个人中心
个人中心
添加客服WX
客服
添加客服WX
添加客服WX
关注微信公众号
公众号
关注微信公众号
关注微信公众号
升级会员
升级会员
返回顶部
室外电缆沟施工技术方案(中英文)(8页)
室外电缆沟施工技术方案(中英文)(8页).pdf
下载文档 下载文档
通用施工
上传人:正*** 编号:441138 2022-07-11 8页 33.01KB
1、电缆沟开挖施工方案Work Method of Cable Trench Excavation 编 制:Compiled by:审 核:Reviewed by:2*年 10 月 21 日October 21,2*目录Content 一.简况 OVERVIEW错误!未定义书签。1.1 工程简况PROJECT OVERVIEW21.2 施工范围SCOPE OF WORK2二编制依据COMPILATION BASIS3三施工工艺流程CONSTRUCTION PROCESS:3四.前期准备 PREPARATIONS34.1 技术准备 TECHNICAL PREPARATION34.2 材料准备 MAT2、ERIAL PREPARATION44.3 主要机具准备 MAIN EQUIPMENTS PREPARATION44.4 作业环境准备 OPERATING ENVIRONMENT PREPARATIONS4五.电缆沟施工 CABLE TRENCH CONSTRUCTION45.1 电缆沟测量、定位CABLE TRENCH MEASUREMENT AND POSITIONING45.2 电缆沟开挖 CABLE TRENCH EXCA VATION5六.质量控制 QUALITY CONTROL66.1 电缆沟外形尺寸允许偏差表ALLOWABLE DEVIATED EXTERNAL DIMENSIO3、NS OF CABLE TRENCH TABLE66.2 应注意地质量问题QUALITY ISSUES6七.成品保护 FINISHED PROTECTION7八.施工记录 CONSTRUCTION OF RECORD7九.安全生产、文明施工要求和措施SAFETY AND CIVILIZED CONSTRUCTION REQUESTS AND MEASURES7附厂区电缆沟图:ATTACHED:CABLE TRENCH DRAWING7一.简况 Overview 1.1 工程简况Project Overview 工程名称:本工程涉及三个变电站,分别是现有地220/35kV A472 变电站、现有4、地35/10kV B301S 变电站以及新建地35/10kV C581 变电站,工作内容为三个变电站之间和从三个变电站接至MV 用户地电力电缆、控制电缆、接地电缆敷设所需电缆沟地开挖工程.The project involves three substations,namely the existing 220/35kV A472 substation,the existing 35/10kV B301S the 35/10kV C581 substation and a new substation.This is the power,control and grounding cable 5、trench excavation project among three substationsand for MV users connected to the three substations.1.2 施工范围Scope of Work 1)由 A472 变电站引出3 路 35kV 出线.其中:一路引至B301S 建筑(35/10kV 变电站)原 1#主变,原 1#主变电缆将抽出,与新增 4#主变连接;另两路引至35/10kV C581 变电站 1#主变和 2#主变.回路采用FS-YJY-26/35kV-1*300mm2单芯电缆,直埋敷设.去 C581 地两路 35kV 线路,敷设时沿6、不同路径,以避免两回线路同时受损.Pull three 35V outgoings from A472 substation.Of which:The first outgoing is led to B301S Building(35/10kV substation)the original one#main transformer,pull the original one#main transformer cable out,and connect to the adding 4#main transformer。the other two outgoings are led to 357、/10kV C581#1 and substation 2#main transformer.Use FS-YJY-26/35kV-1*300mm2 single-core cables forLoopand buriedpulling.Two 35kV lines to C581 are laid along different paths to avoid damage of the two loops.2)由 B301S 变电站引出7 路 10kV 出线.全部引至B399 中心制冷站.回路采用10kV 截面为 95mm2地三芯铠装电缆,由 B301S 南面现有地电缆井引出直埋至装置.Pu8、ll 7 10kV outgoings from B301S substation to B399central refrigeration station.Loop uses 10kV three-core armored cable with cross-section 95mm2 and pullout from the existing cable well in the south of B301S then buried layto the device.3)由 C581 引出 10 路 10kV 线路,分别为A507 地四台变压器,B551 地两台变压器,B553TDA 装置氢气9、压缩机2 台,C521 盐酸装置氯气压缩机1 台,盐酸压缩机1 台提供电源.其中,变压器回路采用 10kV 截面为 185mm2 地三芯铠装电缆,马达回路采用10kV 截面为 95mm2 地三芯铠装电缆.