个人中心
个人中心
添加客服WX
客服
添加客服WX
添加客服WX
关注微信公众号
公众号
关注微信公众号
关注微信公众号
升级会员
升级会员
返回顶部
ImageVerifierCode 换一换

建筑图中常见的英文缩写(5页).doc

  • 资源ID:444843       资源大小:33KB        全文页数:5页
  • 资源格式:  DOC        下载:注册后免费下载
下载报告请您先登录!


友情提示
2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

建筑图中常见的英文缩写(5页).doc

1、ALUM = AluminumAB = Anchor boltBATH = BathroomBT = bathtubBSMT = BasementBM = BeamBR = BedroomBLK = BlockBRK = BrickBD = BoardBLDG = BuildingBL = Building LineCAB = CabinetCSMT = CasementCDR = CedarCLG = CeilingCTR = CenterCOL = ColumnCONC = ConcreteCOR = CorniceDET = DetailDIAM = DiameterDR = Dinin

2、g RoomDW = DishwasherDR = DoorDRM = DormerDH = Double HungDR = Douglas FirDS = DownspoutDW = DrywallELEC = ElectricEL =ElevationEXT = ExteriorFIN = FinishFPL = FireplaceFIX = FixtureFL = FloorFTG = FootingFDN = FoundationFURN = FurnaceGA = GaugeGDR= GirderGL = GlassGR = GradeGRND = GroundGYP BD = Gy

3、psum BoardHBD = HardboardHWD = HardwoodH = HeatINSUL. = InsulationINT = InteriorJMB = JambJST = JoistKIT = KitchenLAU = LaundryLAV = LavatoryLT = LightLC = LouverLR = Living RoomLV = LouverMC = Medicine CabinetMET = MetalOC = On CenterOPNG = OpeningOH = OverhangPNL = PanelPTN = PartitionPL = PlateP

4、= PorchPT = Pressure TreatedRFTR = RafterRWD = RedwoodREF = RefrigeratorREIN = ReinforcedRW = Retaining WallRDG = RidgeR = RiserRF = RoofRFG = RoofingRM = RoomRO = Rough OpeningSC = ScreenSEW = SewerSHK = ShakeSHTH = SheathingSHGL = ShingleSH = ShowerSDG = SidingSL = SillSK = SinkSKL = SkylightSL DR = Sliding DoorSP = Soil PipeSLR PAN = Solar PanelSOF = SoffitSV = Stack VentST = StairsSTWY = StairwaySTL = SteelTH = Top HingedTR = TreadUR = Utility RoomVENT = VentilationVS = Vent StackWP = WaterproofWC = Water ClosetWF = Wide FlangeWDW =WindowWD = Wood


注意事项

本文(建筑图中常见的英文缩写(5页).doc)为本站会员(正***)主动上传,地产文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知地产文库(点击联系客服),我们立即给予删除!