1、金茂深圳JW万豪酒店SHENZHEN JINMAO HOTEL LANDSCAPE DESIGNJINMAO SHENZHEN WANHAO HOTEL金茂深圳万豪酒店目录 Contents1.02.03.04.05.06.07.0项目背景及理解Project Context And Understanding设计展望和策略Design Vision And Strategy景观总平面 Concept Master Plan特色广场区域Main Plaza屋顶花园区域Roof Terrace景观元素 Design Language总结SummaryJINMAO SHENZHEN WANHAO
2、HOTEL金茂深圳万豪酒店项目背景及理解项目背景及理解Project Context And Understanding1.0JINMAO SHENZHEN WANHAO HOTEL金茂深圳万豪酒店Site located in Futian district of Shenzhen.基地地理位置于深圳市福田区。Site area measures 6,500 m2.基地面积6500平方米。Exiting hotel undergoing renovation works.现有酒店正在翻修。项目背景项目背景Project Background 1.1广东省广东省深圳深圳基地基地JINMAO S
3、HENZHEN WANHAO HOTEL金茂深圳万豪酒店场地周边现状场地周边现状 Existing Site Context 1.2Existing hotel of 27 floors,main entrance facing north direction.现有27层宾馆,主要入口面朝北面。Slope in southerly direction with low point in south east corner.南面地形有斜坡和基地东南角是较低的高程点。Existing external area to north with bus shelter,cycle lane,footpa
4、th and planting between site and road.现有北面的外部区域设置公交车落客处,自行车道及现场和道路间的步道和种植区。Surrounded by roads on all sides main city road to north,secondary access roads to other sides.四面由道路环绕-主干道位于北面,其他三面由次干道环绕。JINMAO SHENZHEN WANHAO HOTEL金茂深圳万豪酒店场地周边现状场地周边现状 Site Photos1.3564123543612JINMAO SHENZHEN WANHAO HOTEL
5、金茂深圳万豪酒店场地周边现状场地周边现状 Site Context Architectural elements1.456412375234716JINMAO SHENZHEN WANHAO HOTEL金茂深圳万豪酒店机遇与局限机遇与局限Opportunities and Constraints1.5Opportunities 机遇机遇Climate allows for maximising outdoor spatial activity throughout the year and design scope of horticultural planting.良好的气候条件可使园林植物
6、的设计品种在室外全年候自然生长。High profile renowned operator with reputation for quality service will want reflecting in the landscape treatment.享有盛誉的开发商使用优质的质量服务表现在景观处理中。External plaza provides a good landscape entrance opportunity into the hotel an extension of the lobby into the external space.外部广场提供了极好的景观入口进入
7、酒店-延续的门廊进入到外部空间。Pool deck provides a sizeable continuous area without too many mechanical service elements breaking up the space.水景区域使得空间有一个较大延续性,其中没有太多服务设备来打断空间的连续性。Constraints 限制限制Exiting cycleway and planting on plaza reduce the impact from the road to the hotel.现有广场处的自行车道和种植区一定程度上阻碍了由道路通向酒店的视觉效果
8、。Adjacent sites not of prime quality.现场附近没有高品质的建筑。Sloping site can present problems with landscape detail treatment and during heavy rain.场地内的坡地高差变化会在大雨期间对景观的处理造成影响。JINMAO SHENZHEN WANHAO HOTEL金茂深圳万豪酒店2.0项目背景及理解项目背景及理解Project Context And UnderstandingJINMAO SHENZHEN WANHAO HOTEL金茂深圳万豪酒店2.1设计展望设计展望 D
