个人中心
个人中心
添加客服WX
客服
添加客服WX
添加客服WX
关注微信公众号
公众号
关注微信公众号
关注微信公众号
升级会员
升级会员
返回顶部
深圳新安医院建筑设计方案(81页)
深圳新安医院建筑设计方案(81页).pdf
下载文档 下载文档
建筑设计
上传人:十二 编号:931467 2024-05-29 81页 25.99MB
1、多数时候,人们突然的被疾病侵扰,生病之前,他们并不了解自己的身体。只有在生病的时候,人们才开始注意自己的健康。于是他们意识到健康、安全感、爱和自然是最重要的事如何让人类的这种情感反映在医院的建筑设计中,为医生和患者创造一个舒适,轻松的医疗环境,成了设计的着眼点之一从病人出发的设计从病人出发的设计THE HUMAN BEING AS A PATIENTIn most of the time,sickness of the people is a surprise for themselves.Before,they dont know about their body.But in this m2、oment the sicknesscame out,the people listen to their body.they are concentrated to every step,they do.The longing to health,safety,love and nature is the most importantthing now.nothing else.Thats the point,where we,the architects can start with our work.CONTEXT1、REQUIREMENTS2、CONCEPT SET-UP3、CONCE3、PT PERFORMANCE4、DETAIL INFORMATION5、ECOLOGICAL STRATEGY6、AREA SUMMARY2目录1 1、基地分析、基地分析2 2、设计理念、设计理念3 3、方案解析、方案解析4 4、建筑细部、建筑细部5 5、节能措施、节能措施6 6、设计说明和投资估算、设计说明和投资估算1.基地分析基地分析 REQUIRENMENTS区位分析LOCATION拟建新安医院位于深圳市宝安区政府规划中心区以东,新湖路西侧、湖滨西路北侧,健宝路东侧,博宝路南侧。地块面积80034.74平方米,地形方正平整。地块周围围绕4条市政道路,交通方便,配套相对较完善。基地北面有地4、铁站和公交首末站。地块的有利条件为东南面有大片绿地,西南面百米处为海湾,景观良好。交通四通八达,靠近新中心区。不利条件为北面有学校和公交首末站,噪音影响较大,并有三条正在修建的地铁穿过基地下方,使得基地使用率降低。4基地位置离海较近,规划中属于中心区的开放空间之一,南侧有较好景观。5市政规划PLANNING本项目位置WHERE WE DESIGN A HOSPITAL?基地现状项目位置现状照片基地位于正在开发的宝安中心区,北侧有学校和住宅,西侧为规划的市政建筑和公交首末站,西南侧现为厂房和码头,东南侧为山体绿化,基地两端有现状沟渠,待规划整合,现状道路不完善,基地较平整。6PLOT INFOR5、MATIONS用地条件一期一期72.设计理念设计理念CONCEPT SET-UP9PEOPLE AND SPACE人与空间员工积极的工作轻松的工作氛围积极的就医环境病人people and Space On the design;humans and the narrow space mustrelated.Not only the interaction between Doctor and patient in a separate area,but the Average hospital environment is a place of therapeutic Interventio6、n to be considered.Because rooms/houses practice an effect on people.You can create a have a positive aura,but may also fear and Spread unease.To exploit the potential of architecture for the people profitable and therapeutic use,it is realize their creative forces in order to exploit spaces create 7、the feeling insecure at the level of Patients or contaminated employee who Resolve tension and anxiety and stress relief.How can architectural opposing forces used whose effect in the subconscious hits and healing Effects such as:-Familiar shapes(circle,square,triangle)-Clear language of form(harmon8、y instead of destructively)-Familiar colors(basic colors)-Sensual,soft colors(pain Borders)-Familiar elements(wood,glass,metal,stone)-Natural,familiar materials-Creation of personal areas-Readability of private sector-Receipt of personal status symbols-The possibility of the integration of personal 9、history-Respect for nature/universe(micro-macrocosm)PEOPLE AND SPACEFor the welfare of the sisters,volunteers and staff can occur:-Space for communication-Space for individual relaxation-Opportunity identification through personal influence-Practical nursing friendliness-Freedom of movement friendly10、,life colors The consequence of this influence in the region is at a deliberately designed environment with a positive mood In the closed circuit.Does the environment for Patients and staff,the positive impact on the Personnel.This creates a positive atmosphere.The result is a pleasant work environm11、ent that is turn positive impact on patients and therefore the competitiveness of the house on the market improved or strengthened.That means it must be for the people in its entirety planned.The rooms need for the people as Unity of body,mind and soul under medical technology,building physics,mater12、ial and subtle facial points are planned.By using some creative means it could have positively influences to the sick on the sickness.There are principles in which The design unconscious fears and desires can regulate.人与空间10流线组织流线组织traffic organization功能组织功能组织function organization与城市的关系与城市的关系Inclusi13、on in the urban space11设计理念CONCEPT轴线广场入口位置病人人流住院楼的形式:越高越好,还是越低越好?门诊部分病人的流线入口广场轴线水平方向发展还是垂直方向发展交通和功能分区:传统医院结构还是现在医院结构?设计思路的发展设计思路的发展工作人员物流供应访客入口住院部的位置阴影的影响未来发展用地住院部是否需要广场?门诊部分病人的流线入口广场轴线水平方向发展还是垂直方向发展需考虑大量人流公共部分和非公共部分消防环道的设置DESIGN DEVELOPEMENT以对目标群体以对目标群体/临床实体研究为出发点的规划临床实体研究为出发点的规划模式模式根据这一模式,集群活动尽可能围14、绕治疗的病人,即合理划分护理单元单位和辅助支持单元。医疗单元首要关注的是病人的护理。这是当前医院,基于对不同专业分类的,旨在实现全方位的照顾相似临床症状的患者。分类医疗单位/主题取决于医院的专业类别,而不在于医院现有的专业划分和发展策略保健单位/主题包括“母婴”、“肿瘤”、“脑及感觉器官”、“心血管疾病”辅助支持单位主要分为医疗支持和后勤技术保障两大部分医疗支持包括医学影像诊断、一般器官功能的检查、药房和化验室。后勤技术保障主要包括设施的管理,如管理和提供信息,中央厨房,技术服务和人员的设施。在实践中,结果表明,上述单位在功能和空间规功能和空间规划划中可采用不同的处理方式。有些后勤技术保障单元15、选择结合住院和门诊活布置,并纳入医疗辅助功能。;另一方面其他单元则选择了较为传统的形式,与住院治疗和门诊治疗和医技部分保持适当的距离和独立性。在这种情况下,病人受到的护理过程原则上是基于多学科的合作。在不使用同一个办公室的情况下医学专家协同工作形成一个治疗小组,这种方式是的病人可以收的不同专业医护人员和医疗配套设施的治疗。主题1:脑及感觉器官主题2:肿瘤主题3:免疫系统,新陈代谢和老年病学科主题4:急救中心及肌肉骨骼系统主题5:心血管疾病主题6:生长和生殖系统以合理医护流线为出发点的规划模式以合理医护流线为出发点的规划模式在此模型中区分四个病人流向:急性护理,紧急护理,选择性护理和持续性照顾。16、细分的基本原则是,根据不同的病人状况,在建筑规划和设计层面选择合理的组织形式,技术特点,专业方向,形成不同的护理单元。急性重症监护病房只在患者真正危及生命的情况投入使用。这实际上是一个装备精良的急诊部门,主要救治严重创伤和伤害的患者。紧急加护病房照顾病人保证其在办理治疗手续的同时不会发生万一的危机状况。通过紧急加护病房,保证有足够的时间准备治疗方案和诊断程序。这段时间用于收集病人的资料,准备治疗方案或者安排持续性照顾。通常相当大比例的患者进入急诊护理单元将会进入紧急加护病房。观察单元属于紧急加护病房部分。紧急加护病房的目的,是减轻重症监护病房(急诊室)压力选择性护理单元用于病人提前一段时间(几17、天,几周)的登记和预约。选择性护理单元通常可以很好地制定治疗计划。为了保障计划的准确性,有必要确定每个病人的针对性。治疗计划需要取得普通医生,医疗专家,患者协会和其他有关各方的确认,包括治疗时间,分配任务和责任。持续性照顾单元为病人提供长期而必要的医疗服务。这种类型的服务要求有紧密的个人联系,在一个轻松的,非医院的环境下进行。为病人及其家属提供大量信息咨询和治疗服务,和其他相关治疗的推荐。例如慢性护理心力衰竭患者,背部的问题,肺/支气管哮喘的条件和糖尿病等。以遵循治疗流程为出发点的规划模式以遵循治疗流程为出发点的规划模式这种模式主要是基于对病人从进入医院接受治疗和就诊到离开医院这一流程。可分为18、六个主要过程,具体情况如下:普通科医生治疗,推荐;检查和诊断程序;预约专家,咨询、讨论诊断结果、治疗的可能性和治疗计划;不同形式的治疗;不同形式的照料;不同形式的后续服务围绕这些流程组织的是ICT,组织和设施,形成6种不同的治疗中心:1。影响和诊断中心;2。预约咨询和会诊中心;3。治疗中心;4。护理中心;5。护士站;6。专家中心。这种模式建立在现代ICT应用的基础上,采用复合多学科的治疗流程,包括医院内外。采用这种方式的基础是专业人员必须能获得所需要的信息,这意味着,所有信息必须是数字化的。医院的功能结构组织必须考虑多方面的因素,在原则上适用于以上的三个模式。