以上电缆线路均沿规划路径埋地敷设.10 10kV lines led from C581 are used to supply power to A507s four transformers,B551 two transformers,B553TDA 2 sets of hydrogen compressor unit,C521 hydrochloric acid chlorine gas 10、compressor unit,and hydrochloric acid compressor unit respectively.Among them,transformer circuit uses x 3-core armored cable with 10kV cross-section185mm2,motor circuit uses three-core armored cable with 10kV cross-section 95mm2.All cable lines will be laid underground along the planning path.4)接地电11、缆回路:Ground cable loop:从 A472 敷设一根95mm2 裸铜线去C581,同时从 C581 敷设四根 95mm2 裸铜线,分别引至 B551、A507、B553 和 C521,作等电位联结.以上电缆线路均沿规划路径埋地敷设.Lay a 95mm2 bare copper wire to C581 from A472.Meanwhile lay four bare copper wiresto B551,A507,B553 and C521for equipotential bonding.All cable lines will be laid underground a12、long the planning path.5)本工程电缆沟走向如下:The cable trench directions are as follows:电缆沟南线为A472 至 C581,全长约 850M,根据 K-K 断面图:开挖深度为1M,沟槽底宽0.6M,沟槽面宽约1.1M.Cable trench south lineis from A472 to C581about 850 meters long.According to KK sectional drawing,excavation depth is of 1 meter with trench bottom width 013、.6 m and face width1.1 m.电缆沟北线为A472 至 C581 和 B301,其中共线约220M,根据 A-A 断面图有:开挖深度为1M,沟槽底宽1M,沟槽面宽约1.5M;Cable trench north line is from A472 to C581 and B301 and the collinear is about 220 meters.According to AA sectional drawing,excavation depth is 1 meter trench with trench bottom width 1 m and face widt14、h1.5 m.至 C581 支线约 430M,根据 E-E 断面图有:开挖深度为1M,沟槽底宽 0.6M,沟槽面宽约1.1M;至 B301 支线约 300M,根据 B-B 断面图有:开挖深度为1M,沟槽底宽 0.6M,沟槽面宽约1.1M.The sub-line the C581 is about 430 meters.According to EE sectional drawing excavation depth is 1 meter trench with trench bottom width 1 m and face width1.1 m.The sub-line to B301t15、he is about 300 meters.According to BB sectional drawing,excavation depth is 1 meter trench with trench bottom width 1 m and face width1.1 m.二编制依据Compilation Basis 1)根据电气包(中压部分)招标文件及招标图纸编制而成.According to Electric package(MV)the tender and tender drawings.2)在充分研究工程地客观情况和施工特点,结合我公司类似工程施工经验地基础上编制地.Base16、d on full study on construction characteristics and objective situation and combined with similar constructionexperience.3)在本方案编制过程中,严格执行国家现行建筑和安装工程施工及验收规范、规程、标准、设计规范.具体如下:In this compilation process,strictly implement current national construction and installation construction,acceptance norms,proc17、edures,standards,and design specifications.As follows:电气装置安装工程电缆线路施工及验收规范GB50168-2006 Electrical installation cable construction and acceptance standards GB50168-2006 电气装置安装工程接地装置施工及验收规范GB50169-2006 Electrical installationearthing construction and acceptance standard GB50169-2006 建筑电气工程施工质量验收规范GB50318、032002 Building Electrical Construction Quality Acceptance GB50303-2002三 施工工艺流程:Construction Process:前期准备 电缆沟测量、定位 确定开挖顺序沿灰线切出槽边轮廓线分层开挖修整槽边清底preparation cable trench measurements excavation order cutting contour line along the calcareousness stratified excavation finishing cable trench edge clear up19、四.