9、esign Vision Create a strong entrance statement to the hotel through landscape to enhance the overall visitor experience.通过景观创建一处强有力的酒店入口以增强来宾的体验。Maintain highest quality name of hotel operators in terms of design details and quality of landscape finish.为了维持酒店经营者的盛誉而在设计和景观材料的质量上使用上品。Maximise functio
10、nality of the pool deck to provide excellent leisure facilities and functional setting.景观水景的处理完善地提供了一处优秀的休闲及功能设置。Create comfortable and useable external spaces that do reflect elements of local culture and context.创建一处舒适并且实用的室外空间来反映当地文化和背景的元素。JINMAO SHENZHEN WANHAO HOTEL金茂深圳万豪酒店2.2建筑的考虑建筑的考虑Architec
11、tural ConsiderationsContemporary overall design approach clean lines with sleek finish and reflective glass front faade.现代设计风格-使用圆滑面层、简约线条和建筑正面的反光玻璃。Strong vertical emphasis in entrance and canopy design to ground level.强烈的垂直线条铺地和入口雨蓬的设计来反映入口处强烈的导向性。Simple colour palette of warm beige stone faade,br
12、own vertical ribs and reflective glass.简洁的暖米色石材外观,褐色垂直支撑和反光玻璃。The landscape design aims to pick up on the key architectural elements and overall style to bring into the design to achieve overall design cohesion and setting for the hotel.景观设计目标是提升建筑元素的同时,将建筑风格融入进设计,以达到对酒店整体设计的凝聚力和定位。JINMAO SHENZHEN W
13、ANHAO HOTEL金茂深圳万豪酒店2.4设计概念设计概念Design ConceptContemporary Tropical现代热带风情现代热带风情Application of a minimal design approach to external spaces and feature details clean lines&strong contained spaces.对室外空间和景观详情使用最小限度的设计手法-简约的线条和强有力的空间控制感。Mixture of tropical elements for planting and some material selection
14、 to maximise the tropical climatic feeling.选择符合热带风情的植物和部分材料元素来体现热带气候的感觉。Bring in elements of Chinese style into the design features relating the hotel experience to the context of Shenzhen and Guangdong Province.将中国风格元素溶进设计景观,以展现广东省深圳市特色的酒店体验。JINMAO SHENZHEN WANHAO HOTEL金茂深圳万豪酒店2.5设计灵感设计灵感Design Ide
15、asPreliminary design ideas for the plaza contrasted the scale,proportions and style of key elements such as water features,open lawn areas and planting.对比重点元素的范围比例和风格,例如对水景开放草坪区域和种植区域的初步设计想法。JINMAO SHENZHEN WANHAO HOTEL金茂深圳万豪酒店3.0概念总平面概念总平面 Concept Master Plan JINMAO SHENZHEN WANHAO HOTEL金茂深圳万豪酒店概念总
16、平面图概念总平面图 Concept Master Plan3.1Civic Planting Area 现状市政绿化带Feature Sculpture特色雕塑Flag Pole 旗杆Feature Wall特色景观墙Feature Paving特色铺地Pedestrian Road市政人行道Eco Parking生态停车位Sculpture 文化雕塑Landscape Lighting景观灯柱01020304050608090709深 南 大 道 辅 道泰 然 二 路020102030405060708图例:01020203040506070809深 南 大 道 辅 道泰 然 二 路JINM
17、AO SHENZHEN WANHAO HOTEL金茂深圳万豪酒店4.0特色广场区域特色广场区域Main Plaza JINMAO SHENZHEN WANHAO HOTEL金茂深圳万豪酒店4.1总平面图总平面图Master Plan 深 南 大 道 辅 道泰 然 二 路深 南 大 道 辅 道泰 然 二 路JINMAO SHENZHEN WANHAO HOTEL金茂深圳万豪酒店场地高程分析场地高程分析SITE LEVEL ANALYSIS4.27.109.6010.5010.857.209.557.108.3010.7111.10JINMAO SHENZHEN WANHAO HOTEL金茂深圳万