HOSPITAL REQUIREM19、ENTS设计出发点1213Planning on the basis of target-groups/clinicalentitiesThe basis of this model is clustering activities as far as possiblearound the treatment of the patient,whereby a distinction isgenerally made according to care units and supporting units.The care units concern the primary process,pa20、tient care.Thisis based on grouping the different specializations present in thehospital,aimed at achieving a more or less comprehensiverange of care for patients with similar clinical entities.Classification into care units/themes depends on the careprofile of a hospital,whether or not certain spec21、ializations arepresent,the scope of the existing specializations and thehospitals policy and profiling.Examples of care units/themesinclude mother&child,oncology,brain&sense organs andHeart&vascular.The supporting units are focused on medical and general&technical support for the primary process.Med22、ical support includes imaging diagnostics,general organfunction investigation,the pharmacy and the laboratories.General&technical support mainly comprises facilities formanagement,suchasadministrationandprovisionofinformation,central kitchen,technical service and personnelfacilities.In practice,it i23、s shown that the functional and spatial planningof the above-mentioned units can be tackled in different ways.Some projects have opted to combine inpatient and outpatientactivities within one care unit,with the incorporation of medicalsupporting functions.Other projects on the other hand havechosen 24、a more traditional form of planning in which a greaterdistinctionisadvocatedbetweeninpatientcareandoutpatient care and diagnostics.In this situation,the careprocess around the patient is generally based on the principleof virtual multidisciplinary cooperation.These are forms ofcooperation that are n25、ot recognizable in a physical sense.Themedical specialists work together around one patient group butdo not have office visits at the same time at one location.It isdetermined by means of protocols in what manner the differentspecializations and medical supporting facilities are used in thetreatment26、 of the patient group.Theme 1:Brain&sensory organsTheme 2:OncologyTheme 3:Immune system,metabolism&agingTheme 4:Acute care&musculoskeletal systemTheme 5:Heart&vascularTheme 6:Growth,development and reproductionPlanning on the basis of patient flowsIn this model a distinction is made between four pat27、ient flows:acute care,urgent care,elective care and chronic care.The underlying principle of this subdivision is the assumptionthat each patient flow basically differs from the other in terms ofatmosphere,organization,planability,positionofprofessionals,relationship with referrers and follow-up care28、 andthe building aspect.The acute care unit only deals with patients who are in a trulylife-threateningsituation.Thisisinfactawell-equippedemergency department where mainly patients with severetrauma and injury are treated.The urgent care unit deals with patients in cases where a fewhours between re29、gistration at reception and treatment will notlead to problems.With urgent care there is time betweenregistrationandcarryingoutdiagnosticproceduresandtreatment.This time is used to gather information about thepatient,to prepare the treatment plan within the hospital orarrange any follow-up care.A la30、rge proportion of the patientswho are currently(wrongly)admitted to the emergency careunit will be treated in the urgent care unit.An observation unitforms part of the urgent care unit.The purpose of the urgentcare unit is to relieve pressure on the adjacent acute care unit(emergency department)as f31、ar as possible.The elective care concerns care when there is a period of time(days,weeks)betweenregistrationandanappointment.Elective care can usually be well planned.In order to safeguardthis plan ability,it is necessary to determine what has to beachieved with each patient target-group(the objecti32、ves).Agreements are made between general practitioners,medicalspecialists,patient associations and other parties involvedabout admission waiting-time,total treatment time,allocation oftasks and responsibility.Thechroniccareconcernscarewherealong-termrelationship with the patient is required.This typ33、e of caredemands a strong personal contact in a relaxed,non-hospital-like atmosphere.A great deal of attention is paid to providinginformation and counseling to the patient,relatives,otherparties concerned and the referrer.Examples of chronic careare patients with heart failure,back problems,lung/as34、thmaticconditions and diabetics.Planning on the basis of the care processThis model is largely based on the stages through which apatient passes from the moment the patient arrives in thehospital until the moment he/she leaves it.Six main processesmay be distinguished here,as follows:treatment from 35、the general practitioner,resulting in referral;screening and diagnostic procedures;appointment with the specialist(s)to discuss the diagnosticresults,advice,treatment possibilities and treatment planning;treatment in different forms;care in different forms;aftercare in different forms.Groupedaroundt36、hesemainprocessesareICT,theorganization and the facilities,resulting in six different centers:1.Thecentreforscreeninganddiagnosticswhereinvestigations can be carried out;2.Appointment centre where consultations take place;3.The treatment centre where treatment is carried out;4.The nursing centre whe37、re nursing takes place;5.The logistics centre from which support is given to theabove-mentioned centres;6.The knowledge/expertise centre where the professionals(inthe broadest sense of the word)have a place to work and meeteach other.This model is based on the assumption that modern ICTtechniques ar38、e applied,aimed at integrated planning of thecare process not only in the hospital but also outside.The basic principle is that professionals in the care chain mustbe able to consult all information independent of time andplace.This means that all information must be digitallyavailable.The structure39、 should be in principle suitable for allthree planning models with regard accommodatingto care organization.HOSPITAL REQUIREMENTS设计出发点14BASIC QUALITY REQUIREMENTSThe basic quality requirements formulated below at the level of the hospital as a whole and the basic quality requirements as incorporated40、 in the specific guidelines form the complete set of basic quality requirements with which building plans for new hospitals have to comply.Reach abilityA general hospital should be easily reachable by public transport,assessed on the basis of transport frequency and the distance to the stop,and also41、 by taxi,car or bicycle.Generally speaking,this requirement is complied with if a general hospital is situated at one of the geographic/demographic concentration points in its catchment area.A geographic/demographic concentration point is a municipality where the population level and level of amenit42、ies(schools,retail trade,recreation,and public services)is such that a substantial proportion of the population in the catchment area of the hospital is more or less automatically orientated towards that municipality.AccessThe site needs to be easily accessible by patients,visitors and staff.In this43、 connection,specifications apply to pavements/footpaths(minimum