2018年中国主题公园项目发展预测报告.pdf
下载文档
上传人:故事
编号:166119
2021-07-30
34页
1.64MB
1、1Economics 2018 中国主题公园项目发展预测 China Theme Park Pipeline Report China 4AECOM About This Report Defjnition of Theme park Drawing on decades of experience in the themed entertainment sector, AECOM defjnes the meaning of theme park as follows: A theme park is a type of amusement park in which landscaping2、, buildings/ structures, man-made attractions (rides, games, shows), and activities that are based on one or more unifying theme. A theme park is a gated area requiring an entry ticket and may be indoor, outdoor, or a combination of both. They are tangible, stationary and built for long-lasting oper3、ation, often featuring multiple zones with distinct storylines. Signifjcant capital investment is necessary to deliver a complementary mix of entertainment, food and beverage outlets, retail shops, and other supporting facilities. Selection Criteria AECOM carefully selected existing and pipeline theme parks in Mainland China for inclusion in our research sample according to following criteria: Sel