个人中心
个人中心
添加客服WX
客服
添加客服WX
添加客服WX
关注微信公众号
公众号
关注微信公众号
关注微信公众号
升级会员
升级会员
返回顶部
ImageVerifierCode 换一换

梦幻西游建筑之术详解FantasyWestwardJourneydetaileddescriptionofArchitecture(5页).doc

  • 资源ID:443430       资源大小:22.50KB        全文页数:5页
  • 资源格式:  DOC        下载:注册后免费下载
下载报告请您先登录!


友情提示
2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

梦幻西游建筑之术详解FantasyWestwardJourneydetaileddescriptionofArchitecture(5页).doc

1、梦幻西游建筑之术详解(Fantasy Westward Journey detailed description of Architecture)梦幻西游建筑之术详解(Fantasy Westward Journey detailed description of Architecture) 10 copy to architecture How much does the Jianhua house pay for the building clerk? Help to copy the unified Chinese house construction process. The game

2、 is divided into ordinary housing and luxury, Chinese house three levels, game player Changan can find building officials (28, 65) for the construction of new houses, after the arrival of the Changan move to find the (521129) sent to the home. The first game player can only build a common type of ho

3、using, looking for the urban hell king to learn the art of architecture, and the skill level to meet certain requirements, you can build advanced houses. The construction, consumption, construction difficulty and space size of houses of different sizes are different: Housing categories, construction

4、 costs, physical requirements, maximum space skills requirements 30014 no ordinary 20 taels 100 ounces of 40022 Chinese house building for more than 2 300 ounces of 50032 luxury building for more than 3 Construction cost The cost of building the house, the players can find the Changan yamen building

5、 officials apply for housing, construction costs deducted at the beginning of construction. Physical requirement Physical requirement is one of the conditions for building a house. The player needs full physical strength and meets the requirements to build, and will consume all of his current streng

6、th after starting construction. For example, building an ordinary house requires the player to meet the upper limit and reach at least 300. After construction, the current strength will be 0. Maximum space The maximum space refers to the housing space limit, the final completion of the housing space

7、 is also affected by the game player building skill level, other conditions are the same, the higher the skill level, the construction of housing space is larger, the maximum space but does not exceed the maximum class room. Skills required Refers to the art of architecture skill level, game player

8、can find hell Yama Palace City Wang learning this skill, each level requires the consumption of 3 points, the highest can learn 5, higher skills can help build a higher level of housing and more interior space. Space division Houses, big and small, include warehouse, kitchen, pet room, bedroom and s

9、ervant room, five indoor rooms, and before you start building houses, you need to plan the size of these rooms first. Each room has three levels: ordinary, intermediate and advanced, occupying 2, 6 and 12 respectively. A superior room can perform the functions of the room better. For example, the or

10、dinary warehouse can store 40 items, while the intermediate warehouse can store 80 pieces. Construction process The level of the player is over 30 to build the house, regardless of the size of the house, and the building process is similar. First of all, Changan government house building officials f

11、or the construction of new houses, housing construction sites and selected level, according to their own need to divide the space of houses to the bedroom and kitchen in each room, and then completed a series of building houses on the completion of the task. And then find housing officials apply for

12、 moving, you can stay in the built house. When I went home, as long as you find the entrance Changan grocery store carriers can be sent to. Each player can have up to three houses at the same time, but he can only choose one as his own Lets start with the location of the five line Town - gold, mount

13、ain - earth, lakes - water, forests - wood, the effect of wild fire The interaction of five elements Wood fire, native gold, gold water, aquatic wood Line five grams Water, fire, fire, gold, Jin Kemu, wood, earth, earth and water The hour and the five line The relationship between time and five line

14、: wood, fire - Yin Mao Si, Wu Jin - Shen Hai, sub -, Youshui soil, e, Chen, not ugly. All these things have a lot to do with making good houses, so long as they are well managed! For instance: If you choose to build a lake, then the lake belongs to water, then the first ring that he calls you to buy

15、 is to grow with water. Then, the second is to promote wood to fire, and the third is to spoil, Of course there are five rows of pet to choose according to soil and fire, to fourth, to buy a great beast, (provided much level) and then buy the gold, and soil. Bought first, do not hand in. You can fol

16、low the line of the hour and five grams, to the specified time to pay. The best hand in Jianhu Bo Shen, the hour, I personally feel that the five line on time or not. This is 30% of 40% is 20% double Ziqi Fuzhou real estate should be 10% pairs should be the following. Also, Ill write about the rest

17、of the construction site First, choose cities and towns to build metal houses: The first one: water attribute weapons. Second: Wooden attributes, equipment. Third: fire is the pet, handed in CHEN Si, noon. Fourth: the soil is handed in, Chen Chong, Xu, ugly hour Two, select hills to build soil prope

18、rties of the house: The first one: Metallic weapons. Second: water property equipment. Third: from pet, give zaiyin, prime time. Fourth: fire is the pet, handed in CHEN Si, noon. Three, select the forest built wooden attributes of the house: The first one: fire attribute weapons. Second: soil proper

19、ty equipment. Third: metal pet, in Shen, the hour to pay. Fourth: water is a pet, give in, when the. Four. Choose a house with a fire property built in the countryside: The first one: soil attribute weapons. Second: metal equipment. Third: water is a pet, give in, when the. Fourth: from pet, give zaiyin, prime time.


注意事项

本文(梦幻西游建筑之术详解FantasyWestwardJourneydetaileddescriptionofArchitecture(5页).doc)为本站会员(正***)主动上传,地产文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知地产文库(点击联系客服),我们立即给予删除!