width,minimum free height,maximum slope,and maximum height of kerbs),ramps(minimum width,maximum slope and length,halfway and end platforms),outside stairs(minimum width,maximum rise,installation,height and design of handrails),material44、 properties of paving surfaces(flat,rough and jointless)and lighting.Regulations also apply to the measurements and layout of parking places.There are additional requirements for the less able,such as the size of parking places and the height of parking meters.Obstacles should be indicated by warnin45、g paving,continuous guiding lines must be present.Taxis should be able to come right up to the main entrance and the entrance to the outpatient unit.The entrance to the emergency department and if necessary the main entrance should be accessible by ambulance.Public entrances to a hospital building s46、hould comply with minimum dimensions and also be accessible by people with a physical handicap.These entrances should be covered over and provided with good lighting.There are also specifications that apply to the entrance hall(sheltered situation,minimum dimensions,location of the doors,lighting),t47、hresholds(maximum heights)and door handles.In the case of revolving or carrousel doors,there must be an extra swing or sliding door provided.Where main traffic areas are concerned,specifications apply to e.g.minimum width,free access height,the direction in which doors open,the presence and dimensio48、ns of rails along the walls and lighting.The same applies to internal stairs,which have to comply with specifications concerning the maximum rise and the minimum tread and for halfway landings.Where lifts are concerned,specifications apply for example to cage dimensions and access height and width(d49、epending on the type of lift),the location of the operating elements and rails,and the maneuvers space in front of the lift door.基本功能要求基本功能要求制定了一套清晰的指导方针,形成了一套完整的基本素质要求与建设计划,规定了医院作为一个特殊的功能复合体,必须遵守。可达性一般医院应该很容易通过公共交通到达,评估包括,公交的频率和车站的距离,还包括出租车,汽车或自行车。一般来说,这一要求应当严格遵守,一般医院位于一个地理/人口集中点,包括人口和市政的设施(学校,零售贸易50、,娱乐和公共服务),医院的辐射作用要求它在交通和可达性上面向整个城市。出租车应该能够便捷到达医院主要入口和门诊大楼。急诊部入口应可通过救护车。医院公共入口应符合最小尺寸要求,也可通过人与身体残疾。这些出入口应当提供良好的照明。规定同样适用于入口大厅(百叶尺寸,最小尺度,门的位置,照明),入口旋转门,必须提供额外的动力辅助开启。就主要交通流线而言,规格适用于如最小宽度,开门高度和方向,墙体指向和照明。这同样适用于内部的楼梯,它必须符合有关规范的最大上升和最低台阶和中间平台。就电梯而言,规格适用于例如轿箱尺寸、高度和宽度(取决于电梯的类型),位置和管道,以及消防前室。主入口 医院需要方便患者,陪护51、人员和工作人员抵达。在这方面,规定适用于行人路上/行人(最小宽度,最小自由高度,最大坡度,最大高度路肩),斜坡(最小宽度,最大坡度和长度,中途和最终平台),外楼梯(最小宽度,最大的上升,安装,高度和设计的扶手),材料特性铺平表面(平面,粗糙和无缝)和照明。条例也适用于停车位的设计。HOSPITAL REQUIREMENTS设计理念15环境质量医院内部和外部的环境不仅影响医疗服务的提供,而且也影响患者的治疗。这已经在许多研究中显示出来了。这些研究的结果使我们更加关注包括医院在内医疗保健机构环境造成的心理影响。此外,人们正越来越多地关注医疗环境在医院体系中的作用。研究表明,良好的环境对患者和陪同人52、员同样起到了促进作用:易到达并且指示系统清晰:例如一个明确识别的主要入口和良好的建筑物内部识别系统;舒适,并增加自主权。通过材料,颜色和艺术发挥作用;促进与护理工作人员的联系:例如,正确的护理站 位置,在病房存在足够的护士呼叫系统;提供信心和隐私,无论视觉上(例如走廊里没有令人不安的事物)和听觉(例如通过使用吸声材料保证病房的安静 旁边的职能门诊室);重视亲属:例如访客的设施,如病人房间摆设椅子,母婴同室的可能性(儿童区)为亲人提供休息设施,必要的外部探视时间;提供与外界接触:例如,提供与外界的沟通工具(广播,电视,电话),并置于明显处;安全,可靠和光明的:例如,确保有足够的日光可以穿透,使用53、非体制的家具和照明,并避免走廊长期处于阴暗的光照条件下。空间关系医院各个功能空间之间的关系是基于两个因素。一方面要求制定医院各个功能空间之间的关系是基于两个因素。一方面要求制定的是来自医疗和后勤因素,是独立的组织形式选择的医院。另一方面的是来自医疗和后勤因素,是独立的组织形式选择的医院。另一方面,空间关系的确定由该组织的医院,其中,空间关系的确定由该组织的医院,其中3 3款的可能性已详列在第款的可能性已详列在第3 3章章。也许有必要放下邻近的要求不同地区的一家医院的基础上,医疗或后勤的论点。这些要求是基于不同的活动发生在一所医院和是分开的要求,可以制定的基础上,组织了医院。这些活动是不依赖于组54、织形式的医院。要求医疗的基础上关注的主要论点接近要求,放下,因为快速交通是必不可少的病人的利益。邻近的一个主要要求是遵守,如果有直接的联系在横向或纵向两种感觉功能团体或部门的一家医院。使用,可这里的升降机与预先选定的控制。一个主要环节,这种关系是至关重要的一方面紧急单位和另一方面的经营单位,成像诊断单位和地点紧急治疗是考虑到心脏病患者。一个主要的联系也是必要的之间的业务单位和重症监护和产科单位。邻近要求的后果,后勤因素是基于病人的数量,人员或货物运输之间的不同要素,形成了医院。邻近的要求而产生这方面服从于邻近的要求主要基于医疗因素。这是值得推荐的设施,用于门诊应位于以便容易到达的相互关系。这特55、别涉及门诊预约服务台,设施,器官功能的调查,该医院的实验室和影像学诊断单位。所需经费也可以放下与量的货物运输。作为一项规则,经营单位和中央消毒服务单位通常位于以便使它们很容易到达对方。根据类型的组织,空间的要求可以制定不同组成部分的组织单位之间以及这些单位本身。所需经费的关系而产生的组织形式是服从关系,制定了初级以上。这是值得推荐,为了凝聚力,所选择的组织形式应体现在空间结构。HOSPITAL REQUIREMENTS设计理念16Quality of the environmentThe quality of the built external and internal environmen56、t of hospitals notonly has an impact on the wellbeing of the care providers,but also on thehealing process and behavior of patients.This has been shown by the manystudies that have been carried out in this field in recent years.The results of these studies have led to increased attention being paid 57、to thepsychological impact of environmental aspects of healthcare institutions,including hospitals.In addition,attention is increasingly being focused on therole of the patient in healthcare.Studies have shown that the well-being of patients and visitors is promotedby an environment that:is easy to 58、reach and where everything can be clearly found:for example aclearly recognizable main entrance and good signposting inside the building;is comfortable and increases autonomy.The use of materials,colour andart play a role here;promotes the relationship with nursing staff:for example by the rightloca59、tion of the nursing stationon a ward and the presence of an adequate nurse call system;provides confidence and privacy,both visually(for example no undesirableviews from the corridor)and acoustically(for example by use of sound absorbent materials andlocating mainly quietfunctions next to patient ro60、oms);pays attention to relatives:for example facilities for visitors such as chairsin patient rooms,possibilities for rooming in(childrens ward)and resting facilities should thepresence of relatives benecessary outside visiting hours;provides contact with the outside world:for example by making mean61、s ofcommunication available(radio,tv,telephone)and providing a clear view outside;is safe,secure and bright:for example by ensuring that sufficient daylightcan penetrate,by using non-institutional furnishings and lighting andavoiding long,obscure corridors.Spatial relationships(Functional relationsh62、ips)Thedemandsplacedonspatialrelationshipsbetweenthedifferentcomponents of a hospital in the architectural design are based on twoelements.On the one hand requirements are formulated that are derived frommedicalandlogisticfactorsthatareindependentofthechosenorganizationalformofthehospital.Ontheother63、hand,thespatialrelationships are determined by the organization of the hospitalIt may be necessary to lay down proximity requirements for different parts of ahospital on the basis of medical or logistic arguments.These requirements arebased on the different activities taking place in a hospital and 64、are separate from therequirements that can be formulated on the basis of the organization of the hospital.These activities are not dependent on the organizational form of the