个人中心
个人中心
添加客服WX
客服
添加客服WX
添加客服WX
关注微信公众号
公众号
关注微信公众号
关注微信公众号
升级会员
升级会员
返回顶部
双钢筋叠合板安装施工工艺标准
双钢筋叠合板安装施工工艺标准.doc
下载文档 下载文档
施工专题
上传人:地** 编号:1212262 2024-09-21 53页 134KB
1、双钢筋叠合板安装施工工艺标准(424-1996)范围 本工艺适用于多层及高层多种民用建筑叠合楼板或屋面板的安装。对条件适合的工业建筑亦可采用。施工准备 2.1材料及主要机具:2.1.1双钢筋叠合板:板厚分为50mm和63mm两种系列。平面尺寸以三模为基准,50mm系列,长4.2m6.3m,宽l.5m3.9m.共72种;63mm系列,长4.2m7.2m,宽1.5m3.9m,共99种。预制叠合板的叠合面应有凹凸差不小于4mm的人工粗糙面,表面不得有疏松层和浮浆。双钢筋叠合板要有出厂合格证。2.1.2支座硬架支模及支板缝的木板、木方或定型支柱等应按施工方案配制。2.1.3机具;垂直运输机械、钢卷尺、2、撬棍等。2.2作业条件:2.2.1依据图纸、规范、叠合板图集以及洽商的要求,绘制叠合板安装图。其中应表示出叠合板的平面位置、型号、板缝尺寸、支座搁置长度、支座硬架支模位置、临时支撑位置,以便叠合板安装。2.2.2检查叠合板的质量:详细检查有无裂缝、缺损,检查叠合板的表面质量。凡不符合质量要求的不得使用。并按安装图核对叠合板的型号和规格。2.2.3检查墙体或梁的标高及轴线。梁和圈梁的钢筋及模板办完隐、预检。2.2.4叠合板的堆放及场地要求:2.2.4.1场地应事先抄平、整实,并筑37灰土两步。2.2.4.2堆放的支点位置同吊点。每块叠合板下沿叠合板长向紧靠吊环应放通长垫木,上下对齐、对正、垫平、3、垫实。不同板号应分别码放,不允许不同板号重叠堆放。堆放高度宜不大于6层。条件允许时应随到随上楼。2.2.5墙四周硬架支模及拼板缝处硬架支撑和板的临时支撑,按施工方案安装完毕,并做完预检。操作工艺 3.1工艺流程图:检查支座及板缝硬架支模上平标高 画叠合板位置线 吊装叠合板 调整支座处叠合板搁置长度 整理叠合板甩出钢筋 3.2因叠合板在支座上搁置长度较小(或板未进支座),故一般情况下墙四周宜采用硬架支模,一般为单排支柱与墙体锁固,间距60100cm。墙或梁顶标高应下降l3cm。板的拼缝处亦设硬架支撑,一般为双排支柱,间距为60100cm。安装叠合板前应认真检查硬架支模的支撑系统,检查墙或梁的标高4、轴线,以及硬架支模的水平楞的顶面标高,并校正。3.3画叠合板位置线:在墙、梁或硬架横楞上的侧面,按安装图画出板缝位置线,并标出板号。拼板之间的板缝一般为100mm、如排板需要时,可在80mm170mm之间变动。但大于100mm的拼缝应置于接近板连续边的一侧。见图4-39。 图4-39板缝留置示意图3.4叠合板吊装就位:若叠合板有预留孔洞时,吊装前先查清其位置,明确板的就让方向。同时检查、排除钢筋等就位的障碍。吊装时应按预留吊环位置,采取八个吊环同步起吊的方式。就但时,应使叠合板对准所划定的叠合板位置线,按设计支座搁置年度慢降到位,稳定落实。3.5调整叠合板支座处的搁置长度:3.5.1用撬棍按5、图纸要求的支座处的搁置长度,轻轻调整。必要时要借助吊车绷紧钩绳(但板不离支座),辅以人工用撬棍共同调整搁置长度。3.5.2图纸对支座搁置长度无要求时,板搁置在混凝土构件上时,一般为+20mm(即伸入支座20mm)。若排板需要,亦可在+30mm-50mm之间变动。但若墙厚160mm时,筒支边的搁置长度应0。若必须小于-50mm,应按设计要求加大甩筋长度。搁置长度的状态见图4-40。3.5.3在砖混结构中,板伸入支座的长度一般宜大于50mm。3.6按设计规定,整理叠合板四周甩出的钢筋,不得弯90,亦不得将其压于板下。质量标准 4.1保证项目:4.1.1构件吊运时混凝土强度必须符合设计要求和施工规范6、的规定。检查方法:检查构件出厂证明和同条件养护试块的试验报告。4.1.2叠合板接缝处的混凝土必须计量准确,浇捣密实,养护充分,其强度必须达到设计要求或施工规范的规定。检查方法:观察和检查标准养护龄期28d试块抗压试验报告及施工记录。4.1.3叠合板的型号、位置、支点锚固必须符合设计要求,已无变形损坏现象。检查方法:观察或尺量检查和检查吊装记录。4.2基本项目:叠合板的标高、坐浆、板缝宽度,应符合设计要求和施工规范的规定。检查方法:观察、足量检查。4.3允许偏差项目,见表4-37。表4-37项次 项目 允许偏差(mm) 检查方法 1 轴线位置位移 5 尺量检查 2 层高 10 用水准仪或尺量检查7、 3 板搁置长度 10 尺量检查 抹灰5 不抹灰3 成品保护 5.1叠合板的堆放及堆放场地的要求应严格按2.2.4条执行。5.2现浇墙、梁安装叠合板时,其混凝土强度要达到4MPa时方准施工。5.3叠合板上的甩筋(锚固筋)在堆放、运输、吊装过程中要妥为保护,不得反复弯曲和折断。5.4吊装叠合板,不得采用“兜底”、多块吊运。应按预留吊环位置,采用八个点同步单块起吊的方式。吊运中不得冲撞叠合板。5.5硬架支模支架系统板的临时支撑应在吊装就位前完成。每块板沿长向在板宽取中加设通长木楞作为临时支撑。所有支柱均应在下端铺垫通长脚手板,且脚手板下为基土时,要整平、夯实。5.6不得在板上任意凿洞,板上如需要打8、洞,应用机械钻孔,并按设计和图集要求做相应的加固处理。质量记录 本工艺标准应具备如下质量记录:6.1混凝土构件出厂合格证。6.2结构吊装记录。6.3预制构件吊装工程预检。6.4分项工程技术交底。6.5分项工程质量检验评定。(英文版 ) Two regulations promulgated for implementation is in the party in power for a long time and the rule of law conditions, the implementation of comprehensive strictly strategic plan, i9、mplementation in accordance with the rules and discipline to manage the party, strengthen inner-party supervision of major initiatives. The two regulations supporting each other, the adhere to a positive advocate, focusing on morality is of Party members and Party leading cadres can see, enough to g10、et a high standard; around the party discipline, disciplinary ruler requirements, listed as negative list, focusing on vertical gauge, draw the party organizations and Party members do not touch the bottom line . Here, the main from four square face two party rules of interpretation: the first part 11、introduces two party Revised regulations the necessity and the revision process; the second part is the interpretation of the two fundamental principles of the revision of laws and regulations in the party; the third part introduces two party regulations modified the main changes and needs to grasp 12、several key problems; the fourth part on how to grasp the implementation of the two regulations of the party. and revised the necessity and revised history of the CPC Central Committee the amendment to the Chinese Communist Party members and leading cadres honest politics several guidelines and colu13、mn 1 by 2015 to strengthen party laws and regulations focus. Two party regulations revision work lasted a Years, pooling the wisdom of the whole party, ideological consensus, draw historical experience, respect for the wisdom of our predecessors, which reflects the unity of inheritance and innovatio14、n; follow the correct direction, grasp the limited goals, adhere to the partys leadership, to solve the masses of the people reflect a focus on the problem. The new revision of the and , reflects the partys 18 and the eighth session of the third, the spirit of the fourth plenary session, reflecting 15、the experience of studying and implementing the General Secretary Xi Jinping series of important speech, reflects the partys eighteen years comprehensive strictly practice. (a) revised two regulations of the party need of in based on revised, the promulgation and implementation of January 2010, to s16、trengthen the construction of the contingent of leading cadres play an important role. But with the party to manage the party strictly administering the deepening, has not been able to fully meet the actual needs. Content is too complicated, eight prohibition, 52 are not allowed to hard to remember,17、 and also difficult to put into practice; the second is concisely positive advocated by the lack of prohibited provisions excessive, no autonomy requirements; the third is banned terms and discipline law, both with the party discipline, disciplinary regulations repeat and Criminal law and other laws18、 and regulations repeat; the fourth is to clean the theme is not prominent, not for the existing problems, and is narrow, only needle of county-level leading cadres above. is in 1997 based on revision, in December 2003 the promulgation and implementation, to strengthen the construction of the party 19、play very important role. Along with the development of the situation, which many provisions have been unable to fully meet the comprehensive strictly administering the practice needs. One is Ji law, more than half of the provisions and criminal law and other countries laws and regulations Repetitio20、n; two is the political discipline regulations is not prominent, not specific, for violation of the party constitution, damage the authority of Party Constitution of misconduct lack necessary and serious responsibility to pursue; third is the main discipline for the leading cadres, does not cover al21、l Party members. Based on the above situation, need to and the two is likely to be more relevant regulations first amendment. By revising, really put the authority of Party discipline, the seriousness in the party tree and call up the majority of Party members and cadres of the party constitution of22、 party compasses party consciousness. (II) two party regulations revision process the Central Committee of the Communist Party of China attaches great importance to two regulations revision . Xi Jinping, general books recorded in the Fifth Plenary Session of the eighth session of the Central Commiss23、ion for Discipline Inspection, on the revised regulations made clear instructions. According to the central deployment, the Central Commission for Discipline Inspection from 2014 under six months begin study two regulations revision. The Standing Committee of the Central Commission for Discipline In24、spection 4 review revised. Comrade Wang Qishan 14 times held a special meeting to study two regulations revision, amendment clarifies the direction, major issues of principle, path and target, respectively held a forum will listen to part of the province (area) secretary of the Party committee, Secr25、etary of the Discipline Inspection Commission, part of the central ministries and state organs Department The first party committee is mainly responsible for people, views of experts and scholars and grassroots party organizations and Party members. Approved by the Central Committee of the Communist26、 Party of China, on 7 September 2015, the general office of the Central Committee of the Party issued a notice to solicit the provinces (autonomous regions, municipalities) Party, the