融创奥城广场景观改造方案(23页).pptx
下载文档
上传人:偷****
编号:592039
2022-09-22
23页
17.71MB
1、融创奥城景观改造方案 目录T A B L E O F C O N T E NT S01 Site Analysis基地分析04 C4-C5 PlazaC4-C5广场03 C6-C7 PlazaC6-C7广场02 New Plaza新广场05 Other Images参考资料图片01设计范围Design Range2014 SUNAC AoCheng Landscape Renovation2014融创奥城景观改造方案 01Site AnalysisAo Cheng Master Plan奥城彩色总平面图2014 SUNAC AoCheng Landscape Renovation2014融创奥2、城景观改造方案 01Site AnalysisPlazas:Aerial Views广场:鸟瞰The New Plaza is a blank canvas for design.The LED screen at the plaza end(which feels too small for the space)inspires ideas of casual stadium seating for movie viewings,but the plazas comparatively narrow width and long span present a challenge in tha3、t regard.Not wanting to limit sight-lines for the surrounding retail,landscape designs in this plaza should be low or suspended from above,and maintaining a primarily open space is likely the best option for use as a multi-purpose outdoor entertainment area.新广场像是在一个空白的画布上进行设计。在广场一端的LED屏幕(感觉在这个空间中太小)4、激发的休闲体育场座位收看电影的想法,但广场上的相对较窄的宽度和跨度向设计提出了挑战,在这方面。不想限制周围商铺的观光线,在这个广场的景观设计应该是低矮下去或是悬挂在上面,并保持了主要的开放空间是可能用作多用途户外娱乐区的最佳选择。The C6-C7 Plaza is the most well-designed of the 3;the space is currently successful,with a good balance of green-and hardscapes and a park-like atmosphere.The water feature is a favori5、te for children and families,and people often climb onto the horse sculpture for pictures.Additional plants and trees,as well as some interactive shading device,could create more“staying power”in this location.的C6-C7广场是3个广场中最精心设计的;空间是目前成功的,很好地平衡了绿色植物跟硬质铺地的关系并拥有了一个公园般的氛围。水系和喷泉最受到孩子跟家庭的喜爱,人们通常会爬上马雕塑拍照6、片。其他植物和树木,以及一些互动的遮阳设备,可以在这个位置创造更多“驻足动力”。The C4-C5 Plaza landscape is not lively,and the integrated planter-benches need some maintenance.The trees are lovely.Because this plaza is the least important to this project,we recommend adding more plants and trees,as well as a sculpture in the center of th7、e plaza.在C4-C5广场景观不够活泼,与植物景观一起的长椅需要维护。这些树是可爱的。因为这个广场对这个项目是最重要的,所以我们建议增加更多的植物和树木,以及在广场中心的雕塑。123332102新广场New Plaza02New Plaza2014 SUNAC AoCheng Landscape Renovation2014融创奥城景观改造方案 Option 01方案一Add trees,assorted green and flowering plants,decorative lighting,and seating to the central corridor of the pl8、aza space,with lights strung overhead to create additional drama at night.添加树木,各种绿色和开花植物,装饰照明和座椅到广场空间的中央走廊,串起的灯带挂上空在夜晚创造出更多氛围02New Plaza2014 SUNAC AoCheng Landscape Renovation2014融创奥城景观改造方案 Option 02方案二Add a fountain or sculpture element to the center of the plaza,leaving the rest of the space open 9、to maximize usage options.在广场中心添加一个喷泉或雕塑元素,留给广场的其他功能更多的空间02New Plaza2014 SUNAC AoCheng Landscape Renovation2014融创奥城景观改造方案 Option 03方案三Add an architectural trellis to the center of the plaza,leaving the rest of the space open to maximize usage options.添加一个框架景观建筑,留给广场的其他功能更多的空间。03C6-C7广场C6-C7 Plaza03C10、6-C7 Plaza2014 SUNAC AoCheng Landscape Renovation2014融创奥城景观改造方案 Option 01方案一Expand the existing successful water feature to include an interactive boat fountain to the north,and add modern pergola shaded seating areas with interspersed signage and greenery in the south area.Leave the northernmost gr11、assy area untouched,as it is often the site of seasonal decorations,such as the annual Christmas tree.扩大现有的成功的水体功能,包括增加一个交互式喷泉船到北部,并添加由标示与绿植点缀的现风格的凉棚荫蔽休息区。留下背面草坪不变,因为它往往是季节性的装饰品,就像一年一度的圣诞树的。