阀three way ball valve,with air DPS.filtersele33、cting vent or vacuum with dCT4 solenoid valve and limited switch(2)Valve action:AV-R101-Gand changing(vent/vacuum),SCS13,with the seat mounted DN501G-SGPW-50A-013air+vapor60101.3(abs)5.2m3/minfail to vacuumAV-T102-Gthe flow direction of valvetank bottomDN501G-SGPW-50A-01460101.3(abs)fail to vacuum气动34、切断球阀shutoff ball valve,with air DPS.filterValve action:AV-VP101selecting vacuum or cutoff with dCT4 solenoid valve and limited switchDN501G-SGPW-50A-014air+vapor60101.3(abs)5.2m3/minfail to closeand changing(close),SCS13 antistatic type,24VDCthe valve open/close by 2-notchselector switch 气动切断球阀shuto35、ff ball valve,with air DPS.filterValve action:AV-R201-1selecting the jacket section with dCT4 solenoid valve and limited switchDN501steam+cooling 2000.5500Kg/Hfail to closeAV-R201-2aand changing(close),SCS13 antistatic type,24VDCDN501water2000.5500Kg/Hfail to openAV-R201-2bvalves by 2-notch selector36、 switchDN5012000.5500Kg/Hfail to open气动切断球阀shutoff ball valve,with air DPS.filterValve action:AV-R201-5Sselecting the jacket section with dCT4 solenoid valve and limited switchDN501steam2000.5500Kg/Hfail to closeAV-R201-1.5Sand changing(close),SCS13 antistatic type,24VDCDN501steam1500.5500Kg/Hfail t37、o closeAV-R201-SDvalves by 6-notch selector switchDN401steam1500.5500Kg/Hfail to closeAV-R201-DDN401drain water1500.320m3/Hfail to openAV-R201-APDN151plant air250.15600Nl3/minfail to closeAV-R201-CWDN501cooling water250.320m3/Hfail to closeAV-R201-RCWDN501cooling water300.320m3/Hfail to closeAV-R20138、-CCWDN501chilled water150.320m3/Hfail to closeAV-R201-RCCWDN501chilled water200.320m3/Hfail to close顶底阀tank bottom ball valve,with air DPS.filterAV-R201-Ltank bottom valve-1 of R-201single acting(spring back type)DN651R-201intermediate1500.05down to openon localSCS13,with the seat mounted tank botto39、m resinHV-201remote control of the drop flow单座调节阀single seat ring control valveDN251L-S304-25A-0720.95250.020.7m3/Hrate from H-201with dCT4 positioner and air setsolventHIC-201智能手动操作器 smart manual operatorUT320-001201IP仪仪表表位位号号检检测测点点名名称称仪仪表表名名称称及及规规格格型型号号数数量量安安装装地地点点安安装装图图号号操操作作条条件件 operation condit40、ions备备注注介介质质及及重重度度粘粘度度温温度度表表压压流流量量或或液液位位TAG.NOITEMSNAME AND SPECIFICATIONTYPEQUA.INS.LOC.INS.D.NO.midium/densityviscosityTemp.pressureflow/levelREMARKSkg/m3cPoCMPa第 4 页,共 15 页输入;420mA 输出:420mA 电源 220VAC,50HZp=0.01三三、调调节节回回路路TICA-101Control of the temperature in R-101数字显示控制仪 digital controllerUT550-041、01101IPPID control输入;Pt100 输出:420mA Cascade output to TICA-102电源 220VAC,50HZTR103-1temperature recording0350UR1800-43700121101IPTE101measurement of temperature in R-101双支铠装热电阻double element sheathed RTDWZPK2-443-GVVH100A1R10113000350dCT4,Pt100,SUS316,4.8,A=495main resin2000DN20,class ATICA-102Contro42、l of the temperature in jacket of数字显示控制仪 digital controllerUT550-241101IPR-101 ,PID control输入;Pt100 输出:420mA Cascade input from TICA-101电源 220VAC,50HZTR103-2temperature recording0350UR1800-43700121101IPTE-102measurement of temperature of R-101 jacket双支热电阻double element RTDWZP2-241-B/A1R101heating me43、dium0350dCT4,Pt100,SUS316,12,A=300oilM27x2,class ACV3000系列HTS型顶导向单座调节阀TICV-102-H热媒调节阀heating valve P1=2kgf/cm2 ,P=0.5kgf/cm2,Qmax=60m3/hSUS304,DN1001HO-STPG-125A-H3-0063500.2TICV-102-C冷媒调节阀cooling valve Cv计=91.5 ,Cv选=175 ,DN100SUS304,DN1001RHO-STPG-125A-H0-0083500.2TICV-102-B冷媒旁路调节阀cooling bypass va44、lve 等百分比特性 (CC),logarithm character SUS304,DN1001HO-STPG-125A-H3-0103500.2阀体碳钢,阀芯不锈钢,气关式 air to close 附:空气过滤减压器及防爆电气阀门定位器with air decompression filter and explosion-proof valve alignerequipped with partner flangePICA-101control of the pressure in vacuum line 数字显示控制仪 digital controllerUT550-001101IPf45、rom R-101 and T-102输入;420mA 输出:420mA PID control电源 220VAC,50HZPT-101绝对压力变送器EJA310A-DMS2A-97DB1G-SGPW-50A-014air+vapor60101.3(abs)absolute pressure transmitter 0110KPa(ABS),SUS316L,RC1/2,dCT4P1=0MPa ,P=0.08MPa,Qmax=30m3/hPV-101单座调节阀single seat ring control valve等百分比特性 (CC),logarithm character CV3000系46、列HLS型1A-SGPW-15A-001600仪仪表表位位号号检检测测点点名名称称仪仪表表名名称称及及规规格格型型号号数数量量安安装装地地点点安安装装图图号号操操作作条条件件 operation conditions备备注注介介质质及及重重度度粘粘度度温温度度表表压压流流量量或或液液位位TAG.NOITEMSNAME AND SPECIFICATIONTYPEQUA.INS.LOC.INS.D.NO.midium/densityviscosityTemp.pressureflow/levelREMARKSkg/m3cPoCMPa第 5 页,共 15 页阀体碳钢,阀芯不锈钢,气关式 air to47、 close 小口径单座调节阀101.3(abs)附:空气过滤减压器及防爆电气阀门定位器SUS316,DN15with air decompression filter and explosion-proof valve alignerequipped with partner flangeTICA-201Control of the temperature in R-201数字显示控制仪 digital controllerUT550-001201IP PID control输入;Pt100 输出:420mA 电源 220VAC,50HZTR202-1temperature recordin48、g0200UR1800-43700121201IPTE108measurement of temperature in R-201双支铠装热电阻double element sheathed RTDWZPK2-443-GVVM100A1R2011200200dCT4,Pt100,SUS316,4.8,A=495intermediate 5000DN20,class AresinTICV-201-H单座调节阀single seat ring control valveP1=5kgf/cm2 ,P=0.2kgf/cm2,Qmax=500kg/hCV3000系列HTS型1SUS2000.5 Cv计=49、26.1 ,Cv选=44 ,DN50顶导向单座调节阀等百分比特性 (CC),logarithm character SUS316,DN50阀体不锈钢,阀芯不锈钢,气关式 air to close 附:空气过滤减压器及防爆电气阀门定位器with air decompression filter and explosion-proof valve alignerequipped with partner flangeTICV-201-C单座调节阀single seat ring control valveP1=3kgf/cm2 ,P=0.5kgf/cm2,Qmax=20m3/hCV3000系列HT50、S型1SUS2000.3 Cv计=33.1 ,Cv选=44 ,DN50顶导向单座调节阀等百分比特性 (CC),logarithm character SUS316,DN50阀体不锈钢,阀芯不锈钢,气关式 air to close 附:空气过滤减压器及防爆电气阀门定位器with air decompression filter and explosion-proof valve alignerequipped with partner flangeDN25,Kv=4.3,Kvs=10,SUS304TCV-1control of the temperature in ST-004自力式温度调节阀T51、R711111.5k steam1270.1550kg/Hliquid expansion thermometer with protection well 1.16temperature regulatorDN25,Kv=4.3,Kvs=10,SUS304TCV-2control of the temperature in ST-005自力式温度调节阀TR711111.5k steam1270.1550kg/Hliquid expansion thermometer with protection well 1.16temperature regulator仪仪表表位位号号检检测测点点名名称52、称仪仪表表名名称称及及规规格格型型号号数数量量安安装装地地点点安安装装图图号号操操作作条条件件 operation conditions备备注注介介质质及及重重度度粘粘度度温温度度表表压压流流量量或或液液位位TAG.NOITEMSNAME AND SPECIFICATIONTYPEQUA.INS.LOC.INS.D.NO.midium/densityviscosityTemp.pressureflow/levelREMARKSkg/m3cPoCMPa第 6 页,共 15 页DN25,Kv=4.3,Kvs=10,SUS304TCV-3control of the temperature in H53、OT 自力式温度调节阀TR711111.5k steam1270.1550kg/HSTOCK ROOMliquid expansion thermometer with protection well 1.16temperature regulatorPCV-1control of the pressure in ST004微压氮封阀HPR5021N2400.1Qmax=30Nm3/hliquid expansion thermometer with protection well pressure regulatorPCV-2control of the pressure in ST005微54、压氮封阀HPR5021N2400.1Qmax=30Nm3/hliquid expansion thermometer with protection well pressure regulator四四、温温度度测测点点TR103-5temperature recording0150UR1800-43700121101IPTE-105temperature in T-101双支铠装热电阻double element sheathed