1、工料机表 工程名称:F2空调通风第 页1 编码名称规格单位单价数量合价百分比 AA06264综合工日工日86.0009,082.96781,134.26100.00 * AB00060镀锌铆钉 5kg14.000224.713,145.960.04 * AB00215尼龙砂轮片 400片28.00044.061,233.710.01 * AB00333膨胀螺栓 M12套1.8007,820.4614,076.830.17 AB00340精制六角带帽螺栓 M2-54-2010套2.00021.6343.26 AB00358橡胶板 厚3-5kg8.000877.597,020.700.08 AB02、0649胶带 (9m/卷)卷3.450218.18752.710.01 * AB00689帆布m223.750212.315,042.430.06 AB00693破布kg7.50088.12660.920.01 * AB00752电焊条 结422 3.2kg5.200215.901,122.670.01 * AB00754电焊条 结422 综合2.5-4各1/3kg5.300597.493,166.710.04 * AB00756扁钢 25-45kg4.5821,536.047,038.900.08 AB00824铸铁垫板kg4.500921.604,147.200.05 AB01199调和漆3、kg10.170308.503,137.440.04 * AB01200防锈漆kg14.000817.9811,451.750.13 * AB01430石棉橡胶板 低压 厚0.8-6kg8.400133.601,122.240.01 * AB01463医用胶管 9-10m3.390104.00352.56* AB01685碳钢电焊条kg7.500222.161,666.210.02 * AB01694氧气m32.500246.74616.850.01 * AB01695乙炔气kg16.00088.121,409.950.02 * AB01750圆钢 10-14kg4.442577.202,564.210.03 AB01874槽钢 5-14#kg4.6331,458.426,756.130.08 AB01882角钢立管卡子 DN50副2.440153.67374.95* AB02139压力表
CAD图纸
上传时间:2023-11-24
26份
CAD图纸
上传时间:2023-11-24
17份