central ministries and commissions, state ministries and commissions of the Party (party), the General Political Dep27、artment of the military, every 3 people organization of Party of two regulations revision opinion. Central Commission for Discipline Inspection of extensive solicitation of opinions, careful study, attracting, formed a revised sent reviewers. In October 8 and October 12, Central Committee Political 28、Bureau Standing Committee and the Political Bureau of the Central Committee After consideration of the two regulations revised draft. On October 18, the Central Committee of the Communist Party of China formally issued two regulations. Can say, two laws amendment concentrated the wisdom of the whole29、 party, embodies the party. Second, and revision of the basic principles of two party regulations revision work and implement the partys eighteen, ten eight plenary, the spirit of the Fourth Plenary Session of the Eleventh Central Committee and General Secretary Xi Jinping important instructions on 30、the revised and , highlighting the ruling party characteristics, serious discipline, the discipline quite in front of the law, based on the current, a long-term, advance as a whole, with Bu Xiuding independent and . Main principle is: first, adhere to the party constitution to follow. The constituti31、on about discipline and self-discipline required specific, awaken the party constitution of party compasses party consciousness, maintaining the authority of the constitution. General Secretary Xi Jinping pointed out that no rules, no side round. Party constitution is the fundamental law, the party 32、must follow the general rules. In early 2015 held the eighth session of the Central Commission for Discipline Inspection Fifth Plenary Session of the 16th Central Committee, Xi Jinping again pointed out that constitution is the party must follow the general rules, but also the general rules. the rev33、ision of the and is Method in adhere to the regulations established for the purpose of combining rule of virtue is to adhere to the party constitution as a fundamental to follow, the constitution authority set up, wake up the party constitution and party rules the sense of discipline, the party cons34、titution about discipline and self-discipline specific requirements. 4 second is to adhere to in accordance with the regulations governing the party and the party. The Party of rule of virtue de, mainly refers to the partys ideals and beliefs, excellent traditional style. The revised the closely lin35、ked to the self-discipline, insisting on the positive initiative, for all members, highlight the vital few, emphasized self-discipline, focusing on the morality, and the majority of Party members and the ideological and moral standards. The revised Ji method separately, Ji, Ji Yan to Method, as a ne36、gative list, emphasizing the heteronomy, focusing on vertical gauge. Is this one high and one low, a positive reaction, the strict party discipline and practice results transformation for the integration of the whole party to observe moral and discipline requirements, for the majority of Party membe37、rs and cadres provides benchmarking and ruler. Third, insist on to. In view of the problems existing in the party at the present stage, the main problems of Party members and cadres in the aspect of self-discipline and abide by the discipline to make clearly defined, especially the partys eighteen y38、ears strict political discipline and political rules, organization and discipline and to implement the central eight provisions of the spirit against the four winds and other requirements into Disciplinary provisions. Not one pace reachs the designated position, focusing on in line with reality, pra39、gmatic and effective. After the revision of major changes, major changes in the and modified and needs to grasp several key problems (a) adhere to according to regulations governing the party and party with morals in combination, for at the present stage, the leadership of the party members and cadr40、es and Party members in existing main problems of self-discipline, put forward principles, requirements and specifications, showing Communists noble moral pursuit, reflected at all times and in all over the world ethics from high from low 5 common requirements. One is closely linked to the self-disc41、ipline, removal and no direct relation to the provisions of . the second is adhere to a positive advocate, eight prohibition 52 are not allowed to about the content of the negative list moved into synchronization amendment . Three is for all the party members, will apply object from the leadership o42、f the party members and cadres to expand to all Party members, fully embodies the comprehensive strictly required. The fourth is prominent key minority, seize the leadership of the party members and cadres is the key, and put forward higher requirements than the ordinary Party members. Five is to si43、mplify, and strive to achieve concise, easy to understand, easy to remember. The revised is the ruling Party since the first insists on a positive advocate forAll Party members and the self-discipline norms, moral declaration issued to all members of the party and the National Peoples solemn commitm44、ent. criterion of a clean and honest administration consists of 4 parts, 18, more than 3600 words. After the revision of the , a total of eight, 281 words, including lead, specification and Party member cadre clean fingered self-discipline norms, etc. Part 3 members low-cost clean and self-disciplin45、e, the main contents can be summarized as four must eight code. Lead part, reiterated on ideal and faith, fundamental purpose, the fine traditions and work style, noble sentiments, such as four must the principle of requirements, strong tone of self-discipline, The higher request for 6 and supervise46、d tenet, the foothold in permanent Bao the partys advanced nature and purity, to reflect the revised standards requirements. Members of self-discipline norms around the party members how to correctly treat and deal with the public and private, cheap and rot thrifty and extravagance bitter music, put47、 forward the four norms. Party leader cadre clean fingered self-discipline norms for the leadership of the party members and cadres of the vital few, around the clean politics, from civil servant of the color, the exercise of power, moral integrity, a good family tradition and other aspects of the l48、eadership of the party members and cadres of the four norms to fully adapt to the strictly requirements, reflects the according to the regulations governing the law of recognition of deepening, the realization of the discipline construction and Jin Ju. is party a ruler, members of the basic line and49、 follow. And the majority of Party members and cadres of Party organizations at all levels should adhere to the bottom line of thinking, fear discipline, hold the bottom line, as a preventive measure, to keep the partys advanced nature and purity. 1, respect for the constitution, refinement and disc50、ipline. Revised from comprehensive comb physical constitution began, the party constitution and other regulations of the Party of Party organizations and Party discipline requirements refinement, clearly defined in violation of the party constitution will be in accordance with regulations to give th51、e corresponding disciplinary action. The original 10 categories of misconduct, integration specification for political discipline, discipline, honesty and discipline masses Ji Law and discipline and discipline and other six categories, the content of real return to Party discipline, for the majority52、 of Party members and listed a negative list. 7 2, highlighting the political discipline and political rules. Regulations according to the stage of the discipline of outstanding performance, emphasizing political discipline and political rules, organization and discipline, in opposition to the party53、s leadership and the partys basic theory, basic line, basic program and basic experience, the basic requirement of behavior made prescribed punishment, increase the cliques, against the organization such as violation of the provisions, to ensure that the central government decrees and the Party of c54、entralized and unified. 