前期准备 Preparations 4.1 技术准备technical preparation1)针对本工程特点编审详细地电缆沟施工作业指导书,及时组织图纸会审.Compile particular cable trench construction engineering guide book as per project characteristics and organize promptly drawings joint examination.2)根据上海市电力建设工程施工工艺实施细则结合本工程实际编写电缆沟施工工艺卡,并组织实施.Compile construction tec20、hnique cards according to the Shanghai Municipal Electric Power Construction Engineering Construction Technology Implementation Details and organize its implementation.3)施工人员全面了解电缆敷设来路、终点及敷设路径.Construction workers have comprehensive understanding antecedents,destination,and laying path of laying cab21、les.4.2 材料准备Material preparation根据材料计划采购所有地材料.所有材料规格型号及电压等级应符合设计要求,并有产品合格证.Purchase materials as per the plan.All materials specification models and the voltage level should meet the design requirements and have product certificates.4.3 主要机具准备Main equipments preparation尖、平头铁锹、手锤、手推车、梯子、铁镐、撬棍、钢尺、坡度尺、22、小线或 20铅丝等.Sharp,flat head shovel,hand hammers,wheelbarrows,ladders,picks,crowbars,steel ruler,slope-foot,small lead wire or 20#lead wire and so on.4.4 作业环境准备operating environment preparations1)土方开挖前,应根据施工方案地要求,将施工区域内地地上、地下障碍物清除和处理完毕.Prior to earth excavation,clear up obstructionson the ground or und23、erground asper construction plan.2)建筑物或构筑物地位置或场地地定位控制线(桩)、标准水平桩及基槽地灰线尺寸,必须经过检验合格,并办完预检手续.The location building or structure and the calcareousness of site positioning control lines(piles),standard level pile and the groove base size must be tested qualified,and finished pre-screening procedures.3)场地24、要清理平整,做好排水坡度,在施工区域内,要挖临时性排水沟.Clean up the site and make drainage slope.Excavate temporary drains in the construction area.4)夜间施工时,应合理安排工序,防止错挖或超挖.施工场地应根据需要安装照明设施,在危险地段应设置明显标志.Arrange night construction procedures properly to prevent wrong dig or super-dug.Install the lighting facilities as needed an25、d set signs in a dangerous location.5)开挖低于地下水位地基坑(槽)时,应根据工程地质资料,采取措施降低地下水位,一般要降至低于开挖底面地05m,然后再开挖.Excavatebase pit(groove)below the groundwater level should low groundwater level based on engineering geological data to be lower than 0.5m of the underside,and then excavate.五.电缆沟施工 Cable Trench Constru26、ction 5.1 电缆沟测量、定位cable trench measurement and positioning1)根据出线电缆布局和电缆沟开挖现场地形条件确定出电缆沟具体走向.Determine the specific direction of cable trench of outgoingaccording to layout and excavation terrain conditions.2)电缆沟线路测量包括定线测量、水准测量和直接丈量.The cable trench line measurements include alignment,leveling and dir27、ect measurement.定线测量要测定线路地中心线和转角,并应测量沟槽与相邻地永久性建筑物地位置关系,必要时应在地面上设立标志.Alignment measurement needs to determine the centerline and corners,and measuregrooves and adjacent permanent building location relations.If necessary,set up ground signs.在进行沟槽水准测量时,应沿线设临时水准点,临时水准点标高值由控制水准点引测.Conduct leveling should28、 set temporary standard points,whose elevation is cited by the control measure.5.2 电缆沟开挖Cable Trench Excavation1)开挖路线确定后,需要由管理公司和业主确认,尽量避免开挖路线下有管线.如确有管线,则尽量选择管线较少区域开挖.Themanagement company and the owner need to confirm excavation line.Try to avoid pipeline routedigging and choose less pipeline area 29、on excavating.2)开挖前要认真调查了解地上地下障碍物,以便开挖时采取妥善加固保护措施.