hospital.Requirementsbasedonmedicalargumentsconcernprimaryproximityrequirements that are laid down because fast transport is 65、essential in the interestsof the patient.A primary proximity requirement is complied with if there is a directlink in a horizontal or vertical sense between two function groups or departmentsof a hospital.Use can be made here of a lift with pre-selected control.A primarylink of this kind is essentia66、l between on the one hand the emergency unit andon the other hand the operating unit,the imaging diagnostics unit and thelocation where emergency treatment is given to heart patients.A primary link is also necessary between the operating unit and the intensivecare and obstetric units.Proximity requi67、rements as a consequence of logistic factors are based on thevolume of patient,personnel or goods traffic between the different elements thatform the hospital.The proximity requirements arising from this aspect aresubordinate to the primary proximity requirements based on medical factors.It isworth 68、recommending that the facilities to be used by outpatients should besituated so as to be easily reachable in relation to each other.Thisparticularly concerns the outpatient appointments desk,facilities for organfunction investigations,the hospital laboratory and the imaging diagnosticsunit.Requireme69、nts can also be laid down in connection with the volume ofgoods transport.As a rule,the operating unit and the central sterilizing servicesunit are usually located so as to make them easily reachable from each other.On the basis of the type of organization,spatial requirements can be formulatedbetwe70、en the different components of the organizational units and between theseunits themselves.The relationship requirements arising from the organizationalform are subordinate to the primary relationships formulated above.It is worthrecommending,for the sake of cohesion,that the chosen organizational fo71、rmshould be expressed in the spatial structure.HOSPITAL REQUIREMENTS设计理念灵活性灵活性的概念是指建筑物在某种程度上适应不断变化的空间需求。对医疗部门来说灵活性是很重要的,再设计中关注的结构发展的灵活性和可能性。由于这一点,建筑形式适应空间发展是必然的。高度的灵活性,扩建对原有体系的影响可以保持在最低水平无论是建设中产生的影响还是空间组织的解体-保持在可接受的水平。医院规划结构的设计应具备高度的灵活性。建筑布局应能通过简单的方式向不同的方向延长,应该能够应对医院的内部发展需求。医院是一个复杂的建筑综合体,医院建筑的特点是的在设72、计中考虑到未来的变化和科学的创新,技术的发展。多年来,在各种建筑的概念中发展的灵活性是一个重要的基本准则。随着时间变迁,建筑设计的灵活性方面开始发挥作用,新结构的产生,如梳状结构,交叉结构,线性结构等。基本上说在医院的设计中可以通过以下四种方式体现发展的灵活性,具体情况如下:使用空间的灵活性,使用空间的灵活性,功能配置的灵活性,功能配置的灵活性,布局或内部发展的灵活性,布局或内部发展的灵活性,扩展或外部的灵活性。扩展或外部的灵活性。使用空间的灵活性使用空间的灵活性使用空间的灵活性就是能当必要时能改变一个房间/空间的用途,而不需要重新整修房间/空间。功能配置的灵活性功能配置的灵活性功能配置的灵活73、性关注在不产生负面影响的前提下,以最小的障碍,合理协调使用中产生的功能缺点,并加以优化的可能性内部发展灵活性内部发展灵活性是指建立医院内部灵活交换功能的独立体系的可能性。框架混凝土结构使这种交换成为可能,因为内部空间能在不重新施工装修的条件下,改变功能并重构。内部功能置换的可能性将使医院的“硬”功能(如特殊设备和设施的安装和配置)置换“软”功能(与标准设备和设施的安装和配置)。内部发展可能性使得医院的“硬”功能可以以这种方式置换“软”功能,从而保障了未来的增长。“软”功能在实际上起了缓冲的作用。缓冲的必备条件之一是,有关的功能置换不存在技术要求高的建设,从组织结构的角度来看,并不处于最重要地位74、。从而,功能的置换不会产生任何重大问题。外部空间的灵活性外部空间的灵活性外部空间的灵活性是指规划结构的基础上扩建现有的建筑结构可能性。随着功能的增长,扩建的可能性是可以预期的。在设计,考虑发展扩建的可能性,能使医院的整体发展得到保障。例如:提供延展的可能,再今后的发展中将有需要地部分联系起来,以更合理的方式配置内部交通系统和主要基础设施。在规划医院各功能部分相互关系的同时,也能通过设计获得灵活的未来发展可能。这方面的一个例子是采用一种结构,在该结构下将功能有机划分而不是完全置于主楼之内。护理,诊断和治疗部门都集中在主要的核心部分。药房,实验室,储藏室和厨房设在主楼部分有一定距离的服务大楼。HO75、SPITAL REQUIREMENTS设计理念1718FlexibilityThe concept of flexibility refers to the degree to which a building is adaptable tochanging space needs.Flexibility is important in the healthcare sector because we are concerned here witha structural process of change.As a result of this,spatial adaptation of b76、uildings inthis sector is inevitable.With a high level of flexibility,these adaptations can be keptto a minimum,as a result of which the financial consequences and the hindrance tomanagement both in terms of building nuisance and spatial and organizationaldisintegration remain within acceptable leve77、ls.The main structural design of a hospital should possess a high degree of flexibility.The building structure should be simple to extend at different points and should beable to cope with internal displacement.A general hospital is a complex building with many rooms,the functionalinterpretation of 78、which is highly varied.A characteristic feature of todays hospitalarchitecture is that account was taken of future changes and innovations in science,technology and policy when selecting the building structure.Over the years,variousarchitectural concepts have been developed in which flexibility is a79、n important basiccriterium.In the past,the pavilion and Breitfuss models were among the most common usedstructures for hospitals.From the time that flexibility aspects started to play a role,new structuresappeared such as the comb structure,cross structure,linear structure andvariations on these str80、uctures.There are four types of flexibility,as follows:usageflexibility,disposalflexibility,layoutorinternalflexibilityandextension or external flexibilityUsage flexibilityUsage flexibility concerns the possibility of changing the use made of aroom/space without the need to renovate that room/space.81、Disposal flexibilityDisposal flexibility concerns the possibility of removing building elementswithout a detrimental effect on the cohesion of the building elements to beretained and with a minimum of hindrance.Internal flexibilityThe term internal flexibility refers to the possibility of interchang82、ing hospitalfunctions independent of the supporting structure.A supporting structure withconcrete columns makes this possible because the internal fittings geared tothe function can be removed without constructional consequences and bereconstructed once again.The possibilities for internal displacem83、ent arepositively influenced by situating“hard”hospital functions(where specificconditions are laid down regarding equipment and installations)next to“soft”hospital functions(with standard conditions with respect to equipment andinstallations).The hard hospital functions can in this way displace the84、 softhospital functions,thereby safeguarding future growth.The“soft”hospital functions act in fact as buffers.One condition for thesebuffers is that the relevant functions should not place high technical demandson the building and that their location is not of major importance from anorganizational 85、point of view.Consequently,displacement of these functionsshould not form any great problem.External flexibilityThe term external flexibility refers to the possibility of expanding the existingbuilding structure.Expansion possibilities are mainly programmed for functions where growthmay be expected.86、In the design,it is assumed that after the extensions havebeen carried out,the functionality of the whole building will be guaranteed.For example:possible extensions will need to link up in a logical way to theinternal traffic system and to the main infrastructure of the installations.When planning 87、the hospital functions in relation to each other,it is alsopossible to obtain a flexibly designed hospital.An example of this is a buildingstructure where functions that do not form part of the primary process areplaced in separate building elements.The nursing,diagnostic and treatmentdepartments ar88、e concentrated in the main core of the hospital.The pharmacy,laboratories,storerooms and the kitchen are located in service buildings at adistance from the main coreHOSPITAL REQUIREMENTS设计理念周边环境影响SITE ENVIRONMENT地块的有利条件为东南面有大片绿地,西南面百米处为海湾,景观良好。