个人中心
个人中心
添加客服WX
客服
添加客服WX
添加客服WX
关注微信公众号
公众号
关注微信公众号
关注微信公众号
升级会员
升级会员
返回顶部
ImageVerifierCode 换一换

对于智能建筑的楼宇自动化系统你了解多少呢(5页).doc

  • 资源ID:462136       资源大小:22KB        全文页数:5页
  • 资源格式:  DOC        下载:注册后免费下载
下载报告请您先登录!


友情提示
2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

对于智能建筑的楼宇自动化系统你了解多少呢(5页).doc

1、 对于智能建筑的楼宇自动化系统你了解多少呢 How much do you know about the building automation system of intelligent building. 咱们晓得,智能化修建是高科技与修建的奇妙集成,是信息时代的产品,也是现代化修建的重要发展方向。楼宇主动化体系,作为智能化修建的重要组成部分,是修建智能化的根基。运用智能修建,可以感触其舒适性、高效性、快捷性、安全性和经济性,故楼宇主动化体系具有宏大的实用价值。 We know, intelligent building is wonderful integration of high-t

2、ech and built, is the age of information products, is an important direction of development and modernization construction. Building automation system, as an important part of intelligent building, is the foundation of building intelligent. The use of intelligent building, can feel the comfort, effi

3、ciency, convenience, safety and economy, the building automation system has great practical value. 楼宇主动化体系是以会集监督、操控及办理为意图,将修建物或其内的照明、电力、给排水、空调通风、车库办理体系等设备或体系构成归纳体系。广义的楼宇主动化体系BAS通常包括消防主动化体系FAS和安全主动化体系SAS,但这两种体系较为特别,所以常把它们独立设置,并与BAS监控中间树立通讯,确保灾情发作时能按约好进行操作权搬运,施行一体化的和谐操控。 Building automation system is

4、to gather supervision, control and management for the purpose, will be built or the lighting, power, water supply and drainage, HVAC, garage management system and other equipment or system induction system. The building automation system BAS usually includes fire automation system FAS and security a

5、utomation system SAS, but these two kinds of system is more special, so they are often set up independently, and establish communication with the BAS monitoring centre, the operation can be carried out in handling arranged to ensure the disaster occurs, the harmonious integration of control implemen

6、tation. BAS的首要功用是调理、操控修建的各个设备,并检测显现其运转参数,监督它们的运转状况,依据外界要素、负载改变而主动调理各种设备。BAS与高层修建节能的联系非常亲近,由于修建物各项能耗的检测传感器和外表是BAS的组成部分,集散操控体系是操控BAS各子体系的首要手法,也是施行节能的前言。如今发达国家的智能修建体系大多依照修建物的运用功用来予以设置,虽然没有故意把智能化放在建造目标上,可是智能化体系的配备技能是领先的,体系的设置是齐备的,体系的工程描绘是合理的,故体系可以杰出地完结其功用。 The main function of BAS is built, each equipme

7、nt conditioning manipulation, and detection shows its operation parameters, to oversee their operation conditions, based on the outside factor, load change and the active management of a variety of equipment. BAS and high-rise building energy-saving contact very close, because the detection sensor a

8、nd the appearance of the building energy consumption is part of the BAS, the distributed control system is the primary means to manipulate BAS sub system, and implementation of energy saving objective. Now the intelligent building system in developed countries are mostly in accordance with the use o

9、f power structures to be set, although not deliberately intelligent on the construction of the target, but equipped with skills of intelligent system is the leading, system setup is complete, system project description is reasonable, so the system can be a good ending its function. 智能修建楼宇主动化体系集成 Int

10、elligent building system integration of building automation 所谓体系集成,是指经过计算机网络技能及归纳布线体系,把智能修建的各个首要子体系从别离的设备、功用和信息等会集于一个一致的、有相关的和协环境之中,在同一个操作渠道之下运转,使大家能共享资源,能高效地完结规则使命。体系集成后有如下的特征体现:形式上是一个完好的归纳体系;一致办理和操控硬件、软件及多样化信息的活动;用户的界面一致化,操作简略便利;功用完全、齐备,各个子体系派生出许多新功用。 The so-called system integration, refers to th

11、e computer network skill and induction wiring system, the intelligent building system from each primary separation equipment, the function and the information gathered in a consistent, relevant and environment, operating under the same operating channels, so that everyone can share resources, to end

12、 rule efficient mission. System integration is embodied as follows: the characteristics of the form is a perfect induction system; uniform management and control hardware, software and diversified information activities; user interface consistency, the operation is simple and convenient; complete fu

13、nction, complete, each sub system derive many new functions. 体系集成的必要性 The necessity of the integration system (1)体系集成为办理者供给一致的指挥和和谐,经过功用模块描绘和软件编程,智能修建集成办理软件可为弱电体系供给联动逻辑,进而进步大局事情的操控能力,确保人身及设备的安全。 (2)体系集成为高效物业办理供给能够,体系集成使用同一操作体系的计算机渠道,把修建物的各个子体系进行一致的监控和办理,减少了相关人员,进步了办理功率,也增强物业办理了对大局事情的操控能力。 ( 1 ) the

14、system sets become managers supply consistent command and harmonious, the functional module description and software programming, intelligent building integrated management software logic for the weak system supply linkage, and the ability to control the progress of things, to ensure the safety of p

15、erson and equipment. ( 2 ) system integration for the efficient property management to supply, system integration using the same operating system of the computer channel, the system structure of the consistent monitoring and management, to reduce the related personnel, progress management power, also enhance the property management of overall control capacity of things.


注意事项

本文(对于智能建筑的楼宇自动化系统你了解多少呢(5页).doc)为本站会员(正***)主动上传,地产文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知地产文库(点击联系客服),我们立即给予删除!