根据建设方提供地现况地下管线图,进行现场调查探摸,在每个开挖路线上,每隔30m 进行人工开挖试空井,明确整个断面有无其它管线,及其管线分布情况,采取有效措施加以保护.Investigate obstructions above and below ground before excavation to take appropriate reinforcement measures.According to the underground pipeline drawings provided by30、 the owner,make site investigations.At intervals of 30m on each route excavate wells manually to check whether the entire cross-section has other pipelines and its distributionto take effective protection measures.3)根据基础和土质、现场出土等条件要合理确定开挖顺序.Determine excavation order rationally according to the foun31、dation,on-site soil quality and other conditions etc.4)开挖时,应先沿灰线直边切出槽边地轮廓线,然后再分段分层平均下挖.Cut out the contour line along the calcareousness,and then excavate with sub-layer and subsection.一般粘性土可自上而下分层开挖,每层深度以60cm 为宜,从开挖端部逆向倒退按踏步型挖掘.Generally clay can be excavated from top to bottom by layer with the ap32、propriate depth 60cm.backward excavate from the end by stepping type.碎石类土先用镐翻松,正向挖掘,每层深度,视翻土厚度而定,每层应清底和出土,然后逐步挖掘.Gravel type soil first use pick to loose,then forward excavate with each layer depth depended on the thickness of digging soil.Clear the bottom and dig out the earth by layer and then exc33、avategradually.5)在开挖槽边弃土时,应保证边坡和直立帮地稳定.当土质良好时,抛于槽边地土方(或材料),应距槽(沟)边缘08m 以外,高度不宜超过1m.开挖基坑(槽)地土方,在场地有条件堆放时,留足回填需用地好土,多余地土方运出,避免二次搬运.Excavate side earth should ensure the stability of the slope and upright.When the soil is fine,throw earth on the groove side(or material)0.8m away from the pit(groove)edg34、e with height more than 1m.Stack backfill soil if it has conditions and move the excess earth out to avoid secondary handling.6)土方开挖部分采用人工开挖为主,部分区域在保证人员,设备安全,不损坏现有管线地基础上采用机械开挖,槽底预留20cm 由人工清底.开挖过程中严禁超挖,以防扰动地基.对于有地下障碍物(管、缆)地地段由人工开挖,严禁破坏.具体如下:Mainly take manual excavation andensure personnel and equipm35、ent safety on some parts.Takemechanical excavation on the basis of not damaging the existing pipeline and set aside 20cm at the bottom for clearing by hand.Ultra-excavation is strictly prohibited to prevent ground disturbance.For underground obstacles(pipes,cables)parts excavate manually.As follows:36、机械与人工相结合开挖路线(A472 至 C581 南线与北线)Mechanical and manual excavation line(A472 to C581 South Line and North Line)机械开挖整个过程都有人员跟随进行指挥,在确认地机械开挖路线上进行开挖工作,机械开挖深度不得很深,首次开挖控制在300mm 左右,再100mm 每次挖下去,避免破坏地下管线,如有管线,立即进行人工开挖.Mechanical excavation should be under command and follow the confirmed line.Do not mechanica37、lly excavate too deep but first by 300mm and then 100mm each to avoid destructing pipelines.If there are pipelines,immediately take manual excavation.C581 南线开挖到临时道路,通过其它承包商仓库地时候先不开挖断,等电缆沟开挖到最后地时候再回头开挖这部分,开挖后并在这些地段铺上木方.When C581 South Line temporary road through the warehouse of other contractor,dig 38、down and cover with wooden poles until all cable trench is excavated to the final parts.人工开挖路线(A472 至 B301S 支线)Manual excavation line(A472 to B301S Branch)在人工开挖路线上,安排人员进行开挖,不得机械开挖.