交通四通八达,靠近新中心区。不利条件为北面有学校和公交首末站,噪音影响较大,并有三条正在修建的地铁穿过基地下方,89、使得基地使用率降低。学校商住用地山体绿化市政建筑滨水绿带海景观滨水绿带住宅用地19本项目基地20理念分析CONCEPT ANALYSISEnvironment and orientationThe environment has an important influence in the area using andthe orientation of the hospital,The main factors:-the noise-the reach ability-the main access-the sunshine-the function structure of the surr90、ounding buildings-in this special case the subway line,which makes some partunusable.周边环境和功能定位周边环境和功能定位周围环境对基地的使用和功能分区有重要的影响,主要的影响包括:-噪音-城市人流的方向-主入口的方向-日照的影响-周边地块的用地性质-地铁穿越基地,使得地面一些部分不能修建建筑。城市车流、人流主要来源方向住宅学校市政建筑住宅用地城市绿地优良景观面噪音干扰面地铁穿越地段主体区域对外缓冲区对外缓冲区对外缓冲区停车下客区域禁止开车行口区域人行主入口急救中心综合楼门诊部医技部开放广场住院部预留发展用地停91、车及一层构筑物绿化渗透医院街轴线理念分析CONCEPT ANALYSISMain access and entrance developmentBy following of the requirement of the standard of traffic and the requirement of the main entrance area,there is creating the entrance-out-patient on the intersection of car access and main patient entrance.Also here is showing92、 one of traditional structure of Chinese hospitals.Extension/flexibilityFlexibility is one of the important elements,which is care about.Every part of the hospital should have the possibility of extension.The south east has a lot of potential,to develops the xinan hospital in the different variants.93、The construction must be allow a variety of extension possibilities.主入口的确定主入口的确定根据前面的功能、交通和环境的分析,本设计把医院主入口设置在基地西北角,城市人流的主要方向,车行主入口和人行主入口围合成了一个广场,便于医院众多人员的流动和疏散。由主入口方向,确定了主体建筑的中轴线,并形成了传统医院的前门诊,中医技,后住院的大致格局。二期发展的灵活性二期发展的灵活性加建的灵活性对于医院来说非常重要,随着医疗技术的飞速发展,医院的各部分都有加建发展的可能。用地的西南角作为比较理想的二期发展用地,有几点好处:一,实现了景观的94、二次利用;二,门诊以及医技住院可均衡发展。医技部安静且景观良好的住院区综合楼门诊部入口广场,缓冲区域中轴线21急救中心综合楼门诊部医技部开放广场住院部预留发展用地停车及一层构筑物绿化渗透医院街轴线理念分析CONCEPT ANALYSISReach abilityNot only the access of the patient is a part of the flow.Also the an important part is the reach ability of the staff and the extra access of the emergency.There must be95、 a clear definition about this circulation.Influences by nature“Let the nature in!”In the south east is a huge landscape area in planning.The hospital is a part of the city.So two structures meet each other and going together.Integration of nature is central theme of the concept.Green rooms are tran96、sporting nature to the inside.The hospital extend to the nature(south east)and the nature expand into the hospital and develops green spaces.Sketch-extension可达性可达性医生和工作人员进入医院的方便程度应和患者一样,急诊也需要独立的出入口,因此,医生和患者的流线必须非常清晰。让绿色的自然渗透到建筑中吧!让绿色的自然渗透到建筑中吧!基地的东南向有大片绿色景观,西南向可以看到海景。医院作为城市的重要公共设施,面对众多民众开放,引入自然成为重要的97、设计理念之一。建筑的形态来源于把自然引入建筑的理念,绿色中庭,绿色医院街,屋顶绿化等多种手段帮助我们实现该理念。同时,未来的发展用地处于良好景观中,有效地二次利用了有利的景观环境。医技部安静且景观良好的住院区综合楼门诊部中轴线急救中心引入自然景观22理念分析CONCEPT ANALYSISTraffic circulationBy following of the function structure/area using and Access arrangement,its necessary to develop a circulation and a connection between98、 the different accesses.A central circulation is also necessary for the fire protection of the hospital.The Symbol of medicine:“An Image develops by functions”By analyzing of the area and interpreting of the idea and functions of the hospital,it will create an Image,which gives the hospital an uniqu99、e shape with an own character in relation to the medicine.交通流线交通流线各个功能分区之间需建立必要联系,分别设置独立出入口,方便不同的人群使用。主体建筑周围设环道,解决消防问题。图形的象征意义图形的象征意义通过已经分析的功能分区、医院的功能流线以及引入自然的设计理念,我们得出一个独特建筑形象,与中华医学会的标志相似,更赋予了建筑生动的象征意义。医技部安静且景观良好的住院区综合楼门诊部中轴线急救中心医院街2324功能分区FUNCTION STRUCTURE HORIZONTAL功能分区功能分区道路将地块分成左中右三块,功能分别为行政办公100、主体大楼、二期发展用地。中间的主体大楼以入口方向为中轴线,发展出贯穿前后各功能的医院街,北面最接近城市人流方向的体块为门诊,其后为医技部门,需要与医技部门紧密联系的住院楼位于医技楼的上方。此布局形式有利于未来发展的住院部和现有医技部产生直接联系。医院主体部分二期发展用地行政后勤区25功能体块分区FUNCTION STRUCTURE HORIZONTAL26主体大楼垂直功能分区FUNCTION STRUCTURE VERTICAL1:8001:8003.方案解析方案解析CONCEPT PERFOMANCE28鸟瞰图BIRDSEYE VIEW鸟瞰图BIRDSEYE VIEW2930入口广场ACC101、ESS建筑主入口医院的主入口位于场地的东北。急诊区位于入口大厅的右侧。通过公共交通来的患者或陪护人,首先通过开阔的入口广场进入中央大厅。通过中央大厅顺着开放的走廊(绿色医院街)进入医院综合体。在地面上通过不同色彩的釉面砖形成向导线,指引患者更容易抵达不同的诊室。尽可能的为患者提供自由的空间和温馨的环境。Building main accessThe main entrance of the hospital is located on the ground floor at the head of the entire plant in the northeast.On the right o102、f the entrance hall is the entrance to the emergency(A&E).The patient or visitor,who comes by public transport,arrived on the large square directly to the entrance area.He goes on to a large central hall.From this central hall from the one you get on an open corridor into the interior of the buildin103、g complex.All roads are glazed at the end to the reference to the outer space and an easy guiding line to reach.Wherever it is possible,patients are getting free zones.31门诊大楼透视GARDEN PERSPECTIVE32住院大楼透视IN-PATIENT PERSPECTIVE33入口大堂DETAIL ENTRANCE HALL中央大厅设计中考虑到每天约3.000人前往就医,其中很大一部分是在一些特殊的情绪状态下:孤独,担忧,104、焦虑和无助。入口大厅的设计概念是创造一个开敞、尺度宜人公共空间,提供一个平等、亲切的接待场所。患者并不会因为进入一个宏大的空间而感到不安和渺小。他们能在空间中感受到开放性和情感温暖。门厅、医院街、走廊通过设计出恰当的比例,有助为患者和医生于创造一个理想而高效的空间,通过连接各门诊、医技楼层的自动扶梯,为患者提供了休息和放松的空间氛围。门诊大厅是医院人员最密集亦最公众的场所,同时又是医院中多种流线的交叉点,门诊大厅设计的合理与否直接影响到病员能否方便就诊。门诊部所占总建筑面积的比例在15%左右。合理安排门诊大厅的各种功能,不宜造成病员行走的线路过长,故本设计将门诊大厅根据功能安排设计成几个相连的105、厅。34总平面图MASTERPLAN1:20001:2000经济技术指标经济技术指标:总用地面积:80034.74综合总建筑面积:208700其中地上总建筑面积:162200地下总建筑面积:46500综合容积率:2.03覆盖率:29.6%绿化率:45.0%停车位:1291个其中地上:207个地下:1084个分期经济技术指标:本期总建筑面积:171200其中地上建筑面积:131200地下建筑面积:40000门诊及医技楼建筑面积:52700住院楼:47500综合楼:30000后勤保障用房:1000停车位:1163个其中地上:207个地下:956个二期待建总建筑面积:37500其中地上建筑面积:31106、000地下建筑面积:6500停车位:128个FUNCTION STRUCTURE HORIZONTAL35功能分区图水平分区和垂直分区相结合布置内部功能,一层为入口大厅,传染控制科,急诊中心,内科,影像科,高压氧治疗中心,以及住院部入口。二层为儿科,急诊中心,门诊输液区,外科,皮肤科,康复中心以及检查检验中心。三层为妇产科,口腔科,五官科,肝病治疗中心,功能检查,中心药房等。四层主要为手术室,也有对外的体检中心,和中医科。手术室与外界其他部分隔绝,保持较高的洁净程度。同层设置ICU病房。五层为设备架空层,屋顶花园以及特诊室。可供住院病人休闲活动之用。六到十八层为两栋住院塔楼。36机动车流交通分107、析图VIECLE TRAFFIC ANALYSIS病员及其家属去医院就诊,大都乘坐各式便捷的交通工具,随着经济的高速发展,汽车进入家庭的进程越来越快,医院的停车成了医患双方都头疼的问题。