建筑工程常用英文词汇(4页).doc
下载文档
上传人:正***
编号:452414
2022-07-15
4页
52.01KB
1、Construction Site 建筑工地Apologize for any inconvenience caused during building operation 对施工期间带来的不便表示歉意。Danger of death. Keep out. 生命危险,严禁入内。Danger,building site, keep out 工地危险,禁止入内。Danger,evacuation 危险,请走开Dangerous structure, this bridge is unsafe 危险结构,该桥不安全。Hot work in progress 正在施工No persons allowe2、d beyond this point 任何人不许越过此处。 Safety footwear.穿安全靴 Safety helmets must be worn on this site 此工地必须戴安全帽。Site entrance, dangerous 工地入口,危险 Slow, site entrance 工地入口请慢行 This button has been moved for remedial work 该按钮已卸下拿去修理。This is just for construction personnel 仅供施工人员使用。This lift is only for construct3、ion personal 此电梯仅供施工人员使用。 This work will be completed by the end of this year. Thank you for your patience during the inevitable disruption 此工程于年底完工,感谢你施工期间的宽容大度。We apologize for any inconvenience caused during this works 对施工期间引起的不便表示歉意。Working overhead 上面在施工 关于建筑的英语词汇to build, to construct 建设,建筑,修建4、architecture 建筑学building 修筑,建筑物house 房子skyscraper 摩天大楼block of flats 公寓楼 (美作:apartment block)monument 纪念碑palace 宫殿temple 庙宇basilica 皇宫,教堂cathedral 大教堂church 教堂tower 塔,塔楼ten-storey office block 十层办公大楼column 柱colonnade 柱列arch 拱town planning 市政 (美作:city planning)building permission 营建许可证,建筑开工许可证greenbe5、lt 绿地elevation 建筑物的三面图plan 设计图scale 比例尺to prefabricate 预制excavation 挖土,掘土foundations 基to lay the foundations 打地基course of bricks 砌好的砖列scaffold 脚手架scaffolding 脚手架工程词汇质量合格证书certification of fitness原材料rawmaterial底板 bottom plate垫层 cushion侧壁 sidewall中心线center line条形基础 strip footing附件 accessories型钢 profil6、e steel钢板 steel plate熔渣 slag飞溅 welding spatter定位焊 tacking引弧 generating of arc熄弧 quenching of arc焊道 welding bead坡口 beveled edges外观检查 visual inspection重皮 doubleskin水平方向弧度 radian in horizontal direction成型 molding直线度 straightness accuracy焊缝角变形 welding line angular distortion水平度 levelness铅垂度 verticality翘7、曲变形 buckling deformation角尺 angle square对接焊缝 butt weld母材 parent metal法兰密封面 flange sealing surface夹层interlayer表面锈蚀浓度 surface corrosion concentration挠曲变 bending deformation超声波探伤 ultrasonic testing/ ultrasonic examination压力容器 pressure vessel预制下料prefabrication baiting排版直径 set-type diameter焊缝 welding line8、中幅板 ? center plate测量方法 measuring method基准点 datum mark跳焊 skip welding允许偏差 allowable variation补强板 stiffening plate开孔 tapping对接接头 banjo fixing butt jointing角钢 angle iron安装基准圆 installation fundamental circle吊装立柱 hoisting upright column焊接钢管 welded steel pipe向心斜拉筋 centripetal canting pull rope带板 band plat9、e槽钢胀圈 channel steel expansion ring环口 collar extension局部变形 local distortion环缝 circumferential weld顶板 top plate拱顶 vault顶板加强肋 stiffening rib对接 butt joint胎具 clamping fixture卷板机 plate bending rolls中心支架 center bearing bracket椭圆度 ovality等分线 bisectrix搭接宽度lap width点焊spot welding搭接焊 overlap welding对称:symmetri10、cally螺旋爬梯cockle stairs放料阀baiting valve液位计 content gauge充水试验 filling water test错边量 unfitness of butt joint底圈 foundation ring真空度检漏 vacuum degree leak test丁字焊缝 tee welding渗透探伤 oil whiting test充水试验 