RTDWZPK2-443-GVVM100A1T101resin solution0150dCT4,Pt100,SUS316,4.8,A=495DN20,PL20-155、.0,HG20592,class ATR103-3temperature recording0350UR1800-43700121101IPTE-103inlet vapor temperature of HE-102双支热电阻double element RTDWZP2-241-B/A1V-S304-300A-H2-001vapor0350dCT4,Pt100,SUS316,12,A=300M27x2,class ATR202-2temperature recording0200UR1800-43700121201IPTE-109inlet vapor temperature of HE-256、02双支热电阻double element RTDWZP2-241-B/A1V-S304-150A-H2-004vapor0200dCT4,Pt100,SUS316,12,A=200M27x2,class ATR103-4temperature recording0100UR1800-43700121101IPTE-104temperature in T-103双支铠装热电阻double element sheathed RTDWZPK2-443-GVVM100A1T103R.W.dissolution0100dCT4,Pt100,SUS316,4.8,A=495DN20,class ATR257、02-3temperature recording0100UR1800-43700121201IPTE-110temperature of CW main line双支热电阻double element RTDWZP2-241-B/A1CW-SGPW-350A-007cooling water0100dCT4,Pt100,SUS316,12,A=250M27x2,class ATR202-4temperature recording050UR1800-43700121201IP仪仪表表位位号号检检测测点点名名称称仪仪表表名名称称及及规规格格型型号号数数量量安安装装地地点点安安装装图图号号操操作58、作条条件件 operation conditions备备注注介介质质及及重重度度粘粘度度温温度度表表压压流流量量或或液液位位TAG.NOITEMSNAME AND SPECIFICATIONTYPEQUA.INS.LOC.INS.D.NO.midium/densityviscosityTemp.pressureflow/levelREMARKSkg/m3cPoCMPa第 7 页,共 15 页TE-111temperature of CCW main line双支热电阻double element RTDWZP2-241-B/A1CCW-SGPW-250Achilled water050dCT459、,Pt100,SUS316,12,A=250-C1-005M27x2,class ATR103-6temperature recording0150UR1800-43700121101IPTE-106temperature in T-102双支铠装热电阻double element sheathed RTDWZPK2-443-GVVM100A1T102resin solution 0150dCT4,Pt100,SUS316,4.8,A=495DN20,class ATR103-7temperature recording0150UR1800-43700121101IPTE-107inlet v60、apor temperature of HE-104双支热电阻double element RTDWZP2-241-B/A1V-S304-450A-H2-003vapor0150dCT4,Pt100,SUS316,12,A=400M27x2,class ATR202-5temperature recording0350UR1800-43700121201IPTE-112temperature of HO main line双支热电阻double element RTDWZP2-241-B/A1HO-STPG-150A-H3hot oil0350dCT4,Pt100,SUS316,12,A=2061、0M27x2,class ATR202-6temperature recording0350UR1800-43700121201IPTE-113temperature of RHO main line双支热电阻double element RTDWZP2-241-B/A1RHO-STPG-150A-H3return hot oil0350dCT4,Pt100,SUS316,12,A=200M27x2,class A双金属温度计 bimetal thermometerCWR0603-65-CS1.5级 1.5class加扩大管DN80表头直径head Dia.:100mmwith expando62、r护套直径body Dia.:10mm DN80材质 material :SUS304连接螺纹 thread :M27x2TG-1ST-0040100,插入长度insert length:L=400WSS-4611ST004process liquidTG-2ST-0050100,插入长度insert length:L=400WSS-4611ST005process liquidTG-3ST-0060100,插入长度insert length:L=400WSS-4611ST006process liquidTG-4ST-0070100,插入长度insert length:L=400WSS-4663、11ST007process liquid 压力式温度计non-mercury expansion 1.5级 1.5class,毛细管材质:黄铜表头直径head Dia.:100mm充填介质:甘油连接螺纹 thread :M27x2TG-5H-1010120,插入长度insert length:L=495SUS304,4.8x4951H101process liquidTG-6T-1030100,插入长度insert length:L=495SUS304,4.8x4951T103process liquidTG-7R-1010350,插入长度insert length:L=495SUS304,64、4.8x4951R101process liquidTG-8T-1010120,插入长度insert length:L=495SUS304,4.8x4951T101process liquidTG-9T-1020120,插入长度insert length:L=495SUS304,4.8x4951T102process liquidTG-10R-2010200,插入长度insert length:L=495SUS304,4.8x4951R201process liquid仪仪表表位位号号检检测测点点名名称称仪仪表表名名称称及及规规格格型型号号数数量量安安装装地地点点安安装装图图号号操操作作条条件65、件 operation conditions备备注注介介质质及及重重度度粘粘度度温温度度表表压压流流量量或或液液位位TAG.NOITEMSNAME AND SPECIFICATIONTYPEQUA.INS.LOC.INS.D.NO.midium/densityviscosityTemp.pressureflow/levelREMARKSkg/m3cPoCMPa第 8 页,共 15 页双金属温度计 bimetal thermometer1.5级 