3, adhere to strict discipline in the law and discipline In front, Ji separated. Revised adhere to the problem oriented, do Ji separated. Any national law existing content, will not repeat the provisions, the total removal of 79 and criminal law, repeat the content of the pub55、lic security management punishment law, and other laws and regulations. In the general reiterated that party organizations and Party members must conscientiously accept the partys discipline, die van comply with national laws and regulations; at the same time, to investigate violations of Party memb56、ers and even criminal behavior of Party discipline and responsibility, Regulations distinguish five different conditions, with special provisions were made provisions, so as to realize the connection of Party discipline and state law. 4, reflect Wind building and anti-corruption struggle of the late57、st achievements. the partys eighteen years implement the spirit of the central provisions of the eight, against the requirements of the four winds and transformation for disciplinary provisions, reflecting the style construction is always on the road, not a gust of wind. In the fight against corrupt58、ion out of new problems, increase the trading rights, the use of authority relatives profit and other disciplinary terms. Prominent discipline of the masses, the new against the interests of the masses and ignore the demands of the masses and other disciplinary terms and make provisions of the dispo59、sition and the destruction of the partys close ties with the masses. Discipline to protect the partys purpose. 8 of these regulations, a total of three series, Chapter 15, 178, more than 24000 words, after the revision of the regulations a total of 3 series, Chapter 11, 133, 17000 words, divided int60、o general and special provisions and Supplementary Provisions Part 3. Among them, add, delete, modify the provisions of the proportion of up to nearly 90%. 1, the general general is divided into five chapters. The first chapter to the regulations of the guiding ideology, principles and scope of appl61、ication of the provisions, highlight the strengthening of the party constitution consciousness, maintenance the authority of Party Constitution, increase the party organizations and Party members must abide by the party constitution, Yan Centralized centralized, would examine at all levels of the am62、ended provisions implementing and maintaining Party discipline, and consciously accept the party discipline, exemplary compliance with national laws and regulations. The second chapter of discipline concept, disciplinary action types and effects of the regulations, will be a serious warning from the63、 original a year for a year and a half; increase the Party Congress representative, by leaving the party above (including leave probation) punishment, the party organization should be terminated its representative qualification provisions. The third chapter of the disciplinary rules of use prescribe64、d in the discipline rectifying process, non convergence, not close hand classified as severely or heavier punishment. Discipline straighten At least eighteen years of five years, these five years is to pay close attention to the provisions of the central eight implementation and anti - four winds . 65、The fourth chapter on suspicion of illegal party disciplinary distinguish five different conditions, with special provisions were made provisions, to achieve effective convergence of Party and country 9 method. the provisions of Article 27, Party organizations in the disciplinary review found that p66、arty members have committed embezzlement, bribery, dereliction of duty dereliction of duty and other criminal law act is suspected of committing a crime shall give cancel party posts, probation or expelled from the party. The second is Article 28 the provisions of Party organizations in the discipli67、nary review But found that party members are stipulated in the criminal law, although not involved in a crime shall be investigated for Party discipline and responsibility should be depending on the specific circumstances shall be given a warning until expelled punishment. This situation and a diffe68、rence is that the former regulation behavior has been suspected of a crime, the feeling is quite strict, and the latter for the behavior not involving crime, only the objective performance of the provisions of the criminal code of behavior, but the plot is a crime to slightly. the 29 provisions, Par69、ty organizations in the discipline review found that party members and other illegal behavior, affect the partys image, the damage to the party, the state and the peoples interests, we should depend on the situation Seriousness given disciplinary action. The loss of Party members, seriously damaging70、 the partys image of behavior, should be given expelled from the party. At this article is party member is in violation of the criminal law outside the other illegal acts, such as violates the public security administration punishment law, customs law, financial laws and regulations behavior. The fo71、urth is Article 32 stipulates, minor party members and the circumstances of the crime, the peoples Procuratorate shall make a decision not to initiate a prosecution, or the peoples court shall make a conviction and exempted from criminal punishment shall be given within the party is removed from his72、 post, probation or expelled from the party. Party members and crime, sheets were fined in accordance with For acts; the principal Ordinance amended the provisions of the preceding paragraph. This is the new content, in order to achieve Ji method effective convergence. Five is the thirty third artic73、le 10 of the provisions, the Party member due to an intentional crime is sentenced to criminal law (including probation) sheets or additional deprivation of political rights; due to negligence crime and was sentenced to three years or more (excluding three years) a penalty, shall give expelled punis74、hment. Due to negligence crime is convicted and sentenced to three years (including three years) in prison or be sentenced to public surveillance, detention, shall in general be expelled from the party. For the individual may not be expelled from the party, should control Approval. This is followed 75、and retained the original new ordinance chapter 6 the political discipline column for the six disciplines, that is the main opposition to Party leadership and the opposition of the basic theory, basic line, basic program and basic experience, basic requirements of misconduct made provisions of the d76、isposition, especially the eighteen since the CPC Central Committee put forward the Yan Mingzheng treatment of discipline and political rules requirements and practical achievements transformation for Discipline article, increase the false debate central policies, cliques, against the organization r77、eview, make no discipline of the principle of harmony terms. These are the partys eighteen years in comprehensive strictly Process combined with the practice of rich content. (1) false debate the central policies and undermine the Party of centralized and unified the problem is made in accordance wi78、th the provisions of the party constitution. Constitution in general programme requirements adhere to democratic centralism is one of the requirements of the construction of the party must adhere to the four cardinal. Application of this principle is not only the party the