filling water test内侧角焊缝接头 interior angle welding line jointfoundation settlement 基础沉降测量基准点 datum mark稳定性试验11、 stability test排气阀 outlet valve角钢 angle steel构件 component part机械损伤 mechanical damage缩孔 shrinkage cavityenfoldment 折迭碳钢管 carbon steel tube公称直径 nominal diameter预埋件 embedded part轴测图 axonometric drawing布置图arrangement diagram氧乙炔气割 oxyacetylene gas cutting低合金钢管low alloy steel热影响区 heat affected area修磨polis12、h砂轮片grinding wheel等离子plasma panel重皮 coldlap凹凸unevenness缩口necking down端面 head face倾斜偏差 dip deviation外径 external diameter砂轮grinding wheel管件 pipe casting单线图single line drawing平齐parallel and level两端 two terminals满扣 buckle螺栓紧固 bolton周边 periphery附加应力 additional stress同轴度 axiality平行度 parallelism随机 stochast13、ic允许偏差 allowable variation重直度verticality水平度 levelness隔离盲板 blind plate氩弧焊argon arc welding压盖螺 栓 gland bolt间距spacing有效期 period of validity担任 take charge of undertake焊条 welding rod碳钢焊条carbon steel焊丝 welding wire熔化焊 melting钢丝 steel wire气体保护焊 gas shielded arc welding烘干drying清洗ablution制度system焊接工艺welding 14、procedure相应corresponding手工电弧焊manual electric arc welding手工钨极 manual tungsten electrode打底render电源power source交流alternating current焊件 weldment管壁厚度 pipe thickness对接焊缝 butt weld工件壁厚 workpiece飞溅物 splash沾污 smirch油污 oil stain细锉 smooth file铣刀 milling cutter氧化膜 oxide film脱脂处理 ungrease treatment棉质纤维 cotton fi15、bre丙酮acetone硫 sulfur焊剂 welding flux钢板 steel plate纵向焊缝 longitudinal weld longitudinal seam筒节 shell ring封头 end socket卷管 reelpipe强度试验strength test起弧arc starting穿堂 风draught熔合fusion反面reverse side整体integral封堵block up焊口 weld bond医用 胶 布medical proof fabric高频 high frequency焊炬welding torch送气air supply电流衰减装置cu16、rrent attenuation气体延时保护装置time delay熄弧quenching of arc成型molding钢印代号steel seal质量分析quality analysis负责人principal审批examine and approve补焊工艺repair welding压缩机compression pump平焊法兰welded flange测试流程图 test flow chart加固措施 reinforcement measure校验 verify升压boost pressure读数off scale reading满刻度值ull-scale value盲板blind17、 plate压力表pressure meter强度intensity目测eye survey半径radius公式formula管路pipeline严密性leakproofness导电膏conductive paste压接compression joint地上连接overground埋深buried depth接地 线earth wire说明description分线盒junction box接地装置earthing deivce交叉across塑料保护管protection tube塑料带plastic tape防腐处理preservative treatment接地极earthing pol18、e接地电阻测试earth resistance防雷接地lightning protection遵守comply with避雷网lightning conduction引下线down lead搭接焊overlap welding避雷针lightning rod镀锌制品zinc coating断接卡breaking of contact电阻resistance配电装置power distribution equipment集中接地装置centralized串联cascade connection干线联接main line并列paratactic单独solely机组machine set电力复合脂e19、lectric force compounded grease电缆敷设cable laying电缆槽架cable channel主干线trunk line弯头angle fitting剥落处exfoliation银粉aluminum powder支持点support point拆装disassembly and assembly畅通smooth电压等级electric pressure通断实验onoff终端头 terminals余度remaining标记 牌notice plate表册statistical forms电缆桥架cable testing bridge电机electric mac20、hine相对湿度relative humidity杂物sundries耐压试验withstand voltage test照明器具ligthing paraphernalia铭牌nameplate验收 规 范acceptance specification接线wire splice试运test