地下排水管道钢板桩施工方案(刘在旭)(5页)
地下排水管道钢板桩施工方案(刘在旭)(5页).doc
下载文档 下载文档
其它文档
上传人:正*** 编号:468622 2022-07-20 5页 19.50KB
1、一、 概述General 90万吨/年乙烯装置地下管道污染雨水及生产污水管道(SD)部分主管线施工时,由于沟深较深,且靠近装置区已经施工完毕的道路,故管沟开挖时无法进行放坡处理,为防止开挖时发生塌陷,将已经施工完毕的路基破坏掉,因此靠近路边的沟槽边坡在施工时需要进行特殊施工技术处理,经慎重考虑,采用打钢板桩的方式来保护路基。需要进行技术处理的道路有2#路(MHS.PC-08MHS.PC- 11之间)、4#路、8#路(MHS.PC-49MHS.PC- 51之间)、10#路。During the main pipeline construction of pollution rain water 2、and production pollution pipe (SD) in UG pipe of 900 KTAY ethylene plant ,we will implement the special construction technical treatment to the trench bank preventing collapse and damage to the completed road base instead of sloping treatment which could not be executed as proposed before because of3、 the trenchs depth and the completion of the road adjacent to the plant. With carefully consideration ,we take the method of driving steel plate pile to protect the road base and this method will be used upon NO.2 Road (between MHS.PC-08 & MHS.PC- 11),NO.4 Road ,NO.8 Road (between MHS.PC-49 & MHS.PC4、-51) and NO.10 Road.二、钢板桩施工 steel plate construction 2.1、开挖前,首先进行管沟开挖放线。Setting out before trench excavation. 2.2、管沟开挖应提前进行井点降水,确保施工阶段沟槽无地下水。Well point dewatering before trench excavation to ensure there remains no UG water during the whole period of construction.2.3、沟槽最深挖掘深度为4.6米,因此采用拉森钢板桩,规格为12米/根5、。The max depth of the trench excavated is 4.6m and we use the LASEN steel plate pile which length is 12 meter。2.4、钢板桩的位置距离管带基础600mm。钢板桩位于道路一侧,采用单侧钢板桩铺设方法。沟槽另一侧进行放坡,坡度不小于1:1。The distance between the steel and the pipeline foundation is 600mm. Drive steel plate pile on one side of the trench and slope6、 on the other side with the grade no less than 1:1.2.5、钢板桩采用重锤锤击或夯机锤击的方式进行。钢板桩顶部应高出地平面200mm。Drive the pile by means of punching with heavy punch or punning with punier and the top of the pile should be 200mm higher than the terrace.2.6、钢板桩必须垂直,严禁钢板桩向沟槽方向倾斜。The steel plate pile must be vertical and l7、ean towards the trench is forbidden.2.7、相临的两块钢板桩必须相互正反紧密咬合。The steel plate piles adjacent to each other must tightening bite forward reverse.2.8、由于需要打钢板桩的距离很长,因此为节约施工成本,采取分段打桩的方式进行。每段大约在50米,共需要钢板桩220根,总重70吨。桩机立在需要开挖的沟槽上,沿着沟槽的方向边打边退,桩机下面铺设钢板,钢板规格为40002000,=20mm,共计5块。We drive the piles by means of sub8、section to reduce the construction cost caused by the long piling distance with each subsection 50m in length and totally 220 steel plate piles in number and 70t in weight .The driving machine stands where the trench should be excavated and retrogrades along the trench with 5 steel plates sized 40009、2000,=20mm under its body. 2.9、当一段钢板桩打完后,立即进行土方开挖。将开挖出的泥土堆放到沟槽的另一侧。无法进行堆放的泥土需要用运输车运到甲方指定的渣土场(距离施工现场9公里)进行堆放。Excavate immediately after construction for one subsection is finished and pile the earth excavated out on the other side of the trench ,the remained earth which couldnt be piled should be tra10、nsported to the slag lot(9 km away from the construction site) designated by the client for piling. 3.0、当管道安装完毕试压合格后,经共检合格,马上进行沟槽回填。回填土需要进行压实,回填完毕后,方可将钢板桩拔除。拔除钢板桩同样采用震动起重机,起重机站在道路上,同时需要对已经铺设完毕的路面进行保护,在路面上铺设=20mm的钢板,钢板规格为40002000,共计5块。Backfill the trench after the pipe erection is finished and qualif11、ied in pressure test as well as the test by all the authorities. the backfilling earth should be compacted and only the backfilling is finished could the steel plate be dismantled by vibration crane standing on the terrace with 5 steel plate sized =20mm ,40002000 under its body to protect the n comp12、leted road.3.1、当此段沟槽施工完毕后,方可进行下段沟槽施工。沟槽的开挖断面图见详图1:Only after this section trench is completed could the next trench be constructed ,and the section of excavated trench see detail 1:四、质量控制:Quality Control41基坑开挖的日常质量监督工作由项目部工程部具体负责,设专职质量检查员负责日常质量监督和检验工作。Quality department of project dept. is responsib13、le for daily quality supervision for base trench excavation. Full time quality inspector shall be designated and responsible for daily quality supervision and inspection.42严格工序交接制度,未经检查或经检查上道工序不合格,严禁进行下道工序施工。Execute work procedure handover system strictly; forbid to execute next work procedure strictly if the work is not inspected or the work procedure is unqualified after inspection.五、安全控制:Safety Control51施工人员必须穿戴好防护用品。依据JHA对施工班组进行安全交底,强化安全意识。The worker should wear PPE correctly. Make safety clarification to workers according to JHA to enhance their safety consciousness.
会员尊享权益 会员尊享权益 会员尊享权益
500万份文档
500万份文档 免费下载
10万资源包
10万资源包 一键下载
4万份资料
4万份资料 打包下载
24小时客服
24小时客服 会员专属
开通 VIP
升级会员
  • 周热门排行