18、豪酒店5.0屋顶花园区域Roof TerraceJINMAO SHENZHEN WANHAO HOTEL金茂深圳万豪酒店5.1屋顶花园总平面图屋顶花园总平面图Roof Garden Master Plan JINMAO SHENZHEN WANHAO HOTEL金茂深圳万豪酒店5.1.1屋顶花园鸟瞰屋顶花园鸟瞰Roof Garden Bird ViewJINMAO SHENZHEN WANHAO HOTEL金茂深圳万豪酒店细部图细部图 1Blow up 15.2JINMAO SHENZHEN WANHAO HOTEL金茂深圳万豪酒店细部图细部图 1(透视图透视图&剖面图)剖面图)Blow up
19、 1(perspective§ion)5.2.1剖面剖面ASECTION AAAJINMAO SHENZHEN WANHAO HOTEL金茂深圳万豪酒店细部图细部图 2(泳池区域)泳池区域)Blow up 2(pool area)5.3JINMAO SHENZHEN WANHAO HOTEL金茂深圳万豪酒店细部图细部图 2(泳池剖面透视图)泳池剖面透视图)Blow up 2 (pool sections/perspective)5.3.1剖面剖面ASECTION A剖面剖面BSECTION BABAABBJINMAO SHENZHEN WANHAO HOTEL金茂深圳万豪酒店细部图细部
20、图 3Blow up 35.4JINMAO SHENZHEN WANHAO HOTEL金茂深圳万豪酒店细部图细部图 3Blow up 3 5.4.1JINMAO SHENZHEN WANHAO HOTEL金茂深圳万豪酒店6.0设计元素设计元素Design LanguageJINMAO SHENZHEN WANHAO HOTEL金茂深圳万豪酒店铺地及材料铺地及材料Paving Effects and Materials6.1JINMAO SHENZHEN WANHAO HOTEL金茂深圳万豪酒店家具示意家具示意Site Furniture6.2JINMAO SHENZHEN WANHAO HOT
21、EL金茂深圳万豪酒店景观标志及景墙景观标志及景墙Landscape signage&wall facade6.3JINMAO SHENZHEN WANHAO HOTEL金茂深圳万豪酒店灯具单体灯具单体Lighting Effects and Units6.4JINMAO SHENZHEN WANHAO HOTEL金茂深圳万豪酒店种植示意种植示意Landscape planting6.5行道行道 Street tree 现状照片现状照片 Site Photo深圳金茂酒店软景设计:深圳金茂酒店软景设计:运用植物生态学、美学原理,将该酒店设计成为一处充满现代气息的,有生命活力的舒适场地。入口前庭绿化
22、空间中,以适应当地种植的常规树种来进行前庭区域的适当改造。灌木部分则以金叶女贞、红花继木等结合场地规则式种植,创造一个具有极强的图案美感的屋顶空间。Terminalia mantaly小叶榄仁Delonix regia 凤凰木Artocarpus altilis面包树JINMAO SHENZHEN WANHAO HOTEL金茂深圳万豪酒店灌木灌木 Shrub种植示意种植示意Landscape planting6.7地被地被 Ground coverAlocasia macrorrhiza 海芋Hymenocallis littoralis文殊兰Alpinia purpurata红色姜JINMA
23、O SHENZHEN WANHAO HOTEL金茂深圳万豪酒店种植效果示意种植效果示意-热带植物热带植物Landscape compositions tropical planting6.8JINMAO SHENZHEN WANHAO HOTEL金茂深圳万豪酒店7.0总结总结SummaryJINMAO SHENZHEN WANHAO HOTEL金茂深圳万豪酒店总结总结Summary7.1Contemporary Tropical concept responds to architectural style together with site context and climate.现代热带
24、风情设计概念有机地集合了酒店建筑的风格以及当地的季节特性。Plaza layout creates a strong entrance statement linking the building into the landscape and providing an overall setting for the hotel.广场区域导向性很强的铺地形式和特色景观将人们引导到酒店中心区域中。Pool deck combines function with flexibility advocating a clear and bold open space hierarchy to provide comfortable user space with responsive character.结合功能性和流动性的特色水景区域提升了空间的使用价值,并使用户体验到 一种舒适的景观感受。Emphasis is to maintain the global JW Marriott name and also provide regional contextual elements to reflect local culture in a subtle manner.强调酒店全球化的品牌效应并提供具有较强地域性的元素来展现当地的文化特色。金茂深圳万豪酒店