1.5class表头直径head Dia.:100mm护套直径body Dia.:10mm材质 material :SUS304连接螺纹 thread 66、:M27x2TG-11ST-001A0100,插入长度insert length:L=400WSS-4611ST001Aprocess liquidTG-12ST-001B0100,插入长度insert length:L=400WSS-4611ST001Bprocess liquidTG-13ST-0020100,插入长度insert length:L=400WSS-4611ST002process liquidTG-14ST-0030100,插入长度insert length:L=400WSS-4611ST003process liquidTG-15BT-0010100,插入长度insert67、 length:L=400WSS-4611BT001process liquidTG-16ST-3010100,插入长度insert length:L=400WSS-4611ST301process liquidTG-17ST-3020100,插入长度insert length:L=400WSS-4611ST302process liquidTG-18ST-3030100,插入长度insert length:L=400WSS-4611ST303process liquidTG-19ST-3040100,插入长度insert length:L=400WSS-4611ST304process li68、quidTG-20HE-001 inlet0100,插入长度insert length:L=125WSS-4611加扩大管DN80deionized waterTG-21HE-001 outlet0100,插入长度insert length:L=125WSS-4611加扩大管DN80deionized waterTG-22HE-001 inlet050,插入长度insert length:L=200WSS-4611chilled waterTG-23HE-001 outlet050,插入长度insert length:L=200WSS-4611chilled waterTG-25ST-001A69、 coil inlet050,插入长度insert length:L=200WSS-4611加扩大管DN80process liquidTG-26ST-001A coil outlet050,插入长度insert length:L=200WSS-4611加扩大管DN80process liquidTG-27ST-001B coil inlet050,插入长度insert length:L=200WSS-4611加扩大管DN80process liquidTG-28ST-001B coil outlet050,插入长度insert length:L=200WSS-4611加扩大管DN80proc70、ess liquidTG-29ST-002 coil inlet050,插入长度insert length:L=200WSS-4611加扩大管DN80process liquidTG-30ST-002 coil outlet050,插入长度insert length:L=200WSS-4611加扩大管DN80process liquidTG-31ST-003 coil inlet050,插入长度insert length:L=200WSS-4611加扩大管DN80process liquidTG-32ST-003 coul outlet050,插入长度insert length:L=200WS71、S-4611加扩大管DN80process liquidTG-33ST-301 coil inlet050,插入长度insert length:L=200WSS-4611加扩大管DN80process liquidTG-34ST-301 coil outlet050,插入长度insert length:L=200WSS-4611加扩大管DN80process liquidTG-35ST-302 coil inlet 050,插入长度insert length:L=200WSS-4611加扩大管DN80process liquidTG-36ST-302 coil outlet 050,插入长度i72、nsert length:L=200WSS-4611加扩大管DN80process liquidTG-37ST-303 coil inlet050,插入长度insert length:L=200WSS-4611加扩大管DN80process liquidTG-38ST-303 coil outlet050,插入长度insert length:L=200WSS-4611加扩大管DN80process liquidTG-39ST-304 coil inlet050,插入长度insert length:L=200WSS-4611加扩大管DN80process liquidTG-40ST-304 co73、il outlet 050,插入长度insert length:L=200WSS-4611加扩大管DN80process liquidTG-41R-101 jacket outlet 0350,插入长度insert length:L=300WSS-4611process liquidTG-42HE-105 outlet 0100,插入长度insert length:L=200WSS-4611加扩大管DN80process liquidTG-43R-101 jacket outlet 0350,插入长度insert length:L=300WSS-4611process liquidTG-44H74、E-102 outlet0100,插入长度insert length:L=200WSS-4611process liquidTG-45R-101 jacket outlet 0150,插入长度insert length:L=200WSS-4611process liquidTG-46R-101 coil outlet 0150,插入长度insert length:L=200WSS-4611process liquidTG-47T-101 jacket outlet 0150,插入长度insert length:L=200WSS-4611加扩大管DN80process liquidTG-48HE75、-103 outlet 0100,插入长度insert length:L=200WSS-4611加扩大管DN80process liquidTG-49T-101 coil outlet 0150,插入长度insert length:L=200WSS-4611加扩大管DN80process liquidTG-50T-102 coil outlet 0150,插入长度insert length:L=200WSS-4611process liquidTG-51HE-104 outlet0100,插入长度insert length:L=200WSS-4611process liquid仪仪表表位位号号76、检检测测点点名名称称仪仪表表名名称称及及规规格格型型号号数数量量安安装装地地点点安安装装图图号号操操作作条条件件 operation conditions备备注注介介质质及及重重度度粘粘度度温温度度表表压压流流量量或或液液位位TAG.NOITEMSNAME AND SPECIFICATIONTYPEQUA.INS.LOC.INS.D.NO.midium/densityviscosityTemp.pressureflow/levelREMARKSkg/m3cPoCMPa第 