对停车场地问题,在规划上要留有余地。本设计把沿新湖路一侧全部打开,为将来的停车问题提供了缓冲余地。停车场地理想的位置应在门诊附近,最好是在门诊楼的地下,病员可以乘车至地下停车库,下车后直接从垂直交通达到门诊大厅,就诊后以同样的路线便捷地乘车离去。外来人员车流主要出入口位于博宝路上,穿过门诊部前面的入口广场,为将来新湖路上开设车行出入口,提供了可能性。急救中心在湖滨西路上单独开口,避免和其他车辆交叉,员工入口位于108、博宝路,行政楼有直接对外的入口,物流供应入口和住院车流使用同一个入口,物流直接进入地下层,污物出口位于地块西侧下风向处。人流线交通分析图PEOPLE CIRCULATION ANALYSIS患者通过中央大厅进入医院后,主要使用的是中间的绿色共享中庭医院街,通过医院街进入各个独立的诊室。医生则主要在各个体块内部的诊室内工作,各诊室通过建筑外部的连廊连结,此连廊主要为医生和工作人员使用,减少了流线交叉。3738消防分析图FIRE FIGHTING39室内人流线分析图STAFF&PATIENT FLOW40洁污流线分析CLEAN&SOIL41洁污流线分析CLEAN&SOIL42分期建设示意图FUTU109、RE DEVELOPEMENT医疗事业发展速度一直较快,为满足将来的发展,为二期发展预留了较完整的用地,平行于主体大楼,则满足了门诊扩建,医技扩建和住院扩建等各种需要,同时,北侧角部预留的用地也可以发展行政办公部分。为未来发展提供了多种可能,加强了扩建的灵活性。43绿化分析GREEN SPACE本设计既是集中式的布局,也尽可能的降低了层高。S型的体形比“串”字形 更大程度的引入了自然,并且把建筑基地占用的绿地通过巨大的屋顶花园返还给了医生和患者。不仅满足了外部较高的绿化率要求,同时,医院内部随处可见绿化中庭和露天庭院,使得内部气氛较为轻松,清新。室外活动对于病员的恢复来讲是很重要的,因此医院的110、庭院不仅仅是美化环境的问题,本次设计用地有限,解决的办法是尽可能多的把绿化渗透进医院的建筑体块之间,并且采用屋顶花园的方式补偿建筑占用的绿地。44管线综合CITY FACILITY45日照分析图SUNSHINE住院部满足一半病房冬至日日照大于等于2小时的要求。46规划结构BUILDING STRUCTURE深化发展出住院大楼,综合楼和未来发展。围绕轴线和绿化渗透产生的建筑形态加入公共交通和入口大厅,以及一些辅助体块围绕主体建筑,以及距离道路交叉口70米处开口的条件形成的路网地下室平面BASEMENT地下一层平面约4万平米,包含900多个停车位,以及1500平米的中心供应,设备用房约1500平米111、,以及部分后勤用房,药库以及太平间。洁净楼电梯和污物楼电梯直接通往地下,通过中心供应进行转换。中心供应位于手术室正下方,方便使用。地库入口设在车行入口附近,尽量引导大量车流直接进入地库,再通过垂直交通,进入医院。471ST FLOOR PLAN48一层平面图1:10002ND FLOOR PLAN二层平面图493RD FLOOR PLAN三层平面图504TH FLOOR PLAN四层平面图515TH FLOOR PLAN五层平面图526 TH FLOOR PLAN六层平面图537-10TH FLOOR PLAN七-十层平面图5411-18TH FLOOR PLAN十一至十八层平面图55立面图E112、LEVATION56沿健宝路立面图沿博宝路立面图立面图57ELEVATION沿新湖路立面图沿湖滨西路立面图剖面图SECTIONS58A-A 剖面图B-B剖面图4.建筑细部建筑细部DETAIL INFORMATIONDETAIL FACADE 60立面分析图二期发展500床住院楼一期住院楼A急诊中心医技部绿色医院街一期住院楼B主入口61DETAIL FACADE 立面细部轻质的结构和浅色调使患者感觉更加舒适和安全。所有的住院房间均保证开启面积,保持自然通风。在适宜的位置设计了遮阳百叶,可调节阳光进入室内的多少,同时在冬天,也起到了双层隔绝冷空气的作用。主体大楼的一层设计得较为开敞,多处使用玻璃等113、透明或半透明材质,使室内外产生望而不穿的连通感。开敞的感觉加强了医院的亲切感和温馨感。The louvres fixed on the outside of the hall faade are like a translucent curtain,defining the spatial boundary between inside and outside.They protect the interior against insulation and glare without impeding the view out.The meditative strip of water run114、ning through also enhances this central space.医院街CORRIDOR62医院街在很大程度上,医院的布局是基于两个基本出发点:使患者就医、进行不同检查的距离尽可能短,并确保流线有良好的自然采光和通风,从而为患者提供舒适、放松的就医环境。医院内公共空间的自然采光及通风,这在设计上十分重要。由于门诊大厅一般面向多个不同的功能部门,从侧窗的采光有一定的困难,而且由于门诊大厅人员密集,面积大,从空间尺度上及卫生条件上均适合设计成高空间或共享空间的形式。现实的设计往往采用天窗的形式。这种形式从采光、通风来讲更适合门诊大厅的人员密集的特点,不仅是节省能源,更重要115、地是可舒缓病员焦虑的心情,并且在门诊大厅的高空间中种植一些植物,都会对病员的心理有更好的调剂作用。63住院大楼标准层平面IN-PATIENT STANDARD FLOOR PLAN64住院大楼标准层平面IN-PATIENT STANDARD FLOOR PLAN住院大楼标准层人流线STAFF&PATIENT FLOW OF IN-PATIENT BUILDING 65室内环境INSIDE ENVIRONMENT66内部装饰,采用浅色调,及各种颜色标识,一层空间用玻璃分隔室内外,大量引入绿化和自然光,使内部空间明亮舒适,一层大厅和医院街均设置病人等候区域,咖啡茶座等过渡空间,避免了人们等候时的不116、便。四层通高的中庭,活跃了医院气氛,对采光和通风都有较大的改善。色彩和标识INSIDE ENVIRONMENT67医院是由众多功能不同的空间组织起来的建筑,清晰的标识和颜色能使人们在复杂的空间中以最便捷的路线达到目的地。医院的标识应醒目、清晰、明确。在医院中除用文字、图案表示标识外,用色彩线来引导不同的流线也是标识的一种。而且有时比文字、图案更明晰。如不同的科室在内装时采用不同的色彩会使人们更容易找到目的地。医院色彩上的变化一方面可起标识的作用,另一方面亦可对病员、家属乃至医务人员起到心理的舒缓作用。5.节能设计节能设计ECOLOGICAL STRATEGY绿色医院自由空间与绿色场所与自然的结117、合是设计概念的核心。通过室外花园、内部庭院和绿色诊室形成绿色空间系统,将自然引入医院。体系运输性质的内部。屋面、明亮的庭院-通过各个生态单元的组织凸现设计的绿色思想屋顶花园、内部庭院和宽敞明亮绿色医院街,营造出的轻松和谐的气氛,创造一个有利于患者的场所体验。模糊室内外的边界,将室外花园作为建筑的一部分。Free space-green roomsIntegration of nature is central theme of the concept.Green rooms are transporting nature to the inside.Roofing of the entranc118、e,bright courtyards each equipped with an own theme a roof garden,meditation garden and a variety of integrated terraces offer an atmosphere to relax,breath and regain health.The frontiers of inside and outside are merging and the gardens become part of the building.GREEN SPACE69节能措施ENERGY SAVING70通119、过建筑的智能控制,针对气候环境、资源利用、能源效率和环境保护四方面,充分利用和开发新的材料和构造技术,主要有以下几点:1、充分利用自然采光2、智能化遮阳系统3、改善隔热保温性能4、充分的自然通风5、设置热收集系统6、采用降温隔热措施7、利用压力、温差的作用8、利用植物系统等方法。71节能措施ENERGY SAVING高效能的绿色节能建筑外墙和设备技术会造成较高的投入,但是这种投入在房屋长期使用过程中通过节约了大量的能源而得到多倍的补偿。根据地区的不同,节能措施宜因地制宜,量身定做。深圳处在较高纬度,全年太阳辐射量较高,使用太阳能较方便。太阳能电池的半导体材料中的内部光电效应能将阳光直接转变为电120、压,医院街对采光、通风都起到了改 善的作用。医院街的中庭起着太阳能通道的作用,同时也起到了拔风的作用,加速内外空气交换,降低室内温度。住院部6.设计说明及投资估算设计说明及投资估算AREA SUMMARY建筑设计说明建筑设计说明一一 项目概况项目概况:深圳市新安医院位于深圳市宝安中心区滨海片区,新湖路西侧、湖滨西路北侧,健宝路东侧,博宝路南侧,是市属三级甲等医院和第一级网络核心医院。建设规划建设1500张病床,本次建设规模为住院病床1000床,按一次规划、分期建设实施。地块面积80034.74平方米,地形方正平整。本次建设总建筑面积为171200平米,其中地上建筑面积为131200平米,地下建121、筑面积40000平米。地块周围围绕4条市政道路,交通方便,配套相对较完善。二二 基地分析基地分析基地位于正在开发的宝安中心区,地块周围围绕4条市政道路,交通方便,配套相对较完善。北侧有学校和住宅,西侧为规划的地铁站和公交首末站,西南侧现为厂房和码头,东南侧为山体绿化,基地两端有现状沟渠,待规划整合,现状道路不完善,基地较平整。地块的有利条件为东南面有大片绿地,西南面百米处为海湾,景观良好。交通四通八达,靠近新中心区。不利条件为北面有学校和公交首末站,噪音影响较大,并有三条正在修建的地铁穿过基地下方,使得基地使用率降低。三、三、设计理念设计理念:本设计的出发点如下:1.医院中存在大量的人流及车流122、,因此现代医院要具有清晰的结构、良好的可达性和可识别性;2.研究表明,良好的环境对患者和陪同人员同样起到了促进作用,因此现代医院设计需改善就医环境,引入自然景观,实现室内外空间渗透;并尽量实现低密度的绿色医院;3.现代医院要适应未来的发展,并预留出足够的发展空间。四、总体布局四、总体布局:根据分析,城市主要人流方向来自北面新湖路及博宝路方向。由于城市规划禁止本地块在新湖路上开设车行口,因此在博宝路上设置车行主入口,在等级较高新湖路上设置人行主入口,车行主入口和人行主入口围合成了一个广场,便于医院众多人员的流动和疏散。在基地东南侧湖滨西路上设置急诊车行出入口,在西南侧健宝路上分别设置住院、物流供123、应及污物出入口,使不同人流及车流的的互不干扰。由人行主入口方向,确定了主体建筑的功能轴线。主体建筑包含了门诊、医技、住院三大功能。在人流最多的入口处集中设置门诊科室;在轴线的末端设置住院大楼,拥有最好的景观及日照条件;医技部分设置于两者之间,便于两者联系。综合大楼设在临博宝路侧,通过良好的形象形成了医院的沿街展示面,并可以有效阻挡噪音对基地的影响。将单层的后勤保障用房设在博宝路及健宝路夹角处地铁经过区域内,使之对主楼的干扰最小,并最大程度地利用了用地。基地西南侧设置为二期发展用地,有利于医院的二次建设,可以实现门诊以及医技住院可均衡发展,并有利于景观的二次利用。通过已经分析的功能分区、医院的功124、能流线以及引入自然的设计理念,我们得出一个独特建筑形象,与中华医学会的标志相似,更赋予了建筑生动的象征意义。设计说明AREA SUMMARY五五 建筑设计建筑设计:1 1 门厅门厅考虑到每天都有大量人流前往就医,其中很大一部分是在孤独,担忧,焦虑和无助的情绪状态下。入口大厅的设计概念是创造一个开敞、尺度宜人公共空间,提供一个平等、亲切的接待场所。患者并不会因为进入一个宏大的空间而感到不安和渺小。他们能在空间中感受到开放性和情感温暖。2 2医院街医院街本设计在主轴线上设置了步行医院街,医院街中间设置四层通高绿色共享中庭,两边设置绿色景观庭院,引入自然景观,实现了室内外空间渗透,给患者提供了理想的125、行走及休憩的场所,并避免了医患流线的交叉。3 3走廊走廊在很大程度上,医院的布局是基于两个基本出发点:使患者就医、进行不同检查的距离尽可能短,并确保流线有良好的自然采光和通风,从而为患者提供舒适、放松的就医环境。门厅、医院街、走廊通过设计出恰当的比例,有助于为患者和医生于创造一个理想而高效的空间。通过连接各门诊、医技楼层的自动扶梯,为患者提供了休息和放松的空间氛围。六六 交通组织交通组织:着眼与建立宝安区重点医院的定位,新安医院在未来将吸引很大一部分新区的交通流量,而且将主要从西北侧沿新安西路和新湖路到达基地。建设中的1号线延伸段在上述两条干道的交汇处设新安站;基地西侧隔博宝路规划建设公交车首126、末站;东北侧检查站附近的公交枢纽站也将积聚大量人流,由此基本情况得知,医院建成后,步行到达的人流也主要来自北侧。设计中综合各方面因素,将车行主入口设于基地西北侧博宝路上,并于博宝路侧面开设医院办公人员人行入口;人行主入口设于新湖路侧面;在另一条干道湖滨西路上开设车行次入口,作为急救车入口,使其线路短而畅通,并可相应分流湖滨西路的车流;住院部入口开设于健宝路,相对安静,并兼做供应入口,供应车辆直接开到地库,不干扰住院车流;基地西侧区位、朝向、风向都较为不利的地块,布置后勤辅助用房,相应开设地下车库污物出口,污物运输车辆迅速开离基地,不与基地地面车流交叉。基地共设置四个车行入口,结合地下车库的设计127、和地下供应体系的流线组织,于三个主要车行入口右侧设置地下车库入口,引导医院内部车辆尽快入库,有利于在地面上创造更适宜的步行空间。环道联系基地三个主要车行入口,使门诊车流与住院车流各占半环,互不干扰;使出租车流环形三分之一环道即离开基地。整个基地内不仅车行流线内外分流,短捷通畅,步行路线也舒适惬意,设计合理。人行主入口沿新湖路展开入口广场,精心设计的广场景观,简洁现代的门诊大厅立面,整个新湖路一侧开放美好地面向城市,给城市增添一抹亮丽的风景。经过主入口广场达到门诊大厅,在宽敞明亮的大厅里办完手续,悠闲地走过绿意盎然的中心长廊,到达就诊的科室。73设计说明AREA SUMMARY绿化长廊两侧错落的128、庭院树影婆娑,长廊的玻璃顶将明媚温暖的阳光毫无保留地洒落下来,自然而健康的环境犹如公园的一角,可以在长廊里舒适的座椅上小憩,欣赏风景,淡忘生病的无助与疼痛。病人的步行环境利用绿化长廊整合到室内,无疑减少了日晒雨淋之苦,更多的是加强对病人心理的抚慰。医护人员的步行路线以短而直为主,后勤区与工作区长边平行,流线最短;工作区内医护人员利用空中连廊紧密联系,独立于病人比较集中的绿化长廊,便于内部交流学习、器械药物的运输。