basic organization princip79、le and is also the mass line in party life, it requires that we must fully develop inner-party democracy, respect for the dominant position of Party members, safeguarding the Party member democratic rights, give full play to the enthusiasm and creativity of the party organizations at all levels and 80、Party members, at the same time, also must implement the right concentration, ensure the partys mission 4 Specified in Article 6 to give the appropriate punishment. For did not cause serious consequences, to give criticism and education or the corresponding tissue processing. (2) about the destructi81、on of the partys unity the forty eighth to fifty second article, to damage Partys unity unified and violation of political discipline, punishment situation made explicit provisions. Article 52 of the new in the party get round group, gangs seek private gain, cliques, cultivate private forces or thro82、ugh the exchange of interests, for their own to create momentum and other activities to gain political capital, given a serious warning or withdraw from their party posts disposition; if the circumstances are serious, to give Leave a party to observation or expelled from the party. (3) on against th83、e organization review of the provisions of the constitution, party loyalty honesty is party members must comply with the obligations. Members must obey the organization decision, shall not violate the organization decided encounters by asking questions to find organization, rely on the organization,84、 shall not deceive the organization, against the organization. For example, after the investigation does not take the initiative to explain the situation, but to engage in offensive and defensive alliance, hiding the stolen money is against survey organization, is a violation of the behavior of poli85、tical discipline. Article 24 of the original new regulations increase the Article 57, anti organization review, one of the following acts, given a warning or serious warning; if the circumstances are relatively serious, giving removed from or placed on probation within the party post; if the circums86、tances are serious, give expelled from the party: (a) on supply or forged, destroyed, transfer, conceal evidence; (II) to prevent others expose, providing evidenceMaterial; (III) harboring co personnel; (4) to the organization to provide false information, to hide the fact; (5) the him against the a87、cts of the organization review. add this clause to the Constitution requires more specific, the previous no punishment in accordance with the definite list and put forward clear punishment in accordance with. (4) about organizing or participating in superstitious activities as about engage in activi88、ties of feudal superstition obstruction of social management order violations of Article 164 the provisions, but according to the original only in disrupting production, work, social life order The case to be disciplinary treatment, in other words, alone make the feudal superstition, organize or par89、ticipate in the activities of feudal superstition of, does not constitute a violation. Which is not consistent with the requirements of our partys political party. new regulations in this change is, superstitious activities on the political discipline, increase the Article 58, is the organization of90、 Party members, in superstitious activities included in violation of the negative list of political discipline deserves punishment, which and Party members should adhere to the correct political principle, political standpoint and viewpoint is consistent. 14 the second question about organization an91、d discipline violation behavior of democratic centralism is our The partys fundamental organizational system. Chapter 7 in violation of the behavior of organizational discipline punishment mainly for violation of democratic centralism, contrary to the four obey the discipline behavior for source cla92、ssification rules. Increased not in accordance with the relevant provisions or requirements to the organization for instructions to report on major issues; do not report truthfully report about personal matters; falsify personal archives; hide before joining the party serious mistakes; leading cadre93、s in violation of the relevant provisions of the organization, will participate in the spontaneous formation of the old Xiang, Alumni Association, comrades in arms; to obtain illegal country residence abroad or foreign nationality, illegal for private frontier Documents such as discipline terms. (1)94、 on the report truthfully report personal matters in 2010 the Central Committee of the Communist Party of China office, office of the State Council introduced , is clear about the request, deputy division level and above leading cadres should truthfully report changes in my marriage and spouse, chil95、dren, moved to the country (territory), practitioners, income, real estate, investment and other matters, for failing to report, do not report, concealed and unreported, according to the seriousness of the case, giving criticism and education, and to make a correction within a time limit, shall be o96、rdered to make a check, the commandment Jiemian conversation, informed criticism or jobs, free Post processing, constitute violations, in accordance with the relevant provisions shall be given a disciplinary sanction. But since the original and there is no corresponding specific terms, the violation97、 of the regulations, do not report, as a false report about personal matters, there is no corresponding disciplinary action terms, in practice it is difficult to operate. In this regard, in order to solve is not reported, as a false report about personal matters 15 asked censure, the new add the Art98、icle 67 of violation of personal matters related to reporting requirements, report truthfully report the clear punishment basis, making this kind of violation behavior is no longer free drilling for Exhibition on matters of personal checks to verify and supervision of cadres, discipline review provi99、des a powerful discipline guarantee. (2) about the illegal organization, to fellow, alumni, friends of the war will , leading cadres of the party in violation of relevant provisions of the organization, will participate in the spontaneous formation of fellow, Alumni Association, comrade in arms to g100、ive the punishment according to the seriousness of the case. Here special needs note is three points: this provision for only the leading cadres , reflecting the high requirements of leading cadres; second violation in 2002, the Central Commission for Discipline Inspection, the central Organization 101、Department and the The relevant provisions of the General Political Department jointly issued the . That is to say, to the spontaneous formation of fellow, Alumni Association, comrades in arms will constitute the premise of discipline is a violation of the provisions of this. The notification specif102、ied, leading cadres are not allowed to participate in the spontaneous incorporation of fellow, alumni, between comrades association would like the organization and shall not bear the sororityHuman and the organizer shall not hold the corresponding position in the sorority; shall not borrow machine w103、oven network and engage in kiss sparsely, round and round the gangs, but not align Jieyi Gold Orchid behavior. The third is to emphasize here that shall be organized to participate in the initiative to set up the villager, Alumni Association, comrades in arms. The so-called 16 spontaneous was establ104、ished mainly means without registration. Therefore, Party members include leading cadres in the normal range of fellow, alumni, comrades in the party is not a violation of the rules of Party discipline. The three problem about integrity violations discipline Lian Jie discipline has been eighteen yea105、rs clean