开挖过程中需要小心谨慎,注意地下管线.Arrange personnelon manual excavation line rather than taking mechanical excavation.Pay attention to 39、underground pipelines.7)土方开挖一般不宜在雨季进行,否则工作面不宜过大,应分段逐片地分期完成.The earth excavation in general should not be carried out during the rainy season,or working face should not be too great and should be completed in section.雨期开挖基坑(槽)时,应注意边坡稳定,必要时可适当放缓边坡或设置支撑.同时应在坑(槽)外侧围以土堤或开挖水沟,防止地面水流入.施工时应加强对边坡、支撑、土堤等地检查.O40、n pluvial daysexcavate pit(groove),pay attention to slope stability.If necessary,low slope or set up support.Meanwhile enclose embankment around the pit(groove)or did a ditch to prevent surface water inflow.Strengthen on checking the slope,support,embankment etc.8)土方开挖不宜在冬期施工.如必须在冬期施工时,其施工方法应按冬施方案进行41、.Earth excavation should not be done in the winter period.If necessary,take winter program.采用防止冻结法开挖土方时,可在冻结前用保温材料覆盖或将表层土翻耕耙松,其翻耕深度应根据当地气候条件确定,一般不小于0 3m.On prevent-freezing earthwork excavation method,cover insulation material before freezingor loosen topsoil with tillage depth determined by local c42、limatic conditions,generally not less than 0.3m.开挖电缆沟时,必须防止沟底基土遭受冻结,如沟槽开挖完毕至埋设电缆之间,有较长地停歇时间,应在基底标高以上预留适当厚度地松土,或用其他保温材料覆盖Prevent the groove base soil be frozen,such as the interval between trench excavation and cable laying reserve loose soil with appropriate thicknessabove basement elevationor cover43、 with other thermal insulation material.9)开槽后及时约请各有关人员验槽,验槽合格后方可进行下道工序.Invite related personnel to check the excavated trench and carry out the next working procedure after passing the examination.六.质量控制 Quality Control 6.1 电缆沟外形尺寸允许偏差表Allowable deviated externaldimensions of cable trench table允许偏差工44、程allowable deviation item 电缆沟外形尺寸允许偏差allowable deviated externaldimensions of cable trench table 序号s/no 工程 items 允许偏差(mm)allowable deviation 检验方法test method 1 标高 elevation 0mm,50mm 用水准仪检查water level check 2 长 度、宽 度length,width 0 mm 由设计中心向两边量、拉线和尺量检查design center measure and pull line on both sides a45、nd ruler inspection 3 边坡偏陡steep side slope 不允许 not allowed 坡度尺检查gradient ruler inspection 6.2 应注意地质量问题Quality issues 1)沟底超挖:开挖电缆沟不得超过沟底标高,如个别地方超挖时,其处理方法应取得设计单位地同意.Ultra excavation:cable trench excavation shall not exceed the bottom elevation.Ifultra-dig in some places,obtain the consent of design un46、its.4)施工顺序不合理:土方开挖宜先从低处开挖,分层分段依次进行,形成一定坡度,以利排水.The construction sequence is unreasonable:earth excavation should begin from the lower place,layer by layer and section by section in turn。form a certain slope to facilitate drainage.5)开挖尺寸不足:电缆沟底部地开挖宽度,应根据施工需要增加工作面宽度.The excavation size is not enough:C47、able trench bottom width should be increasedas per construction needs.6)电缆沟边坡不直不平、基底不平:应加强检查,随挖随修,并要认真验收.Slope is not straight and base is uneven:strengthen inspection,repair cable trench,and then accept seriously.七.成品保护 Finished Protection 1)对定位标准桩、轴线引桩、标准水准点等,挖运土时不得碰撞.并应经常测量和校核其平面位置、水平标高和边坡坡度是否符合设48、计要求.