七七 功能分区功能分区:主楼内部功能布置由水平分区和垂直分区相结合:一层为入口大厅,传染控制科,急诊中心,内科,影像科,高压氧治疗中心,以及住院部入口。二层为儿科,急诊中心,门诊输液区129、,外科,皮肤科,康复中心以及检查检验中心。三层为妇产科,口腔科,五官科,肝病治疗中心,功能检查,中心药房等。四层主要为手术室,也有对外的体检中心,和中医科。手术室与外界其他部分隔绝,保持较高的洁净程度。同层设置ICU病房。五层为设备架空层,屋顶花园以及特诊室。可供住院病人休闲活动之用。六到十八层为两栋住院塔楼。综合楼一层、二层主要布置人流量较大的功能空间,如报告厅、餐厅、图书馆等,上部主要设置教室、宿舍、办公室等功能空间。八八 景观规划景观规划:基地的东南向有大片绿色景观,西南向可以看到海景。医院作为城市的重要公共设施,面对众多民众开放,引入自然成为重要的设计理念之一。建筑的形态来源于把自然引130、入建筑的理念,绿色中庭,绿色医院街,屋顶绿化等多种手段帮助我们实现该理念。与自然的结合是设计概念的核心。S型的体形比“串”字形 更大程度的引入了自然。通过室外花园、内部庭院和绿色诊室形成绿色空间系统,将自然引入医院。体系运输性质的内部。屋面、明亮的庭院-通过各个生态单元的组织凸现设计的绿色思想屋顶花园、内部庭院和宽敞明亮绿色医院街,营造出的轻松和谐的气氛,创造一个有利于患者的场所体验。模糊室内外的边界,将室外花园作为建筑的一部分。九九 立面设计立面设计:因基地位于海边,本项目立面采用滨海建筑风格,材料采用轻质建筑材料如玻璃、钢、百叶等,立面色彩协调统一、洁净素雅,建筑形象强烈、简洁,给病患提供131、了轻松、舒适的就医环境。立面体现出医疗建筑的时代特征。本项目的建成,将成为该区域地块的又一标志性建筑。十十 经济技术指标经济技术指标:总用地面积:80034.74综合总建筑面积:208700其中地上总建筑面积:162200地下总建筑面积:46500综合容积率:2.03覆盖率:29.6%绿化率:45.0%停车位:1291个其中地上:207个地下:1084个分期经济技术指标:本期总建筑面积:171200其中地上建筑面积:131200地下建筑面积:40000门诊及医技楼建筑面积:52700住院楼:47500综合楼:30000后勤保障用房:1000停车位:1163个其中地上:207个地下:956个二期132、待建总建筑面积:37500其中地上建筑面积:31000地下建筑面积:6500停车位:128个74主要结构设计说明主要结构设计说明一、工程概况工程概况本工程位于广东省深圳市宝安中心区滨海片区,总建筑面积171200平方米,由门诊及医技大楼(45层)、住院大楼(18层)、综合楼(10层)、后勤保障用房(1层)等组成,下设一层地下室(局部为六级人防地下室)。高层与多层建筑之间设防震缝分开。二、设计依据设计依据国家及广东省现行的有关规范、规定。其中主要的有:建筑结构荷载规范(GB50009-2001)(2006年版)建筑地基基础设计规范(GB50007-2002)建筑桩基技术规范(JGJ94-2008133、)混凝土结构设计规范(GB50010-2002)建筑抗震设计规范(GB50011-2001)(2008年版)高层建筑混凝土结构技术规程(JGJ3-2002 J186-2002)广东省实施高层建筑混凝土结构技术规程(JGJ3-2002)补充规定DBJ/T15-46-2005建筑工程抗震设防分类标准(GB50223-2008)岩土工程勘察报告2基本风压:W0=0.90KN/m2 (18层高层建筑)W0=0.83KN/m2 (单层、多层及10层建筑)地面粗糙度:B类3本地区抗震设防烈度为7度,设计基本地震加速度为0.10g,设计地震分组为第一组。因本工程结构设计使用年限为70年,本建筑相应于设计基准134、期为70年的多遇地震烈度为5.71度,水平地震作用影响系数最大值为max(70)=0.096,其相应于时程分析所采用的水平地震作用加速度峰值为41cm/s2;本建筑相应于设计基准期为70年的罕遇地震烈度为8.28度,水平地震作用影响系数最大值为max(70)=0.56,其相应于时程分析所采用的水平地震作用加速度峰值为243cm/s2。三、结构设计结构设计本工程结构设计使用年限为70年,建筑物安全等级为一级,抗震设防类别为乙类。18层建筑采用钢筋混凝土框架-剪力墙结构,框架及剪力墙抗震等级均为一级。10层建筑采用钢筋混凝土框架结构,框架抗震等级为一级。45层及单层建筑采用钢筋混凝土框架结构,抗震135、等级二级。地下室采用框架结构,抗震等级为一级或二级。地下室的防水等级为二级。混凝土保护层厚度应根据混凝土结构设计规范的规定增加20%。四、基础选型基础选型1因建设方未提供拟建场地的地质勘察报告,根据工程经验基础类型初步选定为天然地基(单层部分)及高强预应力管桩(多层及高层部分)。76AREA SUMMARY给水排水方案设计说明给水排水方案设计说明一、设计依据:设计依据:建设单位提供的设计招标任务书。建设单位提供的建筑物周围的市政条件资料。国家现行的有关规范及规定。深圳地方要求。二、给水系统给水系统:1、本门急诊楼最高日生活用水量约为832 m3/d。2、水源:水源为市政给水管网,两路进水。医院136、区内统一设给水加压泵房。3、给水系统分区供水,系统分三个区:二层以下为一区,由市政管网直接供水;310层为二区,1118层为三区。二、三区采用微机变频供水,变频泵组设于给水泵房内,各层的供水压力不超过0.35MPa,超压设减压阀。医院区内设集中水表计量。三、热水系统热水系统:病房卫生间的热水按集中供应热水考虑,热水制备由医院区内热水换热设备供给,热源为院区内自建锅炉房。下步施工图设计时,可根据具体情况结合节能、环保要求,考虑采用其它形式的热源。四、排水系统排水系统:医院最高日排水量为680 m3/d。建筑的排水为雨,污分流排放,生活污水与生活废水合流排放,在排入市政污水管网之前先进行消毒处理。137、地下室污、废水由各自的集水坑收集后,采用排水泵提升排入室外排水管道,一般的生活污水在室外先进化粪池,将污水简单处理后,再排入医院区域内的污水处理站内集中处理,然后排入市政污水管网。含放射性等特殊污水需单独处理后,方可排入院区污水管网内。建筑物雨水采用内排水系统,屋面雨水经雨水斗收集排至室外雨水管道,地面道路雨水经雨水口收集排至室外雨水管道,最后排至市政雨水管网。建筑屋面雨水的重现期P=5年,降雨历时按5分钟计算;室外雨水重现期P=3年,地面集水时间按10分钟计算。五、消防系统消防系统:1、室外设室外消火栓系统,用水量由市政管道提供,与室外生活共用一个管网。室外消火栓为地上式。2、室内消防按高层138、医院(建筑高度50m)计算。消火栓系统竖向不分区。消防水泵房及消防水池整个院区统一考虑,集中设置。在建筑的最高处屋顶设有消防水箱,为消防系统平时稳压用,屋顶消防水箱容积为18M3。在地下消防泵房内设有二台消火栓加压泵(一备一用),消防时为系统加压送水。消防时,地下室消防泵工作,消防泵可由消火栓箱、消防控制中心及水泵房处的按钮直接启停。消火栓箱内设有消防水喉及启泵按钮。3、地下车库采用泡沫-水喷淋系统,地上设有自动喷水灭火系统。喷头布置车库按中危险级设置。地上喷头布置按中危险级设置。自动喷洒系统竖向不分区,地下消防泵房内设有二台自动喷洒泵(一用一备)。系统平时稳压由屋顶18M3消防水箱及稳压设施139、维持系统压力,消防时,地下室自动喷洒泵工作,该泵可由消防控制中心及水泵房处直接启停。室内消火栓及自动喷洒用水由水池、消防水泵、屋顶水箱联合供水。柴油发电机房及重要的变、配电间采用七氟丙烷气体灭火系统。4、室内消火栓用水量为:30L/S,灭火时间按2 小时计。室外消火栓用水量为:20L/S,灭火时间按2 小时计。自动喷洒系统用水量为:27.7L/S,灭火时间按1小时计。5、院区生活、消防蓄水池及水泵房均设在地下室。消防水池仅储存室内消火栓及自动喷洒水量,水池容积为320M3。6、手提灭火器:建筑内每层消火栓处设手提式磷酸胺盐灭火器。六、节水、节能措施节水、节能措施:在满足正常使用的情况下,采取了140、如下节水措施:1、在与市政管网连接处设总水表计量。2、卫生洁具及五金配件采用节水型产品。3、各系统分区供水,尽量少用减压阀,以节能。4、市政水压要尽量利用,以减少减压水量。5、尽量采用感应式龙头。七、环保设计环保设计:1、地下室的生活、消防水池(箱)上的人孔盖板,均采用防臭型密封盖板,并设置通气管,水泵房内设有机械通风。2、水泵基础均设隔震垫进行隔震,水泵进出水管加可曲挠橡胶接头防震。水泵房内的各种管道均采用防震型吊架和支架。3、污水集水池上的人孔盖板均采用防臭型密封盖板,并设置通气管与室内排水系统的通气管相连。4、污水要集中消毒处理后排放。带有放射线等的特殊废水,要先经专门处理后,再排入室外141、污水管网。设计说明电气方案设计说明电气方案设计说明一、电气电气1,设计依据供配电系统设计规范(GB50052-95)低压配电设计规范(GB50054-95)建筑物防雷设计规范(GB50057-94,2000年版)10kV及以下变电所设计规范(GB50053-94)民用建筑电气设计规范(JGJ16-2008)建筑照明设计标准(GB50034-2004)建筑物电子信息系统防雷技术规范(GB50343-2004)通用用电设备配电设计规范(GB50055-93)高层民用建筑设计防火规范(GB50045-95,2001年版)火灾自动报警系统设计规范(GB50116-98)智能建筑设计标准(GB/T503142、14-2006)综合布线系统工程设计规范(GB50311-2007)民用闭路监视系统工程技术规范(GB50198-94)有线电视系统工程技术规范(GB50200-94)视频安防监控系统技术要求(GA/T367-2001)安全防范工程技术规范(GB50348-2004)电子计算机房设计规范(GB50174-93)2,设计范围:2.1,10/0.4kV变配电系统和应急电源系统;2.2,电力、电气照明;2.3,防雷保护及安全接地;2.4,综合布线;2.5,通信自动化系统;2.6,有线电视系统;2.7,综合保安监控系统;2.8,建筑设备监控系统;2.9,火灾自动报警与消防联动控制系统;2.10,公共广143、播系统。3,变配电系统:3.1,负荷等级:消防水泵、消防控制室、消防电梯、事故照明、防排烟风机、急诊室、监护病房、婴儿室、血弱电机房电源等为一级负荷,高级病房、普通电梯、生活水泵和排污泵为二级负荷,其中,消防用电设备、综合保安监控系统、手术室电源为一级负荷中特别重要负荷,其余负荷为三级负荷。3.2,负荷估算:变压器总安装容量:11400KVA;3.3,供电电源:在地下一层设置1个10KV开关站,本工程由城市电网双路10kV专用电源供电,两路电源同时供电,高压侧联络,一路故障,另一路可供所有一级负荷和主要负荷用电。另设1台1500kW柴油发电机,作为应急电源,保障特别重要负荷供电。柴油发电机房在144、地下一层与变电所相邻布置。变压器安装容量为:4x1600KVA+4x1250KVA地下一层设置1台1500KW柴油发电机组4,配电设计:4.1,消防泵、防排烟风机、消防控制室、消防电梯、事故照明等消防设备和生活泵、弱电机房等重要用电设备的供电电源均采用双电源末端互投自复方式。4.2,大容量干线采用密集型封闭母线槽供电。4.3,沿电缆桥架敷设的电缆均采用阻燃电缆,消防设备电源电缆均采用耐火电缆,消防线路敷设采取防火措施。5,电气照明:5.1,光源选择:以高效荧光灯主,室外照明结合景观设计选择光源。5.2,设计照度标准:照度标准参照国标建筑照明设计标准(GB500342004),主要场所照度如下:145、诊室300 lx化验室500 lx手术室750 lx病房100 lx地下车库75lx护士站300lx5.3,照明种类:变配电室、消防水泵房、楼梯间、电梯前室、走廊、消防控制室、地下车库等处设应急照明,其余地点设一般照明。建筑外立面设轮廓灯和立面照明。6,防雷接地及安全措施:6.1,防雷保护:(1)建筑物按二类防雷建筑设防。(2)屋顶设置明装避雷带,利用结构钢筋作为防雷引下线。(3)低压进线柜设浪涌保护器(SPD),在各弱电机房配电箱和电梯配电箱内装设SPD。6.2,接地系统及安全措施:(1)低压配电系统接地系统型式为TN-S。(2)防直击雷接地、防雷电感应接地、电气设备接地、信息系统接地共同采146、用建筑物基础钢筋,接地电阻不大于1欧姆。(3)建筑物内采用总等电位联结,各弱电机房、电梯机房、楼层强弱电井和浴室设局部等电位联结。AREA SUMMARY设计说明777,通信自动化系统:1本工程为2个电信运营商预留电信机房,位置在地下一层,面积分别为20m2左右,服务整个工程,安装远端通信模块和光纤配线设备。另外,工程还为移动通信运行商提供建筑物内无线信号覆盖条件。8,综合布线系统8.1本工程综合布线系统支持语音、数据、图文、图像等多媒体信息传输要求,满足通信和办公自动化的需求。8.2.水平配线子系统:语音点和数据点配线采用6类4对非屏蔽对绞电缆,数据光纤点采用2芯室内多模光纤。8.3,垂直干147、线系统采用25对3类电话电缆传输语音信号,采用多模光纤传输数字信号。8.4,主配线架设在电信机房内,楼层配线间兼做弱电井,楼层配线架采用19标准配线柜。9,有线电视系统9.1,系统信号光缆接驳城市有线电视网,系统采用750MHz邻频传输方式。在地下一层预留CATV机房,面积为20 m2。9.2,设计用户末端下行电平为654dBV,上行电平为1028dBV。10,综合保安监控系统闭路监视与防盗报警系统按一体化集成控制系统配备。在一层设安防监控机房,与消防控制室共用,面积约60m2。面积需根据各专用管理公司的要求核定,安防监控机房也需与专用管理公司的数量对应。系统设置矩阵主机、视频录像、硬盘录像机148、打印机、监视器等设备。视频自动切换器接收多个摄像点信号输入,定时自动轮换监控信号,也可手动任选一个摄像机画面跟踪监视、录像、打印。10.1,闭路监控系统:在各出入口、电梯厅、走廊、地下车库出入口、停车场、和电梯轿箱等处设置彩色闭路监视摄像机,图像水平清晰度不低于480线,信噪比不小于50dB。10.2,停车场管理系统:地下车库出入口车道均安装电动闸门机、车辆感应线圈、入口车道感应式读卡器、出票机、车辆识别设备等,系统设自动计费功能。停车场管理系统均联网至安防监控机房。11,建筑设备监控系统11.1本工程建筑设备监控系统(BAS)对建筑物内空调系统、通风系统、给排水系统、电梯、配电系统进行监控149、,达到运行安全、可靠、节省能源、节省人力的目的。BAS主机设在大楼地下一层BAS机房内,机房与变电所值班室共用,实现集中统一管理。11.2,系统采用集散式直接控制系统,通过中央监控系统的计算机网络,将各层的控制器、现场传感器、执行器及远程通信设备进行联网,实现集中管理、分散控制。系统选用共享型总线网络,图形组态软件具备中文界面。11.3,系统配备标准的网络接口,可与大楼局域网、火灾报警系统、闭路监视系统联网。12,公共广播系统12.1,设置公共广播、应急广播。系统均采用100V定压输出方式。12.2,应急广播室设在消防控制室内。