government and anti The focus of the work of corruption. This Ordinance to amend, honesty and discipline this biggest adjustment, the new content, most of which prescribed by the original 8 ban and 52 are not allowed into the basic this part. (1) the central eight provisions of the spirit a106、nd requirements into in the regulations of the partys eighteen years, central resolutely implement the provisions of the eight and pay close attention to the node and intensive briefing, on public funds, private bus, public funds tourism, gifts of public funds, the big parade and lavish weddings and107、 festive, illegal payment allowances and subsidies, illegal construction of buildings such as the original masses reflects the relatively strong, four winds problem of the Resolute rectification. But original to eat and drink, super standard reception and no clear and specific expression, new will i108、mplement eight Central provisions of the spirit of the problem increased to clean cheap self-discipline chapter, clear to exceed the standard, beyond the scope of the reception or borrow machine eating and drinking etc. some in violation of the provisions of the spirit of the eight central relevant 109、persons responsible for punishment, once the violation will be according to the severely punished, binding, enhanced significantly. One is to add Article 87, about to obtain illegal, hold, and the actual use of the sports card, golf ball cards and other consumer card. Illegal access to private clubs110、 made the punishment provisions. The second is increase the Article 97, has made provisions of the disposition of illegal self pay or 17 spamming allowances, subsidies and bonuses. The third is added to the Article 99, on violation of super standard, beyond the scope of the reception or borrow machi111、ne eat and drink to make the provisions of punishment. The fourth is to increase the Article 101, on the management of conference activities in violation of the provisions made sanctions regulations. The fifth is the increased Article 102, for violation of office space management provisions made the112、 punishment provisions. Six is to split the original Article 78, formed article 98, Article 100 of public Models of tourism, violate the provisions on the administration of the use of discipline of the bus through the list of made a more detailed provisions, apply more operational. Seven is increase113、d the article 96, in violation of the relevant provisions of the, to participate in public funds to pay for dinner, high consumption of entertainment, fitness activities and public funds to buy gift, send gifts to make the provisions of the disposition. On the violation of the central provisions of 114、the spirit of the eight, in addition to new regulations into violation of honesty and self-discipline misconduct outside, is different with the original , revised clearly defined not only to disposition of the directly responsible persons, but also dispose of collar Guide responsibilities. (2) incre115、ased trading rights, use of authority or position influence as relatives and close to profit violation of the terms of the absorption the relevant provisions spirit, increase the negative list, including trading rights, the functions and powers or duties of influence as relatives and staff around pr116、ofit. Increase Article 81 mutual use of office or authority ring for each other and their spouses, children and their spouses and other relatives, around 18 personnel and other specific relationship between the people to seek benefits engage in trading rights, given a warning or serious warning Sanc117、tions; if the circumstances are relatively serious, giving removed from or placed on probation within the party post; if the circumstances are serious, shall be expelled from the party. Increase Article 82 connivance, acquiescence to the spouse, children and spouse etc. relatives and staff around th118、e effect of Party members and cadres personal authority or position for personal gain, if the circumstances are relatively minor, given a warning or a serious warning; if the circumstances are relatively serious, giving removed from or placed on probation within the party post; if the circumstances 119、are serious, the givenExpelled from the party. Party members and cadres of the spouses, children and their spouses does the actual work and get salary or although the actual work but to receive significantly beyond the same rank salary standard, Party members and cadres informed fails to correct, in120、 accordance with the provisions of the preceding paragraph. (3) about the gifts, gifts misconduct from handling practices in recent years, engaged in official cadres received gifts, gifts problems more prominent. This has seriously affected the image of Party members and cadres, damaged the relation121、s between the party and the masses, and is a hotbed of corruption, is really necessary for this kind of behavior to be disciplined. no on accepting gifts, gifts, Card consumption behavior to engage in simple one size fits all, but the difference between the different separately. One is in accordance122、 with the provisions of Article 83, accepting may affect the impartial enforcement of the official gifts, gifts, consumer cards to depending on the seriousness of the case shall be given disciplinary sanctions. That is to say, for may affect the fair execution of business gifts, gifts, consumer card123、s are not allowed to accept. 19 is in accordance with the provisions of Article 83, accepting was significantly higher than normal ceremony is still exchanges of gifts, gifts, consumer card to disciplinary action. This is new regulations that daily life is purely reciprocity, accepting the same thin124、g, boys , fellow friends gifts, gifts, shopping cards, although and fair execution of business has nothing to do, also want to as the case shall be dealt with, the situation is obviously beyond normal reciprocity . The so-called reciprocity , one is emphasizes the reciprocal in protocol. In other wo125、rds is you to me how, I to you how, not only does not go. The second is to significantly exceeded the normal local economy level, customs and habits, economic capacity of individual gifts, gift value. Specific sanctions to according to the processing of a variety of factors to consider, as appropria126、te. The third is the root according to the provisions of Article 84, to Engaged in public service personnel and their spouses and children, childrens spouses and other relatives and other specific relationship presented Ming Xianchao normal reciprocity of gifts, gifts, consumer card, if the circumst127、ances are relatively serious, given a warning until probation. In accordance with the above provisions, gift giving significantly beyond the normal reciprocity, giver constitute the discipline. (4) on illegal trading of stocks or of other regulations of securities investment Article 88 is engaged in128、 punishment regulation of camp and activity in violation of the relevant provisions on. Among them, 3 will buying and selling stocks or in other securities investment column as one of disciplinary cases Out. First need to be clear, . According to the provisions of Article 3, use of work time, office129、 facilities, the sale of stocks and securities investment fund belongs to illegal behavior. The fourth question, about the violation of the masses of the disciplinary actions would violate public discipline behavior of a single set of a class of restored three rules of discipline and eight note in t130、he discipline of the masses of excellent traditional. Chapter 9 to violate the masses of disciplinary action, mainly the destruction of the partys close ties with the masses of misconduct made provisions on disciplinary; enrich and perfect the super standard, beyond the scope of Xiang Qun All to rai131、se fund and labor, in for