  • 月热门排行

  • 季热门排行

  1. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  2. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  3. 动火作业安全告知卡(1页).docx
  4. 高处作业安全告知卡(1页).docx
  5. 道路改造工程围墙宣传栏改造各类雕塑等土建施工方案53页.doc
  6. 广场工程建设项目施工招标评标报告表格(24页).pdf
  7. 原油码头消防工程维保方案(39页).docx
  8. 2020柏向堂房地产公司材料标准化手册3.0(143页).pdf
  9. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  10. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  11. 住宅小区工程施工方案【234页】.docx
  12. 屋面圆弧形穹顶结构高支模施工方案(40米)(47页).doc
  13. 埋石混凝土挡土墙施工方案(23页).doc
  14. 结构加固专项施工方案(28页).doc
  15. 土方开挖及地下室施工方案(21页).doc
  16. 家园工程项目雨季及防台防汛施工方案(29页).doc
  17. 重庆市五小水利工程建设规划报告(64页).doc
  18. 超高纯氦气厂建设项目办公楼、变电站、水泵房及消防水池、门卫、厂房、仓库、配套工程施工组织设计方案(140页).doc
  19. 邛崃市牟礼镇初级中学校学生宿舍建设工程施工组织设计方案(259页).doc
  20. 高层住宅工程施工方案(249页).doc
  21. 园林工程质量通病控制方案及防治措施(27页).doc
  22. 珠海市三灶镇二级生活污水处理厂工程技术标书方案说明书(135页).doc
  1. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  2. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  3. 2024大楼室内精装修工程专业分包投标文件(393页).docx
  4. 苏州水秀天地商业项目购物中心100%室内设计方案(158页).pptx
  5. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  6. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  7. 室内移动式操作平台工程施工方案(19页).doc
  8. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  9. 矿山治理工程施工组织设计方案(240页).docx
  10. 老旧小区改造工程施工方案及技术措施(364页).doc
  11. 化工公司20000吨/年甲醛工程安全评价预评价报告(97页).doc
  12. 建筑工程外脚手架专项施工方案(悬挑式脚手架、落地式脚手架)(25页).doc
  13. 2020柏向堂房地产公司材料标准化手册3.0(143页).pdf
  14. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  15. 川主寺城镇风貌整治景观规划设计方案(60页).pdf
  16. 新疆风电十三间房二期工程49.5mw风电项目可行性研究报告(附表)(239页).pdf
  17. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  18. 埋石混凝土挡土墙施工方案(23页).doc
  19. 地下停车场环氧地坪漆施工方案(45页).doc
  20. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  21. 住宅定价策略及价格表制定培训课件.ppt
  22. 2010-2030年湖北咸宁市城市总体规划(32页).doc
  1. 建筑工程夜间施工专项施工方案(18页).doc
  2. 赣州无动力亲子乐园景观设计方案(111页).pdf
  3. 2016泰安乡村旅游规划建设示范案例(165页).pdf
  4. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  5. 龙山县里耶文化生态景区里耶古城片区旅游修建性详细规划2015奇创.pdf
  6. 连云港市土地利用总体规划2006-2020年调整方案文本图集(78页).pdf
  7. 850亩项目塑钢门窗工程施工组织设计方案(34页).doc
  8. 老旧小区改造工程施工方案及技术措施(364页).doc
  9. 城市更新项目地价公式测算表.xlsx
  10. 房地产项目规划前期投资收益测算模板带公式.xls
  11. 存储器基地项目及配套设施建筑工程临时用水施工方案(40页).docx
  12. 铁路客运枢纽项目站前框构中桥工程路基注浆加固专项施工方案(19页).doc
  13. 室内移动式操作平台工程施工方案(19页).doc
  14. 装配式结构工业厂房基础、主体结构、门窗及装饰工程施工方案(83页).doc
  15. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  16. 施工工程安全教育培训技术交底(13页).doc
  17. 老旧小区改造施工方案及技术措施(365页).doc
  18. 新建贵广铁路线下工程沉降变形观测及评估监理实施细则(126页).doc
  19. 消防火灾应急疏散演练预案(12页).doc
  20. 矿山治理工程施工组织设计方案(240页).docx
  21. 崖城站悬臂式挡墙施工方案(92页).doc
  22. 北京科技园公寓建设项目整体报告方案.ppt