个人中心
个人中心
添加客服WX
客服
添加客服WX
添加客服WX
关注微信公众号
公众号
关注微信公众号
关注微信公众号
升级会员
升级会员
返回顶部
ImageVerifierCode 换一换

建筑楼工程施工场地自然地面标高测量记录表.doc

  • 资源ID:621631       资源大小:297.54KB        全文页数:11页
  • 资源格式:  DOC         下载积分: 15金币
下载报告请您先登录!


友情提示
2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

建筑楼工程施工场地自然地面标高测量记录表.doc

1、施工场地地面标高测量记录表测量点序号后视()前视高程1.133.1514#楼北面11.492.7921.522.7631.472.8141.462.8251.572.7161.532.7571.492.7981.522.7614#楼15#楼11.472.8121.462.8231.552.7341.422.8651.462.8261.522.7671.482.8081.492.791.133.1515#楼16#楼11.422.8621.492.7931.452.8341.552.7351.482.8061.492.7971.522.7681.492.7916#楼17#楼11.592.6921.

2、492.7931.712.5741.602.6851.522.7661.622.6671.572.7181.542.7426#楼27#楼11.542.7521.532.7631.482.8141.572.7251.492.8061.402.8971.562.7381.502.791.143.1517#楼18#楼11.492.8021.562.7331.582.7141.562.7351.522.7761.572.7271.462.8381.422.8725#楼26#楼11.572.7521.572.7631.422.8141.432.7251.522.8061.542.8971.532.738

3、1.472.7918#楼19#楼11.542.7421.532.7531.562.7241.522.7651.572.7261.592.7071.462.8381.592.7024#楼25#楼11.542.7521.422.8731.572.7241.542.7551.482.8161.472.8271.562.7381.612.681.203.1519#楼20#楼11.572.7821.592.7631.502.8541.462.8951.432.9261.323.0371.462.8981.472.8823#楼24#楼11.572.7821.462.8931.592.7641.482.87

4、51.532.8261.512.8471.472.8881.542.8122#楼23#楼11.542.8121.532.8231.462.8941.422.9351.582.7761.592.7671.582.7781.482.8720#楼南面11.522.8321.582.7731.432.9241.472.8851.522.8361.562.7971.492.8681.542.8122#楼南面11.472.8821.422.9331.512.8441.462.8951.432.9261.492.8471.542.7981.572.761.253.155#楼西面11.542.8621.432

5、.9731.343.0641.353.0551.383.0261.622.7871.552.8581.472.935#楼6#楼11.562.8421.662.7431.592.8141.682.7251.672.7361.622.7871.582.8281.762.736#楼7#楼11.572.8321.522.8831.622.7841.472.9351.582.8261.592.8171.642.7681.672.731.313.1568、69#楼南面11.453.0121.453.0131.482.9841.492.9751.482.9861.373.0971.353.1181.482.

6、9891.343.121.333.1569#楼70#楼、67#楼68#楼11.183.3021.213.2731.243.2441.263.2251.283.2061.423.0471.373.0981.293.171.283.157#楼8#楼11.602.8321.582.8531.552.8841.532.9051.572.8661.642.7971.672.7681.672.7670#楼71#楼、66#楼67#楼11.672.7621.692.7431.642.7941.363.0751.253.1861.223.2171.482.9581.293.141.363.158#楼9#楼11.

7、532.9821.542.9731.552.9641.443.0751.572.9461.612.9071.522.9981.662.8571#楼72#楼、65#楼66#楼13.1623.0332.9842.9552.9362.9472.8482.840.953.5572#楼北面、65#楼北面11.732.7721.632.8731.722.7841.453.0551.383.1261.353.1571.343.1681.393.119#楼10#楼11.483.0221.562.9431.542.9641.622.8851.672.8361.583.9471.642.8681.652.85中心景观11.592.9121.662.8431.542.9641.682.8251.572.9361.622.88测量人员:复核人员:监理单位:业主:


注意事项

本文(建筑楼工程施工场地自然地面标高测量记录表.doc)为本站会员(偷****)主动上传,地产文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知地产文库(点击联系客服),我们立即给予删除!