run进线口incoming line带电electrified盘车转子jigger rotor二次回路secondary circuit中心线center line触头contactor配电 power distribution成套whole set楼板floor slab备件duplicate pa21、rt包装packing器材equipment导线conducting wire脱落fall off规范specification电器electrical appliance断路器line breaker机械联锁mechanical interlocking碰撞collision轻便 portable综合分析判断 comprehensive analysis and judgement变压器transformer抽芯loose core/过道aisle三相电容three phase capacitance芯棒core rod都市规划与土地开发 Urban g and Land Developme22、nt 社区开发及工业区开发 Community Development and Industry Park Development 开发许可申请 Development Permit 土地使用变更计划 Land Use Rezoning Plan 主要计划及细部计划 Master Plan and Detail Plan 都市计划更新计划 Urban Renewal Plan 都市设施 Urban Design 建筑设施 Architecture Design 大地工程 Geotechnical Engineering 工址调查 Site Investigation 现地试验与室内试验 In-23、Situ and Laboratory Test 基础工程 Foundation Design 深开挖工程及建物保护 Deep Excavation and Building Protection 新生地及软弱地层改良 Reclamation and Soft Ground Improvement 山坡地开发与水土保持 Slope land Development, Soil and Water Conservation 潜盾隧道与岩石隧道 Shield Tunnel and Rock Tunnel 大地工程施工顾问 Geotechnical Construction Consultant 土24、壤材料试验 Soil and Material 结构工程 Structural Engineering 各类钢筋混凝土、预力混凝土、钢结构及钢骨钢筋混凝土结构 Structures of R.C., Prestressed Concrete, Steel, and SRC 桥梁、高层建筑、地下结构物、隧道、深开挖挡土结构 Bridges, High-Rise Buildings, Underground Structures, Tunnels, Retaining Structures for Deep Excavations 桥梁安全检测、评估及维修补强 Bridge Inspection,25、 Assessment, and Rehabilitation 钢结构细部设计及制造图 Steel Structural Detail Design and Shop Drawings 厂房工程 Industrial Plant 工业厂房-石化工厂、钢厂、电厂、气体厂、科技工业厂房、一般性厂房 Industrial Plants-Petroleum and Chemical, Steel, Power, Gas, High-Technical and General Plants 环保设施工厂-垃圾焚化厂、垃圾掩埋场、污水处理厂及相关管线 Environment Protecting Plan26、ts-Incineration Plants, Garbage Disposal Plants, Waste Water Treatment Plants and Piping System 设备支撑结构、管架、操作平台 Equipment Supporting Structures, Pipe Racks, Operating Platforms 设备基础 Equipment Foundations 厂区一般土木及公共设施 General Civil Works and Utilities of Plants 运输工程 Transportation Engineering 运输规划 Tran27、sportation Planning 铁路、捷运、高铁路线、车站及机厂工程 高速公路工程及一般道路工程 停车场设施工程规划、设计 Engineering Planning & Design for Parking Facilities 交通维持计划 Traffic Control & Management during Construction B.O.T.可行性分析及方案研究 机场跑道及航站工程 水利及港湾工程 Hydraulic and Harbor Engineering 营建管理 Construction Management 估价及工程预算制作 Estimates and Engi28、neering Budget Works 营建管理 Construction Management 工程监造 Construction Supervision 施工计划 Construction Plan 工程进度控管 Schedule Control during Construction 施工规划 Construction Specifications 环境工程 Environmental Engineering 环境影响评估 Environment Impact Assessment 环境监测 Environmental Monitoring 地下水监测系统 Groundwater Mo29、nitoring 污水处理厂 Wastewater Treatment Plant 污水下水道 Sewage System 噪音振动防治 Noise and Vibration 垃圾焚化厂兴建工程 Waste Incinerator 废弃物处理系统工程 Waste Treatment & Disposal 共同管道 Common Ducts 管道及附属设施之规划设计 Planning and Design of Common Ducts Structures and Subsidiary Facilities 经济效益分析 Economic and Efficiency Analysis 财务评估 Financial Evaluation 管理维护办法及组织订定 Regulation for the Management, Maintenance and Organization