involving the public affairs deliberately, chinakayao, in social security, policy support, disaster relief funds and materials and other matters assigned any kind and affectionate friends, obviously unfair acts against the interests of the masses of the disciplinary terms; 132、increase the terms not in accordance with the provisions of the public party provided, government, factory and village (neighborhood) provided etc. violation of the peoples right to know the behavior of the discipline. The fifth issue, on the violation of work discipline violation of work discipline133、 added negative list, including Party organizations carry out strictlyMain responsibility for poor discipline terms. (1) the new party organization comprehensive strictly the main responsibility of the party does not fulfill the 21 or perform poor disciplinary terms has a lead people to pay attentio134、n to the new terms, that is, in chapter ten on the violation of work discipline behavior punishment increase in the one hundred and fourteenth party fail to perform comprehensive strictly the main responsibility of the party or to perform comprehensive strictly the main responsibility for administer135、ing the ineffective, resulting in serious damage or serious adverse effects, to the person directly responsible and the responsibility of leadership and give a warning or serious warning. The situation is serious, giving removed from their party posts or on probation Punishment. Here the changes. Fo136、r the first time, the main responsibility write . (2) new shall report does not report or false reporting discipline shall increase the 117 bar in the higher level units to check to inspect the work or report to the parent unit, work report of shall report the matters do not report or do not report,137、 cause serious damage or serious adverse effects of, to the person directly responsible and the responsibility of leadership, to give warning or a serious warning; if the circumstances are serious, giving removed from their party posts or placed on probation. For example, during the tour visits to t138、he region, the unit Members the obligation to the inspection teams to reflect the true situation, to conceal not reported or intentionally to the inspection teams to provide false information, causing serious damage or serious adverse effects of, the person directly responsible and the responsibilit139、y of leadership should be in accordance with the provisions of Article 117 to give the appropriate punishment. (3) the new not granted in accordance with the provisions of punishment, not according to the provisions of the implementation of disciplinary measures 22 violation of the provisions of Art140、icle 115 Party organizations have one of the following circumstances, the direct leadership responsibility. Probation: members were sentenced punished, in accordance with the provisions give disciplinary action or in violation of state law Rules of behavior should be given disciplinary punishment an141、d dispose of; disciplinary punishment by decision or complaint review the decision made, not in accordance with the provisions of the implementation decisions on punishment of the party, position, rank, and the treatment of the matters; Party members subject to disciplinary action, not in accordance142、 with the cadre management authority and organizational relationships of by dispose of Party members to carry out education and supervision of daily management. What needs to be pointed out is, cliff demoted with cars, housing, secretary problem, implementation is not a discipline and party posts an143、d ranks treatment by the organization department is responsible for the implementation, with cars, housing by the logistics department is responsible for the implementation of, Ji Commission responsible oversight responsibilities. The six questions, about the acts violating the discipline of life in144、 violation of discipline of life behavior punishment, mainly to four winds problems and a serious violation of social morality, family virtue acts of misconduct made provisions on disciplinary, an increase of extravagant life, contrary to the social public order and good customs disciplinary terms. 145、Worth mentioning is, Regulations in Article 150 about adultery mistress (Cardiff) formulation in the new is removed, to expand the scope of Article 127 provisions and others hair improper sexual relations, let face disciplinary action Wider more strict. Four, and earnestly do a good job in the and i146、mplement system of life lies in execution. and is 23 Party organizations at all levels of a strong constraint and all Party members follow. Learning and implementing the and is party committees (party), commission for discipline, discipline inspection group), the majority of Party members and cadres147、 of the common responsibility, must party caught together, the party one execution. () Party committees (party) and play and implement comprehensive strictly the main responsibility, pays special attention to the two party regulations learning cross penetration. One is to Adhere to the party constit148、ution is fundamental to follow, and resolutely safeguard the authority of the Party Chapter. The second is to adhere to the problem oriented, to strictly political discipline and political rule moments in the first place. The third is to adhere to the discipline and rules quite in front must not all149、ow the bottom line to break the discipline. The fourth is to seriously organize the study of propaganda and education, in the city party members to create a disciplined, about the rules of the strong atmosphere. (II) Commission for Discipline Inspection at all levels (Discipline Inspection Group) to150、 an important basis for the revised two party regulations as, adhere to easily blame, strengthen supervision and enforcementAnd early method in combining Ji, increase accountability efforts. One is to two regulations within the party important basis, adhere to the party constitution duties, with str151、ict discipline to maintain the constitution authority. The second is to adhere to high standards and keep the bottom line, adhere to Ji Yan in law and discipline, the discipline and rules quite in front, grasping grasping small, easily blame, comprehensive use of supervision and discipline of four k152、inds of form in the discipline embodies the strict requirements and care for the discipline, tighten up, Yan. According to discipline in accordance with regulations to carry out disciplinary review. Increase the violations punishment, clues can initiate an investigation on the trial of cases Accordi153、ng to the discipline on the provisions of the proportion of processing and control manager maintains discipline. To focus on investigating non convergence, dont accept hand serious disciplinary violations at the same time, pay more attention to the general review of discipline 24 behavior, and gradu154、ally increase the lighter punishment. Four is to illuminate two party regulations, combined with the local district of the Department of party conduct Lianzheng to relevant laws and regulations system clean, timely research proposes to establish, change, waste release opinion, avoid conflict, and th155、e fasten system of cage, and gradually formed not rot, not rot, not want to rot system and working mechanism. (3) the leadership of the party members and cadres should play an exemplary role. The rate of higher consciousness of the front of the Ordinance to lead practice self-discipline norms, leadi156、ng to maintain discipline of seriousness and authority. One is the above rate, demonstration and guidance, take the lead in learning and mastering the and the requirements and regulations, do the deep understanding, learning to use. The second is to play an exemplary role in abiding by discipline ra157、te, take the lead in practicing self-discipline