1、杭州嘉里中心 Hang Zhou Kerry Center Site Location; Hangzhou 场地位置, 杭州 场地位置, 杭州 | Site Location; Hangzhou 东临延安路,西接长寿路,北靠孩儿巷,南连庆春路,毗邻西湖,项目总占地约101亩,总开发规模约27.6万平方米,集酒店、办公、公寓及商业等多功能物业于一体,是杭州标志性时尚休闲中心。景观与建筑在空间,尺度,功能,色彩,材料上无限融合;景观元素点缀其间,犹如城市明珠,与西湖遥相呼应。人文环境与自然景观在不同层次上有机衔接,充满活力与生机,富含内涵与生命力,景观设计营造空间环境之精致,融合自然风光之秀美。
2、Located near west lake, facing Yanan Road to the east, Changshou Road to the west, Haier Lane to the north and Qingchun Road to the south, the site covers an area of about 101 mu with total development area of about 276,000 SQM. The project is an iconic fashion leisure center with multifunction in H
3、angzhou. The landscape and architecture are well integrated in terms of space, scale, function, color, and materials. The landscape elements are interspersed in between, which makes the site as a pearl in the city, echoing the West Lake to the nation. The cultural environment and the natural landscape areorganically connected at various levels, rich in connotation and liveliness. Landscape design