公共广播和应急广播共用一套喇叭,事故时自动或人工切换。12.3,会150、议室设单独的扩音系统,配备多路混音放大器、音箱、录音机等设备,可接入话筒、DVD、AM/FM收音机等音源,音箱的配备满足会议室声压级和声压均匀度要求。13,火灾自动报警与消防联动控制系统按特级保护设火灾自动报警及联动系统。消防控制室设在一层,与安防监控机房共用,面积约60m2。13.1 系统形式为控制中心报警系统,设计采用智能型火灾自动报警系统。13.2 系统设置:)消防控制室设中央电脑、液晶报警显示盘、打印机、火灾报警控制器、多线联动控制盘、应急广播设备、消防通信设备、电梯监视控制系统等设备。)火灾报警控制器直流备用电源采用蓄电池。)系统接地:利用共用接地装置,要求接地电阻不大于1欧姆。13151、.3报警触发装置的设置如下:)地下室等潮湿场所设感温探测器;)其他场所设感烟探测器;)各防火分区内均设有手动报警按钮。13.4 火灾应急广播及火警警铃设置:)各防火分区均设3W扬声器,吸顶或壁挂安装。)各防火分区内均设置火警警铃,柱上或墙上明装。13.5消防通信设备设置:)消防控制室内设可直接报警的119外线电话。)消防控制室内设共电式专用电话总机。)消防水泵房、变配电室、消防电梯机房、防排烟风机房等处设消防专用电话分机。)主要出入口手动火灾报警按钮处设电话塞孔。13.6联动控制1)对消火栓系统、喷淋系统、防排烟系统采用模块和多线制双重联动控制。2)确认火灾发生后,通过控制模块切断该防火分区内152、的非消防电源,接通疏散通道事故照明灯。3)确认火灾发生后,强制所有电梯归底。4)确认火灾发生后对疏散通道防火卷帘门和防火分隔卷帘门分别按设定程序由模块控制两次或一次落下。5)柴油发电机房气体灭火系统采用就地探测报警方式。78AREA SUMMARY设计说明13.7 电梯监视控制在消防控制室设置电梯控制盘,除显示各台电梯的运行状态、层数等信息外,还设置正常、故障、开门、关门等状态显示。确认火灾发生后,根据火灾情况及位置,由消防控制室指挥电梯按消防程序运行,对全部或某台电梯进行对讲,说明改变运行原因。二、电气节能电气节能:1,变压器节能本工程变压器采用H级绝缘干式变压器,负载损耗小、噪音低。各变压153、器设计负荷率控制在70%85%,有利于降低损耗。2,供配电系统节能:通过合理选择电压等级实现系统节能。各变电所均靠近负荷中心,供电半径基本控制在200米内,以减少线路的损耗。变压器容量、台数设计合理,便于管理人员根据负荷情况确定投入台数,减少不必要的损耗。按当地供电局的要求设置电容补偿。电缆选择合理,降低线路损耗。3,电动机节能:采用Y系列高效率电动机。根据工况合理确定风机、水泵容量,减少运行损耗。4,照明设备和低压电器的节能:通过合理的控制方式、采用节能照明开关等方式实现节能。注意三相负荷的平衡,减少零序电流。采用高功率因数的镇流器、高效光源、高效灯具。采用具有节电效果的低压电器。通风空调设154、计通风空调设计5.1 设计依据设计依据甲方对本工程的设计要求及建筑专业提供的条件图高层民用建筑设计防火规范(GB50045-95)、(2005年版)采暖通风及空气调节设计规范(GBJ50019-2003)汽车库、停车库、停车场设计防火规范GB50067-97)公共建筑节能设计标准(GB 50189-2005)办公建筑设计规范(JGJ 67-2006)综合医院设计规范室内设计参数按节能规范设计;5.2 工程概况工程概况本工程地上建筑面积131200m2;地下建筑面积40000 m2。功能划分为:地下为停车库、设备用房,太平间;地上塔门诊、住院部、综合楼、后勤等。5.3 设计范围设计范围建筑物的防155、排烟设计。建筑物的通风系统设计。工程的空调系统设计。AREA SUMMARY79设计说明5.4 冷、热源系统设计本工程建筑面积约131200平方米,估算空调冷负荷15744Kw,设计采用蓄冷空调系统,估算设计四台680RT的双工况制冷机组,蓄冰槽为14000RTH;为保证急诊及住院部空调系统夜间运行设计400RT基载主机两台。主机、蓄冷装置设置在地下一层,冷却塔设置在屋面。方案阶段除病房生活用热可以估算外,其他用热情况不明,考虑冬季住院部病房空调供暖,估算最大热负荷(含生活热水)4.0MW;设计采用两台2.1MW的燃天然气热水锅炉,如果有蒸汽需求则可设计为蒸汽锅炉(洗衣消毒是否在本医院完成)。156、24小时值班的消防中心、管理中心均采用分体空调器。5.5 5.5 空调通风系统设计空调通风系统设计各区域新风的引入可以考虑溶液除湿全热回收新风系统,采用该系统后,应减小主机的装机容量。各诊室、病房、小办公室采用风机盘管加新风系统。大厅、会议、多功能大空间采用全空气低速空调系统。各空调系统设计空气杀菌设备,供选择的有氢光离子、高压静电等设备。所有有污染的房间、公共卫生间设排风系统。厨房设计排油烟、事故排风系统。汽车库及地下设备用房设计进、排风系统。防排烟系统防排烟系统1.不具备自然排烟条件的防烟楼梯间及前室设机械加压系统。2.不具备自然排烟条件的地上房间、走道设机械排烟系统。2.地下室根据防火分157、区设置机械排风兼排烟系统,不具备自然补风条件的设机械补风。节能、环保节能、环保1.采用低噪声通风设备。2.柴油机房要求工艺做消音、消烟处理。3.新风采用全热回收系统。4.采用高效的空调产品。5.采用蓄冷空调,节能减排。80投资估算AREA SUMMARY估算编制说明估算编制说明一、工程概况一、工程概况深圳市新安医院一期工程位于宝安中心区滨海片区,新湖路以南,湖滨西路西侧。建设地面积80034.7M2,容积率2.03,建筑覆盖率29.6%,绿地率40。7%。一期总建筑面积171200M2,地下1层,地下建筑面积40000M2,地上建筑面积131200M2。二、估算指标二、估算指标本项目建安工程估158、算造价为68,619万元,单位造价4,008元/M2。本造价是指本项目建安工程费用,具体内容包括建筑、结构、装修、给排水、电气、变配电、弱电、消防、通风、空调、电梯、燃气、智能化物流传输系统、供氧系统工程、太阳能热水系统、太阳能光伏照明系统、雨水回收系统、污水处理系统和室外管网、绿化、道路、景观等费用,预备费为5。三、编制依据三、编制依据1.本项目方案设计图纸及说明。2.深圳市建筑工程消耗量标准(2003年)。3.深圳市建筑装饰工程消耗量标准(2003年)。4.深圳市安装工程消耗量标准(2003年)。5.深圳建设工程价格信息2008年第11期材料价格。6.深圳市建设工程技术经济指标2006年7159、月。四、编制说明四、编制说明1.本估算不包括工程建设其他费用,如征地、拆迁费、勘察设计费、监理费、建设单位管理费及市政配套费用。2.本估算参照已完工的类似工程造价指标及本项目方案设计综合测算。五、估算表五、估算表81投资估算AREA SUMMARY序号序号项目及费用名称项目及费用名称建筑面积建筑面积建安工程造价建安工程造价单位造价指标单位造价指标备注备注(M2)(万元)(万元)(元(元/M2)一一土建及装饰工程土建及装饰工程17120043741 2555 总建筑面积(一)主体工程17120032480 1897 1桩基1712001370 80 2地下部分4000010200 2550地下建160、筑面积3地上部分131200209101594 地上建筑面积(1)门诊及科技大楼(4F)527007905 1500(2)住院大楼(18F)475008075 1700(3)综合楼(10F)300004800 1600(4)后勤保障用房(1F)1000130 1300(二)室内装修工程13120011261 8581门诊及科技大楼(4F)527004216 8002住院大楼(18F)475004275 9003综合楼(10F)300002700 9004后勤保障用房(1F)100070 700二二机电安装工程机电安装工程17120020056 1172(一)给排水工程1712001712 10161、0(二)喷淋、消防工程1712002054 120(三)空调工程1312005248 400(四)通风、防排烟工程40000280 70(五)电气、变配电工程1712004794 280(六)弱电工程1312002099 160(七)电梯、扶梯1712001370 80(八)燃气17120068 4(九)智能化物流传输系统1712001027 60(十)供氧系统工程171200308 18(十一)太阳能热水系统171200599 35(十二)太阳能光伏照明系统17120051 3(十三)雨水回收系统171200103 6(十四)污水处理系统171200342 20三三室外工程室外工程56344 1555 276 室外总体面积1管网56344 732 1302道路、广场17000 510 3003绿化、景观小品24010 312 130四四小计小计17120065,3523,817五五预备费预备费5(设计、施工变更、施工措施费)(设计、施工变更、施工措施费)1712003,268191六六估算造价估算造价17120068,6194,008
会员尊享权益 会员尊享权益 会员尊享权益
500万份文档
500万份文档 免费下载
10万资源包
10万资源包 一键下载
4万份资料
4万份资料 打包下载
24小时客服
24小时客服 会员专属
开通 VIP
升级会员
  • 周热门排行

  • 月热门排行

  • 季热门排行

  1. 高速公路路基填筑边坡填料运输水土保持施工设计方案30页.doc
  2. 2023年县乡村振兴示范带新建农旅融合项目可行性研究报告(117页).pdf
  3. 2023城镇19个老旧小区改造项目可行性研究报告(附表)(273页).pdf
  4. 2023西路3个老旧小区改造项目可行性研究报告(199页).pdf
  5. 兰新铁路工程施工测量技术方案(22页).doc
  6. 装饰装修施工项目管理人员岗位职责(19页).doc
  7. 尤庄子小学教学楼施工组织设计方案(155页).doc
  8. 网络机房工程施工组织设计方案(132页).doc
  9. 制药总厂厂区及家属区道路维修施工工程施工组织设计方案(84页).doc
  10. 国际机械城会展中心项目钢结构工程钢筋桁架楼层板施工专项方案(22页).docx
  11. 北京CBD核心区z6地块地质勘察工程高层超高勘察方案(71页).doc
  12. 大厦项目工程承包人实施方案(195页).doc
  13. 赫山区乡镇污水处理设施建设及运营PPP项目泥江口镇污水处理厂及管网工程可行性研究报告(212页).docx
  14. 桃渚风景名胜区总体规划方案文本+图集(2021-2035年).pdf
  15. 春晓家园高层施工组织设计方案(177页).doc
  16. 扬子石化年产20万吨乙二醇项目可行性研究报告(169页).docx
  17. 施工现场建筑垃圾处置方案(7页).doc
  18. 颍泉区国民经济和社会发展第十四个五年规划和2035年远景目标纲要方案(2021-2025年)(119页).pdf
  19. 江西省庐山西海风景名胜区湖岛旅游开发概念性规划设计方案(107页).pdf
  20. 2020两江人才公寓营销推广方案(83页).pptx
  21. 人才公寓日常物业管理方案(158页).doc
  22. 市政污水管工程安全文明施工专项方案(25页).doc
  1. 南风花园二期开口工程施工组织设计方案(23页).doc
  2. 2024党建红色市集(红色市集惠民声主题)活动策划方案-53页.ppt
  3. 电子信息产业园道路路基工程监理项目施工监理细则103页.doc
  4. 高速公路路基填筑边坡填料运输水土保持施工设计方案30页.doc
  5. 学生宿舍施工钢筋混凝土砖砌体涂刷水电施工方案74页.doc
  6. 2023年县乡村振兴示范带新建农旅融合项目可行性研究报告(117页).pdf
  7. 2023古镇旅游景区基础设施配套工程可行性研究报告(184页).pdf
  8. 2023城镇19个老旧小区改造项目可行性研究报告(附表)(273页).pdf
  9. 2023西路3个老旧小区改造项目可行性研究报告(199页).pdf
  10. 中央商务区360米超高层建筑幕墙施工专项方案(219页).doc
  11. 脚手架、配电箱等设施设备设施风险分级管控清单汇编(2页).doc
  12. 施工现场常见隐患培训课件(46页).ppt
  13. 洋房、商业工程淋水试验专项施工方案(15页).doc
  14. 兰新铁路工程施工测量技术方案(22页).doc
  15. 外立面改造装饰工程施工组织设计方案(177页).doc
  16. 杭州金地41外墙防水淋水施工方案(12页).doc
  17. 电力工程(电缆、电力设备安装、配电室安装)施工组织设计方案(76页).doc
  18. 10KV及以下电力工程施工组织设计方案(88页).doc
  19. 武汉超高层豪宅项目前期策划.ppt
  20. 2020中南工程材料管理制度、精装修管理制度修订方案.ppt
  21. 地产项目开盘定价体系-定价工具.xlsx
  22. 2019年时光PARK湿地公园文旅小镇招商及运营推广方案(215页).pdf
  1. 2024长隆北加油站建设项目可行性研究报告(145页).pdf
  2. 客专铁路建设声屏障安装工程施工技术交底书.doc
  3. 48MW风电项目工程风机设备吊装专项施工方案86页.doc
  4. 2025商场地产夏日啤酒龙虾音乐嘉年华(吃货的夏天主题)活动策划方案-47页.pptx
  5. 铁路声屏障工程路基非金属声屏障搭设操作平台单元板安装施工方案27页.docx
  6. 2022城区自来水提质改造智慧水务建设项目设计方案(199页).pdf
  7. 小区人员配置档案建立保洁绿化物业管理服务投标方案(593页).docx
  8. 2023古镇旅游景区基础设施配套工程可行性研究报告(184页).pdf
  9. 南风花园二期开口工程施工组织设计方案(23页).doc
  10. 土建、装饰、维修改造等零星工程施工组织设计方案(187页).doc
  11. 2021柏向堂房地产公司材料标准化手册4.0(108页).pdf
  12. 弱电工程维保合同(15页).doc
  13. 黄埔区广州开发区城市更新专项总体规划方案(2020-2035年)(46页).pdf
  14. 农业种植公司甘草GAP种植基地建设项目可行性研究报告(76页).doc
  15. 公路工程雨季施工专项施工方案(38页).doc
  16. 榆林市档案馆消防工程施工组织设计方案(58页).doc
  17. 阳泽河水库清淤工程建设项目可行性研究报告47页.doc
  18. 襄樊电厂二期主厂房施工方案【202页】.doc
  19. 煤矿与建设机械装备生产制造基地项目锻压、下料厂房、热处理厂房、返修及涂装厂房吊车梁、屋架等预制构件制作及吊装工程施工方案【128页】.doc
  20. 深圳装饰公司施工图纸会审及设计交底管理制度【13页】.doc
  21. 房地产开发全流程培训.ppt
  22. 2010-2030年湖北咸宁市城市总体规划(32页).doc