norms, firmly establish before the discipline are equal, the system has no privilege, discipline is no exception, and consciously do standards, require more strict measures more practical. Third is to consciously accept supervision, conscientiously par158、ticipate in the democratic life and debriefing honesty responsibility, such as Real to the party organization to report personal matters, and to accept the supervision of the work and life of the normal, habits under the supervision of the exercise of power, to carry out the work. The fourth is to s159、et an example for the strict enforcement of discipline. Leading cadres should take the lead in the maintenance of discipline of seriousness and authority, to dare to seriously, dare to struggle, dare to offend people, for misconduct not laissez faire, but do not indulge, not tolerate to ensure the p160、arty constitution of party compasses party put in place. (4) the majority of Party members and cadres to set high standards and hold the bottom line, consciously abide by the and . One is to control the and , tight Close connection with their own thoughts, practical work and life, efforts to solve t161、he problems, to enhance the study and implement of the effectiveness and pertinence. The second is to establish a high standard and hold the bottom line, consciously in the self-discipline pursuit of high standards, strictly in the party away from the red line discipline, discipline, about the rules162、 and know fear, distrust, the formation of the honor system, comply with the system, safeguard system of good habits.Regulations and discipline regulations of and is the Party Central Committee in the new situation to promote the comprehensive strictly root of the lift, the regulations of the party 163、construction of keeping pace with the times. We should study and implement the Standards and as the primary political task, adhere to the party constitution duties, adhere to the discipline of, Ji Yan in law, the full implementation of supervision and discipline accountability responsibilities for c164、oordination and promotion four overall strategic layout in XX District vivid practice to provide a strong guarantee. - Si Jian Wu, and effectively enhance the implementation of the implementation of the The consciousness of General Secretary Xi pointed out that the party is in charge of the party, t165、o manage the party; strictly, it can cure good party. Criterion and keep pace with the times is our party to form a new potential strictly rules, to deepen understanding of the ruling law, is a comprehensive strictly, and strengthen the supervision within the party important grasper. Criterion close166、ly linked to the theme of self-discipline, self-discipline intensity-modulated, focusing on morality, for the majority of Party members and cadres set to see, feel the high standard, show the Communists noble moral sentiment;District Ordinance the constitution of discipline integration into a politi167、cal discipline, organization and discipline, honesty and discipline, discipline of the masses, work discipline, discipline, emphasize discipline, focusing on established rules, to draw the party organizations and Party members do not touch the bottom line. Party committees (party) to effectively str168、engthen the study and publicize the implementation of the and the organization and leadership of criterion and a full range, multi angle, deep publicity, the formation of study and publicize and implement the boom, in order to consolidate the development of good political environment to create a pos169、itive environment and atmosphere. The majority of Party members and cadres to strict requirements, the and as a guide to action and behavior criterion, adhere to the moral standards and discipline of the bottom line, to maintain the discipline of worship and awe, learning, compliance, and maintain p170、arty discipline and rules of the model. The discipline inspection and supervision organs and cadres to the and as the deepening of the three, and strengthen supervision and discipline of accountability is important to follow correctly grasp the use of supervision and discipline of four types, promot171、e the comprehensive strictly in new roots. Strict discipline, adhere to the discipline and rules quite in front of the enterprise in the implementation of expensive to implement to execute. The discipline inspection and supervision organs to implement the and as an opportunity, adhere to the party s172、hould manage the party strictly, serious performance of their duties to promote two regulations implementation. Change discipline concept. From the simple investigation of illegal to a comprehensive stare at violate discipline; from the business case to prosecute the big cases and timely solve the s173、igns of tilt to. From the orientation to the normal supervision; from the tube minority to resist the most. Guide Party members and cadres to seriously implement the and , consciously abide by the political, organizational, honest people, work, life six discipline. Urge the leadership cadres sent to174、 play an exemplary role, take the lead in strictly enforced. Relaxation and rest Strong wind is Su Ji, closely linked to the four winds prone to multiple, the masses reflect the strong important nodes and, glued to the four winds new form, new trends, seriously investigate and deal with violations o175、f the central eight provisions of the spirit, to increase the bulletin exposure intensity, the formation of Chajiu four winds loudly, continue to release and discipline must be strict signal. At the same time, extended supervision tentacles, through the development of the rural and fishery party con176、duct Lianzheng construction inspection, issued in a timely manner, Chajiu occurred in grassroots side of corruption and unhealthy, and earnestly safeguard the interests of the masses and social stability. The creativity and discipline. Grasp and make good use of the supervision and discipline of fou177、r types , to ensure the Promoting clues to lots of discipline and the law of the vacuum tube, strict together. Not only to the less and very few thorough investigation severely punished, but also the most to maintain zero tolerance trend through layers of conductive pressure, let the discipline abou178、t the rules for each party members and cadres consciously follow. At present, it is necessary to implement the list management, strictly follow the clues to the disposal of five standards, make the classification of disposal, dynamic cleanup. Zadok Party committees at all levels to implement the mai179、n responsibility, comprehensive use of disciplinary action and tissue processing and other means to effectively curb the commonplace, used to see do not blame the small problem, not because of practice and exception. Prominent Discipline characteristics, the problems of violation of discipline and r180、ules into the focus of supervision and discipline and disciplinary review. At the same time, increase case double check the intensity, the serious problems of discipline violations or four winds ban but not absolutely, not only to be held directly responsible, but also held leadership responsibility181、; not only to pursue studies the main responsibility of the Party committee, and to pursue Commission for Discipline Inspection and supervision responsibilities and promote accountability to become the new norm. The implementation of supervisory responsibility. Maintain and the seriousness and autho182、rity of the discipline and rules and truly become the partys ruler. Discipline as supervision within the party the specialized agency, we must strengthen the responsibility to act, adhere to the Impartial discipline accountability, earnestly will be strict discipline, discipline must be punished, and severely punish the acts in violation of rules and regulations.