112203C6-C7 Plaza2014 SUNAC AoCheng Landscape Renovation2014融创奥城景观改造方案 3Option 02方案二In the northernmost grass 12、area,add small trees and bushes.To the north of the water feature,add a sail boat sculpture with dramatic lighting;during the day children can play around it and at night the lighting will draw people to the plaza.In the grass at the south end of the plaza,add sculptural trellises with adjacent refl13、ecting pools along the southern footpaths.For added drama,the rounded trellises could be up-lit at night.在最北端的草坪面积,增加小乔木和灌木。在水体的北部,添加帆船雕塑与增添氛围的灯光;白天孩子们可以围绕它玩,晚上的灯光会吸引人们到广场。在广场的南端的草地上,沿人行踏步增加棚架的长廊并在旁边伴有倒影池。为了增加广场氛围,圆形棚架可以在夜间开启景观灯2231103C6-C7 Plaza2014 SUNAC AoCheng Landscape Renovation2014融创奥城景观改造方案 14、Option 03方案三The northern green space becomes a sculpture gallery with a slightly rolling landscape.In the southern green space,add a reflecting pool in the center,bounded on the east and west with a heavy wooden trellis system,including plantings and suspended seating.Two diagonal paths(generally in15、 the same location as the current)slice through the landscape,with stepping stones across the path.在北侧的绿色空间将变成一个有轻微起伏地形的雕塑长廊。在南边的绿色空间部分,中心区域加入倒影池,由厚重的木质荫蔽长廊环抱其中,并设休息座位与绿色植物点缀。两条相对应角度的石板铺就的人形路径(通常在同一位置)横穿其中。121204C4-C5广场C4-C5 Plaza04C4-C5 Plaza2014 SUNAC AoCheng Landscape Renovation2014融创奥城景观改造方案 Opt16、ion 01方案一Replace the existing central red stripe with a horizontal striped pattern of planters with trees,bushes,and flowers and benches,with a linear stripe of grass adjacent.The combination of the green and seating areas will rejuvenate this plaza and likely generate more foot traffic for its busi17、nesses.Alternately,add new bench/planters along the middle of the central red stripe,if there is a desire to keep the red stripe intact.替换现有的中央红色条纹地砖为横条纹图案的花池-树木,灌木和鲜花-和长凳,与邻近的草,像上面的参考图像中的直线条纹。绿色和休息区的结合将重振该广场及可能为广场周边的业务带来更多的客流量。Grass 草Grass 草Trees,Flowers,Benches 树木,花草,长凳04C4-C5 Plaza2014 SUNAC AoCh18、eng Landscape Renovation2014融创奥城景观改造方案 Option 02方案二In the center of the plaza,add a seat-height raised platform,with ramps upon which children(and kids at heart)can play,to include grasses,bushes,and trees.The central location will draw people into the plaza,help to identify C4 and C5 building main 19、entrance doors,which currently get lost in the sea of retail entrances,and create an interactive feature in the otherwise blank plaza.在广场的中心位置,添加座椅高度的平台,斜坡可以供给孩子们(或者有童心的人)玩耍,景观中间由括草,灌木和树木绿化。这个位于区域中央位置的景观,有助于强调目前淹没在零售商店中C4和C5建筑主入口大门,将广场由一片空白创造成具有交互性的新区域。04C4-C5 Plaza2014 SUNAC AoCheng Landscape Renov20、ation2014融创奥城景观改造方案 Option 03方案三Add a modern pergola/trellis down the middle of the central red stripe echoing the height of the bridges on either end of the plaza to include integrated seating.In the winter,the stark,modern design will be architecturally stimulating,and in the warm seasons,green an21、d flowering vines will make it a lush and shady respite from the plazas hot sun.添加一个现代化的凉棚/网格下的中央红色条纹砖的中间-呼应桥梁的高度广场的两端 并包括集成的座位。在冬季,鲜明的,现代的设计是一种建筑风格上的新鲜刺激元素,而在温暖的季节,绿色和开花的藤蔓植物将使它从广场的烈日下获得郁郁葱葱的阴凉和休息的机会。05参考资料图片Additional Reference Images05Additional Reference Images2014 SUNAC AoCheng Landscape Renova22、tion2014融创奥城景观改造方案 Boats雕塑船05Additional Reference Images2014 SUNAC AoCheng Landscape Renovation2014融创奥城景观改造方案 Trellis/Pergola/Arbor格子/花架/刀杆05Additional Reference Images2014 SUNAC AoCheng Landscape Renovation2014融创奥城景观改造方案 Landscaping美化05Additional Reference Images2014 SUNAC AoCheng Landscape Renovation2014融创奥城景观改造方案 Seating休息05Additional Reference Images2014 SUNAC AoCheng Landscape Renovation2014融创奥城景观改造方案 Lighting伞灯