武汉东湖风景名胜区概念规划设计方案文本报告(211页).pdf
下载文档
上传人:十二
编号:244280
2022-01-04
211页
34.82MB
1、武汉东湖风景名胜区概念规划武汉东湖风景名胜区概念规划WUHANEAST LAKE SCENIC AREACONCEPTUAL PLANNING DESIGN STUDY东湖风景名胜区-自然、历史遗产与未来NATURE HERITAGE AND FUTURE AT EAST LAKE SCENIC AREAINTRODUCTION介 绍介 绍东湖风景名胜区-自然、历史遗产与未来NATURE HERITAGE AND FUTURE AT EAST LAKE SCENIC AREAEast Lake Scenic Area is located east of Wuhan city. It is o2、ne of the first state focussed landscape conservation areas. Since 1982 a great lake landscape area has been developed in harmony with the natural landscape and local culture. Theregions size is 107,6 km2.Wuhan is located at the junction of the Beijing-Guanzhou railway and theChangjiang River waterw3、ay, and is always referred to as the Thoroughfare of nineprovinces. It is directly linked up to Shanghai in the east, Changing in the west, Guangzhou in the south, and Beijing in the north.Wuhan, provincial capitol of Hubei on the Jangtse river is communications junctionin central China, historic site of manifold influential events and cultural centre full of traditions. The East Lake lies east of