9 页,共 15 页TG-52T-102 jacket outlet 0150,插入长度insert length:L=2077、0WSS-4611process liquidTG-53vp-101 outlet0100,插入长度insert length:L=200WSS-4611加扩大管DN80process liquidTG-54R-201 outlet0200,插入长度insert length:L=300WSS-4611加扩大管DN80process liquidTG-55HE-202 outlet0100,插入长度insert length:L=200WSS-4611process liquidTG-56R-201 jacket outlet 0200,插入长度insert length:L=200WSS-478、611加扩大管DN80process liquid加扩大管DN80五五、压压力力测测点点隔膜式压力表diaphragm seal pressure gauge100,drip-tight,1.5级 class 1.5连接螺纹thread:G1/2PG-1ST-004P1 discharge01.0MPaY-TML1B1,SUS3161L-SGP-50A-(ST)-H1-003process liquid80PG-2ST-005P1 discharge01.0MPaY-TML1B1,SUS3161L-SGP-50A-(ST)-H1-007process liquid80弹簧管压力表bourdon79、 tube pressure gauge100,drip-tight,1.5级 class 1.5连接螺纹thread:M20 x1.5PG-3ST-006P2 discharge00.6MPaY-100B,SUS3161L-SGP-50A-015process liquid50PG-4ST-006P1 discharge00.6MPaY-100B,SUS3161L-SGP-50A-016process liquid50PG-5ST-007P1 discharge00.6MPaY-100B,SUS3161L-S304-40A-020process liquid60隔膜式压力表diaphragm80、 seal pressure gauge100,drip-tight,1.5级 class 1.5连接螺纹thread:G1/2PG-6H-102P1 discharge01.0MPaY-TML1B1,SUS3161L-SGP-50A-025process liquid80PG-7H-101P1 discharge01.0MPaY-TML1B1,SUS3161L-SGP-50A-(ST)-H1-027process liquid80PG-8T-103P1 discharge01.0MPaY-TML2B1,SUS3161L-S304-40A-044process liquid60PG-9R-1081、1P1 discharge01.0MPaY-TML1B1,SUS3161L-SGP-50A-H1-041process liquid80PG-10R-101P1 discharge01.0MPaY-TML1B1,SUS3161L-SGP-50A-H1-049process liquid80PG-11R-102P2 discharge01.0MPaY-TML2B1,SUS3161L-SGP-65A-106process liquid60PG-12T-102P1 discharge01.0MPaY-TML2B1,SUS3161L-SGP-65A-006process liquid60弹簧管压力表b82、ourdon tube pressure gauge100,drip-tight,1.5级 class 1.5连接螺纹thread:M20 x1.5PG-13WT-102P1 discharge00.6MPaY-100B,SUS3161L-S304-50A-063process liquid60PG-14WT-103P1 discharge00.6MPaY-100B,SUS3161process liquid60隔膜式压力表diaphragm seal pressure gauge100,drip-tight,1.5级 class 1.5连接螺纹thread:G1/2PG-15H-201P1 83、discharge01MPaY-TML2B1,SUS3161L-S304-50A-071process liquid60PG-16R-20100.1MPaY-TML1B1,SUS3161R201process liquid150PG-17R-201P1 discharge01MPaY-TML1B1,SUS3161L-SGP-50A-(ST)-H1-076process liquid100PG-18ST-001AP1 discharge01MPaY-TML2B1,SUS3161L-SGP-50A-052process liquid50PG-19ST-001AP2 discharge01MPaY-84、TML2B1,SUS3161L-SGP-50A-110process liquid50PG-20ST-001BP1 discharge01MPaY-TML2B1,SUS3161L-SGP-50A-114process liquid50仪仪表表位位号号检检测测点点名名称称仪仪表表名名称称及及规规格格型型号号数数量量安安装装地地点点安安装装图图号号操操作作条条件件 operation conditions备备注注介介质质及及重重度度粘粘度度温温度度表表压压流流量量或或液液位位TAG.NOITEMSNAME AND SPECIFICATIONTYPEQUA.INS.LOC.INS.D.NO.midi85、um/densityviscosityTemp.pressureflow/levelREMARKSkg/m3cPoCMPa第 10 页,共 15 页PG-21ST-001BP2 discharge01MPaY-TML2B1,SUS3161L-SGP-50A-117process liquid50PG-22ST-002P1 discharge01MPaY-TML2B1,SUS3161L-SGP-50A-085process liquid50PG-23ST-003P1 discharge01MPaY-TML2B1,SUS3161L-SGP-50A-088process liquid50PG-24B86、T-201P2 discharge01MPaY-TML2B1,SUS3161L-S304-40A-121process liquid50PG-25BT-201P3 discharge01MPaY-TML2B1,SUS3161L-S304-40A-119process liquid50PG-26BT-201P4 discharge01MPaY-TML2B1,SUS3161L-S304-40A-091process liquid50PG-27BT-201P1 discharge01MPaY-TML2B1,SUS3161L-S304-40A-123process liquid50PG-28F-10787、 discharge01MPaY-TML2B1,SUS3161L-SGP-65A-124process liquid50PG-29F-109 discharge01MPaY-TML2B1,SUS3161L-SGP-65A-147process liquid50PG-30F-108 discharge01MPaY-TML2B1,SUS3161L-SGP-65A-146process