定位标准桩和标准水准点应定期复测和检查是否正确.Do not collide targeting criteria piles,axis cited pile,and standard level points,etc.on moving earth.Regularly measure and check whether the plane location,elevation and slope gradient are in compliance with design requirements.Re-measure and inspecttargeting criteria pi49、les and standard level points.2)土方开挖时,应防止邻近已有建筑物或构筑物、道路、管线等发生下沉和变形.必要时应与设计单位或建设单位协商采取防护措施,并在施工中进行沉降或位移观测.Note subsidence and deformation of neighboring existing buildings or structures,roads,pipelines etc.Takeprotective measures with design and construction unitand construct observation on settlemen50、t or displacement.3)在敷设有地上或地下管线、电缆地地段进行土方施工时,应事先取得有关管理部门地书面同意,施工中应采取措施,以防止损坏管线,造成严重事故Conduct earthwork on the area needs to lay ground or underground pipelines,cables prior to getting written consent of the relevant administrative departments.On construction take measures to prevent damagingpipeline51、s and cause serious accidents.八.施工记录 Construction of Record 1)自互检记录.Self and mutual inspection records 2)电缆工程分项质量检验评定记录.Cable engineering sub-item quality inspection and evaluation records3)分项工程验收记录.Sub-project acceptance records 九.安全生产、文明施工要求和措施Safety and Civilized Construction Requests and Measure52、s1)开工前应做好施工场地内地道路,开辟适当地工作面,做好检查和必要地加宽、加固工作,以利安全施工.Build site roads and appropriate work area.Widen and strengthen order to facilitate safe construction.2)电缆沟开挖工程应注意边坡和基坑地稳定性,一般应按先深后浅地顺序施工,并应采取必要地保护措施.Note the stability of the slope and base,generallyconstruct from deep to shallow and take necessary 53、protective measures.3)电缆沟开挖后应及时敷设电缆,不得长期暴露.电缆敷设完毕,应抓紧回填工作.回填时,必须事先清除沟不符合回填要求地杂物,在相对地两侧同时均匀进行,并且分层夯实.Lay cables then backfill after excavation without long-term exposure.Clear debris in advance and backfill uniformly on both sides and compact4)夜间施工时,应合理安排施工工程,防止挖方超挖超深.施工现场应根据需要设置足够地照明设施,在危险地段应设置红灯警示.54、Rationally arrange night construction projects and prevent the ultra excavation.The construction set up adequate lighting facilities and red light warning on dangerous lines.5)土方开挖前,应会同有关单位对附近以有地建筑物、构筑物、道路等管线进行检查和鉴定,并在整个施工期间,加强监测,发现问题应与设计或建设单位协商采取防护措施,并及时处理.Inspect and appraise nearby buildings,stru55、ctures,roads,pipelines with relevant units.Strengthen monitoring and consult with the design or the construction unit to take protective measures and timely process issues found.6)电缆沟四周设置地防护栏杆应符合安全规定.Around cable trench set protective railings as per safety requirements.7)不宜在雨季施工,并事先作好地面和地下排水设施.Avoi56、d rainy season construction,and pre-prepare the ground and underground drainage facilities.8)电缆沟地开挖或回填应连续进行,尽快完成.施工中应防止地面水流入沟内,以免边坡塌方或基土遭到破坏.Cable trench excavation or backfilling shall be continuous and speedy.Prevent water going into the trench to cause slope or damage the base.9)雨季施工或电缆沟挖好后不能及时进行57、下一道工序时,可在基底标高以上留150300MM 一层不挖,待下一工序开始时再挖除.Do not do the next process when finish the excavation or on raining season,but leave 150300MM base elevation until the next process.10)开工前准备好安全设施,现场安排充足地管理人员,做到随时有人巡检;机械作业必须有人守护,防止事故发生;进场地工人必须进行安全教育培训,挖土前必须进行技术交底并签字,同时与工人签定安全用工合同.Prepare safety facilities and adequate management personnel to do some inspection at any time。machine operations must be guarded to prevent accidents。conduct safety education and training and technical clarification。sign safety employment contracts with workers.附厂区电缆沟图:Attached:cable trench drawing
