个人中心
个人中心
添加客服WX
客服
添加客服WX
添加客服WX
关注微信公众号
公众号
关注微信公众号
关注微信公众号
升级会员
升级会员
返回顶部
ImageVerifierCode 换一换

同济大学建筑学专业英语阅读材料(4页).doc

  • 资源ID:437316       资源大小:112.50KB        全文页数:4页
  • 资源格式:  DOC        下载:注册后免费下载
下载报告请您先登录!


友情提示
2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

同济大学建筑学专业英语阅读材料(4页).doc

1、225.FRAMES AS THICKENED EDGES . . . assume that columns and beams are in and that you have marked the exact positions of the doors and windows with string or pencil marks - NATURAL DOORS AND WINDOWS (221). You are ready to build the frames. Remember that a well made frame needs to be continuous with

2、 the surrounding wall, so that it helps the building structurally - EFFICIENT STRUCTURE (206), GRADUAL STIFFENING (208). Any homogeneous membrane which has holes in it will tend to rupture at the holes, unless the edges of the holes are reinforced by thickening. Therefore:Do not consider door and wi

3、ndow frames as separate rigid structures which are inserted into holes in walls. Think of them instead as thickenings of the very fabric of the wall itself, made to protect the wall against the concentrations of stress which develop around openings. In line with this conception, build the frames as

4、thickenings of the wall material, continuous with the wall itself, made of the same materials, and poured, or built up, in a manner which is continuous with the structure of the wall.The most familiar example of this principle at work is in the human face itself. Both eyes and mouth are surrounded b

5、y extra bone and flesh. It is this thickening, around the eyes and mouth, which gives them their character and helps to make them such important parts of human physiognomy. A building also has its eyes and mouth: the windows and the doors. And following the principle which we observe in nature, almo

6、st every building has its windows and doors elaborated, made more special, by just the kind of thickening we see in eyes and mouths. The fact that openings in naturally occurring membranes are invariably thickened can be easily explained by considering how the lines of force in the membrane must flo

7、w around the hole. The density of the lines represent increasingstress concentrations.The increasing density of lines of force around the perimeter of the hole requires that additional material be generated there to prevent tearing. Consider a soap film. When you prick the film, the tension pulls th

8、e film apart, and it disintegrates. But if you insert a ring of string into the film, the hole will hold, because the tensile forces which accumulate around the opening can be held by the thicker ring. This is in tension. The same is true for buckling and compression. When a thin plate is functionin

9、g in compression and a hole is made in it, the hole needs stiffening. It is important to recognize that this stiffening is not only supporting the opening itself against collapse, but it is taking care of the stresses in the membrane which would normally be distributed in that part of the membrane w

10、hich is removed. Familiar examples of such stiffening in plates are the lips of steel around the portholes in a ship or in a locomotive cab. A door frame as a thickening.The same is true for doors and windows in a building. Where the walls are made of wood planks and lightweight concrete fill - ess

11、WALL MEMBRANES (218) - the thickened frames can be made from the same wood planks, placed to form a bulge, and then filled to be continuous with the wall. If other types of skin are used in the wall membranes, there will be other kinds of thickening: edges formed with chicken wire, burlap, and resin

12、, filled with concrete; edges formed with chicken wire filled with rubble, and then mortar, plaster; edges formed with brick, filled, then plastered. More general examples of frames as thickened edges exist all over the world. They include the thickening of the mud around the windows of a mud hut, t

13、he use of stone edges to the opening in a brick wall because the stone is stronger, the use of double studs around an opening in stud construction, the extra stone around the windows in a gothic church, the extra weaving round the hole in any basket hut. In windows, splay the thickening, to create DEEP REVEALS (223); the form of doors and windows which will fill the frame, is given by the later patterns - WINDOWS WHICH OPEN WIDE (236), SOLID DOORS WITH GLASS (237), SMALL PANES (239). . . .


注意事项

本文(同济大学建筑学专业英语阅读材料(4页).doc)为本站会员(正***)主动上传,地产文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知地产文库(点击联系客服),我们立即给予删除!