liquid50PG-31ST-301P1 discharge01MPaY-TML2B1,SUS3161L-SGP-65A-136process liquid50PG-32ST-302P1 discharge01MP88、aY-TML2B1,SUS3161L-SGP-65A-138process liquid50PG-33ST-303P1 discharge01MPaY-TML2B1,SUS3161L-SGP-65A-140process liquid50PG-34ST-304P1 discharge01MPaY-TML2B1,SUS3161L-SGP-65A-142process liquid50弹簧管压力表bourdon tube pressure gauge100,drip-tight,1.5级 class 1.5连接螺纹thread:M20 x1.5PG-35S701.6MPa Y-100B,SUS3189、61S7-SGP-100A-H2-004steam170PG-36S501MPa Y-100B,SUS3161S5-SGP-125A-H2-001steam158PG-37S300.6MPa Y-100B,SUS3161S3-SGP-40A-H2-001steam143PG-38S1.500.6MPa Y-100B,SUS3161S1.5-SGP-125A-H2-001steam127PG-39DWT-001P1(P-7501)discharge00.6MPa Y-100B,SUS3161DW-S304-50A-005deionized water50PG-40HE-001 inlet00.690、MPa Y-100B,SUS3161deionized water50PG-41HE-001 outlet00.6MPa Y-100B,SUS3161deionized water10PG-42HE-001 inlet00.6MPa Y-100,Bs-BASE1chilled water7PG-43HE-001 outlet00.6MPa Y-100,Bs-BASE1chilled water12PG-45T-103 jacket00.6MPa Y-100B,SUS3161process liquid127PG-46R-101 jacket00.6MPa Y-100B,SUS3161HO-ST91、PG-100Aprocess liquid300PG-47T-101 jacket00.6MPa Y-100B,SUS3161RHO-STPG-20A-HO-010process liquid127PG-48T-101 jacket00.6MPa Y-100B,SUS3161U-S304-50A-C1/H2-004process liquid127PG-49T-102 jacket00.6MPa Y-100B,SUS3161U-S304-125A-C1/H2-007process liquid127PG-50R-201 jacket00.6MPa Y-100B,SUS3161U-S304-5092、A-H2/C1-011process liquid158PG-51AP00.6MPa Y-100,Bs-BASE1AP-SGPW-15A-002plant air40PG-5200.6MPa Y-100,Bs-BASE1N2-GCS-20-2301N2ordinary0.3PG-5301.6MPa Y-100,Bs-BASE1AI-GCS-25-2301instrument airordinary0.8PG-5500.6MPa Y-100,Bs-BASE1CCW-CS-80-C1-2301chilled water70.4隔膜式压力真空表diaphragm seal pressure gaug93、e100,drip-tight,1.5级 class 1.5连接螺纹thread:G1/2CG-1R-101-0.10.1MPa Y-TML1B1,SUS3161R101process liquid200CG-2T-102-0.10.1MPa Y-TML2B1,SUS3161T102process liquid60六六、流流量量测测点点仪仪表表位位号号检检测测点点名名称称仪仪表表名名称称及及规规格格型型号号数数量量安安装装地地点点安安装装图图号号操操作作条条件件 operation conditions备备注注介介质质及及重重度度粘粘度度温温度度表表压压流流量量或或液液位位TAG.NOITEM94、SNAME AND SPECIFICATIONTYPEQUA.INS.LOC.INS.D.NO.midium/densityviscosityTemp.pressureflow/levelREMARKSkg/m3cPoCMPa第 11 页,共 15 页 玻璃转子流量计taperd rotameterFG-1R-101 N2 for purgeDN15,PN1.6,0.33Nm3/hLZB-15,GLASS C.S1N2-SGPW-20A-004nitrogen gasordinary0.15FG-2HE-102 CWDN125,PN1.6,12120m3/hLZB-125,GLASS C.S195、CW-SGPW-125A-016cooling waterordinary0.3FG-3T-102 N2 for purgeDN15,PN1.6,0.33Nm3/hLZB-15,GLASS C.S1N2-SGPW-20A-005nitrogen gasordinary0.15FG-4HE-104 CCWDN100,PN1.6,770m3/hLZB-100,GLASS C.S1CCW-SGPW-100Achilled water70.3-C1-12FG-5R-201 N2 for purgeDN15,PN1.6,0.33Nm3/hLZB-15,GLASS C.S1N2-SGPW-20A-007n96、itrogen gasordinary0.15FG-6HE-202 CWDN100,PN1.6,770m3/hLZB-100,GLASS C.S1CW-SGPW-100A-026cooling waterordinary1七七、液液位位测测点点单法兰液位变送器single flange level transmitter LI-9A-1indicating of the level in ST-001A range:05500mm,SUS304,DN80,dCT4EJA210A-DMSJ1E2A-97DN1ST001Asub emulsion10roomboth on local and in97、 control roomsg 1.1temperatureLI-9B-1indicating of the level in ST-001B range:05500mm,SUS304,DN80,dCT4EJA210A-DMSJ1E2A-97DN1ST001Bsub emulsion10roomboth on local and in control roomsg 1.1temperatureLI-10-1indicating of the level in ST-002 range:05500mm,SUS304,DN80,dCT4EJA210A-DMSJ1E2A-97DN1ST002main98、 emulsion10roomboth on local and in control roomsg 1.1temperatureLI-11-1indicating of the level in ST-003 range:05500mm,SUS304,DN80,dCT4EJA210A-DMSJ1E2A-97DN1ST003main emulsion10roomboth