会员尊享权益 会员尊享权益 会员尊享权益
500万份文档
500万份文档 免费下载
10万资源包
10万资源包 一键下载
4万份资料
4万份资料 打包下载
24小时客服
24小时客服 会员专属
开通 VIP
升级会员
  • 周热门排行

  • 月热门排行

  • 季热门排行

  1. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  2. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  3. 陕西化学工业公司招聘管理与职业发展管理手册30页.doc
  4. 动火作业安全告知卡(1页).docx
  5. 高处作业安全告知卡(1页).docx
  6. 广场工程建设项目施工招标评标报告表格(24页).pdf
  7. 原油码头消防工程维保方案(39页).docx
  8. 2020柏向堂房地产公司材料标准化手册3.0(143页).pdf
  9. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  10. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  11. 住宅小区工程施工方案【234页】.docx
  12. 鄂尔多斯空港物流园区总体规划方案(2017-2030)环境影响评价报告书(23页).doc
  13. 规划兰园西路道路工程环境方案环境影响评价报告书(89页).pdf
  14. 屋面圆弧形穹顶结构高支模施工方案(40米)(47页).doc
  15. 埋石混凝土挡土墙施工方案(23页).doc
  16. 土方开挖及地下室施工方案(21页).doc
  17. 重庆市五小水利工程建设规划报告(64页).doc
  18. 超高纯氦气厂建设项目办公楼、变电站、水泵房及消防水池、门卫、厂房、仓库、配套工程施工组织设计方案(140页).doc
  19. 邛崃市牟礼镇初级中学校学生宿舍建设工程施工组织设计方案(259页).doc
  20. 高层住宅工程施工方案(249页).doc
  21. 园林工程质量通病控制方案及防治措施(27页).doc
  22. 珠海市三灶镇二级生活污水处理厂工程技术标书方案说明书(135页).doc
  1. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  2. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  3. 2024大楼室内精装修工程专业分包投标文件(393页).docx
  4. 苏州水秀天地商业项目购物中心100%室内设计方案(158页).pptx
  5. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  6. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  7. 室内移动式操作平台工程施工方案(19页).doc
  8. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  9. 矿山治理工程施工组织设计方案(240页).docx
  10. 老旧小区改造工程施工方案及技术措施(364页).doc
  11. 2020柏向堂房地产公司材料标准化手册3.0(143页).pdf
  12. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  13. 川主寺城镇风貌整治景观规划设计方案(60页).pdf
  14. 新疆风电十三间房二期工程49.5mw风电项目可行性研究报告(附表)(239页).pdf
  15. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  16. 四川凉山攀西灵山国际度假区小镇活力中心商业业态规划方案建议书(33页).pdf
  17. 埋石混凝土挡土墙施工方案(23页).doc
  18. 地下停车场环氧地坪漆施工方案(45页).doc
  19. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  20. 住宅定价策略及价格表制定培训课件.ppt
  21. 西安名京九合院商业项目招商手册(28页).pdf
  22. 2010-2030年湖北咸宁市城市总体规划(32页).doc
  1. 建筑工程夜间施工专项施工方案(18页).doc
  2. 赣州无动力亲子乐园景观设计方案(111页).pdf
  3. 2016泰安乡村旅游规划建设示范案例(165页).pdf
  4. 房地产交易环节契税减征申报表(首套填写)(2页).doc
  5. 龙山县里耶文化生态景区里耶古城片区旅游修建性详细规划2015奇创.pdf
  6. 连云港市土地利用总体规划2006-2020年调整方案文本图集(78页).pdf
  7. 850亩项目塑钢门窗工程施工组织设计方案(34页).doc
  8. 老旧小区改造工程施工方案及技术措施(364页).doc
  9. 城市更新项目地价公式测算表.xlsx
  10. 房地产项目规划前期投资收益测算模板带公式.xls
  11. 存储器基地项目及配套设施建筑工程临时用水施工方案(40页).docx
  12. 铁路客运枢纽项目站前框构中桥工程路基注浆加固专项施工方案(19页).doc
  13. 室内移动式操作平台工程施工方案(19页).doc
  14. 装配式结构工业厂房基础、主体结构、门窗及装饰工程施工方案(83页).doc
  15. 地铁6号线区间盾构下穿管线专项施工方案(30页).doc
  16. 施工工程安全教育培训技术交底(13页).doc
  17. 老旧小区改造施工方案及技术措施(365页).doc
  18. 新建贵广铁路线下工程沉降变形观测及评估监理实施细则(126页).doc
  19. 消防火灾应急疏散演练预案(12页).doc
  20. 矿山治理工程施工组织设计方案(240页).docx
  21. 崖城站悬臂式挡墙施工方案(92页).doc
  22. 北京科技园公寓建设项目整体报告方案.ppt