会员尊享权益 会员尊享权益 会员尊享权益
500万份文档
500万份文档 免费下载
10万资源包
10万资源包 一键下载
4万份资料
4万份资料 打包下载
24小时客服
24小时客服 会员专属
开通 VIP
升级会员
  • 周热门排行

  • 月热门排行

  • 季热门排行

  1. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  2. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  3. 动火作业安全告知卡(1页).docx
  4. 高处作业安全告知卡(1页).docx
  5. 道路改造工程围墙宣传栏改造各类雕塑等土建施工方案53页.doc
  6. 广场工程建设项目施工招标评标报告表格(24页).pdf
  7. 原油码头消防工程维保方案(39页).docx
  8. 2020柏向堂房地产公司材料标准化手册3.0(143页).pdf
  9. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  10. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  11. 住宅小区工程施工方案【234页】.docx
  12. 屋面圆弧形穹顶结构高支模施工方案(40米)(47页).doc
  13. 埋石混凝土挡土墙施工方案(23页).doc
  14. 结构加固专项施工方案(28页).doc
  15. 土方开挖及地下室施工方案(21页).doc
  16. 家园工程项目雨季及防台防汛施工方案(29页).doc
  17. 重庆市五小水利工程建设规划报告(64页).doc
  18. 超高纯氦气厂建设项目办公楼、变电站、水泵房及消防水池、门卫、厂房、仓库、配套工程施工组织设计方案(140页).doc
  19. 邛崃市牟礼镇初级中学校学生宿舍建设工程施工组织设计方案(259页).doc
  20. 高层住宅工程施工方案(249页).doc
  21. 园林工程质量通病控制方案及防治措施(27页).doc
  22. 珠海市三灶镇二级生活污水处理厂工程技术标书方案说明书(135页).doc
  1. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  2. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  3. 2024大楼室内精装修工程专业分包投标文件(393页).docx
  4. 苏州水秀天地商业项目购物中心100%室内设计方案(158页).pptx
  5. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  6. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  7. 室内移动式操作平台工程施工方案(19页).doc
  8. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  9. 矿山治理工程施工组织设计方案(240页).docx
  10. 老旧小区改造工程施工方案及技术措施(364页).doc
  11. 化工公司20000吨/年甲醛工程安全评价预评价报告(97页).doc
  12. 建筑工程外脚手架专项施工方案(悬挑式脚手架、落地式脚手架)(25页).doc
  13. 2020柏向堂房地产公司材料标准化手册3.0(143页).pdf
  14. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  15. 川主寺城镇风貌整治景观规划设计方案(60页).pdf
  16. 新疆风电十三间房二期工程49.5mw风电项目可行性研究报告(附表)(239页).pdf
  17. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  18. 埋石混凝土挡土墙施工方案(23页).doc
  19. 地下停车场环氧地坪漆施工方案(45页).doc
  20. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  21. 住宅定价策略及价格表制定培训课件.ppt
  22. 2010-2030年湖北咸宁市城市总体规划(32页).doc
  1. 建筑工程夜间施工专项施工方案(18页).doc
  2. 赣州无动力亲子乐园景观设计方案(111页).pdf
  3. 2016泰安乡村旅游规划建设示范案例(165页).pdf
  4. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  5. 龙山县里耶文化生态景区里耶古城片区旅游修建性详细规划2015奇创.pdf
  6. 连云港市土地利用总体规划2006-2020年调整方案文本图集(78页).pdf
  7. 850亩项目塑钢门窗工程施工组织设计方案(34页).doc
  8. 老旧小区改造工程施工方案及技术措施(364页).doc
  9. 城市更新项目地价公式测算表.xlsx
  10. 房地产项目规划前期投资收益测算模板带公式.xls
  11. 存储器基地项目及配套设施建筑工程临时用水施工方案(40页).docx
  12. 铁路客运枢纽项目站前框构中桥工程路基注浆加固专项施工方案(19页).doc
  13. 室内移动式操作平台工程施工方案(19页).doc
  14. 装配式结构工业厂房基础、主体结构、门窗及装饰工程施工方案(83页).doc
  15. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  16. 施工工程安全教育培训技术交底(13页).doc
  17. 老旧小区改造施工方案及技术措施(365页).doc
  18. 新建贵广铁路线下工程沉降变形观测及评估监理实施细则(126页).doc
  19. 消防火灾应急疏散演练预案(12页).doc
  20. 矿山治理工程施工组织设计方案(240页).docx
  21. 崖城站悬臂式挡墙施工方案(92页).doc
  22. 北京科技园公寓建设项目整体报告方案.ppt