on local and in control roomsg 1.1temperatureLI-13-1indicating of the level in ST-301 range:05500mm,SUS304,DN80,d99、CT4EJA210A-DMSJ1E2A-97DN1ST301product resin10roomboth on local and in control roomsg 1.1temperatureLI-14-1indicating of the level in ST-302 range:05500mm,SUS304,DN80,dCT4EJA210A-DMSJ1E2A-97DN1ST302product resin10roomboth on local and in control roomsg 1.1temperatureLI-15-1indicating of the level in 100、ST-303 range:05500mm,SUS304,DN80,dCT4EJA210A-DMSJ1E2A-97DN1ST303product resin10roomboth on local and in control roomsg 1.1temperatureLI-16-1indicating of the level in ST-304 range:05500mm,SUS304,DN80,dCT4EJA210A-DMSJ1E2A-97DN1ST304product resin10roomboth on local and in control roomsg 1.1temperature101、LI-1-1indicating of the level in ST-004 range:05500mm,SUS304,DN80,dCT4EJA210A-DMSJ1E2A-97DN1ST004intermediate resin100roomboth on local and in control roomsg 1.0temperatureLI-2-1indicating of the level in ST-005 range:05500mm,SUS304,DN80,dCT4EJA210A-DMSJ1E2A-97DN1ST005intermediate resin100roomboth o102、n local and in control roomsg 1.0temperatureLI-4-1indicating of the level in ST-007 range:05500mm,SUS304,DN80,dCT4EJA210A-DMSJ1E2A-97DN1ST007solvent0.1roomboth on local and in control roomsg 1.0temperature浮子式液位开关 float switch LA-9A-2alarm of the level in ST-001ADN65,SUS304 ,dCT4,L=1225mmUQK-20011231103、ST001Aproduct resin10roomsg 1.1temperatureLA-9B-2alarm of the level in ST-001BDN65,SUS304 ,dCT4,L=1225mmUQK-20011231ST001Bproduct resin10roomsg 1.1temperatureLA-10-2alarm of the level in ST-002DN65,SUS304 ,dCT4,L=1225mmUQK-20011231ST002product resin10room仪仪表表位位号号检检测测点点名名称称仪仪表表名名称称及及规规格格型型号号数数量量安安装装地104、地点点安安装装图图号号操操作作条条件件 operation conditions备备注注介介质质及及重重度度粘粘度度温温度度表表压压流流量量或或液液位位TAG.NOITEMSNAME AND SPECIFICATIONTYPEQUA.INS.LOC.INS.D.NO.midium/densityviscosityTemp.pressureflow/levelREMARKSkg/m3cPoCMPa第 12 页,共 15 页sg 1.1temperatureLA-11-2alarm of the level in ST-003DN65,SUS304 ,dCT4,L=1225mmUQK-200112105、31ST003product resin10roomsg 1.1temperatureLA-13-2alarm of the level in ST-301DN65,SUS304 ,dCT4,L=1225mmUQK-20011231ST301product resin10roomsg 1.1temperatureLA-14-2alarm of the level in ST-302DN65,SUS304 ,dCT4,L=1225mmUQK-20011231ST302product resin10roomsg 1.1temperatureLA-15-2alarm of the level in 106、ST-303DN65,SUS304 ,dCT4,L=1225mmUQK-20011231ST303product resin10roomsg 1.1temperatureLA-16-2alarm of the level in ST-304DN65,SUS304 ,dCT4,L=1225mmUQK-20011231ST304product resin10roomsg 1.1temperatureLA-12alarm of the level in BT-201DN65,SUS304 ,dCT4,L=1225mmUQK-20011231BT201product resin10roomsg 1.1107、temperatureLA-7501alarm of the level in DWT-7501DN65,SUS304 ,dCT4,L=4000mmUQK-20021231DWT7501deionized water0.1room L1=mmtemperature L2=mm L3=mm L4=mmLA-7502alarm of the level in DWT-7502DN65,SUS304 ,dCT4,L=4000mmUQK-20021231DWT7502deionized water0.1room L1=mmtemperature L2=mm L3=mm L4=mmsg 1.0LA-1-108、2alarm of the level in ST-004DN65,SUS304 ,dCT4,L=1225mmUQK-20011231ST004intermediate resin10050sg 1.0LA-2-2alarm of the level in ST-005DN65,SUS304 ,dCT4,L=1225mmUQK-20011231ST005intermediate resin10050sg 1.0LA-3alarm of the level in ST-006DN65,SUS304 ,dCT4,L=1225mmUQK-20011231ST006solvent0.1roomsg 0109、.8temperatureLA-4-2alarm of the level in ST-007DN65,SUS304 ,dCT4,L=1225mmUQK-20011231ST007solvent0.1roomsg 1.0temperatureLA-6alarm of the level in H-101DN65,SUS304 ,dCT4,L=1225mmUQK-20011231H101raw materialLA-7alarm of the level in H-102DN65,SUS304 ,dCT4,L=1225mmUQK-20011231H102raw material LA-8alar110、m of the level in H-201DN65,SUS304 ,dCT4,L=1225mmUQK-20011231H201solvent八八、称称重重METTLER-TOLEDOWE-101weight indicating of platform scale 称重传感器 weighing sensorFWC-0.54W1010.30.9 tonWI-101W-101(WT101)配防爆操作箱 9506-00501W101 nearbyboth on local and in control room称重终端 PANTHERPTPN-1801101IP220VAC,本安型intrins111、ic safety type,0.03%仪仪表表位位号号检检测测点点名名称称仪仪表表名名称称及及规规格格型型号号数数量量安安装装地地点点安安装装图图号号操操作作条条件件 operation conditions备备注注介介质质及及重重度度粘粘度度温温度度表表压压流流量量或或液液位位TAG.NOITEMSNAME AND SPECIFICATIONTYPEQUA.INS.LOC.INS.D.NO.midium/densityviscosityTemp.pressureflow/levelREMARKSkg/m3cPoCMPa第 13 页,共 15 页WIA-101数字显示控制仪 digital 112、controllerLU-94MAJ3001101IP输入:420mA 电源:220VAC,50HZWIA-102weight indicating of platform scale 称重传感器 weighing sensorFWC-24W1021.15.1 tonWI-102W-102(WT102)配防爆操作箱 9506-00501W102 nearbyboth on local and in control room称重终端 PANTHERPTPN-1801101IP220VAC,本安型intrinsic safety type,0.03%WIA-102数字显示控制仪 digital c113、ontrollerLU-94MAJ3001101IP输入:420mA 电源:220VAC,50HZWIA-103weight indicating of platform scale 称重传感器 weighing sensorFWC-24W1031.15.1 tonWI-103W-103(WT103)配防爆操作箱 9506-00501W103 nearbyboth on local and in control room称重终端 PANTHERPTPN-1801101IP220VAC,本安型intrinsic safety type,0.03%WIA-103数字显示控制仪 digital co114、ntrollerLU-94MAJ3001101IP输入:420mA 电源:220VAC,50HZWIA-201weight indicating of H-201称重传感器 weighing sensorFWC-24H-2010.73 tonWI-201配防爆操作箱 9506-00501H201 nearby称重终端 PANTHERPTPN-1801201IP220VAC,本安型intrinsic safety type,0.03%WIA-201数字显示控制仪 digital controllerLU-94MAJ3001201IP输入:420mA 电源:220VAC,50HZ九九、其其他他II115、-R101current indicating of R-101 agitator数字显示控制仪 digital controllerLU-94MAJ3001101IP输入:420mA 电源:220VAC,50HZII-T101current indicating of T-101 agitator数字显示控制仪 digital controllerLU-94MAJ3001101IP输入:420mA 电源:220VAC,50HZII-T102current indicating of T-102 agitator数字显示控制仪 digital controllerLU-94MAJ3001101116、IP输入:420mA 电源:220VAC,50HZII-T103current indicating of T-103 agitator数字显示控制仪 digital controllerLU-94MAJ3001101IP输入:420mA 电源:220VAC,50HZII-R201current indicating of R-201 agitator数字显示控制仪 digital controllerLU-94MAJ3001201IP输入:420mA 电源:220VAC,50HZII-BT201current indicating of BT-201 agitator数字显示控制仪 digi117、tal controllerLU-94MAJ3001201IP仪仪表表位位号号检检测测点点名名称称仪仪表表名名称称及及规规格格型型号号数数量量安安装装地地点点安安装装图图号号操操作作条条件件 operation conditions备备注注介介质质及及重重度度粘粘度度温温度度表表压压流流量量或或液液位位TAG.NOITEMSNAME AND SPECIFICATIONTYPEQUA.INS.LOC.INS.D.NO.midium/densityviscosityTemp.pressureflow/levelREMARKSkg/m3cPoCMPa第 14 页,共 15 页输入:420mA 电源:118、220VAC,50HZII-R1001current indicating of R-1001 agitator数字显示控制仪 digital controllerLU-94MAJ3001201IP输入:420mA 电源:220VAC,50HZII-R1002current indicating of R-1002 agitator数字显示控制仪 digital controllerLU-94MAJ3001201IP输入:420mA 电源:220VAC,50HZPX-203配电器,输入:420mA,输出:15VDC1电源:220CAC,50HzTX-203转换器,输入:420mA,输出:420119、mA1电源:220CAC,50HzPLC system1101.102IP附接操纵台后开柜式仪表盘 instrument panel2100 x1100 x600 x800KGT-2212UPS1printer1仪仪表表位位号号检检测测点点名名称称仪仪表表名名称称及及规规格格型型号号数数量量安安装装地地点点安安装装图图号号操操作作条条件件 operation conditions备备注注介介质质及及重重度度粘粘度度温温度度表表压压流流量量或或液液位位TAG.NOITEMSNAME AND SPECIFICATIONTYPEQUA.INS.LOC.INS.D.NO.midium/densityviscosityTemp.pressureflow/levelREMARKSkg/m3cPoCMPa第 15 页,共 15 页
CAD图纸
上传时间:2024-07-29
13份
CAD图纸
上传时间:2023-12-28
30份
CAD图纸
上传时间:2024-07-25
14份